Bid Tabulations
Letting of
07/14/2010
LA DOTD Headquarters
| Lead Project: 266-02-0025 | |
| Parish: Ascension | |
| Routes: LA 22 | |
| Description: WB LEFT TURN LANE ON LA 22 AT US 61 | |
| Type Const: BASE COURSE, CURB AND GUTTER, SUPERPAVE ASPHALTIC CONCRETE,STRIPING AND RELATED WORK. | |
| Estimated Construction Cost: $451,957.64 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 00481 | Coastal Bridge Co., L.L.C. | $347,278.20 |
| 2 | 12198 | Byron E. Talbot Contractor, Inc. | $427,650.30 |
| 3 | 43371 | RMD Holdings Ltd | $444,576.71 |
| 4 | 00046 | Barber Bros. Contracting Co., L.L.C | $575,578.70 |
| 5 | 00849 | F.G. Sullivan, Jr. Contractor LLC | $626,245.52 |
| 6 | 05693 | Industrial Enterprises, Inc. | $862,918.50 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Coastal Bridge Co., L.L.C. |
- 2 - Byron E. Talbot Contractor, Inc. |
- 3 - RMD Holdings Ltd |
- 4 - Barber Bros. Contracting Co., L.L.C |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-02000 | Removal of Asphalt Drives | 130 | SQYD | 10.00 | 1,300.00 | 7.00 | 910.00 | 21.49 | 2,794.08 | 35.00 | 4,550.00 |
| 0002 | 202-02-38500 | Removal of Surfacing and Stablized Base | 1,423 | SQYD | 5.00 | 7,115.00 | 8.00 | 11,384.00 | 9.65 | 13,735.51 | 10.00 | 14,230.00 |
| 0003 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 30,000.00 | 30,000.00 | 23,000.00 | 23,000.00 | 11,700.00 | 11,700.00 | 20,000.00 | 20,000.00 |
| 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,368 | CUYD | 1.00 | 1,368.00 | 15.50 | 21,204.00 | 22.99 | 31,451.00 | 25.00 | 34,200.00 |
| 0005 | 204-02-00100 | Temporary Hay or Straw Bales | 49 | EACH | 10.00 | 490.00 | 20.00 | 980.00 | 22.23 | 1,089.27 | 20.00 | 980.00 |
| 0006 | 204-06-00100 | Temporary Silt Fencing | 1,497 | LNFT | 1.50 | 2,245.50 | 5.00 | 7,485.00 | 1.70 | 2,539.66 | 2.50 | 3,742.50 |
| 0007 | 302-02-02100 | Class II Base Course (6" Thick) (Stone or Recycled Portland Cement Concrete) | 79 | SQYD | 40.00 | 3,160.00 | 18.00 | 1,422.00 | 24.07 | 1,901.29 | 40.00 | 3,160.00 |
| 0008 | 302-02-06120 | Class II Base Course (12" Thick) (Stone or Recycled Portland Cement Concrete) | 1,530.4 | SQYD | 28.00 | 42,851.20 | 29.50 | 45,146.80 | 25.51 | 39,034.38 | 45.00 | 68,868.00 |
| 0009 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 50 | CUYD | 40.00 | 2,000.00 | 75.00 | 3,750.00 | 66.87 | 3,343.28 | 100.00 | 5,000.00 |
| 0010 | 502-01-00100 | Superpave Asphaltic Concrete | 857.6 | TON | 80.00 | 68,608.00 | 100.00 | 85,760.00 | 118.00 | 101,196.80 | 100.00 | 85,760.00 |
| 0011 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 238.3 | TON | 100.00 | 23,830.00 | 135.00 | 32,170.50 | 118.00 | 28,119.40 | 150.00 | 35,745.00 |
| 0012 | 509-01-00100 | Cold Planing Asphaltic Pavement | 2,111 | SQYD | 4.00 | 8,444.00 | 6.60 | 13,932.60 | 6.00 | 12,666.00 | 6.00 | 12,666.00 |
| 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -88 | CUYD | 1.00 | -88.00 | 1.00 | -88.00 | 0.01 | -0.88 | 0.00 | 0.00 |
| 0014 | 602-10-00100 | Longitudinal Shoulder Joints | 818 | LNFT | 2.00 | 1,636.00 | 7.00 | 5,726.00 | 1.76 | 1,435.59 | 5.00 | 4,090.00 |
| 0015 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 10 | LNFT | 150.00 | 1,500.00 | 195.00 | 1,950.00 | 94.24 | 942.44 | 60.00 | 600.00 |
| 0016 | 701-14-00100 | Cleaning Existing Pipes | 240 | LNFT | 10.00 | 2,400.00 | 7.00 | 1,680.00 | 7.02 | 1,684.80 | 25.00 | 6,000.00 |
| 0017 | 702-02-00001 | Manhole (Remove and Replace Frame and Cover) | 1 | EACH | 2,000.00 | 2,000.00 | 700.00 | 700.00 | 1,152.45 | 1,152.45 | 4,000.00 | 4,000.00 |
| 0018 | 702-03-00300 | Catch Basins (CB-04) | 1 | EACH | 2,000.00 | 2,000.00 | 1,500.00 | 1,500.00 | 2,059.20 | 2,059.20 | 1,500.00 | 1,500.00 |
| 0019 | 702-03-00600 | Catch Basins (CB-07) | 1 | EACH | 4,500.00 | 4,500.00 | 6,100.00 | 6,100.00 | 2,963.82 | 2,963.82 | 6,500.00 | 6,500.00 |
| 0020 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 250.00 | 250.00 | 500.00 | 500.00 | 468.00 | 468.00 | 2,000.00 | 2,000.00 |
| 0021 | 707-03-00100 | Combination Concrete Curb and Gutter | 817.9 | LNFT | 35.00 | 28,626.50 | 30.00 | 24,537.00 | 21.63 | 17,693.88 | 45.00 | 36,805.50 |
| 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,000.00 | 10,000.00 | 35,000.00 | 35,000.00 | 34,327.80 | 34,327.80 | 100,000.00 | 100,000.00 |
| 0023 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 201 | LNFT | 0.30 | 60.30 | 0.30 | 60.30 | 0.23 | 47.03 | 1.00 | 201.00 |
| 0024 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 100 | LNFT | 0.85 | 85.00 | 1.00 | 100.00 | 0.59 | 58.50 | 3.00 | 300.00 |
| 0025 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.896 | MILE | 500.00 | 448.00 | 600.00 | 537.60 | 585.00 | 524.16 | 350.00 | 313.60 |
| 0026 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.896 | MILE | 500.00 | 448.00 | 500.00 | 448.00 | 409.50 | 366.91 | 600.00 | 537.60 |
| 0027 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 2.205 | MILE | 600.00 | 1,323.00 | 600.00 | 1,323.00 | 760.50 | 1,676.90 | 1,000.00 | 2,205.00 |
| 0028 | 726-01-00100 | Bedding Material | 12.8 | CUYD | 1.00 | 12.80 | 100.00 | 1,280.00 | 66.87 | 855.88 | 90.00 | 1,152.00 |
| 0029 | 727-01-00100 | Mobilization | 1 | LUMP | 50,000.00 | 50,000.00 | 48,000.00 | 48,000.00 | 69,315.48 | 69,315.48 | 60,000.00 | 60,000.00 |
| 0030 | 731-02-00100 | Reflectorized Raised Pavement Markers | 428 | EACH | 6.00 | 2,568.00 | 5.75 | 2,461.00 | 5.27 | 2,253.42 | 6.00 | 2,568.00 |
| 0031 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 201 | LNFT | 1.50 | 301.50 | 1.50 | 301.50 | 1.17 | 235.17 | 1.50 | 301.50 |
| 0032 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 190 | LNFT | 5.00 | 950.00 | 5.00 | 950.00 | 3.51 | 666.90 | 4.00 | 760.00 |
| 0033 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 50 | LNFT | 5.50 | 275.00 | 5.50 | 275.00 | 7.02 | 351.00 | 5.00 | 250.00 |
| 0034 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.458 | MILE | 2,750.00 | 1,259.50 | 2,700.00 | 1,236.60 | 3,510.00 | 1,607.58 | 3,000.00 | 1,374.00 |
| 0035 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.102 | MILE | 950.00 | 96.90 | 950.00 | 96.90 | 936.00 | 95.47 | 2,500.00 | 255.00 |
| 0036 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 2 | EACH | 225.00 | 450.00 | 225.00 | 450.00 | 292.50 | 585.00 | 200.00 | 400.00 |
| 0037 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 250.00 | 500.00 | 255.00 | 510.00 | 292.50 | 585.00 | 250.00 | 500.00 |
| 0038 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 225.00 | 450.00 | 225.00 | 450.00 | 292.50 | 585.00 | 250.00 | 500.00 |
| 0039 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 1 | EACH | 250.00 | 250.00 | 250.00 | 250.00 | 292.50 | 292.50 | 250.00 | 250.00 |
| 0040 | 739-01-00100 | Hydro-Seeding | 1 | ACRE | 1,750.00 | 1,750.00 | 2,000.00 | 2,000.00 | 1,755.00 | 1,755.00 | 2,000.00 | 2,000.00 |
| 0041 | 740-01-00100 | Construction Layout | 1 | LUMP | 12,500.00 | 12,500.00 | 9,500.00 | 9,500.00 | 11,700.00 | 11,700.00 | 20,000.00 | 20,000.00 |
| 0042 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 20,628 | INLF | 0.50 | 10,314.00 | 1.00 | 20,628.00 | 0.68 | 13,998.16 | 0.50 | 10,314.00 |
| 0043 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 0.1 | MILE | 50,000.00 | 5,000.00 | 425.00 | 42.50 | 47,238.75 | 4,723.88 | 10,000.00 | 1,000.00 |
| 0044 | NS-MSC-00120 | Drainage Structure (Special Detail PG-DRAIN01) | 4 | EACH | 3,500.00 | 14,000.00 | 3,000.00 | 12,000.00 | 5,000.00 | 20,000.00 | 5,000.00 | 20,000.00 |
| CONTRACTOR TOTAL | 347,278.20 | 427,650.30 | 444,576.71 | 575,578.70 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - F.G. Sullivan, Jr. Contractor LLC |
- 6 - Industrial Enterprises, Inc. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-02000 | Removal of Asphalt Drives | 130 | SQYD | 10.00 | 1,300.00 | 11.50 | 1,495.00 |
| 0002 | 202-02-38500 | Removal of Surfacing and Stablized Base | 1,423 | SQYD | 15.00 | 21,345.00 | 17.25 | 24,546.75 |
| 0003 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 25,000.00 | 25,000.00 | 157,500.00 | 157,500.00 |
| 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 1,368 | CUYD | 20.00 | 27,360.00 | 23.00 | 31,464.00 |
| 0005 | 204-02-00100 | Temporary Hay or Straw Bales | 49 | EACH | 125.00 | 6,125.00 | 11.50 | 563.50 |
| 0006 | 204-06-00100 | Temporary Silt Fencing | 1,497 | LNFT | 1.45 | 2,170.65 | 2.88 | 4,311.36 |
| 0007 | 302-02-02100 | Class II Base Course (6" Thick) (Stone or Recycled Portland Cement Concrete) | 79 | SQYD | 50.00 | 3,950.00 | 34.50 | 2,725.50 |
| 0008 | 302-02-06120 | Class II Base Course (12" Thick) (Stone or Recycled Portland Cement Concrete) | 1,530.4 | SQYD | 80.00 | 122,432.00 | 69.00 | 105,597.60 |
| 0009 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 50 | CUYD | 40.00 | 2,000.00 | 80.50 | 4,025.00 |
| 0010 | 502-01-00100 | Superpave Asphaltic Concrete | 857.6 | TON | 120.00 | 102,912.00 | 172.50 | 147,936.00 |
| 0011 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 238.3 | TON | 120.00 | 28,596.00 | 230.00 | 54,809.00 |
| 0012 | 509-01-00100 | Cold Planing Asphaltic Pavement | 2,111 | SQYD | 8.00 | 16,888.00 | 11.50 | 24,276.50 |
| 0013 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -88 | CUYD | 0.00 | 0.00 | 1.15 | -101.20 |
| 0014 | 602-10-00100 | Longitudinal Shoulder Joints | 818 | LNFT | 7.00 | 5,726.00 | 11.50 | 9,407.00 |
| 0015 | 701-03-01000 | Storm Drain Pipe (15" RCP/PP) | 10 | LNFT | 110.00 | 1,100.00 | 86.25 | 862.50 |
| 0016 | 701-14-00100 | Cleaning Existing Pipes | 240 | LNFT | 20.00 | 4,800.00 | 28.75 | 6,900.00 |
| 0017 | 702-02-00001 | Manhole (Remove and Replace Frame and Cover) | 1 | EACH | 1,000.00 | 1,000.00 | 1,725.00 | 1,725.00 |
| 0018 | 702-03-00300 | Catch Basins (CB-04) | 1 | EACH | 1,400.00 | 1,400.00 | 5,750.00 | 5,750.00 |
| 0019 | 702-03-00600 | Catch Basins (CB-07) | 1 | EACH | 4,200.00 | 4,200.00 | 6,900.00 | 6,900.00 |
| 0020 | 702-04-00100 | Adjusting Manholes | 1 | EACH | 500.00 | 500.00 | 2,875.00 | 2,875.00 |
| 0021 | 707-03-00100 | Combination Concrete Curb and Gutter | 817.9 | LNFT | 45.00 | 36,805.50 | 34.50 | 28,217.55 |
| 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 75,000.00 | 75,000.00 | 46,000.00 | 46,000.00 |
| 0023 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 201 | LNFT | 0.22 | 44.22 | 0.58 | 116.58 |
| 0024 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 100 | LNFT | 0.75 | 75.00 | 1.15 | 115.00 |
| 0025 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.896 | MILE | 500.00 | 448.00 | 402.50 | 360.64 |
| 0026 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.896 | MILE | 100.00 | 89.60 | 414.00 | 370.94 |
| 0027 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 2.205 | MILE | 100.00 | 220.50 | 747.50 | 1,648.24 |
| 0028 | 726-01-00100 | Bedding Material | 12.8 | CUYD | 100.00 | 1,280.00 | 86.25 | 1,104.00 |
| 0029 | 727-01-00100 | Mobilization | 1 | LUMP | 75,000.00 | 75,000.00 | 86,250.00 | 86,250.00 |
| 0030 | 731-02-00100 | Reflectorized Raised Pavement Markers | 428 | EACH | 5.25 | 2,247.00 | 23.00 | 9,844.00 |
| 0031 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 201 | LNFT | 1.35 | 271.35 | 1.15 | 231.15 |
| 0032 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 190 | LNFT | 4.50 | 855.00 | 3.45 | 655.50 |
| 0033 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 50 | LNFT | 5.00 | 250.00 | 6.90 | 345.00 |
| 0034 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.458 | MILE | 2,500.00 | 1,145.00 | 3,450.00 | 1,580.10 |
| 0035 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.102 | MILE | 850.00 | 86.70 | 920.00 | 93.84 |
| 0036 | 732-04-01020 | Plastic Pavement Legends and Symbols (Arrow - Straight) | 2 | EACH | 205.00 | 410.00 | 287.50 | 575.00 |
| 0037 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 235.00 | 470.00 | 230.00 | 460.00 |
| 0038 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 205.00 | 410.00 | 287.50 | 575.00 |
| 0039 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 1 | EACH | 225.00 | 225.00 | 299.00 | 299.00 |
| 0040 | 739-01-00100 | Hydro-Seeding | 1 | ACRE | 1,500.00 | 1,500.00 | 2,300.00 | 2,300.00 |
| 0041 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 34,500.00 | 34,500.00 |
| 0042 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 20,628 | INLF | 1.00 | 20,628.00 | 1.15 | 23,722.20 |
| 0043 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 0.1 | MILE | 3,800.00 | 380.00 | 69,862.50 | 6,986.25 |
| 0044 | NS-MSC-00120 | Drainage Structure (Special Detail PG-DRAIN01) | 4 | EACH | 4,900.00 | 19,600.00 | 5,750.00 | 23,000.00 |
| CONTRACTOR TOTAL | 626,245.52 | 862,918.50 | ||||||