Bid Tabulations
Letting of
06/16/2010
LA DOTD Headquarters
| Lead Project: 265-02-0015 | |
| Parish: Ascension | |
| Routes: LA 44 | |
| Description: LA 44 Sidewalks | |
| Type Const: GRADING, PORTLAND CEMENT CONCRETE SIDEWALKS, AND RELATED WORK. | |
| Estimated Construction Cost: $296,165.36 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 34263 | La Contracting Enterprises Llc | $262,480.90 |
| 2 | 49356 | Kort's Trucking Inc. | $269,452.30 |
| 3 | 51292 | JJH Construction Co. LLC | $270,217.70 |
| 4 | 12198 | Byron E. Talbot Contractor, Inc. | $279,405.43 |
| 5 | 50267 | Hhp Construction Group Llc | $280,878.25 |
| 6 | 42915 | North Sixty Management, Inc. | $288,000.00 |
| 7 | 38610 | Three C's Properties Inc | $293,689.75 |
| 8 | 25088 | RCS Contractors, Inc. | $339,856.95 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - La Contracting Enterprises Llc |
- 2 - Kort's Trucking Inc. |
- 3 - JJH Construction Co. LLC |
- 4 - Byron E. Talbot Contractor, Inc. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 5,000.00 | 5,000.00 | 2,000.00 | 2,000.00 | 4,500.00 | 4,500.00 | 4,500.00 | 4,500.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 1,250.00 | 1,250.00 | 2,000.00 | 2,000.00 | 3,500.00 | 3,500.00 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 565.6 | SQYD | 15.00 | 8,484.00 | 6.00 | 3,393.60 | 13.50 | 7,635.60 | 10.30 | 5,825.68 |
| 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 1,360 | LNFT | 6.50 | 8,840.00 | 7.00 | 9,520.00 | 8.00 | 10,880.00 | 4.50 | 6,120.00 |
| 0005 | 202-03-38000 | Relocation of Sign Existing | 6 | EACH | 170.00 | 1,020.00 | 55.00 | 330.00 | 150.00 | 900.00 | 75.00 | 450.00 |
| 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 25,000.00 | 25,000.00 | 17,000.00 | 17,000.00 | 2,000.00 | 2,000.00 | 20,000.00 | 20,000.00 |
| 0007 | 204-02-00100 | Temporary Hay or Straw Bales | 20 | EACH | 25.00 | 500.00 | 11.50 | 230.00 | 15.00 | 300.00 | 11.25 | 225.00 |
| 0008 | 204-06-00100 | Temporary Silt Fencing | 6,200 | LNFT | 1.75 | 10,850.00 | 1.25 | 7,750.00 | 1.50 | 9,300.00 | 2.00 | 12,400.00 |
| 0009 | 701-05-01000 | Side Drain Pipe (12" RCP/PP/CMP) RCP Only | 16 | LNFT | 70.00 | 1,120.00 | 80.00 | 1,280.00 | 50.00 | 800.00 | 50.00 | 800.00 |
| 0010 | 701-15-00100 | Concrete Collar | 2 | EACH | 400.00 | 800.00 | 1,100.00 | 2,200.00 | 100.00 | 200.00 | 300.00 | 600.00 |
| 0011 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 2,200.00 | 4,400.00 | 2,950.00 | 5,900.00 | 2,250.00 | 4,500.00 | 2,000.00 | 4,000.00 |
| 0012 | 702-03-00300 | Catch Basins (CB-04) | 1 | EACH | 1,700.00 | 1,700.00 | 2,250.00 | 2,250.00 | 1,500.00 | 1,500.00 | 1,465.00 | 1,465.00 |
| 0013 | 702-04-00100 | Adjusting Manholes | 3 | EACH | 750.00 | 2,250.00 | 1,450.00 | 4,350.00 | 400.00 | 1,200.00 | 375.00 | 1,125.00 |
| 0014 | 702-04-00200 | Adjusting Catch Basins Drop Inlets | 6 | EACH | 1,200.00 | 7,200.00 | 595.00 | 3,570.00 | 400.00 | 2,400.00 | 500.00 | 3,000.00 |
| 0015 | 702-08-00100 | Side Drain Safety End (Type I) | 2 | EACH | 1,500.00 | 3,000.00 | 1,350.00 | 2,700.00 | 1,500.00 | 3,000.00 | 1,350.00 | 2,700.00 |
| 0016 | 706-01-00100 | Concrete Walk (4" Thick) | 2,570.1 | SQYD | 43.00 | 110,514.30 | 47.00 | 120,794.70 | 41.00 | 105,374.10 | 47.15 | 121,180.22 |
| 0017 | 706-02-00200 | Concrete Drive (6" Thick) | 507.5 | SQYD | 48.00 | 24,360.00 | 52.00 | 26,390.00 | 50.00 | 25,375.00 | 72.45 | 36,768.38 |
| 0018 | 706-04-00100 | Handicapped Curb Ramps | 15 | EACH | 300.00 | 4,500.00 | 650.00 | 9,750.00 | 1,450.00 | 21,750.00 | 500.00 | 7,500.00 |
| 0019 | 707-01-00100 | Concrete Curb | 560 | LNFT | 9.00 | 5,040.00 | 12.00 | 6,720.00 | 13.00 | 7,280.00 | 11.65 | 6,524.00 |
| 0020 | 712-02-00100 | Sacked Concrete Revetment | 33 | SQYD | 57.00 | 1,881.00 | 175.00 | 5,775.00 | 65.00 | 2,145.00 | 50.00 | 1,650.00 |
| 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,000.00 | 10,000.00 | 13,000.00 | 13,000.00 | 25,000.00 | 25,000.00 | 11,500.00 | 11,500.00 |
| 0022 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 50 | SQYD | 19.00 | 950.00 | 8.00 | 400.00 | 5.00 | 250.00 | 16.50 | 825.00 |
| 0023 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 25 | SQYD | 4.50 | 112.50 | 22.00 | 550.00 | 2.00 | 50.00 | 3.75 | 93.75 |
| 0024 | 727-01-00100 | Mobilization | 1 | LUMP | 7,500.00 | 7,500.00 | 10,000.00 | 10,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 |
| 0025 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 1,313 | LNFT | 3.20 | 4,201.60 | 5.00 | 6,565.00 | 6.00 | 7,878.00 | 2.80 | 3,676.40 |
| 0026 | 735-01-00100 | Mailboxes | 30 | EACH | 1.25 | 37.50 | 2.00 | 60.00 | 30.00 | 900.00 | 6.50 | 195.00 |
| 0027 | 735-02-00100 | Mailbox Supports (Single) | 30 | EACH | 150.00 | 4,500.00 | 120.00 | 3,600.00 | 160.00 | 4,800.00 | 145.00 | 4,350.00 |
| 0028 | 739-01-00100 | Hydro-Seeding | 0.96 | ACRE | 2,000.00 | 1,920.00 | 1,900.00 | 1,824.00 | 2,500.00 | 2,400.00 | 1,700.00 | 1,632.00 |
| 0029 | 741-11-00200 | Adjusting Water Valve and Meter Box | 6 | EACH | 300.00 | 1,800.00 | 50.00 | 300.00 | 150.00 | 900.00 | 300.00 | 1,800.00 |
| CONTRACTOR TOTAL | 262,480.90 | 269,452.30 | 270,217.70 | 279,405.43 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Hhp Construction Group Llc |
- 6 - North Sixty Management, Inc. |
- 7 - Three C's Properties Inc |
- 8 - RCS Contractors, Inc. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 1,150.00 | 1,150.00 | 1,500.00 | 1,500.00 | 2,075.00 | 2,075.00 | 10,000.00 | 10,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,200.00 | 1,200.00 | 1,000.00 | 1,000.00 | 2,723.50 | 2,723.50 | 5,000.00 | 5,000.00 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 565.6 | SQYD | 13.00 | 7,352.80 | 8.00 | 4,524.80 | 7.70 | 4,355.12 | 12.00 | 6,787.20 |
| 0004 | 202-02-06140 | Removal of Curbs (Concrete) | 1,360 | LNFT | 7.50 | 10,200.00 | 5.00 | 6,800.00 | 2.65 | 3,604.00 | 5.00 | 6,800.00 |
| 0005 | 202-03-38000 | Relocation of Sign Existing | 6 | EACH | 160.00 | 960.00 | 70.00 | 420.00 | 262.10 | 1,572.60 | 1,000.00 | 6,000.00 |
| 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 24,800.00 | 24,800.00 | 24,191.45 | 24,191.45 | 14,600.00 | 14,600.00 | 27,000.00 | 27,000.00 |
| 0007 | 204-02-00100 | Temporary Hay or Straw Bales | 20 | EACH | 15.00 | 300.00 | 12.00 | 240.00 | 10.50 | 210.00 | 20.00 | 400.00 |
| 0008 | 204-06-00100 | Temporary Silt Fencing | 6,200 | LNFT | 1.50 | 9,300.00 | 2.00 | 12,400.00 | 2.00 | 12,400.00 | 2.00 | 12,400.00 |
| 0009 | 701-05-01000 | Side Drain Pipe (12" RCP/PP/CMP) RCP Only | 16 | LNFT | 84.00 | 1,344.00 | 53.00 | 848.00 | 116.50 | 1,864.00 | 45.00 | 720.00 |
| 0010 | 701-15-00100 | Concrete Collar | 2 | EACH | 850.00 | 1,700.00 | 600.00 | 1,200.00 | 1,039.00 | 2,078.00 | 750.00 | 1,500.00 |
| 0011 | 702-03-00100 | Catch Basins (CB-01) | 2 | EACH | 1,950.00 | 3,900.00 | 2,860.00 | 5,720.00 | 2,141.50 | 4,283.00 | 2,200.00 | 4,400.00 |
| 0012 | 702-03-00300 | Catch Basins (CB-04) | 1 | EACH | 1,300.00 | 1,300.00 | 1,900.00 | 1,900.00 | 2,018.00 | 2,018.00 | 1,200.00 | 1,200.00 |
| 0013 | 702-04-00100 | Adjusting Manholes | 3 | EACH | 700.00 | 2,100.00 | 1,575.00 | 4,725.00 | 320.25 | 960.75 | 2,000.00 | 6,000.00 |
| 0014 | 702-04-00200 | Adjusting Catch Basins Drop Inlets | 6 | EACH | 2,100.00 | 12,600.00 | 1,625.00 | 9,750.00 | 320.25 | 1,921.50 | 2,000.00 | 12,000.00 |
| 0015 | 702-08-00100 | Side Drain Safety End (Type I) | 2 | EACH | 1,250.00 | 2,500.00 | 1,300.00 | 2,600.00 | 2,515.00 | 5,030.00 | 2,700.00 | 5,400.00 |
| 0016 | 706-01-00100 | Concrete Walk (4" Thick) | 2,570.1 | SQYD | 43.50 | 111,799.35 | 50.00 | 128,505.00 | 48.45 | 124,521.35 | 37.50 | 96,378.75 |
| 0017 | 706-02-00200 | Concrete Drive (6" Thick) | 507.5 | SQYD | 47.00 | 23,852.50 | 63.00 | 31,972.50 | 71.25 | 36,159.38 | 65.00 | 32,987.50 |
| 0018 | 706-04-00100 | Handicapped Curb Ramps | 15 | EACH | 425.00 | 6,375.00 | 600.00 | 9,000.00 | 1,290.00 | 19,350.00 | 1,800.00 | 27,000.00 |
| 0019 | 707-01-00100 | Concrete Curb | 560 | LNFT | 13.50 | 7,560.00 | 18.00 | 10,080.00 | 16.20 | 9,072.00 | 15.00 | 8,400.00 |
| 0020 | 712-02-00100 | Sacked Concrete Revetment | 33 | SQYD | 67.00 | 2,211.00 | 20.00 | 660.00 | 130.00 | 4,290.00 | 47.00 | 1,551.00 |
| 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 16,500.00 | 16,500.00 | 5,500.00 | 5,500.00 | 6,800.00 | 6,800.00 | 8,000.00 | 8,000.00 |
| 0022 | 714-01-00100 | Slab Sodding (Bermuda Grass) | 50 | SQYD | 6.50 | 325.00 | 7.00 | 350.00 | 13.45 | 672.50 | 20.00 | 1,000.00 |
| 0023 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 25 | SQYD | 9.00 | 225.00 | 8.00 | 200.00 | 4.00 | 100.00 | 4.00 | 100.00 |
| 0024 | 727-01-00100 | Mobilization | 1 | LUMP | 18,900.00 | 18,900.00 | 10,000.00 | 10,000.00 | 19,500.00 | 19,500.00 | 30,000.00 | 30,000.00 |
| 0025 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 1,313 | LNFT | 3.00 | 3,939.00 | 5.25 | 6,893.25 | 2.75 | 3,610.75 | 11.00 | 14,443.00 |
| 0026 | 735-01-00100 | Mailboxes | 30 | EACH | 6.50 | 195.00 | 50.00 | 1,500.00 | 35.00 | 1,050.00 | 5.25 | 157.50 |
| 0027 | 735-02-00100 | Mailbox Supports (Single) | 30 | EACH | 150.00 | 4,500.00 | 60.00 | 1,800.00 | 118.75 | 3,562.50 | 350.00 | 10,500.00 |
| 0028 | 739-01-00100 | Hydro-Seeding | 0.96 | ACRE | 1,760.00 | 1,689.60 | 2,000.00 | 1,920.00 | 4,480.00 | 4,300.80 | 1,700.00 | 1,632.00 |
| 0029 | 741-11-00200 | Adjusting Water Valve and Meter Box | 6 | EACH | 350.00 | 2,100.00 | 300.00 | 1,800.00 | 167.50 | 1,005.00 | 350.00 | 2,100.00 |
| CONTRACTOR TOTAL | 280,878.25 | 288,000.00 | 293,689.75 | 339,856.95 | ||||||||