LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: 258-32-0026
Parish: East Baton Rouge
Routes: LA 3064
Description: LA 427 - LA 73
Type Const: PCC PAVEMENT PATCHING AND RELATED WORK
Estimated Construction Cost: $1,487,700.20


RankLicenseBidderConstruction Bid
1 25088 RCS Contractors, Inc. $1,082,406.17
2 49954 Plus Concrete Inc. $1,259,556.80
3 21982 Forby Contracting, Inc. $1,617,523.85
4 12198 Byron E. Talbot Contractor, Inc. $1,929,677.35


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
RCS Contractors, Inc.
- 2 -
Plus Concrete Inc.
- 3 -
Forby Contracting, Inc.
- 4 -
Byron E. Talbot Contractor, Inc.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 202-02-06100 Removal of Concrete Walks and Drives 23.4    SQYD 20.00 468.00 15.00 351.00 25.00 585.00 15.00 351.00
0002 202-02-06140 Removal of Curbs (Concrete) 11.8    LNFT 25.00 295.00 15.00 177.00 20.00 236.00 10.00 118.00
0003 509-01-00100 Cold Planing Asphaltic Pavement 2,031      SQYD 8.80 17,872.80 12.00 24,372.00 15.00 30,465.00 15.00 30,465.00
0004 602-02-00100 Cleaning and Resealing Existing Longitudinal and Transverse Pavement Joints 108,447      LNFT 1.48 160,501.56 2.50 271,117.50 1.75 189,782.25 3.00 325,341.00
0005 602-03-00100 Cleaning and Sealing Random cracks 10,845      LNFT 2.30 24,943.50 3.00 32,535.00 3.50 37,957.50 3.65 39,584.25
0006 602-05-01120 Full Depth Patching of Jointed Concrete Pavement (16.0 square yards and under) (8" Thick) 706.9    SQYD 198.79 140,524.65 175.00 123,707.50 325.00 229,742.50 325.00 229,742.50
0007 602-05-02120 Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8" Thick) 621.7    SQYD 165.59 102,947.30 165.00 102,580.50 290.00 180,293.00 310.00 192,727.00
0008 602-05-03120 Full Depth Patching of Jointed Concrete Pavement (48.1 square yards and over) (8" Thick) 2,453      SQYD 155.56 381,588.68 160.00 392,480.00 290.00 711,370.00 300.00 735,900.00
0009 706-01-00100 Concrete Walk (4" Thick) 23.7    SQYD 40.00 948.00 95.00 2,251.50 100.00 2,370.00 100.00 2,370.00
0010 706-04-00100 Handicapped Curb Ramps 2      EACH 1,000.00 2,000.00 2,000.00 4,000.00 1,500.00 3,000.00 1,000.00 2,000.00
0011 707-01-00100 Concrete Curb 250      LNFT 15.00 3,750.00 30.00 7,500.00 25.00 6,250.00 13.00 3,250.00
0012 713-01-00100 Temporary Signs and Barricades 1      LUMP 60,000.00 60,000.00 20,000.00 20,000.00 50,000.00 50,000.00 90,000.00 90,000.00
0013 727-01-00100 Mobilization 1      LUMP 81,000.00 81,000.00 180,000.00 180,000.00 92,900.00 92,900.00 175,000.00 175,000.00
0014 731-02-00100 Reflectorized Raised Pavement Markers 1,038      EACH 5.14 5,335.32 6.00 6,228.00 4.90 5,086.20 5.40 5,605.20
0015 732-01-01040 Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 2,640      LNFT 0.84 2,217.60 1.00 2,640.00 0.80 2,112.00 0.90 2,376.00
0016 732-01-02080 Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 1,122      LNFT 2.83 3,175.26 3.00 3,366.00 2.70 3,029.40 3.00 3,366.00
0017 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 8.484  MILE 2,310.00 19,598.04 2,500.00 21,210.00 2,200.00 18,664.80 2,400.00 20,361.60
0018 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 4.756  MILE 735.00 3,495.66 800.00 3,804.80 700.00 3,329.20 800.00 3,804.80
0019 732-04-01020 Plastic Pavement Legends and Symbols (Arrow - Straight) 10      EACH 157.00 1,570.00 150.00 1,500.00 150.00 1,500.00 165.00 1,650.00
0020 732-04-01040 Plastic Pavement Legends and Symbols (Arrow - Double) 2      EACH 168.00 336.00 150.00 300.00 160.00 320.00 175.00 350.00
0021 732-04-01060 Plastic Pavement Legends and Symbols (Arrow - Triple) 2      EACH 178.00 356.00 150.00 300.00 170.00 340.00 185.00 370.00
0022 732-04-01080 Plastic Pavement Legends and Symbols (Arrow - Left Turn) 60      EACH 157.00 9,420.00 150.00 9,000.00 150.00 9,000.00 165.00 9,900.00
0023 732-04-01100 Plastic Pavement Legends and Symbols (Arrow - Right Turn) 7      EACH 157.00 1,099.00 150.00 1,050.00 150.00 1,050.00 165.00 1,155.00
0024 732-04-15020 Plastic Pavement Legends and Symbols (ONLY) 37      EACH 173.00 6,401.00 150.00 5,550.00 165.00 6,105.00 180.00 6,660.00
0025 732-04-18000 Plastic Pavement Legends and Symbols (RR Crossing) 5      EACH 420.00 2,100.00 400.00 2,000.00 400.00 2,000.00 450.00 2,250.00
0026 732-05-00100 Removal of Existing Markings 13.24   MILE 1,470.00 19,462.80 1,400.00 18,536.00 1,400.00 18,536.00 2,000.00 26,480.00
0027 740-01-00100 Construction Layout 1      LUMP 15,000.00 15,000.00 18,000.00 18,000.00 1,500.00 1,500.00 8,500.00 8,500.00
0028 NS-713-00001 Dynamic Message Sign Unit 2      EACH 8,000.00 16,000.00 2,500.00 5,000.00 5,000.00 10,000.00 5,000.00 10,000.00
                         
    CONTRACTOR TOTAL       1,082,406.17   1,259,556.80   1,617,523.85   1,929,677.35