Bid Tabulations
Letting of
10/27/2010
LA DOTD Headquarters
| Lead Project: 257-01-0017 | |
| Parish: Iberville | |
| Routes: LA 75 | |
| Description: ST. GABRIEL SIDEWALKS, PHASE IIA | |
| Type Const: CLEARING AND GRUBBING, DRAINAGE STRUCTURES, CLASS II BASE COURSE, CONCRETE SIDEWALKS, AND RELATED WORK | |
| Estimated Construction Cost: $1,272,834.04 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 34263 | La Contracting Enterprises Llc | $832,823.62 |
| 2 | 25088 | RCS Contractors, Inc. | $888,002.04 |
| 3 | 12198 | Byron E. Talbot Contractor, Inc. | $899,996.69 |
| 4 | 29595 | Boone Services Inc. | $968,442.40 |
| 5 | 16724 | Stranco, Inc. | $998,589.54 |
| 6 | 49356 | Kort's Trucking Inc. | $1,091,337.70 |
| 7 | 52550 | Gibbs & Register Inc | $1,125,837.28 |
| 8 | 14807 | Richard Price Contracting Co, Llc | $1,265,300.14 |
| 9 | 48896 | Command Construction Industries LLC | $1,278,175.30 |
| 10 | 43371 | RMD Holdings Ltd | $1,348,111.55 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - La Contracting Enterprises Llc |
- 2 - RCS Contractors, Inc. |
- 3 - Byron E. Talbot Contractor, Inc. |
- 4 - Boone Services Inc. |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 4,000.00 | 4,000.00 | 20,000.00 | 20,000.00 | 5,500.00 | 5,500.00 | 3,000.00 | 3,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 | 6,000.00 | 6,000.00 | 3,000.00 | 3,000.00 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 601.24 | SQYD | 6.00 | 3,607.44 | 8.00 | 4,809.92 | 8.50 | 5,110.54 | 15.90 | 9,559.72 |
| 0004 | 202-02-32120 | Removal of Pipe (Side Drain) SEE PLANS | 857 | LNFT | 9.00 | 7,713.00 | 5.00 | 4,285.00 | 11.50 | 9,855.50 | 8.25 | 7,070.25 |
| 0005 | 202-02-38200 | Removal of Signs | 4 | EACH | 25.00 | 100.00 | 250.00 | 1,000.00 | 55.00 | 220.00 | 73.32 | 293.28 |
| 0006 | 202-02-38500 | Removal of Surfacing and Stablized Base | 30 | SQYD | 9.00 | 270.00 | 12.00 | 360.00 | 11.00 | 330.00 | 13.93 | 417.90 |
| 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 33,000.00 | 33,000.00 | 20,000.00 | 20,000.00 | 25,000.00 | 25,000.00 | 6,000.00 | 6,000.00 |
| 0008 | 203-07-00100 | Borrow (Vehicular Measurement) | 4,000 | CUYD | 13.00 | 52,000.00 | 16.00 | 64,000.00 | 15.50 | 62,000.00 | 11.97 | 47,880.00 |
| 0009 | 204-02-00100 | Temporary Hay or Straw Bales | 12 | EACH | 18.00 | 216.00 | 20.00 | 240.00 | 16.00 | 192.00 | 40.83 | 489.96 |
| 0010 | 204-06-00100 | Temporary Silt Fencing | 5,570 | LNFT | 2.00 | 11,140.00 | 1.50 | 8,355.00 | 2.00 | 11,140.00 | 1.74 | 9,691.80 |
| 0011 | 302-01-00100 | Class II Base Course | 140 | CUYD | 60.00 | 8,400.00 | 100.00 | 14,000.00 | 61.50 | 8,610.00 | 113.51 | 15,891.40 |
| 0012 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 1,577 | LNFT | 34.00 | 53,618.00 | 47.60 | 75,065.20 | 37.00 | 58,349.00 | 35.88 | 56,582.76 |
| 0013 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 1,794 | LNFT | 52.00 | 93,288.00 | 55.99 | 100,446.06 | 47.00 | 84,318.00 | 41.63 | 74,684.22 |
| 0014 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 523 | LNFT | 66.00 | 34,518.00 | 65.82 | 34,423.86 | 64.00 | 33,472.00 | 60.08 | 31,421.84 |
| 0015 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 921 | LNFT | 81.00 | 74,601.00 | 75.07 | 69,139.47 | 75.00 | 69,075.00 | 71.04 | 65,427.84 |
| 0016 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 68 | LNFT | 38.00 | 2,584.00 | 42.60 | 2,896.80 | 46.00 | 3,128.00 | 35.88 | 2,439.84 |
| 0017 | 701-06-01060 | Side Drain Pipe Arch (30" Equiv. RCPA/CMPA) | 147 | LNFT | 61.00 | 8,967.00 | 60.82 | 8,940.54 | 65.00 | 9,555.00 | 57.69 | 8,480.43 |
| 0018 | 701-06-01080 | Side Drain Pipe Arch (36" Equiv. RCPA/CMPA) | 143 | LNFT | 75.00 | 10,725.00 | 70.07 | 10,020.01 | 73.00 | 10,439.00 | 66.80 | 9,552.40 |
| 0019 | 701-07-00100 | Yard Drain Pipe (4") | 10 | LNFT | 10.00 | 100.00 | 12.00 | 120.00 | 18.50 | 185.00 | 14.99 | 149.90 |
| 0020 | 701-07-00600 | Yard Drain Pipe (15") | 80 | LNFT | 22.00 | 1,760.00 | 15.00 | 1,200.00 | 40.00 | 3,200.00 | 25.61 | 2,048.80 |
| 0021 | 702-03-00100 | Catch Basins (CB-01) | 61 | EACH | 2,100.00 | 128,100.00 | 2,200.00 | 134,200.00 | 2,270.00 | 138,470.00 | 2,488.66 | 151,808.26 |
| 0023 | 706-01-00100 | Concrete Walk (4" Thick) | 2,413.32 | SQYD | 39.00 | 94,119.48 | 35.00 | 84,466.20 | 48.45 | 116,925.35 | 35.07 | 84,635.13 |
| 0024 | 706-02-00200 | Concrete Drive (6" Thick) | 437.58 | SQYD | 45.00 | 19,691.10 | 38.00 | 16,628.04 | 60.00 | 26,254.80 | 65.91 | 28,840.90 |
| 0025 | 711-01-03020 | Riprap (30 lb, 18" Thick) | 130 | SQYD | 68.00 | 8,840.00 | 60.00 | 7,800.00 | 90.00 | 11,700.00 | 88.08 | 11,450.40 |
| 0026 | 711-04-00100 | Geotextile Fabric | 4,700 | SQYD | 1.40 | 6,580.00 | 1.00 | 4,700.00 | 1.30 | 6,110.00 | 1.65 | 7,755.00 |
| 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 9,500.00 | 9,500.00 | 10,000.00 | 10,000.00 | 10,500.00 | 10,500.00 | 43,866.27 | 43,866.27 |
| 0028 | 717-01-00100 | Seeding | 28 | LB | 27.00 | 756.00 | 30.00 | 840.00 | 24.50 | 686.00 | 28.35 | 793.80 |
| 0029 | 718-01-00100 | Fertilizer | 940 | LB | 1.00 | 940.00 | 1.00 | 940.00 | 0.90 | 846.00 | 1.23 | 1,156.20 |
| 0030 | 726-01-00100 | Bedding Material | 700 | CUYD | 35.00 | 24,500.00 | 50.00 | 35,000.00 | 50.00 | 35,000.00 | 67.42 | 47,194.00 |
| 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 8,000.00 | 8,000.00 | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 | 104,200.00 | 104,200.00 |
| 0032 | 729-01-00100 | Sign (Type A) | 100 | SQFT | 14.00 | 1,400.00 | 20.00 | 2,000.00 | 20.15 | 2,015.00 | 20.95 | 2,095.00 |
| 0033 | 729-21-00100 | U-Channel Post | 20 | EACH | 45.00 | 900.00 | 60.00 | 1,200.00 | 53.00 | 1,060.00 | 55.13 | 1,102.60 |
| 0034 | 735-01-00100 | Mailboxes | 7 | EACH | 6.00 | 42.00 | 7.00 | 49.00 | 10.00 | 70.00 | 6.93 | 48.51 |
| 0035 | 735-02-00100 | Mailbox Supports (Single) | 7 | EACH | 170.00 | 1,190.00 | 225.00 | 1,575.00 | 230.00 | 1,610.00 | 248.33 | 1,738.31 |
| 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,000.00 | 4,000.00 | 18,000.00 | 18,000.00 | 7,400.00 | 7,400.00 | 25,000.00 | 25,000.00 |
| 0037 | 741-06-00100 | Relocating Fire Hydrant | 4 | EACH | 2,000.00 | 8,000.00 | 1,500.00 | 6,000.00 | 1,150.00 | 4,600.00 | 800.51 | 3,202.04 |
| 0038 | 741-11-00200 | Adjusting Water Valve and Meter Box | 6 | EACH | 250.00 | 1,500.00 | 500.00 | 3,000.00 | 375.00 | 2,250.00 | 114.11 | 684.66 |
| 0039 | NS-201-00001 | Tree and Stump Removal (Under 36" - 36" Diameter) | 6 | EACH | 1,150.00 | 6,900.00 | 1,000.00 | 6,000.00 | 1,400.00 | 8,400.00 | 739.41 | 4,436.46 |
| 0040 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 150 | INLF | 1.00 | 150.00 | 1.00 | 150.00 | 0.95 | 142.50 | 1.50 | 225.00 |
| 0041 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 852 | INLF | 1.30 | 1,107.60 | 1.00 | 852.00 | 1.50 | 1,278.00 | 1.50 | 1,278.00 |
| 0043 | NS-ENH-16040 | Pedestrian Bridge 56' SPAN | 1 | LUMP | 49,000.00 | 49,000.00 | 37,468.64 | 37,468.64 | 44,500.00 | 44,500.00 | 44,782.92 | 44,782.92 |
| 0044 | NS-ENH-16040 | Pedestrian Bridge 64" SPAN | 1 | LUMP | 52,000.00 | 52,000.00 | 42,831.30 | 42,831.30 | 49,500.00 | 49,500.00 | 48,066.60 | 48,066.60 |
| CONTRACTOR TOTAL | 832,823.62 | 888,002.04 | 899,996.69 | 968,442.40 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Stranco, Inc. |
- 6 - Kort's Trucking Inc. |
- 7 - Gibbs & Register Inc |
- 8 - Richard Price Contracting Co, Llc |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 1,000.00 | 1,000.00 | 3,000.00 | 3,000.00 | 4,000.00 | 4,000.00 | 32,000.00 | 32,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,100.00 | 2,100.00 | 5,000.00 | 5,000.00 | 1,500.00 | 1,500.00 | 20,000.00 | 20,000.00 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 601.24 | SQYD | 10.50 | 6,313.02 | 7.50 | 4,509.30 | 8.00 | 4,809.92 | 12.00 | 7,214.88 |
| 0004 | 202-02-32120 | Removal of Pipe (Side Drain) SEE PLANS | 857 | LNFT | 10.00 | 8,570.00 | 6.00 | 5,142.00 | 10.00 | 8,570.00 | 16.00 | 13,712.00 |
| 0005 | 202-02-38200 | Removal of Signs | 4 | EACH | 55.00 | 220.00 | 25.00 | 100.00 | 30.00 | 120.00 | 600.00 | 2,400.00 |
| 0006 | 202-02-38500 | Removal of Surfacing and Stablized Base | 30 | SQYD | 10.50 | 315.00 | 25.00 | 750.00 | 15.00 | 450.00 | 60.00 | 1,800.00 |
| 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 36,000.00 | 36,000.00 | 36,000.00 | 36,000.00 | 11,000.00 | 11,000.00 | 56,000.00 | 56,000.00 |
| 0008 | 203-07-00100 | Borrow (Vehicular Measurement) | 4,000 | CUYD | 15.60 | 62,400.00 | 11.00 | 44,000.00 | 19.00 | 76,000.00 | 18.00 | 72,000.00 |
| 0009 | 204-02-00100 | Temporary Hay or Straw Bales | 12 | EACH | 12.00 | 144.00 | 15.00 | 180.00 | 20.00 | 240.00 | 39.00 | 468.00 |
| 0010 | 204-06-00100 | Temporary Silt Fencing | 5,570 | LNFT | 2.00 | 11,140.00 | 1.60 | 8,912.00 | 2.00 | 11,140.00 | 2.75 | 15,317.50 |
| 0011 | 302-01-00100 | Class II Base Course | 140 | CUYD | 78.00 | 10,920.00 | 45.00 | 6,300.00 | 190.00 | 26,600.00 | 96.00 | 13,440.00 |
| 0012 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 1,577 | LNFT | 47.00 | 74,119.00 | 60.00 | 94,620.00 | 62.00 | 97,774.00 | 55.00 | 86,735.00 |
| 0013 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 1,794 | LNFT | 59.00 | 105,846.00 | 74.00 | 132,756.00 | 72.00 | 129,168.00 | 75.50 | 135,447.00 |
| 0014 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 523 | LNFT | 74.00 | 38,702.00 | 105.00 | 54,915.00 | 92.00 | 48,116.00 | 98.00 | 51,254.00 |
| 0015 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 921 | LNFT | 88.00 | 81,048.00 | 115.00 | 105,915.00 | 121.00 | 111,441.00 | 123.00 | 113,283.00 |
| 0016 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 68 | LNFT | 60.00 | 4,080.00 | 97.00 | 6,596.00 | 62.00 | 4,216.00 | 61.50 | 4,182.00 |
| 0017 | 701-06-01060 | Side Drain Pipe Arch (30" Equiv. RCPA/CMPA) | 147 | LNFT | 100.00 | 14,700.00 | 105.00 | 15,435.00 | 92.00 | 13,524.00 | 85.00 | 12,495.00 |
| 0018 | 701-06-01080 | Side Drain Pipe Arch (36" Equiv. RCPA/CMPA) | 143 | LNFT | 118.00 | 16,874.00 | 124.00 | 17,732.00 | 121.00 | 17,303.00 | 102.00 | 14,586.00 |
| 0019 | 701-07-00100 | Yard Drain Pipe (4") | 10 | LNFT | 33.00 | 330.00 | 62.00 | 620.00 | 50.00 | 500.00 | 94.00 | 940.00 |
| 0020 | 701-07-00600 | Yard Drain Pipe (15") | 80 | LNFT | 40.00 | 3,200.00 | 69.00 | 5,520.00 | 80.00 | 6,400.00 | 68.00 | 5,440.00 |
| 0021 | 702-03-00100 | Catch Basins (CB-01) | 61 | EACH | 2,600.00 | 158,600.00 | 2,345.00 | 143,045.00 | 2,400.00 | 146,400.00 | 2,725.00 | 166,225.00 |
| 0023 | 706-01-00100 | Concrete Walk (4" Thick) | 2,413.32 | SQYD | 47.00 | 113,426.04 | 45.00 | 108,599.40 | 37.00 | 89,292.84 | 38.00 | 91,706.16 |
| 0024 | 706-02-00200 | Concrete Drive (6" Thick) | 437.58 | SQYD | 56.00 | 24,504.48 | 50.00 | 21,879.00 | 44.00 | 19,253.52 | 40.00 | 17,503.20 |
| 0025 | 711-01-03020 | Riprap (30 lb, 18" Thick) | 130 | SQYD | 65.00 | 8,450.00 | 58.00 | 7,540.00 | 60.00 | 7,800.00 | 75.00 | 9,750.00 |
| 0026 | 711-04-00100 | Geotextile Fabric | 4,700 | SQYD | 1.30 | 6,110.00 | 1.25 | 5,875.00 | 1.80 | 8,460.00 | 2.50 | 11,750.00 |
| 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,500.00 | 10,500.00 | 25,000.00 | 25,000.00 | 10,000.00 | 10,000.00 | 58,000.00 | 58,000.00 |
| 0028 | 717-01-00100 | Seeding | 28 | LB | 20.00 | 560.00 | 25.00 | 700.00 | 30.00 | 840.00 | 27.00 | 756.00 |
| 0029 | 718-01-00100 | Fertilizer | 940 | LB | 2.00 | 1,880.00 | 1.00 | 940.00 | 1.00 | 940.00 | 1.00 | 940.00 |
| 0030 | 726-01-00100 | Bedding Material | 700 | CUYD | 46.00 | 32,200.00 | 27.00 | 18,900.00 | 58.00 | 40,600.00 | 73.75 | 51,625.00 |
| 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 46,500.00 | 46,500.00 | 95,000.00 | 95,000.00 | 96,000.00 | 96,000.00 | 60,000.00 | 60,000.00 |
| 0032 | 729-01-00100 | Sign (Type A) | 100 | SQFT | 15.00 | 1,500.00 | 21.00 | 2,100.00 | 18.00 | 1,800.00 | 23.00 | 2,300.00 |
| 0033 | 729-21-00100 | U-Channel Post | 20 | EACH | 90.00 | 1,800.00 | 45.00 | 900.00 | 40.00 | 800.00 | 60.00 | 1,200.00 |
| 0034 | 735-01-00100 | Mailboxes | 7 | EACH | 10.00 | 70.00 | 8.00 | 56.00 | 11.00 | 77.00 | 8.00 | 56.00 |
| 0035 | 735-02-00100 | Mailbox Supports (Single) | 7 | EACH | 130.00 | 910.00 | 225.00 | 1,575.00 | 200.00 | 1,400.00 | 258.00 | 1,806.00 |
| 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 11,000.00 | 11,000.00 | 5,000.00 | 5,000.00 | 14,000.00 | 14,000.00 | 13,600.00 | 13,600.00 |
| 0037 | 741-06-00100 | Relocating Fire Hydrant | 4 | EACH | 1,580.00 | 6,320.00 | 3,500.00 | 14,000.00 | 1,200.00 | 4,800.00 | 1,000.00 | 4,000.00 |
| 0038 | 741-11-00200 | Adjusting Water Valve and Meter Box | 6 | EACH | 255.00 | 1,530.00 | 62.00 | 372.00 | 250.00 | 1,500.00 | 161.00 | 966.00 |
| 0039 | NS-201-00001 | Tree and Stump Removal (Under 36" - 36" Diameter) | 6 | EACH | 1.00 | 6.00 | 975.00 | 5,850.00 | 500.00 | 3,000.00 | 1,700.00 | 10,200.00 |
| 0040 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 150 | INLF | 1.00 | 150.00 | 2.00 | 300.00 | 1.00 | 150.00 | 1.20 | 180.00 |
| 0041 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 852 | INLF | 1.00 | 852.00 | 2.00 | 1,704.00 | 1.00 | 852.00 | 1.20 | 1,022.40 |
| 0043 | NS-ENH-16040 | Pedestrian Bridge 56' SPAN | 1 | LUMP | 48,500.00 | 48,500.00 | 39,000.00 | 39,000.00 | 50,000.00 | 50,000.00 | 48,000.00 | 48,000.00 |
| 0044 | NS-ENH-16040 | Pedestrian Bridge 64" SPAN | 1 | LUMP | 45,200.00 | 45,200.00 | 45,000.00 | 45,000.00 | 55,000.00 | 55,000.00 | 55,000.00 | 55,000.00 |
| CONTRACTOR TOTAL | 998,589.54 | 1,091,337.70 | 1,125,837.28 | 1,265,300.14 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 9 - Command Construction Industries LLC |
- 10 - RMD Holdings Ltd |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 100,000.00 | 100,000.00 | 4,165.00 | 4,165.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 5,950.00 | 5,950.00 |
| 0003 | 202-02-06100 | Removal of Concrete Walks and Drives | 601.24 | SQYD | 10.00 | 6,012.40 | 9.52 | 5,723.80 |
| 0004 | 202-02-32120 | Removal of Pipe (Side Drain) SEE PLANS | 857 | LNFT | 10.00 | 8,570.00 | 12.79 | 10,961.03 |
| 0005 | 202-02-38200 | Removal of Signs | 4 | EACH | 50.00 | 200.00 | 98.67 | 394.68 |
| 0006 | 202-02-38500 | Removal of Surfacing and Stablized Base | 30 | SQYD | 50.00 | 1,500.00 | 11.90 | 357.00 |
| 0007 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 125,000.00 | 125,000.00 | 35,700.00 | 35,700.00 |
| 0008 | 203-07-00100 | Borrow (Vehicular Measurement) | 4,000 | CUYD | 8.00 | 32,000.00 | 16.36 | 65,440.00 |
| 0009 | 204-02-00100 | Temporary Hay or Straw Bales | 12 | EACH | 50.00 | 600.00 | 17.85 | 214.20 |
| 0010 | 204-06-00100 | Temporary Silt Fencing | 5,570 | LNFT | 2.00 | 11,140.00 | 1.67 | 9,301.90 |
| 0011 | 302-01-00100 | Class II Base Course | 140 | CUYD | 150.00 | 21,000.00 | 71.40 | 9,996.00 |
| 0012 | 701-04-01020 | Storm Drain Pipe Arch (18" Equiv. RCPA) | 1,577 | LNFT | 55.00 | 86,735.00 | 63.18 | 99,634.86 |
| 0013 | 701-04-01040 | Storm Drain Pipe Arch (24" Equiv. RCPA) | 1,794 | LNFT | 65.00 | 116,610.00 | 80.79 | 144,937.26 |
| 0014 | 701-04-01060 | Storm Drain Pipe Arch (30" Equiv. RCPA) | 523 | LNFT | 75.00 | 39,225.00 | 100.42 | 52,519.66 |
| 0015 | 701-04-01080 | Storm Drain Pipe Arch (36" Equiv. RCPA) | 921 | LNFT | 85.00 | 78,285.00 | 119.60 | 110,151.60 |
| 0016 | 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 68 | LNFT | 55.00 | 3,740.00 | 62.78 | 4,269.04 |
| 0017 | 701-06-01060 | Side Drain Pipe Arch (30" Equiv. RCPA/CMPA) | 147 | LNFT | 75.00 | 11,025.00 | 100.42 | 14,761.74 |
| 0018 | 701-06-01080 | Side Drain Pipe Arch (36" Equiv. RCPA/CMPA) | 143 | LNFT | 85.00 | 12,155.00 | 119.60 | 17,102.80 |
| 0019 | 701-07-00100 | Yard Drain Pipe (4") | 10 | LNFT | 50.00 | 500.00 | 93.51 | 935.10 |
| 0020 | 701-07-00600 | Yard Drain Pipe (15") | 80 | LNFT | 50.00 | 4,000.00 | 50.09 | 4,007.20 |
| 0021 | 702-03-00100 | Catch Basins (CB-01) | 61 | EACH | 2,150.00 | 131,150.00 | 2,730.68 | 166,571.48 |
| 0023 | 706-01-00100 | Concrete Walk (4" Thick) | 2,413.32 | SQYD | 60.00 | 144,799.20 | 44.69 | 107,851.27 |
| 0024 | 706-02-00200 | Concrete Drive (6" Thick) | 437.58 | SQYD | 65.00 | 28,442.70 | 67.58 | 29,571.66 |
| 0025 | 711-01-03020 | Riprap (30 lb, 18" Thick) | 130 | SQYD | 65.00 | 8,450.00 | 85.50 | 11,115.00 |
| 0026 | 711-04-00100 | Geotextile Fabric | 4,700 | SQYD | 1.00 | 4,700.00 | 2.06 | 9,682.00 |
| 0027 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,000.00 | 10,000.00 | 26,932.08 | 26,932.08 |
| 0028 | 717-01-00100 | Seeding | 28 | LB | 25.00 | 700.00 | 145.78 | 4,081.84 |
| 0029 | 718-01-00100 | Fertilizer | 940 | LB | 2.00 | 1,880.00 | 0.95 | 893.00 |
| 0030 | 726-01-00100 | Bedding Material | 700 | CUYD | 50.00 | 35,000.00 | 101.14 | 70,798.00 |
| 0031 | 727-01-00100 | Mobilization | 1 | LUMP | 130,000.00 | 130,000.00 | 150,781.30 | 150,781.30 |
| 0032 | 729-01-00100 | Sign (Type A) | 100 | SQFT | 25.00 | 2,500.00 | 5.95 | 595.00 |
| 0033 | 729-21-00100 | U-Channel Post | 20 | EACH | 125.00 | 2,500.00 | 69.46 | 1,389.20 |
| 0034 | 735-01-00100 | Mailboxes | 7 | EACH | 50.00 | 350.00 | 65.65 | 459.55 |
| 0035 | 735-02-00100 | Mailbox Supports (Single) | 7 | EACH | 200.00 | 1,400.00 | 65.65 | 459.55 |
| 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 10,000.00 | 10,000.00 | 35,700.00 | 35,700.00 |
| 0037 | 741-06-00100 | Relocating Fire Hydrant | 4 | EACH | 3,500.00 | 14,000.00 | 2,808.40 | 11,233.60 |
| 0038 | 741-11-00200 | Adjusting Water Valve and Meter Box | 6 | EACH | 250.00 | 1,500.00 | 1,106.70 | 6,640.20 |
| 0039 | NS-201-00001 | Tree and Stump Removal (Under 36" - 36" Diameter) | 6 | EACH | 750.00 | 4,500.00 | 1,695.75 | 10,174.50 |
| 0040 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 150 | INLF | 3.00 | 450.00 | 1.19 | 178.50 |
| 0041 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 852 | INLF | 3.00 | 2,556.00 | 1.49 | 1,269.48 |
| 0043 | NS-ENH-16040 | Pedestrian Bridge 56' SPAN | 1 | LUMP | 40,000.00 | 40,000.00 | 50,939.14 | 50,939.14 |
| 0044 | NS-ENH-16040 | Pedestrian Bridge 64" SPAN | 1 | LUMP | 35,000.00 | 35,000.00 | 54,272.33 | 54,272.33 |
| CONTRACTOR TOTAL | 1,278,175.30 | 1,348,111.55 | ||||||