Bid Tabulations
Letting of
09/28/2011
LA DOTD Headquarters
| Lead Project: 256-12-0002 | |
| Parish: St. John | |
| Routes: US 51 | |
| Description: US 51: US 61 - MAIN STREET | |
| Type Const: GRADING, COLD PLANING ASPHALTIC CONCRETE, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, THIN ASPHALTIC CONCRETE OVERLAY AND RELATED WORK. | |
| Estimated Construction Cost: $1,684,754.15 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC | $1,786,587.81 |
| 2 | 00481 | Coastal Bridge Co., L.L.C. | $1,790,749.63 |
| 3 | 12487 | Diamond B Construction Co., L.L.C. | $2,253,538.71 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC |
- 2 - Coastal Bridge Co., L.L.C. |
- 3 - Diamond B Construction Co., L.L.C. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-38300 | Removal of Sign and U-Channel Post | 8 | EACH | 10.00 | 80.00 | 11.00 | 88.00 | 24.00 | 192.00 |
| 0002 | 203-01-00100 | General Excavation | 533 | CUYD | 35.00 | 18,655.00 | 25.00 | 13,325.00 | 58.00 | 30,914.00 |
| 0003 | 204-02-00100 | Temporary Hay or Straw Bales | 24 | EACH | 10.00 | 240.00 | 15.00 | 360.00 | 18.00 | 432.00 |
| 0004 | 204-06-00100 | Temporary Silt Fencing | 5,760 | LNFT | 1.00 | 5,760.00 | 1.75 | 10,080.00 | 2.00 | 11,520.00 |
| 0005 | 501-01-00005 | Thin Asphaltic Concrete (Coarse Mix) | 3,529.9 | TON | 126.00 | 444,767.40 | 150.00 | 529,485.00 | 155.00 | 547,134.50 |
| 0006 | 501-02-00001 | Tack Coat (This quantity is for use with Thin Asphalt Concrete Only) | 10,587 | GAL | 4.25 | 44,994.75 | 5.00 | 52,935.00 | 5.00 | 52,935.00 |
| 0007 | 502-01-00100 | Superpave Asphaltic Concrete | 8,837.3 | TON | 82.00 | 724,658.60 | 87.00 | 768,845.10 | 115.00 | 1,016,289.50 |
| 0008 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 98.7 | TON | 82.00 | 8,093.40 | 215.00 | 21,220.50 | 150.00 | 14,805.00 |
| 0009 | 509-01-00100 | Cold Planing Asphaltic Pavement | 74,106 | SQYD | 1.00 | 74,106.00 | 2.25 | 166,738.50 | 4.00 | 296,424.00 |
| 0010 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -2,992 | CUYD | 1.00 | -2,992.00 | 18.39 | -55,022.88 | 1.00 | -2,992.00 |
| 0011 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 100 | SQYD | 80.00 | 8,000.00 | 135.00 | 13,500.00 | 160.00 | 16,000.00 |
| 0012 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 150,000.00 | 150,000.00 | 25,000.00 | 25,000.00 | 12,000.00 | 12,000.00 |
| 0013 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 208 | LNFT | 0.20 | 41.60 | 0.25 | 52.00 | 0.25 | 52.00 |
| 0014 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 120 | LNFT | 0.10 | 12.00 | 1.00 | 120.00 | 0.85 | 102.00 |
| 0015 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 7.508 | MILE | 132.00 | 991.06 | 180.00 | 1,351.44 | 180.00 | 1,351.44 |
| 0016 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 7.508 | MILE | 150.00 | 1,126.20 | 165.00 | 1,238.82 | 475.00 | 3,566.30 |
| 0017 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 25.522 | MILE | 200.00 | 5,104.40 | 225.00 | 5,742.45 | 235.00 | 5,997.67 |
| 0018 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 8 | EACH | 45.00 | 360.00 | 50.00 | 400.00 | 50.00 | 400.00 |
| 0019 | 713-05-00200 | Temporary Pavement Legends & Symbols (Double Arrow) | 4 | EACH | 55.00 | 220.00 | 60.00 | 240.00 | 60.00 | 240.00 |
| 0020 | 713-05-00300 | Temporary Pavement Legends & Symbols (ONLY) | 4 | EACH | 45.00 | 180.00 | 50.00 | 200.00 | 50.00 | 200.00 |
| 0021 | 716-01-00100 | Mulch (Vegetative) | 0.5 | TON | 100.00 | 50.00 | 2,750.00 | 1,375.00 | 2,900.00 | 1,450.00 |
| 0022 | 717-01-00100 | Seeding | 8 | LB | 5.00 | 40.00 | 30.00 | 240.00 | 29.00 | 232.00 |
| 0023 | 718-01-00100 | Fertilizer | 264 | LB | 2.00 | 528.00 | 2.25 | 594.00 | 2.00 | 528.00 |
| 0024 | 727-01-00100 | Mobilization | 1 | LUMP | 170,000.00 | 170,000.00 | 150,000.00 | 150,000.00 | 155,000.00 | 155,000.00 |
| 0025 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 125.00 | 1,000.00 | 140.00 | 1,120.00 | 130.00 | 1,040.00 |
| 0026 | 731-02-00100 | Reflectorized Raised Pavement Markers | 498 | EACH | 5.25 | 2,614.50 | 6.00 | 2,988.00 | 6.00 | 2,988.00 |
| 0027 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 104 | LNFT | 1.30 | 135.20 | 1.50 | 156.00 | 1.60 | 166.40 |
| 0028 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 60 | LNFT | 4.50 | 270.00 | 1.00 | 60.00 | 11.00 | 660.00 |
| 0029 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 11.261 | MILE | 2,800.00 | 31,530.80 | 3,100.00 | 34,909.10 | 2,900.00 | 32,656.90 |
| 0030 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.754 | MILE | 850.00 | 3,190.90 | 900.00 | 3,378.60 | 1,000.00 | 3,754.00 |
| 0031 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 265.00 | 530.00 | 290.00 | 580.00 | 300.00 | 600.00 |
| 0032 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 200.00 | 400.00 | 225.00 | 450.00 | 250.00 | 500.00 |
| 0033 | 732-04-01100 | Plastic Pavement Legends and Symbols (Arrow - Right Turn) | 2 | EACH | 200.00 | 400.00 | 225.00 | 450.00 | 250.00 | 500.00 |
| 0034 | 732-04-15020 | Plastic Pavement Legends and Symbols (ONLY) | 2 | EACH | 200.00 | 400.00 | 250.00 | 500.00 | 250.00 | 500.00 |
| 0035 | 732-04-19020 | Plastic Pavement Legends and Symbols (SCHOOL ZONE) | 2 | EACH | 400.00 | 800.00 | 425.00 | 850.00 | 450.00 | 900.00 |
| 0036 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 16,000.00 | 16,000.00 | 7,000.00 | 7,000.00 |
| 0037 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 600 | INLF | 0.50 | 300.00 | 2.00 | 1,200.00 | 2.50 | 1,500.00 |
| 0038 | NS-713-00001 | Dynamic Message Sign Unit | 4 | EACH | 10,000.00 | 40,000.00 | 5,000.00 | 20,000.00 | 9,000.00 | 36,000.00 |
| CONTRACTOR TOTAL | 1,786,587.81 | 1,790,749.63 | 2,253,538.71 | |||||||