Bid Tabulations
Letting of
06/29/2011
LA DOTD Headquarters
| Lead Project: 248-03-0011 | |
| Parish: Terrebonne | |
| Routes: LA 55 | |
| Description: LEFT TURN LANE FROM LA 55 TO KLONDYKE BRIDGE | |
| Type Const: ROADWAY WIDENING, SUPERPAVE ASPHALTIC CONCRETE, SIGNAGE, PAVEMENT MARKINGS AND RELATED WORK. | |
| Estimated Construction Cost: $218,332.35 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06276 | Barriere Construction Co., LLC | $230,789.80 |
| 2 | 06487 | Huey Stockstill, Inc. | $243,387.20 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Barriere Construction Co., LLC |
- 2 - Huey Stockstill, Inc. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-32000 | Removal of Paved Ditches | 2 | SQYD | 100.00 | 200.00 | 1.00 | 2.00 |
| 0002 | 202-02-32180 | Removal of Pipe Headwalls | 2 | EACH | 2,500.00 | 5,000.00 | 2,500.00 | 5,000.00 |
| 0003 | 202-03-00010 | Relocation relocating existing roadway signs | 2 | EACH | 10.00 | 20.00 | 350.00 | 700.00 |
| 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 250 | CUYD | 23.00 | 5,750.00 | 5.00 | 1,250.00 |
| 0005 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 125 | CUYD | 50.00 | 6,250.00 | 5.00 | 625.00 |
| 0006 | 502-01-00100 | Superpave Asphaltic Concrete | 811 | TON | 100.00 | 81,100.00 | 135.00 | 109,485.00 |
| 0007 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 77.8 | TON | 150.00 | 11,670.00 | 200.00 | 15,560.00 |
| 0008 | 701-12-01040 | Corrugated Metal Pipe (Extension) (18") | 8 | LNFT | 100.00 | 800.00 | 120.00 | 960.00 |
| 0009 | 701-14-00100 | Cleaning Existing Pipes | 125 | LNFT | 10.00 | 1,250.00 | 25.00 | 3,125.00 |
| 0010 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 3,000.00 | 3,000.00 | 4,400.00 | 4,400.00 |
| 0011 | 702-07-00100 | Cross Drain Safety End (Type 1) | 2 | EACH | 3,800.00 | 7,600.00 | 4,400.00 | 8,800.00 |
| 0012 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 25,000.00 | 25,000.00 | 17,000.00 | 17,000.00 |
| 0013 | 713-02-00300 | Temporary Pavement Markings (8" Width) | 150 | LNFT | 0.25 | 37.50 | 0.25 | 37.50 |
| 0014 | 713-02-00400 | Temporary Pavement Markings (12" Width) | 100 | LNFT | 0.30 | 30.00 | 0.30 | 30.00 |
| 0015 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 366 | LNFT | 0.75 | 274.50 | 0.80 | 292.80 |
| 0016 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 0.046 | MILE | 200.00 | 9.20 | 1,000.00 | 46.00 |
| 0017 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 0.046 | MILE | 500.00 | 23.00 | 500.00 | 23.00 |
| 0018 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 1.06 | MILE | 550.00 | 583.00 | 500.00 | 530.00 |
| 0019 | 713-05-00100 | Temporary Pavement Legends & Symbols (Arrow) | 4 | EACH | 45.00 | 180.00 | 30.00 | 120.00 |
| 0020 | 717-01-00100 | Seeding | 5.7 | LB | 30.00 | 171.00 | 40.00 | 228.00 |
| 0021 | 718-01-00100 | Fertilizer | 188 | LB | 3.50 | 658.00 | 4.00 | 752.00 |
| 0022 | 727-01-00100 | Mobilization | 1 | LUMP | 22,000.00 | 22,000.00 | 24,000.00 | 24,000.00 |
| 0023 | 729-01-00102 | Sign (Type A)(Furnish and Install) | 8.75 | SQFT | 20.00 | 175.00 | 40.00 | 350.00 |
| 0024 | 729-19-00200 | Dead End Road Installations (Type B) | 1 | EACH | 900.00 | 900.00 | 2,400.00 | 2,400.00 |
| 0025 | 729-21-00100 | U-Channel Post | 1 | EACH | 50.00 | 50.00 | 10.00 | 10.00 |
| 0026 | 731-02-00100 | Reflectorized Raised Pavement Markers | 391 | EACH | 6.00 | 2,346.00 | 6.00 | 2,346.00 |
| 0027 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 75 | LNFT | 1.50 | 112.50 | 1.70 | 127.50 |
| 0028 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 50 | LNFT | 3.00 | 150.00 | 2.90 | 145.00 |
| 0029 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 183 | LNFT | 5.00 | 915.00 | 6.00 | 1,098.00 |
| 0030 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.76 | MILE | 3,000.00 | 2,280.00 | 3,200.00 | 2,432.00 |
| 0031 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.023 | MILE | 800.00 | 18.40 | 1,000.00 | 23.00 |
| 0032 | 735-01-00100 | Mailboxes | 2 | EACH | 6.00 | 12.00 | 7.00 | 14.00 |
| 0033 | 735-02-00100 | Mailbox Supports (Single) | 2 | EACH | 300.00 | 600.00 | 250.00 | 500.00 |
| 0034 | 736-09-00100 | Loop Detector | 33 | LNFT | 25.00 | 825.00 | 24.00 | 792.00 |
| 0035 | 740-01-00100 | Construction Layout | 1 | LUMP | 20,000.00 | 20,000.00 | 2,500.00 | 2,500.00 |
| 0036 | NS-500-00280 | Surface Preparation | 1 | LUMP | 20,000.00 | 20,000.00 | 28,000.00 | 28,000.00 |
| 0037 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 882 | INLF | 0.85 | 749.70 | 1.20 | 1,058.40 |
| 0038 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 10,000.00 | 10,000.00 | 8,000.00 | 8,000.00 |
| 0039 | 202-02-38240 | Removal of Signs and Supports | 5 | EACH | 10.00 | 50.00 | 125.00 | 625.00 |
| CONTRACTOR TOTAL | 230,789.80 | 243,387.20 | ||||||