Bid Tabulations
Letting of
12/16/2009
LA DOTD Headquarters
| Lead Project: 246-01-0069 | |
| Parish: Terrebonne | |
| Routes: LA 57 | |
| Description: 7.200 MILES N. OF LA 3011 - 1.500 MILES N. OF LA 3011 | |
| Type Const: GRADING, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK. | |
| Estimated Construction Cost: $1,002,455.26 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 06487 | Huey Stockstill, Inc. | $992,018.90 |
| 2 | 06276 | Barriere Construction Co., LLC | $1,007,536.45 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Huey Stockstill, Inc. |
- 2 - Barriere Construction Co., LLC |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 203-07-00100 | Borrow (Vehicular Measurement) | 650 | CUYD | 8.00 | 5,200.00 | 1.00 | 650.00 |
| 0002 | 502-01-00100 | Superpave Asphaltic Concrete | 9,421.1 | TON | 78.00 | 734,845.80 | 73.00 | 687,740.30 |
| 0003 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 250 | TON | 140.00 | 35,000.00 | 73.00 | 18,250.00 |
| 0004 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 103 | SQYD | 155.00 | 15,965.00 | 25.00 | 2,575.00 |
| 0005 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 8,000.00 | 8,000.00 | 60,000.00 | 60,000.00 |
| 0006 | 713-02-00400 | Temporary Pavement Markings (12" Width) | 180 | LNFT | 0.10 | 18.00 | 0.10 | 18.00 |
| 0007 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 300 | LNFT | 0.10 | 30.00 | 0.10 | 30.00 |
| 0008 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 6 | MILE | 300.00 | 1,800.00 | 250.00 | 1,500.00 |
| 0009 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 4.63 | MILE | 10.00 | 46.30 | 5.00 | 23.15 |
| 0010 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 16.06 | MILE | 10.00 | 160.60 | 5.00 | 80.30 |
| 0011 | 713-05-00500 | Temporary Pavement Legends & Symbols (SCHOOL CROSSING) | 2 | EACH | 150.00 | 300.00 | 5.00 | 10.00 |
| 0012 | 727-01-00100 | Mobilization | 1 | LUMP | 67,000.00 | 67,000.00 | 100,000.00 | 100,000.00 |
| 0013 | 731-02-00100 | Reflectorized Raised Pavement Markers | 752 | EACH | 5.50 | 4,136.00 | 5.00 | 3,760.00 |
| 0014 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 180 | LNFT | 2.80 | 504.00 | 2.50 | 450.00 |
| 0015 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 300 | LNFT | 4.70 | 1,410.00 | 4.50 | 1,350.00 |
| 0016 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 16.06 | MILE | 2,700.00 | 43,362.00 | 2,500.00 | 40,150.00 |
| 0017 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 4.63 | MILE | 900.00 | 4,167.00 | 850.00 | 3,935.50 |
| 0018 | 732-04-19000 | Plastic Pavement Legends and Symbols (SCHOOL CROSSING) | 2 | EACH | 430.00 | 860.00 | 400.00 | 800.00 |
| 0019 | 740-01-00100 | Construction Layout | 1 | LUMP | 4,000.00 | 4,000.00 | 16,000.00 | 16,000.00 |
| 0020 | NS-500-00280 | Surface Preparation | 1 | LUMP | 65,000.00 | 65,000.00 | 70,000.00 | 70,000.00 |
| 0021 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 2,142 | INLF | 0.10 | 214.20 | 0.10 | 214.20 |
| CONTRACTOR TOTAL | 992,018.90 | 1,007,536.45 | ||||||