LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: 227-04-0018
Parish: Pointe Coupee
Routes: LA 413
Description: LA 413: LA 414(S) - LA 414(N)
Type Const: GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC CONCRETE, LIME TREATMENT, IN-PLACE CEMENT STABILIZED BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, AND RELATED WORK.
Estimated Construction Cost: $6,030,518.60


RankLicenseBidderConstruction Bid
1 00849 F.G. Sullivan, Jr. Contractor LLC $6,448,846.70
2 00046 Barber Bros. Contracting Co., L.L.C $6,739,106.49
3 00481 Coastal Bridge Co., L.L.C. $6,844,063.15


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
F.G. Sullivan, Jr. Contractor LLC
- 2 -
Barber Bros. Contracting Co., L.L.C
- 3 -
Coastal Bridge Co., L.L.C.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 202-02-02000 Removal of Asphalt Drives 312.3    SQYD 10.00 3,123.00 30.00 9,369.00 20.00 6,246.00
0002 202-02-02020 Removal of Asphalt Pavement 47.2    SQYD 10.00 472.00 10.00 472.00 30.00 1,416.00
0003 202-02-06060 Removal of Concrete Catch Basin 5      EACH 300.00 1,500.00 400.00 2,000.00 500.00 2,500.00
0004 202-02-06100 Removal of Concrete Walks and Drives 51.5    SQYD 10.00 515.00 15.00 772.50 35.00 1,802.50
0005 202-02-14500 Removal of Guard Rail 230.5    LNFT 10.00 2,305.00 10.00 2,305.00 10.00 2,305.00
0006 202-02-32100 Removal of Pipe (Cross Drain) 504+95.15 32      LNFT 10.00 320.00 20.00 640.00 5.25 168.00
0007 202-02-32100 Removal of Pipe (Cross Drain) 497+03.25 32      LNFT 10.00 320.00 20.00 640.00 5.25 168.00
0008 202-02-32100 Removal of Pipe (Cross Drain) 88+81.21 8      LNFT 10.00 80.00 25.00 200.00 5.25 42.00
0009 202-02-32100 Removal of Pipe (Cross Drain) 119+91.26 50      LNFT 10.00 500.00 20.00 1,000.00 5.25 262.50
0010 202-02-32100 Removal of Pipe (Cross Drain) 410+52.50 36      LNFT 10.00 360.00 20.00 720.00 5.25 189.00
0011 202-02-32120 Removal of Pipe (Side Drain) 27+98.23 32.5    LNFT 10.00 325.00 20.00 650.00 1.00 32.50
0012 202-02-32120 Removal of Pipe (Side Drain) 253+87.43 19      LNFT 10.00 190.00 25.00 475.00 1.00 19.00
0013 202-02-32120 Removal of Pipe (Side Drain) 255+04.51 20      LNFT 10.00 200.00 20.00 400.00 1.00 20.00
0014 202-02-32120 Removal of Pipe (Side Drain) 368+83.54 20      LNFT 10.00 200.00 20.00 400.00 1.00 20.00
0015 202-02-32120 Removal of Pipe (Side Drain) 27+65.08 32.5    LNFT 10.00 325.00 20.00 650.00 1.00 32.50
0016 202-02-32120 Removal of Pipe (Side Drain) 226+83.80 30      LNFT 10.00 300.00 20.00 600.00 1.00 30.00
0017 202-02-32120 Removal of Pipe (Side Drain) 307+09.34 21      LNFT 10.00 210.00 20.00 420.00 1.00 21.00
0018 202-02-32120 Removal of Pipe (Side Drain) 254+65.47 26      LNFT 10.00 260.00 20.00 520.00 1.00 26.00
0019 202-02-32120 Removal of Pipe (Side Drain) 367+21.34 17      LNFT 10.00 170.00 25.00 425.00 1.00 17.00
0020 202-02-32120 Removal of Pipe (Side Drain) 305+63.36 18      LNFT 10.00 180.00 25.00 450.00 1.00 18.00
0021 202-02-32120 Removal of Pipe (Side Drain) 301+75.84 18      LNFT 10.00 180.00 25.00 450.00 1.00 18.00
0022 202-02-32120 Removal of Pipe (Side Drain) 369+65.64 9      LNFT 10.00 90.00 25.00 225.00 1.00 9.00
0023 202-02-32120 Removal of Pipe (Side Drain) 304+81.59 19      LNFT 10.00 190.00 25.00 475.00 1.00 19.00
0024 202-02-32120 Removal of Pipe (Side Drain) 369+24.14 75      LNFT 10.00 750.00 25.00 1,875.00 1.00 75.00
0025 202-02-32180 Removal of Pipe Headwalls 88+81.21 1      EACH 300.00 300.00 2,000.00 2,000.00 5,200.00 5,200.00
0026 202-02-32180 Removal of Pipe Headwalls 27+46.70 1      EACH 300.00 300.00 2,000.00 2,000.00 5,200.00 5,200.00
0027 203-04-00300 Nonplastic Embankment (Stone) 105      CUYD 90.00 9,450.00 120.00 12,600.00 72.00 7,560.00
0028 203-06-00100 Excavation and Embankment 2,300      LNFT 8.00 18,400.00 5.00 11,500.00 5.25 12,075.00
0029 203-07-00100 Borrow (Vehicular Measurement) 500      CUYD 25.00 12,500.00 25.00 12,500.00 40.00 20,000.00
0030 203-07-00200 Borrow (Vehicular Measurement) (Selected Soils) 2,350      CUYD 25.00 58,750.00 16.00 37,600.00 40.00 94,000.00
0031 204-02-00100 Temporary Hay or Straw Bales 102      EACH 12.00 1,224.00 20.00 2,040.00 12.25 1,249.50
0032 204-06-00100 Temporary Silt Fencing 65,226      LNFT 1.00 65,226.00 1.60 104,361.60 1.10 71,748.60
0033 303-01-00400 In-Place Cement Stabilized Base Course (12" Thick) 160,172.2    SQYD 8.00 1,281,377.60 7.50 1,201,291.50 8.25 1,321,420.65
0034 304-05-00100 Lime Treatment (Type E) 1,261.36   TON 0.01 12.61 200.00 252,272.00 50.00 63,068.00
0035 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 1,750      CUYD 15.00 26,250.00 50.00 87,500.00 40.00 70,000.00
0036 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 1,000      CUYD 35.00 35,000.00 25.00 25,000.00 40.00 40,000.00
0038 502-01-00100 Superpave Asphaltic Concrete 33,547.2    TON 85.00 2,851,512.00 80.00 2,683,776.00 78.00 2,616,681.60
0039 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 4,131.2    TON 85.00 351,152.00 120.00 495,744.00 78.00 322,233.60
0040 507-01-00100 Asphaltic Material (CRS-2P Emulsion) 108,917      GAL 4.00 435,668.00 4.00 435,668.00 3.40 370,317.80
0041 507-02-00200 Aggregate (S2) 160,172.2    SQYD 1.00 160,172.20 1.05 168,180.81 0.95 152,163.59
0042 507-02-00300 Aggregate (S3) 160,172.2    SQYD 1.00 160,172.20 0.90 144,154.98 0.80 128,137.76
0043 509-01-00100 Cold Planing Asphaltic Pavement 102,348      SQYD 2.50 255,870.00 2.60 266,104.80 2.50 255,870.00
0044 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -3,415      CUYD 0.00 0.00 0.00 0.00 30.00 -102,450.00
0045 701-01-01000 Cross Drain Pipe (24" RCP/PP) 150      LNFT 85.00 12,750.00 120.00 18,000.00 66.00 9,900.00
0046 701-03-01020 Storm Drain Pipe (18" RCP/PP) 786      LNFT 45.00 35,370.00 35.00 27,510.00 40.00 31,440.00
0047 701-05-01040 Side Drain Pipe (18" RCP/PP/CMP) 528      LNFT 45.00 23,760.00 55.00 29,040.00 40.00 21,120.00
0048 701-10-01040 Reinforced Concrete Pipe (Extension) (18") 32      LNFT 120.00 3,840.00 150.00 4,800.00 81.00 2,592.00
0049 701-14-00100 Cleaning Existing Pipes 123      LNFT 10.00 1,230.00 25.00 3,075.00 15.50 1,906.50
0050 701-15-00100 Concrete Collar 4      EACH 800.00 3,200.00 1,200.00 4,800.00 510.00 2,040.00
0051 702-03-00100 Catch Basins (CB-01) 17      EACH 2,500.00 42,500.00 2,000.00 34,000.00 2,900.00 49,300.00
0052 704-03-00100 Blocked Out Guard Rail 112.5    LNFT 20.00 2,250.00 25.00 2,812.50 20.50 2,306.25
0053 704-08-00200 Guard Rail Transitions (Double Thrie Beam) 75      LNFT 50.00 3,750.00 60.00 4,500.00 51.00 3,825.00
0054 704-11-00100 Guard Rail End Treatment (Flared) 4      EACH 2,100.00 8,400.00 2,500.00 10,000.00 2,150.00 8,600.00
0055 706-02-00200 Concrete Drive (6" Thick) 51.5    SQYD 80.00 4,120.00 180.00 9,270.00 120.00 6,180.00
0056 711-03-00300 Riprap (30 lb) 24.2    TON 90.00 2,178.00 250.00 6,050.00 96.00 2,323.20
0057 713-01-00100 Temporary Signs and Barricades 1      LUMP 140,600.00 140,600.00 60,000.00 60,000.00 250,000.00 250,000.00
0058 713-02-00300 Temporary Pavement Markings (8" Width) 60      LNFT 0.50 30.00 1.00 60.00 0.50 30.00
0059 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 35.283  MILE 159.49 5,627.29 300.00 10,584.90 155.00 5,468.87
0060 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 21.98   MILE 200.00 4,396.00 230.00 5,055.40 205.00 4,505.90
0061 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 34.945  MILE 300.00 10,483.50 300.00 10,483.50 305.00 10,658.23
0062 713-05-00100 Temporary Pavement Legends & Symbols (Arrow) 1      EACH 45.00 45.00 60.00 60.00 46.00 46.00
0063 713-05-00300 Temporary Pavement Legends & Symbols (ONLY) 1      EACH 50.00 50.00 60.00 60.00 51.00 51.00
0064 726-01-00100 Bedding Material 143.6    CUYD 60.00 8,616.00 60.00 8,616.00 76.00 10,913.60
0065 727-01-00100 Mobilization 1      LUMP 182,000.00 182,000.00 300,000.00 300,000.00 625,000.00 625,000.00
0066 729-16-00200 Object Marker Assembly (Type 2) 140      EACH 65.00 9,100.00 75.00 10,500.00 66.00 9,240.00
0067 729-16-00300 Object Marker Assembly (Type 3) 4      EACH 70.00 280.00 90.00 360.00 71.00 284.00
0068 731-02-00100 Reflectorized Raised Pavement Markers 1,600      EACH 4.75 7,600.00 5.50 8,800.00 4.80 7,680.00
0069 732-01-01040 Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) 60      LNFT 8.00 480.00 10.00 600.00 8.10 486.00
0070 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 29.243  MILE 2,600.00 76,031.80 3,000.00 87,729.00 2,700.00 78,956.10
0071 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 10.99   MILE 750.00 8,242.50 900.00 9,891.00 760.00 8,352.40
0072 732-04-01080 Plastic Pavement Legends and Symbols (Arrow - Left Turn) 1      EACH 300.00 300.00 400.00 400.00 305.00 305.00
0073 732-04-15020 Plastic Pavement Legends and Symbols (ONLY) 1      EACH 400.00 400.00 500.00 500.00 405.00 405.00
0074 735-01-00100 Mailboxes 571      EACH 10.00 5,710.00 12.00 6,852.00 1.00 571.00
0075 735-02-00100 Mailbox Supports (Single) 465      EACH 90.00 41,850.00 105.00 48,825.00 105.00 48,825.00
0076 735-03-00100 Mailbox Supports (Double) 35      EACH 120.00 4,200.00 140.00 4,900.00 110.00 3,850.00
0077 735-04-00100 Mailbox Supports (Multiple) 9      EACH 180.00 1,620.00 225.00 2,025.00 300.00 2,700.00
0078 740-01-00100 Construction Layout 1      LUMP 50,000.00 50,000.00 25,000.00 25,000.00 150,000.00 150,000.00
0079 805-06-00100 Class R Concrete 10      CUYD 250.00 2,500.00 350.00 3,500.00 315.00 3,150.00
0080 NS-200-00020 Cleaning Existing Ditches 100      LNFT 10.00 1,000.00 5.00 500.00 12.10 1,210.00
0081 NS-202-00001 Removal of Debris 1      LUMP 1,500.00 1,500.00 2,500.00 2,500.00 2,500.00 2,500.00
0082 NS-500-00340 Saw Cutting Asphaltic Concrete Pavement 2,400      INLF 0.65 1,560.00 1.20 2,880.00 1.00 2,400.00
0083 NS-600-00220 Saw Cutting Portland Cement Concrete Pavement 600      INLF 2.00 1,200.00 2.00 1,200.00 1.00 600.00
0084 NS-500-00300 Traffic Maintenance Superpave Asphaltic Concrete 29.4    TON 125.00 3,675.00 100.00 2,940.00 150.00 4,410.00
                     
    CONTRACTOR TOTAL       6,448,846.70   6,739,106.49   6,844,063.15