Bid Tabulations
Letting of
07/14/2010
LA DOTD Headquarters
| Lead Project: 217-01-0017 | |
| Parish: Lafayette | |
| Routes: LA 93, LA 98 | |
| Description: LA 98 AND LA 93 ROUNDABOUT | |
| Type Const: CLEARING AND GRUBBING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC PAVEMENT, SUBGRADE TREATMENT, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, PORTLAND CEMENT CONCRETE PAVEMENT, AND RELATED WORK. | |
| Estimated Construction Cost: $997,439.06 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 04089 | H & S Construction Co., Inc. | $578,715.75 |
| 2 | 51821 | Elliott Construction, LLC | $699,616.12 |
| 3 | 12198 | Byron E. Talbot Contractor, Inc. | $739,084.11 |
| 4 | 12312 | Gilchrist Construction Co. LLC | $991,612.00 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - H & S Construction Co., Inc. |
- 2 - Elliott Construction, LLC |
- 3 - Byron E. Talbot Contractor, Inc. |
- 4 - Gilchrist Construction Co. LLC |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 2,442.84 | 2,442.84 | 5,000.00 | 5,000.00 | 14,000.00 | 14,000.00 | 5,000.00 | 5,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 2,520.01 | 2,520.01 | 5,500.00 | 5,500.00 | 2,200.00 | 2,200.00 | 5,000.00 | 5,000.00 |
| 0003 | 202-02-02000 | Removal of Asphalt Drives | 480 | SQYD | 5.75 | 2,760.00 | 10.45 | 5,016.00 | 7.00 | 3,360.00 | 4.00 | 1,920.00 |
| 0004 | 202-02-06100 | Removal of Concrete Walks and Drives | 377 | SQYD | 7.00 | 2,639.00 | 12.00 | 4,524.00 | 9.00 | 3,393.00 | 6.00 | 2,262.00 |
| 0005 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 30,000.00 | 30,000.00 | 40,000.00 | 40,000.00 | 56,500.00 | 56,500.00 | 110,000.00 | 110,000.00 |
| 0006 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 8 | EACH | 165.37 | 1,322.96 | 132.00 | 1,056.00 | 138.00 | 1,104.00 | 350.00 | 2,800.00 |
| 0007 | 204-06-00100 | Temporary Silt Fencing | 2,000 | LNFT | 2.15 | 4,300.00 | 1.40 | 2,800.00 | 1.60 | 3,200.00 | 2.00 | 4,000.00 |
| 0008 | 302-02-05020 | Class II Base Course (10" Thick) (Soil Cement) | 5,594.9 | SQYD | 8.58 | 48,004.24 | 12.00 | 67,138.80 | 8.00 | 44,759.20 | 20.00 | 111,898.00 |
| 0009 | 305-01-04020 | Subgrade Layer (12" Thick) (Treated) | 5,595 | SQYD | 7.00 | 39,165.00 | 8.50 | 47,557.50 | 4.70 | 26,296.50 | 11.00 | 61,545.00 |
| 0010 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 70 | CUYD | 32.69 | 2,288.30 | 45.00 | 3,150.00 | 85.00 | 5,950.00 | 40.00 | 2,800.00 |
| 0011 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 100 | CUYD | 30.47 | 3,047.00 | 50.00 | 5,000.00 | 85.00 | 8,500.00 | 40.00 | 4,000.00 |
| 0012 | 502-01-00100 | Superpave Asphaltic Concrete | 1,505.9 | TON | 85.25 | 128,377.98 | 110.00 | 165,649.00 | 99.00 | 149,084.10 | 110.00 | 165,649.00 |
| 0013 | 509-01-00100 | Cold Planing Asphaltic Pavement | 3,557.2 | SQYD | 3.45 | 12,272.34 | 4.00 | 14,228.80 | 4.40 | 15,651.68 | 5.00 | 17,786.00 |
| 0014 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -444 | CUYD | 0.01 | -4.44 | 0.01 | -4.44 | 1.00 | -444.00 | 1.00 | -444.00 |
| 0015 | 601-02-01100 | Portland Cement Concrete Pavement (10" Thick) (Crossovers & Turnouts) | 394.8 | SQYD | 75.00 | 29,610.00 | 75.00 | 29,610.00 | 77.00 | 30,399.60 | 125.00 | 49,350.00 |
| 0016 | 701-03-01020 | Storm Drain Pipe (18" RCP/PP) | 286 | LNFT | 43.69 | 12,495.34 | 48.00 | 13,728.00 | 50.00 | 14,300.00 | 110.00 | 31,460.00 |
| 0017 | 701-15-00100 | Concrete Collar | 1 | EACH | 178.60 | 178.60 | 1,210.00 | 1,210.00 | 365.00 | 365.00 | 700.00 | 700.00 |
| 0018 | 702-03-00600 | Catch Basins (CB-07) | 1 | EACH | 4,278.80 | 4,278.80 | 4,325.00 | 4,325.00 | 3,000.00 | 3,000.00 | 7,500.00 | 7,500.00 |
| 0019 | 706-02-00200 | Concrete Drive (6" Thick) | 835 | SQYD | 47.00 | 39,245.00 | 49.50 | 41,332.50 | 62.00 | 51,770.00 | 78.00 | 65,130.00 |
| 0020 | 706-03-00300 | Incidental Concrete Paving (6" Thick) | 340.9 | SQYD | 47.00 | 16,022.30 | 46.25 | 15,766.63 | 52.00 | 17,726.80 | 88.00 | 29,999.20 |
| 0021 | 707-01-00200 | Concrete Curb (Barrier) | 544.6 | LNFT | 18.00 | 9,802.80 | 7.00 | 3,812.20 | 35.00 | 19,061.00 | 12.00 | 6,535.20 |
| 0022 | 707-03-00100 | Combination Concrete Curb and Gutter | 2,914.3 | LNFT | 23.00 | 67,028.90 | 20.00 | 58,286.00 | 31.00 | 90,343.30 | 30.00 | 87,429.00 |
| 0023 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 30,000.00 | 30,000.00 | 20,000.00 | 20,000.00 | 19,800.00 | 19,800.00 | 20,000.00 | 20,000.00 |
| 0024 | 715-01-00100 | Topsoil | 160 | CUYD | 24.53 | 3,924.80 | 27.00 | 4,320.00 | 20.75 | 3,320.00 | 30.00 | 4,800.00 |
| 0025 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 2,500.00 | 2,500.00 | 6,600.00 | 6,600.00 | 6,500.00 | 6,500.00 | 6,000.00 | 6,000.00 |
| 0026 | 726-01-00100 | Bedding Material | 100 | CUYD | 45.00 | 4,500.00 | 80.00 | 8,000.00 | 95.00 | 9,500.00 | 90.00 | 9,000.00 |
| 0027 | 727-01-00100 | Mobilization | 1 | LUMP | 23,000.00 | 23,000.00 | 37,500.00 | 37,500.00 | 48,000.00 | 48,000.00 | 90,000.00 | 90,000.00 |
| 0028 | 729-01-00100 | Sign (Type A) | 72 | SQFT | 28.66 | 2,063.52 | 28.60 | 2,059.20 | 24.20 | 1,742.40 | 38.00 | 2,736.00 |
| 0029 | 729-02-00100 | Sign (Type B) | 101.8 | SQFT | 28.66 | 2,917.59 | 28.60 | 2,911.48 | 30.80 | 3,135.44 | 38.00 | 3,868.40 |
| 0030 | 729-04-00100 | Sign (Type D) | 144 | SQFT | 38.59 | 5,556.96 | 38.50 | 5,544.00 | 30.80 | 4,435.20 | 50.00 | 7,200.00 |
| 0031 | 729-08-00100 | Mounting (2 1/2" Size Post) | 8 | EACH | 992.21 | 7,937.68 | 990.00 | 7,920.00 | 825.00 | 6,600.00 | 1,300.00 | 10,400.00 |
| 0032 | 729-08-00200 | Mounting (3 1/2" Size Post) | 5 | EACH | 1,085.91 | 5,429.55 | 1,083.50 | 5,417.50 | 880.00 | 4,400.00 | 1,400.00 | 7,000.00 |
| 0033 | 731-02-00100 | Reflectorized Raised Pavement Markers | 240 | EACH | 5.79 | 1,389.60 | 4.40 | 1,056.00 | 5.77 | 1,384.80 | 7.00 | 1,680.00 |
| 0034 | 732-01-01000 | Plastic Pavement Striping (4" Width) (Thermoplastic 90 mil) | 2,869 | LNFT | 0.55 | 1,577.95 | 0.55 | 1,577.95 | 0.55 | 1,577.95 | 0.70 | 2,008.30 |
| 0035 | 732-01-01040 | Plastic Pavement Striping (8" Width) (Thermoplastic 90 mil) | 1,686 | LNFT | 1.49 | 2,512.14 | 1.10 | 1,854.60 | 1.49 | 2,512.14 | 1.90 | 3,203.40 |
| 0036 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 150 | LNFT | 4.96 | 744.00 | 5.50 | 825.00 | 4.95 | 742.50 | 6.50 | 975.00 |
| 0037 | 732-03-02030 | Plastic Pvmt Strip (Dotted Line)(8" W)(2' L)(Thermo 90 mil) | 0.027 | MILE | 2,449.63 | 66.14 | 55,000.00 | 1,485.00 | 3,300.00 | 89.10 | 4,500.00 | 121.50 |
| 0038 | 735-01-00100 | Mailboxes | 4 | EACH | 55.12 | 220.48 | 6.60 | 26.40 | 6.60 | 26.40 | 10.00 | 40.00 |
| 0039 | 735-02-00100 | Mailbox Supports (Single) | 4 | EACH | 165.37 | 661.48 | 198.00 | 792.00 | 49.50 | 198.00 | 300.00 | 1,200.00 |
| 0040 | 736-11-00500 | Conduit (4" HDPE, Schedule 80) | 220 | LNFT | 16.54 | 3,638.80 | 14.00 | 3,080.00 | 14.75 | 3,245.00 | 15.00 | 3,300.00 |
| 0041 | 739-01-00100 | Hydro-Seeding | 0.1 | ACRE | 3,307.30 | 330.73 | 8,250.00 | 825.00 | 10,450.00 | 1,045.00 | 10,000.00 | 1,000.00 |
| 0042 | 740-01-00100 | Construction Layout | 1 | LUMP | 3,916.85 | 3,916.85 | 15,000.00 | 15,000.00 | 18,000.00 | 18,000.00 | 10,000.00 | 10,000.00 |
| 0043 | 742-03-00100 | Adjusting Sanitary Sewer Services Lines | 40 | LNFT | 82.68 | 3,307.20 | 25.00 | 1,000.00 | 50.00 | 2,000.00 | 120.00 | 4,800.00 |
| 0044 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 2,080 | INLF | 1.02 | 2,121.60 | 1.10 | 2,288.00 | 1.65 | 3,432.00 | 1.50 | 3,120.00 |
| 0045 | NS-713-00001 | Dynamic Message Sign Unit | 4 | EACH | 1,378.06 | 5,512.24 | 2,695.00 | 10,780.00 | 4,400.00 | 17,600.00 | 5,000.00 | 20,000.00 |
| 0046 | NS-729-00004 | Square Steel Tubular Sign Posts and Hardware (2" x 2")(1.74lb/ft) | 400 | LNFT | 6.61 | 2,644.00 | 6.60 | 2,640.00 | 16.50 | 6,600.00 | 7.00 | 2,800.00 |
| 0047 | NS-729-00006 | Square Steel Tubular Sign Posts and Hardware (2 1/4" x 2 1/4") | 132 | LNFT | 16.54 | 2,183.28 | 16.50 | 2,178.00 | 16.50 | 2,178.00 | 20.00 | 2,640.00 |
| 0048 | NS-MSC-00120 | Drainage Structure PAVED GUTTER DRAIN | 7 | EACH | 323.17 | 2,262.19 | 2,750.00 | 19,250.00 | 1,500.00 | 10,500.00 | 200.00 | 1,400.00 |
| CONTRACTOR TOTAL | 578,715.75 | 699,616.12 | 739,084.11 | 991,612.00 | ||||||||