Bid Tabulations
Letting of
04/28/2010
LA DOTD Headquarters
| Lead Project: 177-30-0025 | |
| Parish: Concordia | |
| Routes: LA 131 | |
| Description: GILLESPIE ST. - US 425 (P.M.) | |
| Type Const: PARTIAL DEPTH PATCHING OF JOINTED CONCRETE PAVEMENT AND RELATED WORK. | |
| Estimated Construction Cost: $65,838.90 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 21982 | Forby Contracting, Inc. | $94,400.50 |
| 2 | 45004 | Bondco LLC | $109,924.64 |
| 3 | 26911 | Kelly B. Estes | $123,051.00 |
| 4 | 35849 | T.L. Construction Inc | $138,548.50 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Forby Contracting, Inc. |
- 2 - Bondco LLC |
- 3 - Kelly B. Estes |
- 4 - T.L. Construction Inc |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-06100 | Removal of Concrete Walks and Drives | 63 | SQYD | 10.00 | 630.00 | 18.00 | 1,134.00 | 75.00 | 4,725.00 | 35.00 | 2,205.00 |
| 0002 | 202-02-06140 | Removal of Curbs (Concrete) | 204 | LNFT | 5.00 | 1,020.00 | 20.00 | 4,080.00 | 17.50 | 3,570.00 | 10.00 | 2,040.00 |
| 0003 | 202-02-32500 | Removal of Portland Cement Concrete Pavement | 39 | SQYD | 25.00 | 975.00 | 36.00 | 1,404.00 | 100.00 | 3,900.00 | 60.00 | 2,340.00 |
| 0004 | 202-02-38500 | Removal of Surfacing and Stablized Base | 101.6 | SQYD | 20.00 | 2,032.00 | 18.00 | 1,828.80 | 75.00 | 7,620.00 | 35.00 | 3,556.00 |
| 0005 | 601-01-00500 | Portland Cement Concrete Pavement (10" Thick) | 141.1 | SQYD | 150.00 | 21,165.00 | 95.00 | 13,404.50 | 150.00 | 21,165.00 | 125.00 | 17,637.50 |
| 0006 | 602-02-00200 | Cleaning and Resealing Existing Longitudinal Pavement Joints | 3,722 | LNFT | 1.75 | 6,513.50 | 5.00 | 18,610.00 | 1.00 | 3,722.00 | 5.00 | 18,610.00 |
| 0007 | 602-02-00300 | Cleaning and Resealing Existing Transverse Pavements Joints | 4,698 | LNFT | 2.25 | 10,570.50 | 4.00 | 18,792.00 | 1.00 | 4,698.00 | 5.00 | 23,490.00 |
| 0008 | 602-06-00100 | Partial Depth Patching of Jointed Concrete Pavement | 26.3 | SQYD | 405.00 | 10,651.50 | 549.00 | 14,438.70 | 150.00 | 3,945.00 | 400.00 | 10,520.00 |
| 0009 | 706-02-00200 | Concrete Drive (6" Thick) | 58 | SQYD | 75.00 | 4,350.00 | 90.00 | 5,220.00 | 75.00 | 4,350.00 | 75.00 | 4,350.00 |
| 0010 | 707-01-00200 | Concrete Curb (Barrier) | 103 | LNFT | 15.00 | 1,545.00 | 36.00 | 3,708.00 | 22.00 | 2,266.00 | 25.00 | 2,575.00 |
| 0011 | 707-01-00300 | Concrete Curb (Mountable) | 101 | LNFT | 10.00 | 1,010.00 | 25.00 | 2,525.00 | 22.00 | 2,222.00 | 25.00 | 2,525.00 |
| 0012 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,000.00 | 10,000.00 | 2,500.00 | 2,500.00 | 15,000.00 | 15,000.00 | 10,000.00 | 10,000.00 |
| 0013 | 727-01-00100 | Mobilization | 1 | LUMP | 15,000.00 | 15,000.00 | 12,000.00 | 12,000.00 | 30,000.00 | 30,000.00 | 20,000.00 | 20,000.00 |
| 0014 | 731-02-00100 | Reflectorized Raised Pavement Markers | 69 | EACH | 4.50 | 310.50 | 4.50 | 310.50 | 17.00 | 1,173.00 | 15.00 | 1,035.00 |
| 0015 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 2.048 | MILE | 2,500.00 | 5,120.00 | 2,680.00 | 5,488.64 | 4,000.00 | 8,192.00 | 5,000.00 | 10,240.00 |
| 0016 | 732-05-00100 | Removal of Existing Markings | 0.512 | MILE | 4,000.00 | 2,048.00 | 4,000.00 | 2,048.00 | 7,000.00 | 3,584.00 | 5,000.00 | 2,560.00 |
| 0017 | NS-600-00220 | Saw Cutting Portland Cement Concrete Pavement | 973 | INLF | 1.50 | 1,459.50 | 2.50 | 2,432.50 | 3.00 | 2,919.00 | 5.00 | 4,865.00 |
| CONTRACTOR TOTAL | 94,400.50 | 109,924.64 | 123,051.00 | 138,548.50 | ||||||||