Bid Tabulations
Letting of
08/25/2010
LA DOTD Headquarters
| Lead Project: 169-01-0027 | |
| Parish: Franklin | |
| Routes: LA 130 | |
| Description: US 425 - POLK STREET (P.M.) | |
| Type Const: Cold Plane, Pavement Patching, Superpave Asphaltic Concrete Overlay and related work. | |
| Estimated Construction Cost: $299,076.70 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 05789 | D & J Construction Co., Inc. | $218,733.08 |
| 2 | 12487 | Diamond B Construction Co., L.L.C. | $230,377.71 |
| 3 | 12312 | Gilchrist Construction Co. LLC | $275,513.15 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - D & J Construction Co., Inc. |
- 2 - Diamond B Construction Co., L.L.C. |
- 3 - Gilchrist Construction Co. LLC |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 238 | CUYD | 20.00 | 4,760.00 | 78.11 | 18,590.18 | 70.00 | 16,660.00 |
| 0002 | 502-01-00100 | Superpave Asphaltic Concrete | 1,021.6 | TON | 94.00 | 96,030.40 | 82.96 | 84,751.94 | 110.00 | 112,376.00 |
| 0003 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 368.4 | TON | 94.00 | 34,629.60 | 128.72 | 47,420.45 | 135.00 | 49,734.00 |
| 0004 | 509-01-00100 | Cold Planing Asphaltic Pavement | 9,329 | SQYD | 2.00 | 18,658.00 | 2.57 | 23,975.53 | 1.50 | 13,993.50 |
| 0005 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -141 | CUYD | 0.01 | -1.41 | 0.10 | -14.10 | 1.00 | -141.00 |
| 0006 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 72 | SQYD | 125.00 | 9,000.00 | 146.86 | 10,573.92 | 105.00 | 7,560.00 |
| 0007 | 702-04-00150 | Adjusting Manholes w/Manhole Adjustment Rings | 5 | EACH | 1,200.00 | 6,000.00 | 427.33 | 2,136.65 | 750.00 | 3,750.00 |
| 0008 | 712-01-00100 | Concrete Cast-in-Place Revetment (4" Thick) | 35 | SQYD | 75.00 | 2,625.00 | 176.06 | 6,162.10 | 120.00 | 4,200.00 |
| 0009 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 15,000.00 | 15,000.00 | 6,021.92 | 6,021.92 | 25,000.00 | 25,000.00 |
| 0010 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.653 | MILE | 225.00 | 371.93 | 161.39 | 266.78 | 250.00 | 413.25 |
| 0011 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 6.158 | MILE | 1.00 | 6.16 | 461.95 | 2,844.69 | 100.00 | 615.80 |
| 0012 | 727-01-00100 | Mobilization | 1 | LUMP | 15,000.00 | 15,000.00 | 13,068.59 | 13,068.59 | 27,000.00 | 27,000.00 |
| 0013 | 731-02-00100 | Reflectorized Raised Pavement Markers | 110 | EACH | 8.00 | 880.00 | 5.20 | 572.00 | 6.25 | 687.50 |
| 0014 | 732-01-02040 | Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) | 65 | LNFT | 7.00 | 455.00 | 2.31 | 150.15 | 1.60 | 104.00 |
| 0015 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 63 | LNFT | 8.50 | 535.50 | 6.93 | 436.59 | 5.30 | 333.90 |
| 0016 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 3.079 | MILE | 2,800.00 | 8,621.20 | 2,540.70 | 7,822.82 | 2,800.00 | 8,621.20 |
| 0017 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.227 | MILE | 2,500.00 | 567.50 | 923.88 | 209.72 | 1,000.00 | 227.00 |
| 0018 | 732-04-01040 | Plastic Pavement Legends and Symbols (Arrow - Double) | 2 | EACH | 250.00 | 500.00 | 317.59 | 635.18 | 290.00 | 580.00 |
| 0019 | 732-04-01080 | Plastic Pavement Legends and Symbols (Arrow - Left Turn) | 2 | EACH | 200.00 | 400.00 | 317.59 | 635.18 | 250.00 | 500.00 |
| 0020 | 735-01-00100 | Mailboxes | 1 | EACH | 5.00 | 5.00 | 1.15 | 1.15 | 100.00 | 100.00 |
| 0021 | 735-02-00100 | Mailbox Supports (Single) | 1 | EACH | 750.00 | 750.00 | 866.15 | 866.15 | 150.00 | 150.00 |
| 0022 | 741-11-00100 | Adjusting Water Valve | 4 | EACH | 800.00 | 3,200.00 | 470.65 | 1,882.60 | 300.00 | 1,200.00 |
| 0023 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 1,848 | INLF | 0.40 | 739.20 | 0.74 | 1,367.52 | 1.00 | 1,848.00 |
| CONTRACTOR TOTAL | 218,733.08 | 230,377.71 | 275,513.15 | |||||||