LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: 141-03-0010
Parish: Rapides
Routes:
Description: E. DAVIS RD. - JCT. LA 121
Type Const: GRADING, DRAINAGE STRUCTURES, LIME TREATMENT, IN-PLACE CEMENT TREATED BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK
Estimated Construction Cost: $1,486,379.71


RankLicenseBidderConstruction Bid
1 12312 Gilchrist Construction Co. LLC $1,177,969.15
2 08815 W. E. Mcdonald & Son, LLC. $1,179,549.65
3 12487 Diamond B Construction Co., L.L.C. $1,183,243.40
4 05789 D & J Construction Co., Inc. $1,392,615.28


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
Gilchrist Construction Co. LLC
- 2 -
W. E. Mcdonald & Son, LLC.
- 3 -
Diamond B Construction Co., L.L.C.
- 4 -
D & J Construction Co., Inc.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 202-01-00100 Removal of Structures and Obstructions 1      LUMP 3,000.00 3,000.00 2,000.00 2,000.00 1,983.24 1,983.24 4,000.00 4,000.00
0002 202-02-06100 Removal of Concrete Walks and Drives 14      SQYD 40.00 560.00 100.00 1,400.00 96.14 1,345.96 50.00 700.00
0003 203-07-00100 Borrow (Vehicular Measurement) 300      CUYD 20.00 6,000.00 5.00 1,500.00 7.83 2,349.00 30.00 9,000.00
0004 203-07-00200 Borrow (Vehicular Measurement) (Selected Soils) 700      CUYD 20.00 14,000.00 5.00 3,500.00 7.83 5,481.00 7.00 4,900.00
0005 304-05-00100 Lime Treatment (Type E) 149.15   TON 100.00 14,915.00 319.00 47,578.85 363.39 54,199.62 325.00 48,473.75
0006 308-01-00100 In-Place Cement Treated Base Course (12" Thick) 47,579      SQYD 6.00 285,474.00 6.00 285,474.00 5.81 276,433.99 5.25 249,789.75
0007 308-02-00100 Removal of Existing Patches 300      SQYD 5.00 1,500.00 15.00 4,500.00 16.77 5,031.00 15.00 4,500.00
0008 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 1,700      CUYD 23.00 39,100.00 0.10 170.00 24.51 41,667.00 14.00 23,800.00
0009 502-01-00100 Superpave Asphaltic Concrete 8,719.4    TON 65.00 566,761.00 68.00 592,919.20 65.58 571,818.25 84.00 732,429.60
0010 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 369.4    TON 120.00 44,328.00 163.00 60,212.20 162.60 60,064.44 125.00 46,175.00
0011 509-01-00100 Cold Planing Asphaltic Pavement 43,011      SQYD 1.30 55,914.30 1.05 45,161.55 1.00 43,011.00 1.50 64,516.50
0012 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -1,931      CUYD 1.00 -1,931.00 0.01 -19.31 0.10 -193.10 0.10 -193.10
0013 701-01-01000 Cross Drain Pipe (24" RCP/PP) 40      LNFT 95.00 3,800.00 85.00 3,400.00 245.99 9,839.60 125.00 5,000.00
0014 701-02-01020 Cross Drain Pipe Arch (30" Equiv. RCPA) 40      LNFT 125.00 5,000.00 95.00 3,800.00 278.90 11,156.00 150.00 6,000.00
0015 713-01-00100 Temporary Signs and Barricades 1      LUMP 10,000.00 10,000.00 35,000.00 35,000.00 8,946.87 8,946.87 35,000.00 35,000.00
0016 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 10.542  MILE 250.00 2,635.50 400.00 4,216.80 150.00 1,581.30 200.00 2,108.40
0017 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 10.23   MILE 100.00 1,023.00 0.01 0.10 1.00 10.23 300.00 3,069.00
0018 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 25.584  MILE 100.00 2,558.40 0.01 0.26 1.00 25.58 1.00 25.58
0019 716-01-00100 Mulch (Vegetative) 6.8    TON 545.00 3,706.00 500.00 3,400.00 559.05 3,801.54 450.00 3,060.00
0020 717-01-00100 Seeding 102      LB 7.60 775.20 7.00 714.00 7.83 798.66 7.00 714.00
0021 718-01-00100 Fertilizer 3,400      LB 0.50 1,700.00 0.45 1,530.00 0.50 1,700.00 0.45 1,530.00
0022 722-01-00100 Project Site Laboratory 1      EACH 3,000.00 3,000.00 1,000.00 1,000.00 1,118.11 1,118.11 6,000.00 6,000.00
0023 726-01-00100 Bedding Material 17      CUYD 110.00 1,870.00 100.00 1,700.00 84.38 1,434.46 100.00 1,700.00
0024 727-01-00100 Mobilization 1      LUMP 75,000.00 75,000.00 42,000.00 42,000.00 40,500.00 40,500.00 95,000.00 95,000.00
0025 729-16-00300 Object Marker Assembly (Type 3) 4      EACH 80.00 320.00 125.00 500.00 139.76 559.04 125.00 500.00
0026 731-02-00100 Reflectorized Raised Pavement Markers 475      EACH 5.75 2,731.25 7.00 3,325.00 5.03 2,389.25 7.00 3,325.00
0027 732-01-02080 Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 12      LNFT 4.95 59.40 25.00 300.00 6.71 80.52 25.00 300.00
0028 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 8.528  MILE 2,600.00 22,172.80 2,500.00 21,320.00 2,459.84 20,977.52 2,600.00 22,172.80
0029 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 3.41   MILE 930.00 3,171.30 1,300.00 4,433.00 894.49 3,050.21 1,400.00 4,774.00
0030 735-01-00100 Mailboxes 14      EACH 10.00 140.00 1.00 14.00 1.12 15.68 5.00 70.00
0031 735-02-00100 Mailbox Supports (Single) 11      EACH 135.00 1,485.00 125.00 1,375.00 139.76 1,537.36 125.00 1,375.00
0032 735-03-00100 Mailbox Supports (Double) 3      EACH 200.00 600.00 175.00 525.00 195.67 587.01 200.00 600.00
0033 740-01-00100 Construction Layout 1      LUMP 5,000.00 5,000.00 5,000.00 5,000.00 6,708.66 6,708.66 10,000.00 10,000.00
0034 NS-200-00020 Cleaning Existing Ditches 40      LNFT 20.00 800.00 10.00 400.00 51.36 2,054.40 15.00 600.00
0035 NS-600-00220 Saw Cutting Portland Cement Concrete Pavement 400      INLF 2.00 800.00 3.00 1,200.00 2.95 1,180.00 4.00 1,600.00
                         
    CONTRACTOR TOTAL       1,177,969.15   1,179,549.65   1,183,243.40   1,392,615.28