LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: 117-02-0014
Parish: Sabine
Routes:
Description: PEASON - NATCHITOCHES PARISH LINE
Type Const: COLD PLANING ASPHALTIC CONCRETE, LIME TREATMENT, IN-PLACE CEMENT TREATED BASE COURSE, PAVEMENT PATCHING, PAVEMENT WIDENING, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT AND RELATED WORK.
Estimated Construction Cost: $1,411,190.00


RankLicenseBidderConstruction Bid
1 08815 W. E. Mcdonald & Son, LLC. $1,359,952.38
2 12487 Diamond B Construction Co., L.L.C. $1,420,798.85
3 12312 Gilchrist Construction Co. LLC $1,603,031.72


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
W. E. Mcdonald & Son, LLC.
- 2 -
Diamond B Construction Co., L.L.C.
- 3 -
Gilchrist Construction Co. LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 202-02-14500 Removal of Guard Rail 744      LNFT 7.00 5,208.00 4.00 2,976.00 9.00 6,696.00
0002 203-07-00100 Borrow (Vehicular Measurement) 40      CUYD 10.00 400.00 30.00 1,200.00 25.00 1,000.00
0003 203-07-00200 Borrow (Vehicular Measurement) (Selected Soils) 200      CUYD 10.00 2,000.00 30.00 6,000.00 25.00 5,000.00
0004 304-01-00100 Lime 176.13   TON 1.00 176.13 187.00 32,936.31 165.00 29,061.45
0005 304-03-00400 Lime Treatment (Type C) (12" Thick) 11,183      SQYD 0.01 111.83 3.50 39,140.50 3.50 39,140.50
0006 304-05-00100 Lime Treatment (Type E) 440.34   TON 330.00 145,312.20 250.00 110,085.00 350.00 154,119.00
0007 308-01-00100 In-Place Cement Treated Base Course (12" Thick) 28,452      SQYD 5.50 156,486.00 7.00 199,164.00 8.00 227,616.00
0008 308-02-00100 Removal of Existing Patches 75      SQYD 15.00 1,125.00 30.00 2,250.00 30.00 2,250.00
0009 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 1,535      CUYD 25.00 38,375.00 25.00 38,375.00 28.00 42,980.00
0010 502-01-00100 Superpave Asphaltic Concrete 7,365.9    TON 77.00 567,174.30 75.00 552,442.50 78.00 574,540.20
0011 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 211.8    TON 150.00 31,770.00 175.00 37,065.00 175.00 37,065.00
0012 509-01-00100 Cold Planing Asphaltic Pavement 25,463      SQYD 2.25 57,291.75 2.00 50,926.00 2.30 58,564.90
0013 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -2,682      CUYD 0.01 -26.82 0.10 -268.20 0.10 -268.20
0014 510-01-00200 Pavement Patching (12" Minimum Thickness) 800      SQYD 103.00 82,400.00 66.00 52,800.00 105.00 84,000.00
0015 510-02-00100 Pavement Widening 1,139      SQYD 70.00 79,730.00 55.00 62,645.00 95.00 108,205.00
0016 704-01-01000 Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) 200      LNFT 37.00 7,400.00 38.00 7,600.00 40.00 8,000.00
0017 704-01-01020 Guard Rail (Single Thrie Beam) (6'-3" post spacing) 304      LNFT 59.00 17,936.00 55.00 16,720.00 64.00 19,456.00
0018 704-03-00100 Blocked Out Guard Rail 100      LNFT 17.50 1,750.00 15.00 1,500.00 19.00 1,900.00
0019 704-11-00100 Guard Rail End Treatment (Flared) 4      EACH 1,950.00 7,800.00 2,000.00 8,000.00 2,100.00 8,400.00
0020 704-11-00200 Guard Rail End Treatment (Tangent) 4      EACH 2,250.00 9,000.00 2,500.00 10,000.00 2,400.00 9,600.00
0021 713-01-00100 Temporary Signs and Barricades 1      LUMP 12,000.00 12,000.00 10,000.00 10,000.00 7,500.00 7,500.00
0022 713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 7.7    MILE 300.00 2,310.00 150.00 1,155.00 300.00 2,310.00
0023 713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 4.737  MILE 0.01 0.05 220.00 1,042.14 10.00 47.37
0024 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 26.06   MILE 0.01 0.26 375.00 9,772.50 10.00 260.60
0025 716-01-00100 Mulch (Vegetative) 1      TON 600.00 600.00 650.00 650.00 665.00 665.00
0026 717-01-00100 Seeding 23      LB 8.00 184.00 8.50 195.50 8.50 195.50
0027 718-01-00100 Fertilizer 500      LB 1.00 500.00 1.00 500.00 1.10 550.00
0028 722-01-00100 Project Site Laboratory 1      EACH 10,000.00 10,000.00 5,100.00 5,100.00 5,000.00 5,000.00
0029 727-01-00100 Mobilization 1      LUMP 42,000.00 42,000.00 93,000.00 93,000.00 100,000.00 100,000.00
0030 729-16-00300 Object Marker Assembly (Type 3) 8      EACH 75.00 600.00 75.00 600.00 85.00 680.00
0031 731-02-00100 Reflectorized Raised Pavement Markers 467      EACH 4.25 1,984.75 4.50 2,101.50 5.80 2,708.60
0032 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 12.181  MILE 2,300.00 28,016.30 2,500.00 30,452.50 2,700.00 32,888.70
0033 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 1.954  MILE 595.00 1,162.63 600.00 1,172.40 1,000.00 1,954.00
0034 735-01-00100 Mailboxes 1      EACH 1.00 1.00 11.00 11.00 10.00 10.00
0035 735-02-00100 Mailbox Supports (Single) 1      EACH 500.00 500.00 550.00 550.00 135.00 135.00
0036 740-01-00100 Construction Layout 1      LUMP 10,000.00 10,000.00 8,000.00 8,000.00 8,000.00 8,000.00
0037 NS-500-00280 Surface Preparation 1      LUMP 20,000.00 20,000.00 10,000.00 10,000.00 20,000.00 20,000.00
0038 NS-500-00340 Saw Cutting Asphaltic Concrete Pavement 18,674      INLF 1.00 18,674.00 0.80 14,939.20 0.15 2,801.10
                     
    CONTRACTOR TOTAL       1,359,952.38   1,420,798.85   1,603,031.72