Bid Tabulations
Letting of
06/13/2012
LA DOTD Headquarters
| Lead Project: 116-04-0007 | |
| Parish: Natchitoches | |
| Routes: LA 478 | |
| Description: JCT. I-49 - JCT. LA 1 (WATER WELL ROAD) | |
| Type Const: GRADING, DRAINAGE STRUCTURES, LIME TREATMENT, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, CONCRETE SLAB SPAN BRIDGES, AND RELATED WORK. | |
| Estimated Construction Cost: $7,896,218.60 | |
| Maximum Number of Days Allowed for Construction: 9999 | |
| Calculated Daily User Cost: $1,000.00 | |
| Rank | License | Bidder | Construction Bid | Bidder's Proposed Contract Time |
Total Bid |
|---|---|---|---|---|---|
| 1 | 12312 | Gilchrist Construction Co. LLC | $7,150,711.72 | 285 | $7,435,711.72 |
| 2 | 39462 | Jb James Construction Llc | $7,543,300.98 | 598 | $8,141,300.98 |
| 3 | 34567 | James Construction Group LLC | $8,221,285.79 | 450 | $8,671,285.79 |
| 4 | 36374 | Best-Yet Builders, Llc | $9,576,994.87 | 450 | $10,026,994.87 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Gilchrist Construction Co. LLC |
- 2 - Jb James Construction Llc |
- 3 - James Construction Group LLC |
- 4 - Best-Yet Builders, Llc |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00200 | Clearing and Grubbing (Selective) | 1 | LUMP | 200,000.00 | 200,000.00 | 450,000.00 | 450,000.00 | 220,000.00 | 220,000.00 | 400,000.00 | 400,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 | 13,000.00 | 13,000.00 | 25,000.00 | 25,000.00 | 200,000.00 | 200,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge Sta. 261+12.53, 151' x 18' TIMBER TRESTLE BRIDGE | 1 | EACH | 20,000.00 | 20,000.00 | 30,000.00 | 30,000.00 | 18,000.00 | 18,000.00 | 22,000.00 | 22,000.00 |
| 0004 | 202-02-04000 | Removal of Bridge STA. 308+01.36, 57' X 26', CONCRETE PRESTRESSED CHANNEL BRIDGE | 1 | EACH | 10,000.00 | 10,000.00 | 25,000.00 | 25,000.00 | 8,000.00 | 8,000.00 | 12,500.00 | 12,500.00 |
| 0005 | 202-02-06100 | Removal of Concrete Walks and Drives | 211 | SQYD | 6.00 | 1,266.00 | 8.00 | 1,688.00 | 11.00 | 2,321.00 | 10.00 | 2,110.00 |
| 0006 | 202-02-06140 | Removal of Curbs (Concrete) | 274 | LNFT | 6.00 | 1,644.00 | 3.00 | 822.00 | 6.00 | 1,644.00 | 5.00 | 1,370.00 |
| 0007 | 202-02-14500 | Removal of Guard Rail | 387.5 | LNFT | 8.50 | 3,293.75 | 5.00 | 1,937.50 | 6.20 | 2,402.50 | 4.00 | 1,550.00 |
| 0008 | 202-02-38500 | Removal of Surfacing and Stablized Base | 9,106.8 | SQYD | 5.00 | 45,534.00 | 4.00 | 36,427.20 | 2.50 | 22,767.00 | 3.50 | 31,873.80 |
| 0009 | 203-01-00100 | General Excavation | 284,490 | CUYD | 4.20 | 1,194,858.00 | 3.00 | 853,470.00 | 4.90 | 1,394,001.00 | 6.00 | 1,706,940.00 |
| 0010 | 203-02-00100 | Drainage Excavation | 950 | CUYD | 12.00 | 11,400.00 | 22.00 | 20,900.00 | 14.00 | 13,300.00 | 10.00 | 9,500.00 |
| 0011 | 203-03-00100 | Embankment | 180,604 | CUYD | 3.25 | 586,963.00 | 3.25 | 586,963.00 | 5.80 | 1,047,503.20 | 6.00 | 1,083,624.00 |
| 0012 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 291 | EACH | 160.00 | 46,560.00 | 50.00 | 14,550.00 | 73.00 | 21,243.00 | 100.00 | 29,100.00 |
| 0013 | 204-05-00200 | Temporary Sediment Check Dams (Stone) | 14 | EACH | 400.00 | 5,600.00 | 450.00 | 6,300.00 | 260.00 | 3,640.00 | 250.00 | 3,500.00 |
| 0014 | 204-06-00100 | Temporary Silt Fencing | 44,640 | LNFT | 1.00 | 44,640.00 | 2.00 | 89,280.00 | 2.70 | 120,528.00 | 1.90 | 84,816.00 |
| 0015 | 302-02-03100 | Class II Base Course (8" Thick) (Stone) | 322.9 | SQYD | 35.00 | 11,301.50 | 20.00 | 6,458.00 | 30.00 | 9,687.00 | 22.35 | 7,216.82 |
| 0016 | 302-02-04020 | Class II Base Course (8 1/2" Thick) (Soil Cement) | 65,600.8 | SQYD | 10.00 | 656,008.00 | 9.25 | 606,807.40 | 12.75 | 836,410.20 | 7.00 | 459,205.60 |
| 0017 | 304-05-00100 | Lime Treatment (Type E) | 93.2 | TON | 425.00 | 39,610.00 | 490.00 | 45,668.00 | 300.00 | 27,960.00 | 200.00 | 18,640.00 |
| 0018 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 306 | CUYD | 30.00 | 9,180.00 | 80.00 | 24,480.00 | 35.00 | 10,710.00 | 60.00 | 18,360.00 |
| 0019 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 2,000 | CUYD | 17.00 | 34,000.00 | 68.00 | 136,000.00 | 52.00 | 104,000.00 | 40.00 | 80,000.00 |
| 0020 | 502-01-00100 | Superpave Asphaltic Concrete | 13,545.7 | TON | 84.00 | 1,137,838.80 | 85.00 | 1,151,384.50 | 84.00 | 1,137,838.80 | 93.00 | 1,259,750.10 |
| 0021 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 710.6 | TON | 136.00 | 96,641.60 | 162.00 | 115,117.20 | 160.00 | 113,696.00 | 100.50 | 71,415.30 |
| 0022 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 44,609 | GAL | 3.60 | 160,592.40 | 3.70 | 165,053.30 | 3.61 | 161,038.49 | 3.20 | 142,748.80 |
| 0023 | 507-02-00200 | Aggregate (S2) | 65,601 | SQYD | 1.05 | 68,881.05 | 1.05 | 68,881.05 | 1.02 | 66,913.02 | 1.15 | 75,441.15 |
| 0024 | 507-02-00300 | Aggregate (S3) | 65,601 | SQYD | 0.78 | 51,168.78 | 0.85 | 55,760.85 | 0.79 | 51,824.79 | 0.95 | 62,320.95 |
| 0025 | 601-01-00100 | Portland Cement Concrete Pavement (8" Thick) | 322.9 | SQYD | 100.00 | 32,290.00 | 80.00 | 25,832.00 | 95.00 | 30,675.50 | 75.00 | 24,217.50 |
| 0026 | 701-01-01000 | Cross Drain Pipe (24" RCP/PP) | 464 | LNFT | 85.00 | 39,440.00 | 80.00 | 37,120.00 | 88.00 | 40,832.00 | 68.00 | 31,552.00 |
| 0027 | 701-01-01040 | Cross Drain Pipe (36" RCP/PP) | 40 | LNFT | 160.00 | 6,400.00 | 160.00 | 6,400.00 | 155.00 | 6,200.00 | 135.00 | 5,400.00 |
| 0028 | 701-01-01080 | Cross Drain Pipe (48" RCP/PP) | 264 | LNFT | 120.00 | 31,680.00 | 185.00 | 48,840.00 | 162.00 | 42,768.00 | 225.00 | 59,400.00 |
| 0029 | 701-01-01140 | Cross Drain Pipe (72" RCP) | 224 | LNFT | 225.00 | 50,400.00 | 350.00 | 78,400.00 | 298.00 | 66,752.00 | 450.00 | 100,800.00 |
| 0030 | 701-05-01040 | Side Drain Pipe (18" RCP/PP/CMP) | 896 | LNFT | 48.00 | 43,008.00 | 60.00 | 53,760.00 | 45.00 | 40,320.00 | 40.00 | 35,840.00 |
| 0031 | 701-05-01060 | Side Drain Pipe (24" RCP/PP/CMP) | 80 | LNFT | 70.00 | 5,600.00 | 70.00 | 5,600.00 | 78.00 | 6,240.00 | 68.00 | 5,440.00 |
| 0032 | 701-05-01100 | Side Drain Pipe (36" RCP/PP/CMP) | 56 | LNFT | 115.00 | 6,440.00 | 125.00 | 7,000.00 | 114.00 | 6,384.00 | 135.00 | 7,560.00 |
| 0033 | 701-15-00100 | Concrete Collar | 2 | EACH | 950.00 | 1,900.00 | 1,000.00 | 2,000.00 | 1,000.00 | 2,000.00 | 1,000.00 | 2,000.00 |
| 0034 | 702-03-00100 | Catch Basins (CB-01) | 1 | EACH | 3,500.00 | 3,500.00 | 3,000.00 | 3,000.00 | 1,800.00 | 1,800.00 | 2,000.00 | 2,000.00 |
| 0035 | 704-03-00100 | Blocked Out Guard Rail | 337.5 | LNFT | 20.00 | 6,750.00 | 20.00 | 6,750.00 | 18.50 | 6,243.75 | 35.00 | 11,812.50 |
| 0036 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 200 | LNFT | 60.00 | 12,000.00 | 53.00 | 10,600.00 | 53.00 | 10,600.00 | 70.00 | 14,000.00 |
| 0037 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,200.00 | 8,800.00 | 2,000.00 | 8,000.00 | 2,000.00 | 8,000.00 | 2,500.00 | 10,000.00 |
| 0038 | 705-01-00100 | Barbed Wire Fence | 9,093 | LNFT | 6.50 | 59,104.50 | 8.00 | 72,744.00 | 6.00 | 54,558.00 | 6.50 | 59,104.50 |
| 0039 | 705-04-00100 | Single Swinging Driveway Gates | 1 | EACH | 700.00 | 700.00 | 325.00 | 325.00 | 500.00 | 500.00 | 600.00 | 600.00 |
| 0040 | 705-05-00100 | Double Swinging Driveway Gates | 3 | DBGT | 900.00 | 2,700.00 | 600.00 | 1,800.00 | 750.00 | 2,250.00 | 800.00 | 2,400.00 |
| 0041 | 705-06-00100 | Chain Link Fence (4-Foot Height) | 250 | LNFT | 17.00 | 4,250.00 | 16.00 | 4,000.00 | 16.00 | 4,000.00 | 20.00 | 5,000.00 |
| 0042 | 706-02-00200 | Concrete Drive (6" Thick) | 15.5 | SQYD | 165.00 | 2,557.50 | 66.00 | 1,023.00 | 95.00 | 1,472.50 | 100.00 | 1,550.00 |
| 0043 | 707-01-00300 | Concrete Curb (Mountable) | 185.2 | LNFT | 30.00 | 5,556.00 | 11.00 | 2,037.20 | 33.00 | 6,111.60 | 50.00 | 9,260.00 |
| 0044 | 708-01-00100 | Right-of-Way Monument | 81 | EACH | 225.00 | 18,225.00 | 125.00 | 10,125.00 | 140.00 | 11,340.00 | 215.00 | 17,415.00 |
| 0045 | 708-02-00100 | Right-of-Way Monument Witness Post | 81 | EACH | 225.00 | 18,225.00 | 125.00 | 10,125.00 | 50.00 | 4,050.00 | 215.00 | 17,415.00 |
| 0046 | 711-01-02020 | Riprap (10 lb, 12" Thick) | 410 | SQYD | 55.00 | 22,550.00 | 40.00 | 16,400.00 | 39.00 | 15,990.00 | 50.00 | 20,500.00 |
| 0047 | 711-01-03000 | Riprap (30 lb, 14" Thick) | 570 | SQYD | 48.00 | 27,360.00 | 44.00 | 25,080.00 | 42.00 | 23,940.00 | 65.00 | 37,050.00 |
| 0048 | 711-04-00100 | Geotextile Fabric | 980 | SQYD | 2.30 | 2,254.00 | 1.50 | 1,470.00 | 7.00 | 6,860.00 | 2.00 | 1,960.00 |
| 0049 | 712-04-00100 | Flexible Revetment | 1,042 | SQYD | 50.00 | 52,100.00 | 46.00 | 47,932.00 | 57.00 | 59,394.00 | 70.00 | 72,940.00 |
| 0050 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 35,000.00 | 35,000.00 | 50,000.00 | 50,000.00 | 30,000.00 | 30,000.00 | 135,000.00 | 135,000.00 |
| 0051 | 713-02-00400 | Temporary Pavement Markings (12" Width) | 104 | LNFT | 0.35 | 36.40 | 0.30 | 31.20 | 0.30 | 31.20 | 0.50 | 52.00 |
| 0052 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 164 | LNFT | 1.15 | 188.60 | 0.60 | 98.40 | 0.60 | 98.40 | 1.00 | 164.00 |
| 0053 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 7.766 | MILE | 350.00 | 2,718.10 | 275.00 | 2,135.65 | 400.00 | 3,106.40 | 800.00 | 6,212.80 |
| 0054 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 7.766 | MILE | 475.00 | 3,688.85 | 275.00 | 2,135.65 | 200.00 | 1,553.20 | 250.00 | 1,941.50 |
| 0055 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 26.517 | MILE | 550.00 | 14,584.35 | 275.00 | 7,292.18 | 270.00 | 7,159.59 | 350.00 | 9,280.95 |
| 0056 | 713-05-00400 | Temporary Pavement Legends & Symbols (RR Crossing) | 1 | EACH | 100.00 | 100.00 | 100.00 | 100.00 | 50.00 | 50.00 | 500.00 | 500.00 |
| 0057 | 716-01-00100 | Mulch (Vegetative) | 154 | TON | 320.00 | 49,280.00 | 585.00 | 90,090.00 | 325.00 | 50,050.00 | 1,500.00 | 231,000.00 |
| 0058 | 717-01-00100 | Seeding | 6,160 | LB | 8.70 | 53,592.00 | 8.00 | 49,280.00 | 8.00 | 49,280.00 | 8.50 | 52,360.00 |
| 0059 | 718-01-00100 | Fertilizer | 77,000 | LB | 0.65 | 50,050.00 | 0.65 | 50,050.00 | 0.60 | 46,200.00 | 0.50 | 38,500.00 |
| 0060 | 720-01-01000 | Erosion Control System (Slope Protection) (Type A) | 48,400 | SQYD | 1.05 | 50,820.00 | 2.00 | 96,800.00 | 1.00 | 48,400.00 | 1.40 | 67,760.00 |
| 0061 | 720-01-02020 | Erosion Control System, Flexible (Channel Liner) (Type D) | 22,200 | SQYD | 1.60 | 35,520.00 | 2.00 | 44,400.00 | 1.50 | 33,300.00 | 1.75 | 38,850.00 |
| 0062 | 722-02-00100 | Project Site Laboratory (Equipped) | 1 | EACH | 12,000.00 | 12,000.00 | 30,000.00 | 30,000.00 | 15,000.00 | 15,000.00 | 40,000.00 | 40,000.00 |
| 0063 | 726-01-00100 | Bedding Material | 766.8 | CUYD | 80.00 | 61,344.00 | 70.00 | 53,676.00 | 85.00 | 65,178.00 | 65.00 | 49,842.00 |
| 0064 | 727-01-00100 | Mobilization | 1 | LUMP | 700,000.00 | 700,000.00 | 750,000.00 | 750,000.00 | 800,000.00 | 800,000.00 | 725,000.00 | 725,000.00 |
| 0065 | 729-16-00200 | Object Marker Assembly (Type 2) | 16 | EACH | 70.00 | 1,120.00 | 65.00 | 1,040.00 | 65.00 | 1,040.00 | 65.00 | 1,040.00 |
| 0066 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 80.00 | 640.00 | 75.00 | 600.00 | 75.00 | 600.00 | 100.00 | 800.00 |
| 0067 | 731-02-00100 | Reflectorized Raised Pavement Markers | 643 | EACH | 5.50 | 3,536.50 | 4.50 | 2,893.50 | 4.50 | 2,893.50 | 4.00 | 2,572.00 |
| 0068 | 732-01-02060 | Plastic Pavement Striping (12" Width) (Thermoplastic 125 mil) | 104 | LNFT | 2.90 | 301.60 | 3.00 | 312.00 | 3.00 | 312.00 | 2.00 | 208.00 |
| 0069 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 164 | LNFT | 5.50 | 902.00 | 6.00 | 984.00 | 6.00 | 984.00 | 5.00 | 820.00 |
| 0070 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 12.918 | MILE | 2,500.00 | 32,295.00 | 2,600.00 | 33,586.80 | 2,575.00 | 33,263.85 | 2,900.00 | 37,462.20 |
| 0071 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.554 | MILE | 950.00 | 1,476.30 | 600.00 | 932.40 | 600.00 | 932.40 | 1,000.00 | 1,554.00 |
| 0072 | 732-04-18000 | Plastic Pavement Legends and Symbols (RR Crossing) | 1 | EACH | 450.00 | 450.00 | 375.00 | 375.00 | 375.00 | 375.00 | 500.00 | 500.00 |
| 0073 | 735-01-00100 | Mailboxes | 16 | EACH | 20.00 | 320.00 | 30.00 | 480.00 | 12.00 | 192.00 | 50.00 | 800.00 |
| 0074 | 735-02-00100 | Mailbox Supports (Single) | 16 | EACH | 150.00 | 2,400.00 | 225.00 | 3,600.00 | 115.00 | 1,840.00 | 75.00 | 1,200.00 |
| 0075 | 740-01-00100 | Construction Layout | 1 | LUMP | 50,000.00 | 50,000.00 | 75,000.00 | 75,000.00 | 60,000.00 | 60,000.00 | 500,000.00 | 500,000.00 |
| 0076 | 804-01-00300 | Precast Concrete Piles (16") | 1,600 | LNFT | 49.00 | 78,400.00 | 60.00 | 96,000.00 | 70.00 | 112,000.00 | 64.00 | 102,400.00 |
| 0077 | 804-01-00600 | Precast Concrete Piles (24") | 2,409 | LNFT | 84.00 | 202,356.00 | 90.00 | 216,810.00 | 90.00 | 216,810.00 | 122.00 | 293,898.00 |
| 0078 | 805-01-00300 | Class A Concrete (Box Culvert Headwalls) | 19.1 | CUYD | 1,300.00 | 24,830.00 | 1,200.00 | 22,920.00 | 1,430.00 | 27,313.00 | 600.00 | 11,460.00 |
| 0079 | 805-01-00700 | Class A Concrete (Bents) | 133.86 | CUYD | 880.00 | 117,796.80 | 1,250.00 | 167,325.00 | 920.00 | 123,151.20 | 900.00 | 120,474.00 |
| 0080 | 805-03-00100 | Class AA Concrete | 380.82 | CUYD | 640.00 | 243,724.80 | 750.00 | 285,615.00 | 640.00 | 243,724.80 | 750.00 | 285,615.00 |
| 0081 | 805-12-02000 | Reinforced Concrete Box Culverts (5' x 5') | 432 | LNFT | 350.00 | 151,200.00 | 375.00 | 162,000.00 | 290.00 | 125,280.00 | 495.00 | 213,840.00 |
| 0082 | 806-01-00100 | Deformed Reinforcing Steel | 87,403 | LB | 0.78 | 68,174.34 | 1.00 | 87,403.00 | 0.90 | 78,662.70 | 1.00 | 87,403.00 |
| 0083 | 810-01-00100 | Concrete Railing (Standard Barrier) | 560 | LNFT | 65.00 | 36,400.00 | 62.00 | 34,720.00 | 68.00 | 38,080.00 | 75.00 | 42,000.00 |
| 0084 | 813-01-00100 | Concrete Approach Slabs | 551.12 | SQYD | 210.00 | 115,735.20 | 200.00 | 110,224.00 | 210.00 | 115,735.20 | 220.00 | 121,246.40 |
| 0085 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 1,880 | INLF | 2.00 | 3,760.00 | 1.00 | 1,880.00 | 1.00 | 1,880.00 | 3.00 | 5,640.00 |
| 0086 | NS-700-00240 | Special Guard Rail Anchor Section | 4 | EACH | 1,300.00 | 5,200.00 | 3,800.00 | 15,200.00 | 1,150.00 | 4,600.00 | 1,100.00 | 4,400.00 |
| 0087 | NS-804-00001 | Vibration Monitoring | 5 | EACH | 3,000.00 | 15,000.00 | 1,000.00 | 5,000.00 | 500.00 | 2,500.00 | 1,200.00 | 6,000.00 |
| ITEM TOTAL (CONSTRUCTION BID) | 7,150,711.72 | 7,543,300.98 | 8,221,285.79 | 9,576,994.87 | ||||||||
| NUMBER OF DAYS BID AT $1000 PER DAY. | 285,000.00 | 598,000.00 | 450,000.00 | 450,000.00 | ||||||||
| TOTAL BID | 7,435,711.72 | 8,141,300.98 | 8,671,285.79 | 10,026,994.87 | ||||||||