Bid Tabulations
Letting of
10/27/2010
LA DOTD Headquarters
| Lead Project: 116-03-0004 | |
| Parish: Natchitoches | |
| Routes: LA 478 | |
| Description: BAYOU PROVENCAL BRIDGE | |
| Type Const: GRADING, REMOVAL OF BRIDGE, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, CONCRETE QUAD BEAM BRIDGE, and RELATED WORK. | |
| Estimated Construction Cost: $2,040,599.33 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12312 | Gilchrist Construction Co. LLC | $1,816,709.85 |
| 2 | 01012 | Cecil D. Gassiott, LLC | $1,945,887.30 |
| 3 | 09090 | Guinn Brothers, LLC. | $2,346,994.00 |
| 4 | 39462 | Jb James Construction Llc | $2,387,898.00 |
| 5 | 18546 | C W & W Contractors, Inc. | $2,546,528.90 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Gilchrist Construction Co. LLC |
- 2 - Cecil D. Gassiott, LLC |
- 3 - Guinn Brothers, LLC. |
- 4 - Jb James Construction Llc |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 80,000.00 | 80,000.00 | 60,000.00 | 60,000.00 | 45,000.00 | 45,000.00 | 200,000.00 | 200,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,200.00 | 1,200.00 | 20,000.00 | 20,000.00 | 5,000.00 | 5,000.00 | 2,000.00 | 2,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge (Treated Timber Trestle Bridge) | 1 | EACH | 20,000.00 | 20,000.00 | 30,000.00 | 30,000.00 | 25,000.00 | 25,000.00 | 40,000.00 | 40,000.00 |
| 0004 | 202-02-14500 | Removal of Guard Rail | 732 | LNFT | 5.00 | 3,660.00 | 5.00 | 3,660.00 | 5.00 | 3,660.00 | 5.00 | 3,660.00 |
| 0005 | 203-02-00100 | Drainage Excavation | 1,318 | CUYD | 10.00 | 13,180.00 | 20.00 | 26,360.00 | 8.00 | 10,544.00 | 13.00 | 17,134.00 |
| 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 340,000.00 | 340,000.00 | 150,000.00 | 150,000.00 | 400,000.00 | 400,000.00 | 475,000.00 | 475,000.00 |
| 0007 | 204-06-00100 | Temporary Silt Fencing | 4,200 | LNFT | 1.95 | 8,190.00 | 2.20 | 9,240.00 | 3.00 | 12,600.00 | 1.50 | 6,300.00 |
| 0008 | 302-02-04120 | Class II Base Course (8 1/2" Thick) (Stone or Recycled Portland Cement Concrete) | 6,058 | SQYD | 20.00 | 121,160.00 | 30.00 | 181,740.00 | 24.00 | 145,392.00 | 24.00 | 145,392.00 |
| 0009 | 304-05-00100 | Lime Treatment (Type E) | 30.4 | TON | 380.00 | 11,552.00 | 300.00 | 9,120.00 | 600.00 | 18,240.00 | 150.00 | 4,560.00 |
| 0010 | 502-01-00100 | Superpave Asphaltic Concrete | 1,042.5 | TON | 88.00 | 91,740.00 | 170.00 | 177,225.00 | 165.00 | 172,012.50 | 94.00 | 97,995.00 |
| 0011 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 131.2 | TON | 155.00 | 20,336.00 | 170.00 | 22,304.00 | 200.00 | 26,240.00 | 175.00 | 22,960.00 |
| 0012 | 507-01-00200 | Asphaltic Material (PAC-15 Hot Application) | 131.2 | GAL | 19.00 | 2,492.80 | 20.00 | 2,624.00 | 25.00 | 3,280.00 | 17.50 | 2,296.00 |
| 0013 | 704-03-00100 | Blocked Out Guard Rail | 287.5 | LNFT | 20.00 | 5,750.00 | 20.00 | 5,750.00 | 22.00 | 6,325.00 | 18.50 | 5,318.75 |
| 0014 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 60.00 | 6,000.00 | 60.00 | 6,000.00 | 60.00 | 6,000.00 | 56.00 | 5,600.00 |
| 0015 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,500.00 | 10,000.00 | 2,400.00 | 9,600.00 | 2,500.00 | 10,000.00 | 2,200.00 | 8,800.00 |
| 0016 | 705-01-00100 | Barbed Wire Fence | 90 | LNFT | 13.00 | 1,170.00 | 10.00 | 900.00 | 15.00 | 1,350.00 | 15.00 | 1,350.00 |
| 0017 | 708-01-00100 | Right-of-Way Monument | 10 | EACH | 340.00 | 3,400.00 | 550.00 | 5,500.00 | 125.00 | 1,250.00 | 220.00 | 2,200.00 |
| 0018 | 708-02-00100 | Right-of-Way Monument Witness Post | 10 | EACH | 340.00 | 3,400.00 | 250.00 | 2,500.00 | 125.00 | 1,250.00 | 200.00 | 2,000.00 |
| 0019 | 711-02-00400 | Riprap (55 lb) | 230 | CUYD | 110.00 | 25,300.00 | 120.00 | 27,600.00 | 100.00 | 23,000.00 | 102.00 | 23,460.00 |
| 0020 | 711-04-00100 | Geotextile Fabric | 460 | SQYD | 2.80 | 1,288.00 | 3.00 | 1,380.00 | 4.00 | 1,840.00 | 2.50 | 1,150.00 |
| 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 6,750.00 | 6,750.00 | 15,000.00 | 15,000.00 | 25,000.00 | 25,000.00 |
| 0022 | 716-01-00100 | Mulch (Vegetative) | 12.4 | TON | 450.00 | 5,580.00 | 600.00 | 7,440.00 | 500.00 | 6,200.00 | 550.00 | 6,820.00 |
| 0023 | 717-01-00100 | Seeding | 558 | LB | 7.80 | 4,352.40 | 6.00 | 3,348.00 | 15.00 | 8,370.00 | 6.00 | 3,348.00 |
| 0024 | 718-01-00100 | Fertilizer | 6,200 | LB | 0.50 | 3,100.00 | 0.75 | 4,650.00 | 1.00 | 6,200.00 | 0.70 | 4,340.00 |
| 0025 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 7,000.00 | 7,000.00 | 25,000.00 | 25,000.00 | 12,500.00 | 12,500.00 | 15,000.00 | 15,000.00 |
| 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 170,000.00 | 170,000.00 | 100,000.00 | 100,000.00 | 180,000.00 | 180,000.00 | 240,000.00 | 240,000.00 |
| 0027 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 85.00 | 340.00 | 75.00 | 300.00 | 100.00 | 400.00 | 75.00 | 300.00 |
| 0028 | 731-02-00100 | Reflectorized Raised Pavement Markers | 52 | EACH | 6.00 | 312.00 | 20.00 | 1,040.00 | 25.00 | 1,300.00 | 20.00 | 1,040.00 |
| 0029 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.544 | MILE | 2,800.00 | 4,323.20 | 3,000.00 | 4,632.00 | 5,500.00 | 8,492.00 | 3,000.00 | 4,632.00 |
| 0030 | 740-01-00100 | Construction Layout | 1 | LUMP | 25,000.00 | 25,000.00 | 15,000.00 | 15,000.00 | 30,000.00 | 30,000.00 | 45,000.00 | 45,000.00 |
| 0031 | 804-01-00600 | Precast Concrete Piles (24") | 1,800 | LNFT | 110.00 | 198,000.00 | 110.00 | 198,000.00 | 160.00 | 288,000.00 | 100.00 | 180,000.00 |
| 0032 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 2,000.00 | 2,000.00 | 800.00 | 800.00 | 1.00 | 1.00 | 500.00 | 500.00 |
| 0033 | 805-01-00700 | Class A Concrete (Bents) | 102.78 | CUYD | 800.00 | 82,224.00 | 1,450.00 | 149,031.00 | 950.00 | 97,641.00 | 1,300.00 | 133,614.00 |
| 0034 | 805-04-00100 | Class AA(M) Concrete | 285.93 | CUYD | 730.00 | 208,728.90 | 1,100.00 | 314,523.00 | 850.00 | 243,040.50 | 975.00 | 278,781.75 |
| 0035 | 805-08-00800 | Precast-Prestressed Concrete Girder (Type Quad Beam) | 2,133 | LNFT | 50.00 | 106,650.00 | 60.00 | 127,980.00 | 125.00 | 266,625.00 | 65.00 | 138,645.00 |
| 0036 | 805-11-00100 | Strip Seal Joints | 60 | LNFT | 220.00 | 13,200.00 | 150.00 | 9,000.00 | 225.00 | 13,500.00 | 185.00 | 11,100.00 |
| 0037 | 806-01-00100 | Deformed Reinforcing Steel | 123,239 | LB | 0.65 | 80,105.35 | 0.90 | 110,915.10 | 1.00 | 123,239.00 | 0.90 | 110,915.10 |
| 0038 | 807-08-00100 | Structural Metalwork (Anchor Bolts) | 1 | LUMP | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 15,000.00 | 17,000.00 | 17,000.00 |
| 0039 | 810-01-00100 | Concrete Railing (Standard Barrier) | 240 | LNFT | 60.00 | 14,400.00 | 60.00 | 14,400.00 | 65.00 | 15,600.00 | 60.00 | 14,400.00 |
| 0040 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 480 | LNFT | 60.00 | 28,800.00 | 60.00 | 28,800.00 | 75.00 | 36,000.00 | 62.00 | 29,760.00 |
| 0041 | 813-01-00100 | Concrete Approach Slabs | 275.12 | SQYD | 210.00 | 57,775.20 | 210.00 | 57,775.20 | 225.00 | 61,902.00 | 220.00 | 60,526.40 |
| CONTRACTOR TOTAL | 1,816,709.85 | 1,945,887.30 | 2,346,994.00 | 2,387,898.00 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - C W & W Contractors, Inc. |
|
| Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 15,000.00 | 15,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 25,000.00 | 25,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge (Treated Timber Trestle Bridge) | 1 | EACH | 25,000.00 | 25,000.00 |
| 0004 | 202-02-14500 | Removal of Guard Rail | 732 | LNFT | 10.00 | 7,320.00 |
| 0005 | 203-02-00100 | Drainage Excavation | 1,318 | CUYD | 15.00 | 19,770.00 |
| 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 530,000.00 | 530,000.00 |
| 0007 | 204-06-00100 | Temporary Silt Fencing | 4,200 | LNFT | 3.00 | 12,600.00 |
| 0008 | 302-02-04120 | Class II Base Course (8 1/2" Thick) (Stone or Recycled Portland Cement Concrete) | 6,058 | SQYD | 22.00 | 133,276.00 |
| 0009 | 304-05-00100 | Lime Treatment (Type E) | 30.4 | TON | 400.00 | 12,160.00 |
| 0010 | 502-01-00100 | Superpave Asphaltic Concrete | 1,042.5 | TON | 150.00 | 156,375.00 |
| 0011 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 131.2 | TON | 200.00 | 26,240.00 |
| 0012 | 507-01-00200 | Asphaltic Material (PAC-15 Hot Application) | 131.2 | GAL | 22.00 | 2,886.40 |
| 0013 | 704-03-00100 | Blocked Out Guard Rail | 287.5 | LNFT | 25.00 | 7,187.50 |
| 0014 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 75.00 | 7,500.00 |
| 0015 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,700.00 | 10,800.00 |
| 0016 | 705-01-00100 | Barbed Wire Fence | 90 | LNFT | 20.00 | 1,800.00 |
| 0017 | 708-01-00100 | Right-of-Way Monument | 10 | EACH | 300.00 | 3,000.00 |
| 0018 | 708-02-00100 | Right-of-Way Monument Witness Post | 10 | EACH | 300.00 | 3,000.00 |
| 0019 | 711-02-00400 | Riprap (55 lb) | 230 | CUYD | 90.00 | 20,700.00 |
| 0020 | 711-04-00100 | Geotextile Fabric | 460 | SQYD | 3.00 | 1,380.00 |
| 0021 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 35,000.00 | 35,000.00 |
| 0022 | 716-01-00100 | Mulch (Vegetative) | 12.4 | TON | 1,000.00 | 12,400.00 |
| 0023 | 717-01-00100 | Seeding | 558 | LB | 20.00 | 11,160.00 |
| 0024 | 718-01-00100 | Fertilizer | 6,200 | LB | 1.00 | 6,200.00 |
| 0025 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 15,000.00 | 15,000.00 |
| 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 200,000.00 | 200,000.00 |
| 0027 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 100.00 | 400.00 |
| 0028 | 731-02-00100 | Reflectorized Raised Pavement Markers | 52 | EACH | 30.00 | 1,560.00 |
| 0029 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.544 | MILE | 6,000.00 | 9,264.00 |
| 0030 | 740-01-00100 | Construction Layout | 1 | LUMP | 40,000.00 | 40,000.00 |
| 0031 | 804-01-00600 | Precast Concrete Piles (24") | 1,800 | LNFT | 160.00 | 288,000.00 |
| 0032 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 1.00 | 1.00 |
| 0033 | 805-01-00700 | Class A Concrete (Bents) | 102.78 | CUYD | 1,000.00 | 102,780.00 |
| 0034 | 805-04-00100 | Class AA(M) Concrete | 285.93 | CUYD | 800.00 | 228,744.00 |
| 0035 | 805-08-00800 | Precast-Prestressed Concrete Girder (Type Quad Beam) | 2,133 | LNFT | 65.00 | 138,645.00 |
| 0036 | 805-11-00100 | Strip Seal Joints | 60 | LNFT | 600.00 | 36,000.00 |
| 0037 | 806-01-00100 | Deformed Reinforcing Steel | 123,239 | LB | 2.00 | 246,478.00 |
| 0038 | 807-08-00100 | Structural Metalwork (Anchor Bolts) | 1 | LUMP | 20,000.00 | 20,000.00 |
| 0039 | 810-01-00100 | Concrete Railing (Standard Barrier) | 240 | LNFT | 100.00 | 24,000.00 |
| 0040 | 810-01-00200 | Concrete Railing (Slotted Barrier) | 480 | LNFT | 100.00 | 48,000.00 |
| 0041 | 813-01-00100 | Concrete Approach Slabs | 275.12 | SQYD | 225.00 | 61,902.00 |
| CONTRACTOR TOTAL | 2,546,528.90 | |||||