LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Bid Tabulations


Lead Project: 112-07-0015
Parish: Red River
Routes: LA 174
Description: BLACK BAYOU BRIDGE ON LA 174
Type Const: GRADING, DRAINAGE STRUCTURES, COLD PLANING ASPHALTIC PAVEMENT, LIME TREATMENT, CLASS II BASE COURSE, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, REINFORCED CONCRETE BOX CULVERT AND RELATED WORK.
Estimated Construction Cost: $873,703.48


RankLicenseBidderConstruction Bid
1 48925 David V. Temple $668,973.92
2 49239 W L Bass Construction Inc. $713,361.90
3 28218 F. J. Burnell, Inc. $811,448.40
4 44289 Jeff Mercer LLC $821,930.75
5 12135 Blount Bros. Construction, Inc. $868,183.95
6 01012 Cecil D. Gassiott, LLC $880,608.60
7 51413 Iverstine & Campbell LLC $882,514.00
8 12312 Gilchrist Construction Co. LLC $924,120.16
9 18546 C W & W Contractors, Inc. $1,016,410.00
10 09090 Guinn Brothers, LLC. $1,070,927.60


Line
Number
Item Number Item Description Quantity Unit of
Measure
- 1 -
David V. Temple
- 2 -
W L Bass Construction Inc.
- 3 -
F. J. Burnell, Inc.
- 4 -
Jeff Mercer LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 6,039.28 6,039.28 15,000.00 15,000.00 20,000.00 20,000.00 15,000.00 15,000.00
0002 202-02-04000 Removal of Bridge STA. 110+97.29 39' X 24' CONCRETE PRECAST SLAB UNITS 1      EACH 4,290.00 4,290.00 5,000.00 5,000.00 22,000.00 22,000.00 10,000.00 10,000.00
0003 202-02-12000 Removal of Fence 554      LNFT 1.00 554.00 1.00 554.00 3.00 1,662.00 2.50 1,385.00
0004 202-02-14500 Removal of Guard Rail 276      LNFT 3.00 828.00 5.00 1,380.00 10.00 2,760.00 5.00 1,380.00
0005 202-02-32120 Removal of Pipe (Side Drain) 15" X 22' CMP 22      LNFT 6.82 150.04 10.00 220.00 20.00 440.00 8.00 176.00
0006 202-02-38500 Removal of Surfacing and Stablized Base 601      SQYD 10.00 6,010.00 5.00 3,005.00 10.00 6,010.00 11.00 6,611.00
0007 203-05-00100 Excavation and Embankment 1      LUMP 26,876.00 26,876.00 25,000.00 25,000.00 21,000.00 21,000.00 30,000.00 30,000.00
0008 204-05-00100 Temporary Sediment Check Dams (Hay) 10      EACH 110.00 1,100.00 0.00 0.00 100.00 1,000.00 100.00 1,000.00
0009 204-06-00100 Temporary Silt Fencing 946      LNFT 2.25 2,128.50 0.00 0.00 2.00 1,892.00 1.00 946.00
0010 302-02-04121 Class II Base Course (8 1/2" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) 577.8    SQYD 20.00 11,556.00 23.00 13,289.40 18.00 10,400.40 45.00 26,001.00
0011 304-05-00100 Lime Treatment (Type E) 8.19   TON 450.00 3,685.50 0.00 0.00 400.00 3,276.00 350.00 2,866.50
0012 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 24.6    CUYD 59.85 1,472.31 80.00 1,968.00 80.00 1,968.00 75.00 1,845.00
0013 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 100      CUYD 50.44 5,044.00 0.00 0.00 40.00 4,000.00 45.00 4,500.00
0014 502-01-00100 Superpave Asphaltic Concrete 124.3    TON 215.00 26,724.50 135.00 16,780.50 150.00 18,645.00 200.00 24,860.00
0015 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 5.9    TON 265.00 1,563.50 135.00 796.50 300.00 1,770.00 250.00 1,475.00
0016 509-01-00100 Cold Planing Asphaltic Pavement 256      SQYD 3.75 960.00 42.00 10,752.00 15.00 3,840.00 1.00 256.00
0017 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -8      CUYD 1.00 -8.00 25.00 -200.00 1.00 -8.00 0.00 0.00
0018 701-05-01040 Side Drain Pipe (18" RCP/PP/CMP) 148      LNFT 40.25 5,957.00 50.00 7,400.00 50.00 7,400.00 100.00 14,800.00
0019 702-06-01000 Side Drain End Treatment (1 Barrel, 18" RCP/PP or 24" CMP) 3      EACH 685.00 2,055.00 1,300.00 3,900.00 1,200.00 3,600.00 2,500.00 7,500.00
0020 705-01-00100 Barbed Wire Fence 170      LNFT 8.75 1,487.50 7.00 1,190.00 7.00 1,190.00 3.00 510.00
0021 705-02-00100 Combination Mesh & Barbed Wire Fence 870      LNFT 9.50 8,265.00 8.00 6,960.00 10.00 8,700.00 3.00 2,610.00
0022 708-01-00100 Right-of-Way Monument 8      EACH 150.00 1,200.00 110.00 880.00 500.00 4,000.00 180.00 1,440.00
0023 708-02-00100 Right-of-Way Monument Witness Post 8      EACH 150.00 1,200.00 110.00 880.00 500.00 4,000.00 105.00 840.00
0024 711-01-03000 Riprap (30 lb, 14" Thick) 391      SQYD 62.00 24,242.00 66.00 25,806.00 75.00 29,325.00 75.00 29,325.00
0025 713-01-00100 Temporary Signs and Barricades 1      LUMP 6,500.00 6,500.00 7,500.00 7,500.00 10,000.00 10,000.00 8,500.00 8,500.00
0026 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 0.35   MILE 975.00 341.25 750.00 262.50 7,000.00 2,450.00 765.00 267.75
0027 713-06-00100 Temporary Reflectorized Raised Pavement Markers 8      EACH 77.00 616.00 5.00 40.00 50.00 400.00 5.50 44.00
0028 716-01-00100 Mulch (Vegetative) 3.5    TON 750.00 2,625.00 850.00 2,975.00 600.00 2,100.00 1,050.00 3,675.00
0029 717-01-00100 Seeding 53      LB 12.50 662.50 10.00 530.00 12.00 636.00 5.00 265.00
0030 718-01-00100 Fertilizer 1,770      LB 0.55 973.50 1.00 1,770.00 1.00 1,770.00 1.00 1,770.00
0031 720-01-01000 Erosion Control System (Slope Protection) (Type A) 58      SQYD 1.50 87.00 1.00 58.00 3.00 174.00 2.00 116.00
0032 720-01-02000 Erosion Control System, Flexible (Channel Liner) (Type C) 163      SQYD 1.85 301.55 2.00 326.00 3.00 489.00 2.00 326.00
0033 720-01-02020 Erosion Control System, Flexible (Channel Liner) (Type D) 234      SQYD 2.50 585.00 2.00 468.00 5.00 1,170.00 2.00 468.00
0034 722-01-00100 Project Site Laboratory 1      EACH 7,500.00 7,500.00 5,000.00 5,000.00 500.00 500.00 500.00 500.00
0035 725-01-00100 Temporary Detour Roads 2,769.4    SQYD 73.93 204,741.74 80.00 221,552.00 75.00 207,705.00 65.00 180,011.00
0036 726-01-00100 Bedding Material 462.3    CUYD 65.00 30,049.50 0.00 0.00 90.00 41,607.00 125.00 57,787.50
0037 727-01-00100 Mobilization 1      LUMP 53,000.00 53,000.00 67,000.00 67,000.00 60,000.00 60,000.00 60,000.00 60,000.00
0038 729-16-00300 Object Marker Assembly (Type 3) 4      EACH 85.00 340.00 75.00 300.00 100.00 400.00 250.00 1,000.00
0039 731-02-00100 Reflectorized Raised Pavement Markers 16      EACH 77.00 1,232.00 25.00 400.00 50.00 800.00 26.00 416.00
0040 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 0.275  MILE 7,500.00 2,062.50 12,000.00 3,300.00 10,000.00 2,750.00 12,500.00 3,437.50
0041 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 0.111  MILE 5,000.00 555.00 8,000.00 888.00 10,000.00 1,110.00 8,500.00 943.50
0042 732-05-00100 Removal of Existing Markings 0.162  MILE 5,000.00 810.00 6,000.00 972.00 10,000.00 1,620.00 8,500.00 1,377.00
0043 740-01-00100 Construction Layout 1      LUMP 5,500.00 5,500.00 7,000.00 7,000.00 5,000.00 5,000.00 6,600.00 6,600.00
0044 805-01-00300 Class A Concrete (Box Culvert Headwalls) 38.92   CUYD 1,130.00 43,979.60 1,150.00 44,758.00 1,000.00 38,920.00 1,050.00 40,866.00
0046 806-01-00100 Deformed Reinforcing Steel 3,257      LB 0.85 2,768.45 1.00 3,257.00 1.00 3,257.00 2.00 6,514.00
0047 NS-500-00340 Saw Cutting Asphaltic Concrete Pavement 144      INLF 5.30 763.20 1.00 144.00 5.00 720.00 5.00 720.00
0048 805-12-04000 Reinforced Concrete Box Culverts (7' x 7') 360      LNFT 435.00 156,600.00 565.00 203,400.00 650.00 234,000.00 700.00 252,000.00
0049 202-02-00010 Removal of (Abandoned Oil Lines) 6      EACH 500.00 3,000.00 150.00 900.00 2,500.00 15,000.00 1,500.00 9,000.00
                         
    CONTRACTOR TOTAL       668,973.92   713,361.90   811,448.40   821,930.75



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 5 -
Blount Bros. Construction, Inc.
- 6 -
Cecil D. Gassiott, LLC
- 7 -
Iverstine & Campbell LLC
- 8 -
Gilchrist Construction Co. LLC
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 20,000.00 20,000.00 5,000.00 5,000.00 7,750.00 7,750.00 15,000.00 15,000.00
0002 202-02-04000 Removal of Bridge STA. 110+97.29 39' X 24' CONCRETE PRECAST SLAB UNITS 1      EACH 25,000.00 25,000.00 10,000.00 10,000.00 13,625.00 13,625.00 10,000.00 10,000.00
0003 202-02-12000 Removal of Fence 554      LNFT 7.00 3,878.00 2.00 1,108.00 3.75 2,077.50 1.50 831.00
0004 202-02-14500 Removal of Guard Rail 276      LNFT 7.00 1,932.00 10.00 2,760.00 17.50 4,830.00 9.50 2,622.00
0005 202-02-32120 Removal of Pipe (Side Drain) 15" X 22' CMP 22      LNFT 20.00 440.00 10.00 220.00 6.25 137.50 20.00 440.00
0006 202-02-38500 Removal of Surfacing and Stablized Base 601      SQYD 10.00 6,010.00 3.50 2,103.50 13.75 8,263.75 8.00 4,808.00
0007 203-05-00100 Excavation and Embankment 1      LUMP 3,000.00 3,000.00 34,000.00 34,000.00 31,625.00 31,625.00 40,000.00 40,000.00
0008 204-05-00100 Temporary Sediment Check Dams (Hay) 10      EACH 200.00 2,000.00 120.00 1,200.00 50.00 500.00 275.00 2,750.00
0009 204-06-00100 Temporary Silt Fencing 946      LNFT 3.00 2,838.00 2.00 1,892.00 2.50 2,365.00 1.75 1,655.50
0010 302-02-04121 Class II Base Course (8 1/2" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) 577.8    SQYD 25.00 14,445.00 25.00 14,445.00 25.00 14,445.00 35.50 20,511.90
0011 304-05-00100 Lime Treatment (Type E) 8.19   TON 305.00 2,497.95 300.00 2,457.00 558.00 4,570.02 705.00 5,773.95
0012 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 24.6    CUYD 80.00 1,968.00 85.00 2,091.00 55.00 1,353.00 155.00 3,813.00
0013 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 100      CUYD 80.00 8,000.00 50.00 5,000.00 15.00 1,500.00 60.00 6,000.00
0014 502-01-00100 Superpave Asphaltic Concrete 124.3    TON 190.00 23,617.00 220.00 27,346.00 300.00 37,290.00 285.00 35,425.50
0015 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 5.9    TON 200.00 1,180.00 280.00 1,652.00 331.20 1,954.08 500.00 2,950.00
0016 509-01-00100 Cold Planing Asphaltic Pavement 256      SQYD 20.00 5,120.00 13.00 3,328.00 47.50 12,160.00 27.00 6,912.00
0017 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -8      CUYD 1.00 -8.00 1.00 -8.00 1.00 -8.00 0.01 -0.08
0018 701-05-01040 Side Drain Pipe (18" RCP/PP/CMP) 148      LNFT 40.00 5,920.00 67.00 9,916.00 45.60 6,748.80 43.00 6,364.00
0019 702-06-01000 Side Drain End Treatment (1 Barrel, 18" RCP/PP or 24" CMP) 3      EACH 2,500.00 7,500.00 1,700.00 5,100.00 2,500.00 7,500.00 1,730.00 5,190.00
0020 705-01-00100 Barbed Wire Fence 170      LNFT 11.00 1,870.00 10.00 1,700.00 8.75 1,487.50 9.50 1,615.00
0021 705-02-00100 Combination Mesh & Barbed Wire Fence 870      LNFT 11.00 9,570.00 10.00 8,700.00 18.75 16,312.50 10.00 8,700.00
0022 708-01-00100 Right-of-Way Monument 8      EACH 250.00 2,000.00 160.00 1,280.00 187.50 1,500.00 240.00 1,920.00
0023 708-02-00100 Right-of-Way Monument Witness Post 8      EACH 200.00 1,600.00 60.00 480.00 250.00 2,000.00 240.00 1,920.00
0024 711-01-03000 Riprap (30 lb, 14" Thick) 391      SQYD 80.00 31,280.00 45.00 17,595.00 65.00 25,415.00 51.00 19,941.00
0025 713-01-00100 Temporary Signs and Barricades 1      LUMP 15,000.00 15,000.00 4,500.00 4,500.00 9,375.00 9,375.00 6,500.00 6,500.00
0026 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 0.35   MILE 1,000.00 350.00 700.00 245.00 625.00 218.75 600.00 210.00
0027 713-06-00100 Temporary Reflectorized Raised Pavement Markers 8      EACH 10.00 80.00 25.00 200.00 1.25 10.00 5.50 44.00
0028 716-01-00100 Mulch (Vegetative) 3.5    TON 1,000.00 3,500.00 800.00 2,800.00 1,125.00 3,937.50 800.00 2,800.00
0029 717-01-00100 Seeding 53      LB 20.00 1,060.00 15.00 795.00 12.50 662.50 13.00 689.00
0030 718-01-00100 Fertilizer 1,770      LB 1.00 1,770.00 0.60 1,062.00 2.50 4,425.00 0.60 1,062.00
0031 720-01-01000 Erosion Control System (Slope Protection) (Type A) 58      SQYD 3.00 174.00 1.60 92.80 2.50 145.00 1.65 95.70
0032 720-01-02000 Erosion Control System, Flexible (Channel Liner) (Type C) 163      SQYD 3.00 489.00 1.90 309.70 2.50 407.50 2.00 326.00
0033 720-01-02020 Erosion Control System, Flexible (Channel Liner) (Type D) 234      SQYD 2.00 468.00 2.75 643.50 2.50 585.00 2.75 643.50
0034 722-01-00100 Project Site Laboratory 1      EACH 20,000.00 20,000.00 12,000.00 12,000.00 6,250.00 6,250.00 2,300.00 2,300.00
0035 725-01-00100 Temporary Detour Roads 2,769.4    SQYD 85.00 235,399.00 134.00 371,099.60 101.90 282,201.86 92.00 254,784.80
0036 726-01-00100 Bedding Material 462.3    CUYD 80.00 36,984.00 105.00 48,541.50 71.90 33,239.37 117.00 54,089.10
0037 727-01-00100 Mobilization 1      LUMP 30,000.00 30,000.00 45,000.00 45,000.00 28,750.00 28,750.00 100,000.00 100,000.00
0038 729-16-00300 Object Marker Assembly (Type 3) 4      EACH 150.00 600.00 100.00 400.00 100.00 400.00 78.00 312.00
0039 731-02-00100 Reflectorized Raised Pavement Markers 16      EACH 10.00 160.00 80.00 1,280.00 6.25 100.00 5.50 88.00
0040 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 0.275  MILE 4,000.00 1,100.00 8,000.00 2,200.00 25,000.00 6,875.00 3,300.00 907.50
0041 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 0.111  MILE 2,000.00 222.00 5,000.00 555.00 1,250.00 138.75 940.00 104.34
0042 732-05-00100 Removal of Existing Markings 0.162  MILE 8,000.00 1,296.00 5,000.00 810.00 25,000.00 4,050.00 5,500.00 891.00
0043 740-01-00100 Construction Layout 1      LUMP 15,000.00 15,000.00 5,500.00 5,500.00 9,375.00 9,375.00 10,000.00 10,000.00
0044 805-01-00300 Class A Concrete (Box Culvert Headwalls) 38.92   CUYD 1,000.00 38,920.00 1,000.00 38,920.00 1,238.00 48,182.96 1,050.00 40,866.00
0046 806-01-00100 Deformed Reinforcing Steel 3,257      LB 2.00 6,514.00 1.00 3,257.00 1.88 6,123.16 0.85 2,768.45
0047 NS-500-00340 Saw Cutting Asphaltic Concrete Pavement 144      INLF 10.00 1,440.00 3.00 432.00 1.25 180.00 9.00 1,296.00
0048 805-12-04000 Reinforced Concrete Box Culverts (7' x 7') 360      LNFT 700.00 252,000.00 460.00 165,600.00 593.00 213,480.00 620.00 223,200.00
0049 202-02-00010 Removal of (Abandoned Oil Lines) 6      EACH 4,000.00 24,000.00 2,500.00 15,000.00 3,000.00 18,000.00 2,500.00 15,000.00
                         
    CONTRACTOR TOTAL       868,183.95   880,608.60   882,514.00   924,120.16



Line
Number
Item Number Item Description Quantity Unit of
Measure
- 9 -
C W & W Contractors, Inc.
- 10 -
Guinn Brothers, LLC.
Unit PriceTotal
Amount
Unit PriceTotal
Amount
0001 201-01-00100 Clearing and Grubbing 1      LUMP 30,000.00 30,000.00 15,000.00 15,000.00
0002 202-02-04000 Removal of Bridge STA. 110+97.29 39' X 24' CONCRETE PRECAST SLAB UNITS 1      EACH 18,000.00 18,000.00 12,500.00 12,500.00
0003 202-02-12000 Removal of Fence 554      LNFT 2.00 1,108.00 5.00 2,770.00
0004 202-02-14500 Removal of Guard Rail 276      LNFT 7.00 1,932.00 3.00 828.00
0005 202-02-32120 Removal of Pipe (Side Drain) 15" X 22' CMP 22      LNFT 10.00 220.00 10.00 220.00
0006 202-02-38500 Removal of Surfacing and Stablized Base 601      SQYD 7.00 4,207.00 6.00 3,606.00
0007 203-05-00100 Excavation and Embankment 1      LUMP 61,000.00 61,000.00 35,000.00 35,000.00
0008 204-05-00100 Temporary Sediment Check Dams (Hay) 10      EACH 150.00 1,500.00 100.00 1,000.00
0009 204-06-00100 Temporary Silt Fencing 946      LNFT 3.00 2,838.00 3.00 2,838.00
0010 302-02-04121 Class II Base Course (8 1/2" Thick) (Stone or Recycled Portland Cement Concrete, or Blended Calcium Sulfate) 577.8    SQYD 55.00 31,779.00 22.00 12,711.60
0011 304-05-00100 Lime Treatment (Type E) 8.19   TON 200.00 1,638.00 1,000.00 8,190.00
0012 401-02-00100 Aggregate Surface Course (Adjusted Vehicular Measurement) 24.6    CUYD 60.00 1,476.00 100.00 2,460.00
0013 402-01-00100 Traffic Maintenance Aggregate (Vehicular Measurement) 100      CUYD 30.00 3,000.00 50.00 5,000.00
0014 502-01-00100 Superpave Asphaltic Concrete 124.3    TON 180.00 22,374.00 250.00 31,075.00
0015 502-01-00200 Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous 5.9    TON 185.00 1,091.50 500.00 2,950.00
0016 509-01-00100 Cold Planing Asphaltic Pavement 256      SQYD 40.00 10,240.00 40.00 10,240.00
0017 509-02-00100 Contractor Retained Reclaimed Asphaltic Pavement -8      CUYD 1.00 -8.00 0.00 0.00
0018 701-05-01040 Side Drain Pipe (18" RCP/PP/CMP) 148      LNFT 45.00 6,660.00 60.00 8,880.00
0019 702-06-01000 Side Drain End Treatment (1 Barrel, 18" RCP/PP or 24" CMP) 3      EACH 1,000.00 3,000.00 1,600.00 4,800.00
0020 705-01-00100 Barbed Wire Fence 170      LNFT 10.00 1,700.00 10.00 1,700.00
0021 705-02-00100 Combination Mesh & Barbed Wire Fence 870      LNFT 12.00 10,440.00 15.00 13,050.00
0022 708-01-00100 Right-of-Way Monument 8      EACH 50.00 400.00 300.00 2,400.00
0023 708-02-00100 Right-of-Way Monument Witness Post 8      EACH 150.00 1,200.00 300.00 2,400.00
0024 711-01-03000 Riprap (30 lb, 14" Thick) 391      SQYD 45.00 17,595.00 80.00 31,280.00
0025 713-01-00100 Temporary Signs and Barricades 1      LUMP 7,000.00 7,000.00 15,000.00 15,000.00
0026 713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 0.35   MILE 1,750.00 612.50 1,000.00 350.00
0027 713-06-00100 Temporary Reflectorized Raised Pavement Markers 8      EACH 5.00 40.00 100.00 800.00
0028 716-01-00100 Mulch (Vegetative) 3.5    TON 1,500.00 5,250.00 1,000.00 3,500.00
0029 717-01-00100 Seeding 53      LB 10.00 530.00 25.00 1,325.00
0030 718-01-00100 Fertilizer 1,770      LB 1.00 1,770.00 1.00 1,770.00
0031 720-01-01000 Erosion Control System (Slope Protection) (Type A) 58      SQYD 4.00 232.00 10.00 580.00
0032 720-01-02000 Erosion Control System, Flexible (Channel Liner) (Type C) 163      SQYD 4.00 652.00 6.00 978.00
0033 720-01-02020 Erosion Control System, Flexible (Channel Liner) (Type D) 234      SQYD 4.00 936.00 6.00 1,404.00
0034 722-01-00100 Project Site Laboratory 1      EACH 2,500.00 2,500.00 15,000.00 15,000.00
0035 725-01-00100 Temporary Detour Roads 2,769.4    SQYD 125.00 346,175.00 130.00 360,022.00
0036 726-01-00100 Bedding Material 462.3    CUYD 60.00 27,738.00 85.00 39,295.50
0037 727-01-00100 Mobilization 1      LUMP 100,000.00 100,000.00 75,000.00 75,000.00
0038 729-16-00300 Object Marker Assembly (Type 3) 4      EACH 85.00 340.00 100.00 400.00
0039 731-02-00100 Reflectorized Raised Pavement Markers 16      EACH 60.00 960.00 100.00 1,600.00
0040 732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 0.275  MILE 6,000.00 1,650.00 8,000.00 2,200.00
0041 732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 0.111  MILE 4,000.00 444.00 6,500.00 721.50
0042 732-05-00100 Removal of Existing Markings 0.162  MILE 4,000.00 648.00 6,000.00 972.00
0043 740-01-00100 Construction Layout 1      LUMP 15,000.00 15,000.00 9,000.00 9,000.00
0044 805-01-00300 Class A Concrete (Box Culvert Headwalls) 38.92   CUYD 1,300.00 50,596.00 1,500.00 58,380.00
0046 806-01-00100 Deformed Reinforcing Steel 3,257      LB 2.00 6,514.00 3.00 9,771.00
0047 NS-500-00340 Saw Cutting Asphaltic Concrete Pavement 144      INLF 3.00 432.00 15.00 2,160.00
0048 805-12-04000 Reinforced Concrete Box Culverts (7' x 7') 360      LNFT 575.00 207,000.00 580.00 208,800.00
0049 202-02-00010 Removal of (Abandoned Oil Lines) 6      EACH 1,000.00 6,000.00 8,500.00 51,000.00
                 
    CONTRACTOR TOTAL       1,016,410.00   1,070,927.60