Bid Tabulations
Letting of
12/16/2009
LA DOTD Headquarters
| Lead Project: 098-01-0007 | |
| Parish: Desoto | |
| Routes: LA 172 | |
| Description: Texas State Line to LA 5 | |
| Type Const: GRADING, DRAINAGE STRUCTURES, PAVEMENT PATCHING, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, AND RELATED WORK. | |
| Estimated Construction Cost: $3,186,415.00 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 17464 | Benton & Brown, LLC. | $3,273,024.55 |
| 2 | 36374 | Best-Yet Builders, LLC | $3,365,405.15 |
| 3 | 08584 | Madden Contracting Co., Inc. | $3,475,822.23 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Benton & Brown, LLC. |
- 2 - Best-Yet Builders, LLC |
- 3 - Madden Contracting Co., Inc. |
|||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-02-02020 | Removal of Asphalt Pavement | 496 | SQYD | 8.00 | 3,968.00 | 4.00 | 1,984.00 | 20.15 | 9,994.40 |
| 0002 | 202-02-14500 | Removal of Guard Rail | 280 | LNFT | 4.50 | 1,260.00 | 4.00 | 1,120.00 | 8.00 | 2,240.00 |
| 0003 | 202-02-32100 | Removal of Pipe (Cross Drain) See Sheets 10-12 for stations | 127 | LNFT | 7.00 | 889.00 | 50.00 | 6,350.00 | 50.00 | 6,350.00 |
| 0004 | 203-07-00100 | Borrow (Vehicular Measurement) | 6,000 | CUYD | 12.00 | 72,000.00 | 12.00 | 72,000.00 | 16.35 | 98,100.00 |
| 0005 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 130 | CUYD | 100.00 | 13,000.00 | 50.00 | 6,500.00 | 45.00 | 5,850.00 |
| 0006 | 502-01-00100 | Superpave Asphaltic Concrete | 25,933.1 | TON | 87.00 | 2,256,179.70 | 85.00 | 2,204,313.50 | 85.30 | 2,212,093.43 |
| 0007 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 1,500 | TON | 65.00 | 97,500.00 | 95.00 | 142,500.00 | 133.15 | 199,725.00 |
| 0008 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 4,500 | SQYD | 73.00 | 328,500.00 | 94.50 | 425,250.00 | 64.90 | 292,050.00 |
| 0009 | 701-10-01060 | Reinforced Concrete Pipe (Extension) (24") | 72 | LNFT | 135.00 | 9,720.00 | 84.24 | 6,065.28 | 180.00 | 12,960.00 |
| 0010 | 701-10-01080 | Reinforced Concrete Pipe (Extension) (30") | 32 | LNFT | 165.00 | 5,280.00 | 119.16 | 3,813.12 | 205.00 | 6,560.00 |
| 0011 | 701-10-01100 | Reinforced Concrete Pipe (Extension) (36") | 32 | LNFT | 195.00 | 6,240.00 | 164.00 | 5,248.00 | 270.00 | 8,640.00 |
| 0012 | 701-15-00100 | Concrete Collar | 24 | EACH | 800.00 | 19,200.00 | 1,000.00 | 24,000.00 | 850.00 | 20,400.00 |
| 0013 | 704-01-01000 | Guard Rail (Single Thrie Beam) (3'-1 1/2" post spacing) | 175 | LNFT | 71.00 | 12,425.00 | 65.00 | 11,375.00 | 53.50 | 9,362.50 |
| 0014 | 704-03-00100 | Blocked Out Guard Rail | 100 | LNFT | 22.00 | 2,200.00 | 20.00 | 2,000.00 | 27.00 | 2,700.00 |
| 0015 | 704-07-00200 | Guard Rail Bridge Attachments (Single Thrie Beam) | 75 | LNFT | 47.00 | 3,525.00 | 43.00 | 3,225.00 | 90.00 | 6,750.00 |
| 0016 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 75.00 | 7,500.00 | 68.00 | 6,800.00 | 65.00 | 6,500.00 |
| 0017 | 704-11-00100 | Guard Rail End Treatment (Flared) | 8 | EACH | 2,400.00 | 19,200.00 | 2,200.00 | 17,600.00 | 2,400.00 | 19,200.00 |
| 0018 | 712-04-00100 | Flexible Revetment | 495 | SQYD | 88.00 | 43,560.00 | 65.00 | 32,175.00 | 85.00 | 42,075.00 |
| 0019 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 90,000.00 | 90,000.00 | 10,000.00 | 10,000.00 | 169,500.00 | 169,500.00 |
| 0020 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 17 | MILE | 345.00 | 5,865.00 | 800.00 | 13,600.00 | 325.00 | 5,525.00 |
| 0021 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 7.7 | MILE | 1.00 | 7.70 | 125.00 | 962.50 | 1.00 | 7.70 |
| 0022 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 57.7 | MILE | 1.00 | 57.70 | 250.00 | 14,425.00 | 1.00 | 57.70 |
| 0023 | 716-01-00100 | Mulch (Vegetative) | 30 | TON | 1,200.00 | 36,000.00 | 700.00 | 21,000.00 | 660.00 | 19,800.00 |
| 0024 | 717-01-00100 | Seeding | 500 | LB | 7.00 | 3,500.00 | 6.50 | 3,250.00 | 12.00 | 6,000.00 |
| 0025 | 718-01-00100 | Fertilizer | 20,000 | LB | 0.50 | 10,000.00 | 0.40 | 8,000.00 | 1.10 | 22,000.00 |
| 0026 | 727-01-00100 | Mobilization | 1 | LUMP | 90,000.00 | 90,000.00 | 230,000.00 | 230,000.00 | 169,500.00 | 169,500.00 |
| 0027 | 729-16-00300 | Object Marker Assembly (Type 3) | 8 | EACH | 110.00 | 880.00 | 100.00 | 800.00 | 80.00 | 640.00 |
| 0028 | 731-02-00100 | Reflectorized Raised Pavement Markers | 1,123 | EACH | 5.25 | 5,895.75 | 4.75 | 5,334.25 | 4.50 | 5,053.50 |
| 0029 | 732-01-01080 | Plastic Pavement Striping (24" Width) (Thermoplastic 90 mil) | 12 | LNFT | 6.50 | 78.00 | 6.00 | 72.00 | 3.00 | 36.00 |
| 0030 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 28.85 | MILE | 2,700.00 | 77,895.00 | 2,450.00 | 70,682.50 | 2,500.00 | 72,125.00 |
| 0031 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 3.85 | MILE | 650.00 | 2,502.50 | 600.00 | 2,310.00 | 700.00 | 2,695.00 |
| 0032 | 735-01-00100 | Mailboxes | 42 | EACH | 1.10 | 46.20 | 50.00 | 2,100.00 | 1.00 | 42.00 |
| 0033 | 735-02-00100 | Mailbox Supports (Single) | 38 | EACH | 125.00 | 4,750.00 | 75.00 | 2,850.00 | 130.00 | 4,940.00 |
| 0034 | 735-03-00100 | Mailbox Supports (Double) | 2 | EACH | 200.00 | 400.00 | 100.00 | 200.00 | 175.00 | 350.00 |
| 0035 | 740-01-00100 | Construction Layout | 1 | LUMP | 43,000.00 | 43,000.00 | 7,500.00 | 7,500.00 | 36,000.00 | 36,000.00 |
| CONTRACTOR TOTAL | 3,273,024.55 | 3,365,405.15 | 3,475,822.23 | |||||||