Bid Tabulations
Letting of
10/27/2010
LA DOTD Headquarters
| Lead Project: 093-02-0006 | |
| Parish: Bienville | |
| Routes: LA 501 | |
| Description: Fouse Bayou Bridge | |
| Type Const: GRADING, SUPERPAVE ASPHALTIC CONCRETE PAVEMENT, CONCRETE SLAB SPAN BRIDGE AND RELATED WORK | |
| Estimated Construction Cost: $1,979,190.50 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 12312 | Gilchrist Construction Co. LLC | $1,706,686.70 |
| 2 | 09090 | Guinn Brothers, LLC. | $2,188,890.00 |
| 3 | 01012 | Cecil D. Gassiott, LLC | $2,354,573.00 |
| 4 | 39462 | Jb James Construction Llc | $2,424,431.50 |
| 5 | 09476 | Key Constructors, Inc. | $2,435,004.70 |
| 6 | 18546 | C W & W Contractors, Inc. | $2,704,617.50 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Gilchrist Construction Co. LLC |
- 2 - Guinn Brothers, LLC. |
- 3 - Cecil D. Gassiott, LLC |
- 4 - Jb James Construction Llc |
||||
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 75,000.00 | 75,000.00 | 35,000.00 | 35,000.00 | 60,000.00 | 60,000.00 | 400,000.00 | 400,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,500.00 | 1,500.00 | 4,000.00 | 4,000.00 | 50,000.00 | 50,000.00 | 20,000.00 | 20,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge STA. 111+09.33; 27.0 FT x 209 FT CONCRETE PRECAST SLAB UNIT BRIDGE | 1 | EACH | 45,000.00 | 45,000.00 | 22,000.00 | 22,000.00 | 30,000.00 | 30,000.00 | 75,000.00 | 75,000.00 |
| 0004 | 202-02-38500 | Removal of Surfacing and Stablized Base | 2,045 | SQYD | 4.50 | 9,202.50 | 5.00 | 10,225.00 | 4.00 | 8,180.00 | 3.00 | 6,135.00 |
| 0005 | 203-02-00100 | Drainage Excavation | 550 | CUYD | 8.00 | 4,400.00 | 10.00 | 5,500.00 | 50.00 | 27,500.00 | 20.00 | 11,000.00 |
| 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 30,000.00 | 30,000.00 | 40,000.00 | 40,000.00 | 30,000.00 | 30,000.00 | 170,000.00 | 170,000.00 |
| 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 12 | EACH | 250.00 | 3,000.00 | 100.00 | 1,200.00 | 185.00 | 2,220.00 | 150.00 | 1,800.00 |
| 0008 | 204-06-00100 | Temporary Silt Fencing | 1,340 | LNFT | 1.50 | 2,010.00 | 3.00 | 4,020.00 | 2.25 | 3,015.00 | 2.60 | 3,484.00 |
| 0009 | 204-07-00100 | Temporary Stone Construction Entrance | 1 | EACH | 4,000.00 | 4,000.00 | 2,000.00 | 2,000.00 | 3,000.00 | 3,000.00 | 3,000.00 | 3,000.00 |
| 0010 | 303-01-00400 | In-Place Cement Stabilized Base Course (12" Thick) | 2,127 | SQYD | 10.00 | 21,270.00 | 16.00 | 34,032.00 | 10.00 | 21,270.00 | 7.50 | 15,952.50 |
| 0011 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 50 | CUYD | 95.00 | 4,750.00 | 50.00 | 2,500.00 | 110.00 | 5,500.00 | 80.00 | 4,000.00 |
| 0012 | 502-01-00100 | Superpave Asphaltic Concrete | 244.2 | TON | 115.00 | 28,083.00 | 225.00 | 54,945.00 | 200.00 | 48,840.00 | 200.00 | 48,840.00 |
| 0013 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 187.6 | TON | 130.00 | 24,388.00 | 250.00 | 46,900.00 | 250.00 | 46,900.00 | 230.00 | 43,148.00 |
| 0014 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 660 | GAL | 5.20 | 3,432.00 | 13.00 | 8,580.00 | 5.50 | 3,630.00 | 5.00 | 3,300.00 |
| 0015 | 507-02-00300 | Aggregate (S3) | 2,127 | SQYD | 7.50 | 15,952.50 | 8.00 | 17,016.00 | 8.00 | 17,016.00 | 8.00 | 17,016.00 |
| 0016 | 704-03-00100 | Blocked Out Guard Rail | 262.5 | LNFT | 20.00 | 5,250.00 | 22.00 | 5,775.00 | 20.00 | 5,250.00 | 18.00 | 4,725.00 |
| 0017 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 63.00 | 6,300.00 | 60.00 | 6,000.00 | 60.00 | 6,000.00 | 55.00 | 5,500.00 |
| 0018 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,300.00 | 9,200.00 | 2,200.00 | 8,800.00 | 2,200.00 | 8,800.00 | 2,000.00 | 8,000.00 |
| 0019 | 708-01-00100 | Right-of-Way Monument | 3 | EACH | 450.00 | 1,350.00 | 500.00 | 1,500.00 | 1,000.00 | 3,000.00 | 250.00 | 750.00 |
| 0020 | 708-02-00100 | Right-of-Way Monument Witness Post | 3 | EACH | 450.00 | 1,350.00 | 500.00 | 1,500.00 | 250.00 | 750.00 | 250.00 | 750.00 |
| 0021 | 712-04-00100 | Flexible Revetment | 1,750 | SQYD | 55.00 | 96,250.00 | 75.00 | 131,250.00 | 55.00 | 96,250.00 | 55.00 | 96,250.00 |
| 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 20,000.00 | 20,000.00 | 20,000.00 | 20,000.00 | 12,500.00 | 12,500.00 | 25,000.00 | 25,000.00 |
| 0023 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.686 | MILE | 700.00 | 480.20 | 600.00 | 411.60 | 1,500.00 | 1,029.00 | 1,000.00 | 686.00 |
| 0024 | 716-01-00100 | Mulch (Vegetative) | 11 | TON | 345.00 | 3,795.00 | 500.00 | 5,500.00 | 750.00 | 8,250.00 | 800.00 | 8,800.00 |
| 0025 | 717-01-00100 | Seeding | 219 | LB | 8.00 | 1,752.00 | 15.00 | 3,285.00 | 10.00 | 2,190.00 | 12.00 | 2,628.00 |
| 0026 | 718-01-00100 | Fertilizer | 547 | LB | 0.50 | 273.50 | 1.00 | 547.00 | 2.00 | 1,094.00 | 2.50 | 1,367.50 |
| 0027 | 720-01-01020 | Erosion Control System (Slope Protection) (Type B) | 601 | SQYD | 1.15 | 691.15 | 4.00 | 2,404.00 | 1.50 | 901.50 | 1.35 | 811.35 |
| 0028 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 551 | SQYD | 1.15 | 633.65 | 5.00 | 2,755.00 | 1.50 | 826.50 | 1.65 | 909.15 |
| 0029 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 10,000.00 | 10,000.00 | 12,500.00 | 12,500.00 | 8,500.00 | 8,500.00 | 5,000.00 | 5,000.00 |
| 0030 | 725-01-00100 | Temporary Detour Roads | 2,195.7 | SQYD | 80.00 | 175,656.00 | 85.00 | 186,634.50 | 110.00 | 241,527.00 | 102.00 | 223,961.40 |
| 0031 | 725-02-00100 | Temporary Detour Bridging | 180 | LNFT | 1,100.00 | 198,000.00 | 2,250.00 | 405,000.00 | 2,100.00 | 378,000.00 | 1,000.00 | 180,000.00 |
| 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 170,000.00 | 170,000.00 | 180,000.00 | 180,000.00 | 235,000.00 | 235,000.00 | 240,000.00 | 240,000.00 |
| 0033 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 80.00 | 320.00 | 100.00 | 400.00 | 75.00 | 300.00 | 80.00 | 320.00 |
| 0034 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 30 | EACH | 11.00 | 330.00 | 15.00 | 450.00 | 25.00 | 750.00 | 16.00 | 480.00 |
| 0035 | 731-02-00100 | Reflectorized Raised Pavement Markers | 69 | EACH | 6.00 | 414.00 | 10.00 | 690.00 | 10.00 | 690.00 | 6.00 | 414.00 |
| 0036 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.758 | MILE | 2,800.00 | 2,122.40 | 12,000.00 | 9,096.00 | 6,000.00 | 4,548.00 | 3,500.00 | 2,653.00 |
| 0037 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.19 | MILE | 985.00 | 187.15 | 1,200.00 | 228.00 | 5,000.00 | 950.00 | 3,000.00 | 570.00 |
| 0038 | 740-01-00100 | Construction Layout | 1 | LUMP | 40,000.00 | 40,000.00 | 18,000.00 | 18,000.00 | 25,000.00 | 25,000.00 | 50,000.00 | 50,000.00 |
| 0039 | 804-01-00600 | Precast Concrete Piles (24") | 2,262 | LNFT | 81.00 | 183,222.00 | 140.00 | 316,680.00 | 120.00 | 271,440.00 | 100.00 | 226,200.00 |
| 0040 | 804-05-00600 | Precast Concrete Test Piles (24") | 1 | EACH | 45,000.00 | 45,000.00 | 40,000.00 | 40,000.00 | 35,000.00 | 35,000.00 | 40,000.00 | 40,000.00 |
| 0041 | 804-09-00100 | Loading Test Piles | 1 | EACH | 35,000.00 | 35,000.00 | 1.00 | 1.00 | 5,000.00 | 5,000.00 | 30,000.00 | 30,000.00 |
| 0042 | 804-10-00100 | Reloading Test Piles | 1 | EACH | 4,000.00 | 4,000.00 | 1.00 | 1.00 | 2,500.00 | 2,500.00 | 100.00 | 100.00 |
| 0043 | 804-11-00100 | Redriving Test Piles | 1 | EACH | 3,000.00 | 3,000.00 | 1.00 | 1.00 | 2,500.00 | 2,500.00 | 100.00 | 100.00 |
| 0044 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 1,000.00 | 1,000.00 | 1.00 | 1.00 | 1,000.00 | 1,000.00 | 100.00 | 100.00 |
| 0045 | 804-17-00100 | Dynamic Monitoring | 9 | EACH | 500.00 | 4,500.00 | 1,000.00 | 9,000.00 | 5,000.00 | 45,000.00 | 1,200.00 | 10,800.00 |
| 0046 | 805-01-00700 | Class A Concrete (Bents) | 122.07 | CUYD | 900.00 | 109,863.00 | 950.00 | 115,966.50 | 1,000.00 | 122,070.00 | 950.00 | 115,966.50 |
| 0047 | 805-03-00100 | Class AA Concrete | 326.28 | CUYD | 600.00 | 195,768.00 | 850.00 | 277,338.00 | 1,000.00 | 326,280.00 | 550.00 | 179,454.00 |
| 0048 | 806-01-00100 | Deformed Reinforcing Steel | 73,041 | LB | 0.65 | 47,476.65 | 0.90 | 65,736.90 | 1.00 | 73,041.00 | 0.90 | 65,736.90 |
| 0049 | 810-01-00100 | Concrete Railing (Standard Barrier) | 480 | LNFT | 70.00 | 33,600.00 | 75.00 | 36,000.00 | 65.00 | 31,200.00 | 75.00 | 36,000.00 |
| 0050 | 813-01-00100 | Concrete Approach Slabs | 137.78 | SQYD | 200.00 | 27,556.00 | 225.00 | 31,000.50 | 250.00 | 34,445.00 | 240.00 | 33,067.20 |
| 0051 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 52 | INLF | 4.00 | 208.00 | 10.00 | 520.00 | 10.00 | 520.00 | 3.00 | 156.00 |
| 0052 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 0.3 | MILE | 500.00 | 150.00 | 20,000.00 | 6,000.00 | 18,000.00 | 5,400.00 | 15,000.00 | 4,500.00 |
| CONTRACTOR TOTAL | 1,706,686.70 | 2,188,890.00 | 2,354,573.00 | 2,424,431.50 | ||||||||
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 5 - Key Constructors, Inc. |
- 6 - C W & W Contractors, Inc. |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 201-01-00100 | Clearing and Grubbing | 1 | LUMP | 100,000.00 | 100,000.00 | 40,000.00 | 40,000.00 |
| 0002 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 10,000.00 | 10,000.00 | 40,000.00 | 40,000.00 |
| 0003 | 202-02-04000 | Removal of Bridge STA. 111+09.33; 27.0 FT x 209 FT CONCRETE PRECAST SLAB UNIT BRIDGE | 1 | EACH | 20,000.00 | 20,000.00 | 35,000.00 | 35,000.00 |
| 0004 | 202-02-38500 | Removal of Surfacing and Stablized Base | 2,045 | SQYD | 6.50 | 13,292.50 | 10.00 | 20,450.00 |
| 0005 | 203-02-00100 | Drainage Excavation | 550 | CUYD | 18.00 | 9,900.00 | 20.00 | 11,000.00 |
| 0006 | 203-05-00100 | Excavation and Embankment | 1 | LUMP | 65,000.00 | 65,000.00 | 65,000.00 | 65,000.00 |
| 0007 | 204-05-00100 | Temporary Sediment Check Dams (Hay) | 12 | EACH | 12.00 | 144.00 | 125.00 | 1,500.00 |
| 0008 | 204-06-00100 | Temporary Silt Fencing | 1,340 | LNFT | 3.00 | 4,020.00 | 3.00 | 4,020.00 |
| 0009 | 204-07-00100 | Temporary Stone Construction Entrance | 1 | EACH | 5,000.00 | 5,000.00 | 5,000.00 | 5,000.00 |
| 0010 | 303-01-00400 | In-Place Cement Stabilized Base Course (12" Thick) | 2,127 | SQYD | 9.00 | 19,143.00 | 20.00 | 42,540.00 |
| 0011 | 402-01-00100 | Traffic Maintenance Aggregate (Vehicular Measurement) | 50 | CUYD | 75.00 | 3,750.00 | 100.00 | 5,000.00 |
| 0012 | 502-01-00100 | Superpave Asphaltic Concrete | 244.2 | TON | 200.00 | 48,840.00 | 180.00 | 43,956.00 |
| 0013 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 187.6 | TON | 225.00 | 42,210.00 | 220.00 | 41,272.00 |
| 0014 | 507-01-00100 | Asphaltic Material (CRS-2P Emulsion) | 660 | GAL | 4.50 | 2,970.00 | 10.00 | 6,600.00 |
| 0015 | 507-02-00300 | Aggregate (S3) | 2,127 | SQYD | 6.50 | 13,825.50 | 10.00 | 21,270.00 |
| 0016 | 704-03-00100 | Blocked Out Guard Rail | 262.5 | LNFT | 18.00 | 4,725.00 | 25.00 | 6,562.50 |
| 0017 | 704-08-00200 | Guard Rail Transitions (Double Thrie Beam) | 100 | LNFT | 55.00 | 5,500.00 | 70.00 | 7,000.00 |
| 0018 | 704-11-00100 | Guard Rail End Treatment (Flared) | 4 | EACH | 2,000.00 | 8,000.00 | 2,500.00 | 10,000.00 |
| 0019 | 708-01-00100 | Right-of-Way Monument | 3 | EACH | 250.00 | 750.00 | 300.00 | 900.00 |
| 0020 | 708-02-00100 | Right-of-Way Monument Witness Post | 3 | EACH | 250.00 | 750.00 | 300.00 | 900.00 |
| 0021 | 712-04-00100 | Flexible Revetment | 1,750 | SQYD | 55.00 | 96,250.00 | 90.00 | 157,500.00 |
| 0022 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 10,000.00 | 10,000.00 | 20,000.00 | 20,000.00 |
| 0023 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 0.686 | MILE | 1,000.00 | 686.00 | 5,000.00 | 3,430.00 |
| 0024 | 716-01-00100 | Mulch (Vegetative) | 11 | TON | 800.00 | 8,800.00 | 1,100.00 | 12,100.00 |
| 0025 | 717-01-00100 | Seeding | 219 | LB | 12.00 | 2,628.00 | 20.00 | 4,380.00 |
| 0026 | 718-01-00100 | Fertilizer | 547 | LB | 2.50 | 1,367.50 | 2.00 | 1,094.00 |
| 0027 | 720-01-01020 | Erosion Control System (Slope Protection) (Type B) | 601 | SQYD | 1.35 | 811.35 | 4.00 | 2,404.00 |
| 0028 | 720-01-02000 | Erosion Control System, Flexible (Channel Liner) (Type C) | 551 | SQYD | 1.65 | 909.15 | 4.00 | 2,204.00 |
| 0029 | 722-01-00100 | Project Site Laboratory | 1 | EACH | 20,000.00 | 20,000.00 | 15,000.00 | 15,000.00 |
| 0030 | 725-01-00100 | Temporary Detour Roads | 2,195.7 | SQYD | 140.00 | 307,398.00 | 120.00 | 263,484.00 |
| 0031 | 725-02-00100 | Temporary Detour Bridging | 180 | LNFT | 2,230.00 | 401,400.00 | 2,875.00 | 517,500.00 |
| 0032 | 727-01-00100 | Mobilization | 1 | LUMP | 245,000.00 | 245,000.00 | 250,000.00 | 250,000.00 |
| 0033 | 729-16-00300 | Object Marker Assembly (Type 3) | 4 | EACH | 72.00 | 288.00 | 100.00 | 400.00 |
| 0034 | 731-01-00100 | Nonreflectorized Raised Pavement Markers | 30 | EACH | 16.00 | 480.00 | 30.00 | 900.00 |
| 0035 | 731-02-00100 | Reflectorized Raised Pavement Markers | 69 | EACH | 6.00 | 414.00 | 20.00 | 1,380.00 |
| 0036 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 0.758 | MILE | 3,500.00 | 2,653.00 | 8,000.00 | 6,064.00 |
| 0037 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 0.19 | MILE | 3,000.00 | 570.00 | 6,000.00 | 1,140.00 |
| 0038 | 740-01-00100 | Construction Layout | 1 | LUMP | 45,000.00 | 45,000.00 | 20,000.00 | 20,000.00 |
| 0039 | 804-01-00600 | Precast Concrete Piles (24") | 2,262 | LNFT | 165.00 | 373,230.00 | 160.00 | 361,920.00 |
| 0040 | 804-05-00600 | Precast Concrete Test Piles (24") | 1 | EACH | 25,000.00 | 25,000.00 | 5,000.00 | 5,000.00 |
| 0041 | 804-09-00100 | Loading Test Piles | 1 | EACH | 25,000.00 | 25,000.00 | 5,000.00 | 5,000.00 |
| 0042 | 804-10-00100 | Reloading Test Piles | 1 | EACH | 2,500.00 | 2,500.00 | 1.00 | 1.00 |
| 0043 | 804-11-00100 | Redriving Test Piles | 1 | EACH | 2,500.00 | 2,500.00 | 1.00 | 1.00 |
| 0044 | 804-12-00100 | Loading Permanent Piles | 1 | EACH | 2,500.00 | 2,500.00 | 5,000.00 | 5,000.00 |
| 0045 | 804-17-00100 | Dynamic Monitoring | 9 | EACH | 3,000.00 | 27,000.00 | 2,500.00 | 22,500.00 |
| 0046 | 805-01-00700 | Class A Concrete (Bents) | 122.07 | CUYD | 920.00 | 112,304.40 | 1,000.00 | 122,070.00 |
| 0047 | 805-03-00100 | Class AA Concrete | 326.28 | CUYD | 590.00 | 192,505.20 | 800.00 | 261,024.00 |
| 0048 | 806-01-00100 | Deformed Reinforcing Steel | 73,041 | LB | 1.10 | 80,345.10 | 2.00 | 146,082.00 |
| 0049 | 810-01-00100 | Concrete Railing (Standard Barrier) | 480 | LNFT | 55.00 | 26,400.00 | 100.00 | 48,000.00 |
| 0050 | 813-01-00100 | Concrete Approach Slabs | 137.78 | SQYD | 250.00 | 34,445.00 | 250.00 | 34,445.00 |
| 0051 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 52 | INLF | 25.00 | 1,300.00 | 12.00 | 624.00 |
| 0052 | NS-724-00002 | Rumble Strips (Shoulder Ground-In) | 0.3 | MILE | 25,000.00 | 7,500.00 | 20,000.00 | 6,000.00 |
| CONTRACTOR TOTAL | 2,435,004.70 | 2,704,617.50 | ||||||