Bid Tabulations
Letting of
08/31/2011
LA DOTD Headquarters
| Lead Project: 092-01-0016 | |
| Parish: Natchitoches | |
| Routes: LA 156 | |
| Description: LA 156: JCT. LA 9 - W. OF PLACID OIL RD. | |
| Type Const: DRAINAGE STRUCTURES, PAVEMENT PATCHING, COLD PLANING ASPHALTIC CONCRETE PAVEMENT, SUPERPAVE ASPHALTIC CONCRETE OVERLAY, AND RELATED WORK. | |
| Estimated Construction Cost: $1,169,317.03 | |
| Rank | License | Bidder | Construction Bid |
|---|---|---|---|
| 1 | 08584 | Madden Contracting Co., Inc. | $1,090,160.04 |
| 2 | 12312 | Gilchrist Construction Co. LLC | $1,303,915.13 |
| Line Number |
Item Number | Item Description | Quantity | Unit of Measure |
- 1 - Madden Contracting Co., Inc. |
- 2 - Gilchrist Construction Co. LLC |
||
| Unit Price | Total Amount |
Unit Price | Total Amount |
|||||
| 0001 | 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | 1,000.00 | 1,000.00 | 1,200.00 | 1,200.00 |
| 0002 | 203-07-00100 | Borrow (Vehicular Measurement) | 12 | CUYD | 30.00 | 360.00 | 35.00 | 420.00 |
| 0003 | 401-02-00100 | Aggregate Surface Course (Adjusted Vehicular Measurement) | 1,100 | CUYD | 23.50 | 25,850.00 | 55.00 | 60,500.00 |
| 0004 | 502-01-00100 | Superpave Asphaltic Concrete | 6,451.4 | TON | 89.00 | 574,174.60 | 85.00 | 548,369.00 |
| 0005 | 502-01-00200 | Superpave Asphaltic Concrete, Drives, Turnouts and Miscellaneous | 256.4 | TON | 50.00 | 12,820.00 | 195.00 | 49,998.00 |
| 0006 | 509-01-00100 | Cold Planing Asphaltic Pavement | 650 | SQYD | 1.00 | 650.00 | 11.00 | 7,150.00 |
| 0007 | 509-02-00100 | Contractor Retained Reclaimed Asphaltic Pavement | -18 | CUYD | 1.00 | -18.00 | 1.00 | -18.00 |
| 0008 | 510-01-00200 | Pavement Patching (12" Minimum Thickness) | 4,300 | SQYD | 71.50 | 307,450.00 | 85.00 | 365,500.00 |
| 0009 | 701-01-01001 | Cross Drain Pipe (24" RCP) | 8 | LNFT | 350.00 | 2,800.00 | 155.00 | 1,240.00 |
| 0010 | 701-10-01040 | Reinforced Concrete Pipe (Extension) (18") | 8 | LNFT | 300.00 | 2,400.00 | 145.00 | 1,160.00 |
| 0011 | 701-15-00100 | Concrete Collar | 2 | EACH | 1,250.00 | 2,500.00 | 880.00 | 1,760.00 |
| 0012 | 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | 37,500.00 | 37,500.00 | 5,800.00 | 5,800.00 |
| 0013 | 713-02-00500 | Temporary Pavement Markings (24" Width) | 20 | LNFT | 0.10 | 2.00 | 1.90 | 38.00 |
| 0014 | 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 4.286 | MILE | 400.00 | 1,714.40 | 375.00 | 1,607.25 |
| 0015 | 713-03-02000 | Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) | 1.635 | MILE | 1.00 | 1.64 | 535.00 | 874.73 |
| 0016 | 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 8.395 | MILE | 1.00 | 8.40 | 620.00 | 5,204.90 |
| 0017 | 726-01-00100 | Bedding Material | 4 | CUYD | 100.00 | 400.00 | 115.00 | 460.00 |
| 0018 | 727-01-00100 | Mobilization | 1 | LUMP | 37,500.00 | 37,500.00 | 160,000.00 | 160,000.00 |
| 0019 | 729-16-00300 | Object Marker Assembly (Type 3) | 2 | EACH | 75.00 | 150.00 | 85.00 | 170.00 |
| 0020 | 731-02-00100 | Reflectorized Raised Pavement Markers | 620 | EACH | 5.00 | 3,100.00 | 5.90 | 3,658.00 |
| 0021 | 732-01-02080 | Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) | 20 | LNFT | 6.00 | 120.00 | 5.65 | 113.00 |
| 0022 | 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 8.395 | MILE | 2,600.00 | 21,827.00 | 3,200.00 | 26,864.00 |
| 0023 | 732-03-02000 | Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) | 1.635 | MILE | 800.00 | 1,308.00 | 950.00 | 1,553.25 |
| 0024 | 735-01-00100 | Mailboxes | 13 | EACH | 1.00 | 13.00 | 11.00 | 143.00 |
| 0025 | 735-02-00100 | Mailbox Supports (Single) | 13 | EACH | 133.00 | 1,729.00 | 100.00 | 1,300.00 |
| 0026 | 739-01-00100 | Hydro-Seeding | 3.5 | ACRE | 2,700.00 | 9,450.00 | 1,200.00 | 4,200.00 |
| 0027 | 740-01-00100 | Construction Layout | 1 | LUMP | 15,000.00 | 15,000.00 | 6,800.00 | 6,800.00 |
| 0028 | NS-200-00020 | Cleaning Existing Ditches | 30 | LNFT | 10.00 | 300.00 | 30.00 | 900.00 |
| 0029 | NS-500-00280 | Surface Preparation | 1 | LUMP | 30,000.00 | 30,000.00 | 45,000.00 | 45,000.00 |
| 0030 | NS-500-00340 | Saw Cutting Asphaltic Concrete Pavement | 5,000 | INLF | 0.01 | 50.00 | 0.39 | 1,950.00 |
| CONTRACTOR TOTAL | 1,090,160.04 | 1,303,915.13 | ||||||