| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - JAMES CONSTRUCTION GROUP LLC |
- 3 - RMD HOLDINGS LTD |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
30,000.00 |
30,000.00 |
190,000.00 |
190,000.00 |
47,000.00 |
47,000.00 |
|
|
| 202-02-A-01 |
removal of bridges (sta. 10+611.610; 7.569 m x
17.351 m concrete slab span bridge with timber piles) |
1   |
ea |
9,000.00 |
9,000.00 |
75,000.00 |
75,000.00 |
20,000.00 |
20,000.00 |
|
|
| 202-02-A-02 |
removal of bridges (sta. 10+991.970; 7.575 m x
10.328 m concrete slab span bridge with timber piles) |
1   |
ea |
9,000.00 |
9,000.00 |
75,000.00 |
75,000.00 |
20,000.00 |
20,000.00 |
|
|
| 202-02-A-03 |
removal of bridges (sta. 11+182.497; 7.573 m x
10.304 m concrete slab span bridge with timber piles) |
1   |
ea |
9,000.00 |
9,000.00 |
75,000.00 |
75,000.00 |
20,000.00 |
20,000.00 |
|
|
| 202-02-A-04 |
removal of bridges (sta. 11+627.055; 7.563 m x
17.318 m concrete slab span bridge with timber piles) |
1   |
ea |
9,000.00 |
9,000.00 |
75,000.00 |
75,000.00 |
20,000.00 |
20,000.00 |
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
1,380   |
sq m |
8.00 |
11,040.00 |
15.00 |
20,700.00 |
15.00 |
20,700.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
2,753   |
sq m |
7.00 |
19,271.00 |
10.00 |
27,530.00 |
11.00 |
30,283.00 |
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
63.8 |
ln m |
17.00 |
1,084.60 |
25.00 |
1,595.00 |
19.00 |
1,212.20 |
|
|
| 203-01 |
general excavation
|
25,675   |
cu m |
12.00 |
308,100.00 |
10.00 |
256,750.00 |
12.00 |
308,100.00 |
|
|
| 203-02 |
drainage excavation
|
1,792   |
cu m |
12.00 |
21,504.00 |
16.00 |
28,672.00 |
15.00 |
26,880.00 |
|
|
| 203-03 |
embankment
|
26,457   |
cu m |
14.00 |
370,398.00 |
17.00 |
449,769.00 |
14.00 |
370,398.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
1,442   |
ea |
19.00 |
27,398.00 |
10.00 |
14,420.00 |
20.00 |
28,840.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
48   |
ea |
230.00 |
11,040.00 |
115.00 |
5,520.00 |
100.00 |
4,800.00 |
|
|
| 204-05-B |
temporary sediment check dams (stone)
|
6   |
ea |
700.00 |
4,200.00 |
650.00 |
3,900.00 |
750.00 |
4,500.00 |
|
|
| 204-06 |
temporary silt fencing
|
4,735   |
ln m |
4.00 |
18,940.00 |
5.00 |
23,675.00 |
3.50 |
16,572.50 |
|
|
| 204-07 |
temporary stone construction entrance
|
2   |
ea |
3,000.00 |
6,000.00 |
3,000.00 |
6,000.00 |
2,500.00 |
5,000.00 |
|
|
| 302-02-C |
class ii base course (200 mm thick)
|
536.6 |
sq m |
33.00 |
17,707.80 |
34.00 |
18,244.40 |
33.00 |
17,707.80 |
|
|
| 302-02-E |
class ii base course (250 mm thick)
|
33,233.4 |
sq m |
25.00 |
830,835.00 |
31.00 |
1,030,235.40 |
30.00 |
997,002.00 |
|
|
| 304-05 |
lime treatment (type e) (300 mm thick)
|
170.56 |
Mg |
100.00 |
17,056.00 |
150.00 |
25,584.00 |
360.00 |
61,401.60 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
1,000.0 |
cu m |
50.00 |
50,000.00 |
65.00 |
65,000.00 |
57.00 |
57,000.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
47.6 |
Mg |
300.00 |
14,280.00 |
300.00 |
14,280.00 |
275.00 |
13,090.00 |
|
|
| 601-01-G |
portland cement concrete pavement (200 mm thick)
|
27,221.7 |
sq m |
48.00 |
1,306,641.60 |
55.00 |
1,497,193.50 |
65.00 |
1,769,410.50 |
|
|
| 601-02-G |
portland cement concrete pavement (200 mm thick)
(crossovers & turnouts) |
4,287.7 |
sq m |
96.00 |
411,619.20 |
90.00 |
385,893.00 |
87.00 |
373,029.90 |
|
|
| 601-04 |
portland cement concrete pavement coring
|
40   |
ea |
150.00 |
6,000.00 |
75.00 |
3,000.00 |
180.00 |
7,200.00 |
|
|
| 701-03-F |
storm drain pipe (375 mm rcp/pcp)
|
2,528.5 |
ln m |
115.00 |
290,777.50 |
130.00 |
328,705.00 |
125.50 |
317,326.75 |
|
|
| 701-03-F/G-01 |
storm drain pipe (375 mm rpvccp/450 mm cmp)(outfall)
|
45.0 |
ln m |
150.00 |
6,750.00 |
130.00 |
5,850.00 |
130.00 |
5,850.00 |
|
|
| 701-03-G |
storm drain pipe (450 mm rcp/pcp)
|
417.9 |
ln m |
130.00 |
54,327.00 |
140.00 |
58,506.00 |
142.00 |
59,341.80 |
|
|
| 701-03-G/H-01 |
storm drain pipe (450 mm rpvccp/525 mm cmp)(outfall)
|
31.9 |
ln m |
190.00 |
6,061.00 |
140.00 |
4,466.00 |
145.00 |
4,625.50 |
|
|
| 701-03-I |
storm drain pipe (600 mm rcp/pcp)
|
350.7 |
ln m |
175.00 |
61,372.50 |
275.00 |
96,442.50 |
189.00 |
66,282.30 |
|
|
| 701-03-I/J-01 |
storm drain pipe (600 mm rpvccp/675 mm cmp)(outfall)
|
133.4 |
ln m |
220.00 |
29,348.00 |
275.00 |
36,685.00 |
190.00 |
25,346.00 |
|
|
| 701-03-K |
storm drain pipe (750 mm rcp/pcp)
|
13.9 |
ln m |
250.00 |
3,475.00 |
350.00 |
4,865.00 |
295.00 |
4,100.50 |
|
|
| 701-03-M/N-01 |
storm drain pipe (900 mm rpvccp/1050 mm cmp)(outfall)
|
9.5 |
ln m |
330.00 |
3,135.00 |
400.00 |
3,800.00 |
389.00 |
3,695.50 |
|
|
| 701-03-Q |
storm drain pipe (1500 mm rcp/pcp)
|
77.8 |
ln m |
790.00 |
61,462.00 |
900.00 |
70,020.00 |
587.00 |
45,668.60 |
|
|
| 701-03-Q/R-01 |
storm drain pipe (1500 mm rpvccp/1650 mm cmp)(outfall)
|
18.0 |
ln m |
420.00 |
7,560.00 |
900.00 |
16,200.00 |
590.00 |
10,620.00 |
|
|
| 701-09 |
fabricating pipe fittings
|
5   |
ea |
700.00 |
3,500.00 |
2,000.00 |
10,000.00 |
760.00 |
3,800.00 |
|
|
| 701-10-F |
reinforced concrete pipe (extension)(375 mm)
|
2.0 |
ln m |
325.00 |
650.00 |
400.00 |
800.00 |
200.00 |
400.00 |
|
|
| 701-10-I |
reinforced concrete pipe (extension)(600 mm)
|
2.0 |
ln m |
370.00 |
740.00 |
500.00 |
1,000.00 |
240.00 |
480.00 |
|
|
| 701-15 |
concrete collar
|
2   |
ea |
700.00 |
1,400.00 |
2,000.00 |
4,000.00 |
500.00 |
1,000.00 |
|
|
| 702-02-A |
manholes (mh-06)
|
2   |
ea |
5,500.00 |
11,000.00 |
7,000.00 |
14,000.00 |
4,500.00 |
9,000.00 |
|
|
| 702-02-F |
manholes (mh-01m)
|
11   |
ea |
5,500.00 |
60,500.00 |
3,200.00 |
35,200.00 |
3,900.00 |
42,900.00 |
|
|
| 702-02-G |
manholes (type ii)
|
7   |
ea |
7,500.00 |
52,500.00 |
3,700.00 |
25,900.00 |
4,200.00 |
29,400.00 |
|
|
| 702-03-A |
catch basins (cb-01m)
|
36   |
ea |
3,500.00 |
126,000.00 |
2,500.00 |
90,000.00 |
2,100.00 |
75,600.00 |
|
|
| 702-03-C |
catch basins (cb-06m)
|
86   |
ea |
4,000.00 |
344,000.00 |
3,500.00 |
301,000.00 |
3,900.00 |
335,400.00 |
|
|
| 702-03-D |
catch basins (cb-07m)
|
34   |
ea |
4,900.00 |
166,600.00 |
4,100.00 |
139,400.00 |
4,800.00 |
163,200.00 |
|
|
| 702-03-F |
catch basins (cb-08m)
|
16   |
ea |
7,000.00 |
112,000.00 |
7,000.00 |
112,000.00 |
5,700.00 |
91,200.00 |
|
|
| 702-03-G |
catch basins (cb-09m)
|
1   |
ea |
6,000.00 |
6,000.00 |
5,000.00 |
5,000.00 |
4,800.00 |
4,800.00 |
|
|
| 702-04-A |
adjusting manholes
|
11   |
ea |
1,200.00 |
13,200.00 |
1,000.00 |
11,000.00 |
900.00 |
9,900.00 |
|
|
| 702-04-A-01 |
adjusting manholes (special detail)
|
5   |
ea |
1,400.00 |
7,000.00 |
1,500.00 |
7,500.00 |
1,800.00 |
9,000.00 |
|
|
| 702-04-B |
adjusting catch basins
|
1   |
ea |
2,800.00 |
2,800.00 |
1,500.00 |
1,500.00 |
1,800.00 |
1,800.00 |
|
|
| 706-01-A |
concrete walk (100 mm thick)
|
6,035.0 |
sq m |
44.00 |
265,540.00 |
45.00 |
271,575.00 |
58.00 |
350,030.00 |
|
|
| 706-02-C |
concrete drive (150 mm thick)
|
3,764.9 |
sq m |
52.00 |
195,774.80 |
51.00 |
192,009.90 |
72.00 |
271,072.80 |
|
|
| 706-04 |
handicapped curb ramps
|
21   |
ea |
600.00 |
12,600.00 |
500.00 |
10,500.00 |
1,200.00 |
25,200.00 |
|
|
| 707-01 |
concrete curb
|
7,011.0 |
ln m |
8.50 |
59,593.50 |
7.00 |
49,077.00 |
80.00 |
560,880.00 |
|
|
| 707-03 |
combination concrete curb & gutter
|
279.7 |
ln m |
58.00 |
16,222.60 |
100.00 |
27,970.00 |
150.00 |
41,955.00 |
|
|
| 711-01-B |
riprap (5 kg, 260 mm thick)
|
48   |
sq m |
80.00 |
3,840.00 |
50.00 |
2,400.00 |
120.00 |
5,760.00 |
|
|
| 711-01-C |
riprap (15 kg, 365 mm thick)
|
356   |
sq m |
80.00 |
28,480.00 |
60.00 |
21,360.00 |
120.00 |
42,720.00 |
|
|
| 711-04 |
geotextile fabric
|
404   |
sq m |
2.50 |
1,010.00 |
3.00 |
1,212.00 |
3.60 |
1,454.40 |
|
|
| 712-04 |
flexible revetment
|
584   |
sq m |
80.00 |
46,720.00 |
74.00 |
43,216.00 |
78.00 |
45,552.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
255,000.00 |
255,000.00 |
300,000.00 |
300,000.00 |
550,000.00 |
550,000.00 |
|
|
| 713-03-B-01 |
temporary pvmt. markings (broken line)(100 mm w)(3.0 m
l)(type i removable) |
1.000 |
km |
1,800.00 |
1,800.00 |
1,900.00 |
1,900.00 |
1,500.00 |
1,500.00 |
|
|
| 713-04-A-01 |
temporary pavement markings (solid line)(100 mm width)
(type i removable) |
7.200 |
km |
5,500.00 |
39,600.00 |
7,300.00 |
52,560.00 |
5,000.00 |
36,000.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
25,000   |
kg |
0.70 |
17,500.00 |
0.60 |
15,000.00 |
1.00 |
25,000.00 |
|
|
| 717-01 |
seeding
|
460   |
kg |
20.00 |
9,200.00 |
18.50 |
8,510.00 |
19.00 |
8,740.00 |
|
|
| 718-01 |
fertilizer
|
15,160   |
kg |
1.00 |
15,160.00 |
0.90 |
13,644.00 |
0.50 |
7,580.00 |
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
3,400   |
sq m |
1.60 |
5,440.00 |
1.50 |
5,100.00 |
1.50 |
5,100.00 |
|
|
| 722-01 |
project site laboratory
|
1   |
ea |
30,000.00 |
30,000.00 |
30,000.00 |
30,000.00 |
45,000.00 |
45,000.00 |
|
|
| 726-01 |
bedding material
|
309.1 |
cu m |
115.00 |
35,546.50 |
85.00 |
26,273.50 |
120.00 |
37,092.00 |
|
|
| 727-01 |
mobilization
|
lump |
lump |
850,000.00 |
850,000.00 |
940,000.00 |
940,000.00 |
792,000.00 |
792,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
ea |
90.00 |
720.00 |
85.00 |
680.00 |
120.00 |
960.00 |
|
|
| 732-01-C |
plastic pavement striping (200 mm width)
|
69.0 |
ln m |
4.50 |
310.50 |
4.00 |
276.00 |
4.00 |
276.00 |
|
|
| 732-01-E |
plastic pavement striping (600 mm width)
|
65.0 |
ln m |
15.50 |
1,007.50 |
12.00 |
780.00 |
13.50 |
877.50 |
|
|
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
13.860 |
km |
1,700.00 |
23,562.00 |
2,075.00 |
28,759.50 |
1,500.00 |
20,790.00 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
3   |
ea |
250.00 |
750.00 |
250.00 |
750.00 |
215.00 |
645.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
3   |
ea |
245.00 |
735.00 |
250.00 |
750.00 |
215.00 |
645.00 |
|
|
| 735-01 |
mailboxes
|
59   |
ea |
10.00 |
590.00 |
10.00 |
590.00 |
5.00 |
295.00 |
|
|
| 735-02 |
mailbox supports (single)
|
34   |
ea |
150.00 |
5,100.00 |
150.00 |
5,100.00 |
130.00 |
4,420.00 |
|
|
| 735-03 |
mailbox supports (double)
|
11   |
ea |
160.00 |
1,760.00 |
225.00 |
2,475.00 |
150.00 |
1,650.00 |
|
|
| 735-04 |
mailbox supports (multiple)
|
1   |
ea |
300.00 |
300.00 |
360.00 |
360.00 |
180.00 |
180.00 |
|
|
| 740-01 |
construction layout
|
lump |
lump |
200,000.00 |
200,000.00 |
275,000.00 |
275,000.00 |
275,000.00 |
275,000.00 |
|
|
| 742-01-B |
sanitary sewer pipe (150 mm pvc)
|
63.0 |
ln m |
150.00 |
9,450.00 |
130.00 |
8,190.00 |
105.00 |
6,615.00 |
|
|
| 742-01-C-01 |
sanitary sewer pipe (200 mm pvc)
|
260.0 |
ln m |
450.00 |
117,000.00 |
165.00 |
42,900.00 |
120.00 |
31,200.00 |
|
|
| 742-01-C-02 |
sanitary sewer pipe (200 mm di)
|
56.0 |
ln m |
480.00 |
26,880.00 |
230.00 |
12,880.00 |
180.00 |
10,080.00 |
|
|
| 742-01-D |
sanitary sewer pipe (250 mm di)
|
46.0 |
ln m |
610.00 |
28,060.00 |
265.00 |
12,190.00 |
195.00 |
8,970.00 |
|
|
| 742-02 |
adjusting sanitary sewer house connection
|
5   |
ea |
1,800.00 |
9,000.00 |
1,500.00 |
7,500.00 |
270.00 |
1,350.00 |
|
|
| 742-03 |
adjusting sanitary sewer service lines
|
270   |
ln m |
95.00 |
25,650.00 |
75.00 |
20,250.00 |
30.00 |
8,100.00 |
|
|
| 804-01-B |
precast concrete piles (350 mm)
|
930.0 |
ln m |
130.00 |
120,900.00 |
200.00 |
186,000.00 |
240.00 |
223,200.00 |
|
|
| 804-12 |
loading permanent piles
|
2   |
ea |
500.00 |
1,000.00 |
1,000.00 |
2,000.00 |
1,200.00 |
2,400.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
61.13 |
cu m |
1,400.00 |
85,582.00 |
1,450.00 |
88,638.50 |
1,965.00 |
120,120.45 |
|
|
| 805-01-C |
class a concrete (retaining walls)
|
10.87 |
cu m |
1,600.00 |
17,392.00 |
1,450.00 |
15,761.50 |
1,965.00 |
21,359.55 |
|
|
| 805-01-F |
class a concrete (bents)
|
69.42 |
cu m |
1,500.00 |
104,130.00 |
1,400.00 |
97,188.00 |
1,575.00 |
109,336.50 |
|
|
| 805-03 |
class aa concrete
|
266.00 |
cu m |
800.00 |
212,800.00 |
750.00 |
199,500.00 |
1,179.00 |
313,614.00 |
|
|
| 805-12-M |
reinforced concrete box culverts (1800 mm x 1800 mm)
|
77.10 |
ln m |
1,800.00 |
138,780.00 |
1,550.00 |
119,505.00 |
2,100.00 |
161,910.00 |
|
|
| 805-12-V |
reinforced concrete box culverts (2700 mm x 2700 mm)
|
62.10 |
ln m |
3,000.00 |
186,300.00 |
2,550.00 |
158,355.00 |
3,000.00 |
186,300.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
37,686   |
kg |
1.90 |
71,603.40 |
2.00 |
75,372.00 |
4.20 |
158,281.20 |
|
|
| 810-01 |
concrete railing (barrier)
|
223.90 |
ln m |
170.00 |
38,063.00 |
145.00 |
32,465.50 |
250.00 |
55,975.00 |
|
|
| 810-03 |
pipe railing (75 mm)
|
60.00 |
ln m |
950.00 |
57,000.00 |
900.00 |
54,000.00 |
1,200.00 |
72,000.00 |
|
|
| 813-01 |
concrete approach slabs
|
642.60 |
sq m |
240.00 |
154,224.00 |
210.00 |
134,946.00 |
252.00 |
161,935.20 |
|
|
| S-001 |
saw cutting concrete pavement (25 mm/meter)
|
1,080.0 |
ln m |
5.00 |
5,400.00 |
4.00 |
4,320.00 |
5.00 |
5,400.00 |
|
|
| S-002 |
sanitary sewer pipe service connection w/cleanout
|
7   |
ea |
650.00 |
4,550.00 |
1,500.00 |
10,500.00 |
300.00 |
2,100.00 |
|
|
| S-003 |
relocated/rebuild block planters, brick structures,
signs, brick columns w/ light and replace vegetation in planters |
6   |
ea |
4,000.00 |
24,000.00 |
3,500.00 |
21,000.00 |
4,500.00 |
27,000.00 |
|
|
| S-004 |
permanent rock check dam (adjusted vehicular
measurement) |
290.00 |
cu m |
300.00 |
87,000.00 |
310.00 |
89,900.00 |
300.00 |
87,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
8,599,900.00 |
|
9,472,990.20 |
|
10,493,486.05 |
|
|
| | NUMBER OF DAYS BID AT $3,000 PER DAY. |
|
|
|
1,200,000.00 |
|
1,440,000.00 |
|
960,000.00 |
|
|
| | TOTAL BID |
|
|
|
9,799,900.00 |
|
10,912,990.20 |
|
11,453,486.05 |
|
|
|