Letting of 8/19/2009 LA DOTD Headquarters


REBID
go back
Go Back
DBE GOAL FED
Lead Project: 742-07-0098
Parish: RAPIDES
Routes: LA 3144
Description: SUSEK DRIVE
Type Const: grad, drain struct, lime trmt, class ii bc, superpave acp, pccp, sanitary sewer,
box culvert, slab span bridges, and related work
Estimated Construction Cost: $8,423,933.28
Maximum Number of Days Allowed for Construction: 590
Calculated Daily User Cost: $3,000.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 12312 GILCHRIST CONSTRUCTION CO. LLC $8,599,900.00 400 $9,799,900.00
2 34567 JAMES CONSTRUCTION GROUP LLC $9,472,990.20 480 $10,912,990.20
3 43371 RMD HOLDINGS LTD $10,493,486.05 320 $11,453,486.05
 
Item Number Item Description Quantity Unit of Measure - 1 -
GILCHRIST CONSTRUCTION CO. LLC
- 2 -
JAMES CONSTRUCTION GROUP LLC
- 3 -
RMD HOLDINGS LTD

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      lump 30,000.00 30,000.00 190,000.00 190,000.00 47,000.00 47,000.00    
202-02-A-01 removal of bridges (sta. 10+611.610; 7.569 m x
17.351 m concrete slab span bridge with timber
piles)
1      ea 9,000.00 9,000.00 75,000.00 75,000.00 20,000.00 20,000.00    
202-02-A-02 removal of bridges (sta. 10+991.970; 7.575 m x
10.328 m concrete slab span bridge with timber
piles)
1      ea 9,000.00 9,000.00 75,000.00 75,000.00 20,000.00 20,000.00    
202-02-A-03 removal of bridges (sta. 11+182.497; 7.573 m x
10.304 m concrete slab span bridge with timber
piles)
1      ea 9,000.00 9,000.00 75,000.00 75,000.00 20,000.00 20,000.00    
202-02-A-04 removal of bridges (sta. 11+627.055; 7.563 m x
17.318 m concrete slab span bridge with timber
piles)
1      ea 9,000.00 9,000.00 75,000.00 75,000.00 20,000.00 20,000.00    
202-02-C removal of portland cement concrete pavement 1,380      sq m 8.00 11,040.00 15.00 20,700.00 15.00 20,700.00    
202-02-D removal of concrete walks & drives 2,753      sq m 7.00 19,271.00 10.00 27,530.00 11.00 30,283.00    
202-02-F removal of concrete combination curb & gutter 63.8    ln m 17.00 1,084.60 25.00 1,595.00 19.00 1,212.20    
203-01 general excavation 25,675      cu m 12.00 308,100.00 10.00 256,750.00 12.00 308,100.00    
203-02 drainage excavation 1,792      cu m 12.00 21,504.00 16.00 28,672.00 15.00 26,880.00    
203-03 embankment 26,457      cu m 14.00 370,398.00 17.00 449,769.00 14.00 370,398.00    
204-02 temporary hay or straw bales 1,442      ea 19.00 27,398.00 10.00 14,420.00 20.00 28,840.00    
204-05-A temporary sediment check dams (hay) 48      ea 230.00 11,040.00 115.00 5,520.00 100.00 4,800.00    
204-05-B temporary sediment check dams (stone) 6      ea 700.00 4,200.00 650.00 3,900.00 750.00 4,500.00    
204-06 temporary silt fencing 4,735      ln m 4.00 18,940.00 5.00 23,675.00 3.50 16,572.50    
204-07 temporary stone construction entrance 2      ea 3,000.00 6,000.00 3,000.00 6,000.00 2,500.00 5,000.00    
302-02-C class ii base course (200 mm thick) 536.6    sq m 33.00 17,707.80 34.00 18,244.40 33.00 17,707.80    
302-02-E class ii base course (250 mm thick) 33,233.4    sq m 25.00 830,835.00 31.00 1,030,235.40 30.00 997,002.00    
304-05 lime treatment (type e) (300 mm thick) 170.56   Mg 100.00 17,056.00 150.00 25,584.00 360.00 61,401.60    
402-01 traffic maintenance aggregate (vehicular measurement) 1,000.0    cu m 50.00 50,000.00 65.00 65,000.00 57.00 57,000.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
47.6    Mg 300.00 14,280.00 300.00 14,280.00 275.00 13,090.00    
601-01-G portland cement concrete pavement (200 mm thick) 27,221.7    sq m 48.00 1,306,641.60 55.00 1,497,193.50 65.00 1,769,410.50    
601-02-G portland cement concrete pavement (200 mm thick)
(crossovers & turnouts)
4,287.7    sq m 96.00 411,619.20 90.00 385,893.00 87.00 373,029.90    
601-04 portland cement concrete pavement coring 40      ea 150.00 6,000.00 75.00 3,000.00 180.00 7,200.00    
701-03-F storm drain pipe (375 mm rcp/pcp) 2,528.5    ln m 115.00 290,777.50 130.00 328,705.00 125.50 317,326.75    
701-03-F/G-01 storm drain pipe (375 mm rpvccp/450 mm cmp)(outfall) 45.0    ln m 150.00 6,750.00 130.00 5,850.00 130.00 5,850.00    
701-03-G storm drain pipe (450 mm rcp/pcp) 417.9    ln m 130.00 54,327.00 140.00 58,506.00 142.00 59,341.80    
701-03-G/H-01 storm drain pipe (450 mm rpvccp/525 mm cmp)(outfall) 31.9    ln m 190.00 6,061.00 140.00 4,466.00 145.00 4,625.50    
701-03-I storm drain pipe (600 mm rcp/pcp) 350.7    ln m 175.00 61,372.50 275.00 96,442.50 189.00 66,282.30    
701-03-I/J-01 storm drain pipe (600 mm rpvccp/675 mm cmp)(outfall) 133.4    ln m 220.00 29,348.00 275.00 36,685.00 190.00 25,346.00    
701-03-K storm drain pipe (750 mm rcp/pcp) 13.9    ln m 250.00 3,475.00 350.00 4,865.00 295.00 4,100.50    
701-03-M/N-01 storm drain pipe (900 mm rpvccp/1050 mm cmp)(outfall) 9.5    ln m 330.00 3,135.00 400.00 3,800.00 389.00 3,695.50    
701-03-Q storm drain pipe (1500 mm rcp/pcp) 77.8    ln m 790.00 61,462.00 900.00 70,020.00 587.00 45,668.60    
701-03-Q/R-01 storm drain pipe (1500 mm rpvccp/1650 mm cmp)(outfall) 18.0    ln m 420.00 7,560.00 900.00 16,200.00 590.00 10,620.00    
701-09 fabricating pipe fittings 5      ea 700.00 3,500.00 2,000.00 10,000.00 760.00 3,800.00    
701-10-F reinforced concrete pipe (extension)(375 mm) 2.0    ln m 325.00 650.00 400.00 800.00 200.00 400.00    
701-10-I reinforced concrete pipe (extension)(600 mm) 2.0    ln m 370.00 740.00 500.00 1,000.00 240.00 480.00    
701-15 concrete collar 2      ea 700.00 1,400.00 2,000.00 4,000.00 500.00 1,000.00    
702-02-A manholes (mh-06) 2      ea 5,500.00 11,000.00 7,000.00 14,000.00 4,500.00 9,000.00    
702-02-F manholes (mh-01m) 11      ea 5,500.00 60,500.00 3,200.00 35,200.00 3,900.00 42,900.00    
702-02-G manholes (type ii) 7      ea 7,500.00 52,500.00 3,700.00 25,900.00 4,200.00 29,400.00    
702-03-A catch basins (cb-01m) 36      ea 3,500.00 126,000.00 2,500.00 90,000.00 2,100.00 75,600.00    
702-03-C catch basins (cb-06m) 86      ea 4,000.00 344,000.00 3,500.00 301,000.00 3,900.00 335,400.00    
702-03-D catch basins (cb-07m) 34      ea 4,900.00 166,600.00 4,100.00 139,400.00 4,800.00 163,200.00    
702-03-F catch basins (cb-08m) 16      ea 7,000.00 112,000.00 7,000.00 112,000.00 5,700.00 91,200.00    
702-03-G catch basins (cb-09m) 1      ea 6,000.00 6,000.00 5,000.00 5,000.00 4,800.00 4,800.00    
702-04-A adjusting manholes 11      ea 1,200.00 13,200.00 1,000.00 11,000.00 900.00 9,900.00    
702-04-A-01 adjusting manholes (special detail) 5      ea 1,400.00 7,000.00 1,500.00 7,500.00 1,800.00 9,000.00    
702-04-B adjusting catch basins 1      ea 2,800.00 2,800.00 1,500.00 1,500.00 1,800.00 1,800.00    
706-01-A concrete walk (100 mm thick) 6,035.0    sq m 44.00 265,540.00 45.00 271,575.00 58.00 350,030.00    
706-02-C concrete drive (150 mm thick) 3,764.9    sq m 52.00 195,774.80 51.00 192,009.90 72.00 271,072.80    
706-04 handicapped curb ramps 21      ea 600.00 12,600.00 500.00 10,500.00 1,200.00 25,200.00    
707-01 concrete curb 7,011.0    ln m 8.50 59,593.50 7.00 49,077.00 80.00 560,880.00    
707-03 combination concrete curb & gutter 279.7    ln m 58.00 16,222.60 100.00 27,970.00 150.00 41,955.00    
711-01-B riprap (5 kg, 260 mm thick) 48      sq m 80.00 3,840.00 50.00 2,400.00 120.00 5,760.00    
711-01-C riprap (15 kg, 365 mm thick) 356      sq m 80.00 28,480.00 60.00 21,360.00 120.00 42,720.00    
711-04 geotextile fabric 404      sq m 2.50 1,010.00 3.00 1,212.00 3.60 1,454.40    
712-04 flexible revetment 584      sq m 80.00 46,720.00 74.00 43,216.00 78.00 45,552.00    
713-01 temporary signs & barricades lump      lump 255,000.00 255,000.00 300,000.00 300,000.00 550,000.00 550,000.00    
713-03-B-01 temporary pvmt. markings (broken line)(100 mm w)(3.0 m
l)(type i removable)
1.000  km 1,800.00 1,800.00 1,900.00 1,900.00 1,500.00 1,500.00    
713-04-A-01 temporary pavement markings (solid line)(100 mm width)
(type i removable)
7.200  km 5,500.00 39,600.00 7,300.00 52,560.00 5,000.00 36,000.00    
716-01-A mulch (vegetative) 25,000      kg 0.70 17,500.00 0.60 15,000.00 1.00 25,000.00    
717-01 seeding 460      kg 20.00 9,200.00 18.50 8,510.00 19.00 8,740.00    
718-01 fertilizer 15,160      kg 1.00 15,160.00 0.90 13,644.00 0.50 7,580.00    
720-01-A erosion control system, slope protection (type a) 3,400      sq m 1.60 5,440.00 1.50 5,100.00 1.50 5,100.00    
722-01 project site laboratory 1      ea 30,000.00 30,000.00 30,000.00 30,000.00 45,000.00 45,000.00    
726-01 bedding material 309.1    cu m 115.00 35,546.50 85.00 26,273.50 120.00 37,092.00    
727-01 mobilization lump      lump 850,000.00 850,000.00 940,000.00 940,000.00 792,000.00 792,000.00    
729-16-C object marker assembly (type 3) 8      ea 90.00 720.00 85.00 680.00 120.00 960.00    
732-01-C plastic pavement striping (200 mm width) 69.0    ln m 4.50 310.50 4.00 276.00 4.00 276.00    
732-01-E plastic pavement striping (600 mm width) 65.0    ln m 15.50 1,007.50 12.00 780.00 13.50 877.50    
732-02-A plastic pavement striping (solid line)(100 mm width) 13.860  km 1,700.00 23,562.00 2,075.00 28,759.50 1,500.00 20,790.00    
732-04-A plastic pavement legends & symbols (arrow) 3      ea 250.00 750.00 250.00 750.00 215.00 645.00    
732-04-C plastic pavement legends & symbols (only) 3      ea 245.00 735.00 250.00 750.00 215.00 645.00    
735-01 mailboxes 59      ea 10.00 590.00 10.00 590.00 5.00 295.00    
735-02 mailbox supports (single) 34      ea 150.00 5,100.00 150.00 5,100.00 130.00 4,420.00    
735-03 mailbox supports (double) 11      ea 160.00 1,760.00 225.00 2,475.00 150.00 1,650.00    
735-04 mailbox supports (multiple) 1      ea 300.00 300.00 360.00 360.00 180.00 180.00    
740-01 construction layout lump      lump 200,000.00 200,000.00 275,000.00 275,000.00 275,000.00 275,000.00    
742-01-B sanitary sewer pipe (150 mm pvc) 63.0    ln m 150.00 9,450.00 130.00 8,190.00 105.00 6,615.00    
742-01-C-01 sanitary sewer pipe (200 mm pvc) 260.0    ln m 450.00 117,000.00 165.00 42,900.00 120.00 31,200.00    
742-01-C-02 sanitary sewer pipe (200 mm di) 56.0    ln m 480.00 26,880.00 230.00 12,880.00 180.00 10,080.00    
742-01-D sanitary sewer pipe (250 mm di) 46.0    ln m 610.00 28,060.00 265.00 12,190.00 195.00 8,970.00    
742-02 adjusting sanitary sewer house connection 5      ea 1,800.00 9,000.00 1,500.00 7,500.00 270.00 1,350.00    
742-03 adjusting sanitary sewer service lines 270      ln m 95.00 25,650.00 75.00 20,250.00 30.00 8,100.00    
804-01-B precast concrete piles (350 mm) 930.0    ln m 130.00 120,900.00 200.00 186,000.00 240.00 223,200.00    
804-12 loading permanent piles 2      ea 500.00 1,000.00 1,000.00 2,000.00 1,200.00 2,400.00    
805-01-B class a concrete (box culvert headwalls) 61.13   cu m 1,400.00 85,582.00 1,450.00 88,638.50 1,965.00 120,120.45    
805-01-C class a concrete (retaining walls) 10.87   cu m 1,600.00 17,392.00 1,450.00 15,761.50 1,965.00 21,359.55    
805-01-F class a concrete (bents) 69.42   cu m 1,500.00 104,130.00 1,400.00 97,188.00 1,575.00 109,336.50    
805-03 class aa concrete 266.00   cu m 800.00 212,800.00 750.00 199,500.00 1,179.00 313,614.00    
805-12-M reinforced concrete box culverts (1800 mm x 1800 mm) 77.10   ln m 1,800.00 138,780.00 1,550.00 119,505.00 2,100.00 161,910.00    
805-12-V reinforced concrete box culverts (2700 mm x 2700 mm) 62.10   ln m 3,000.00 186,300.00 2,550.00 158,355.00 3,000.00 186,300.00    
806-01 deformed reinforcing steel 37,686      kg 1.90 71,603.40 2.00 75,372.00 4.20 158,281.20    
810-01 concrete railing (barrier) 223.90   ln m 170.00 38,063.00 145.00 32,465.50 250.00 55,975.00    
810-03 pipe railing (75 mm) 60.00   ln m 950.00 57,000.00 900.00 54,000.00 1,200.00 72,000.00    
813-01 concrete approach slabs 642.60   sq m 240.00 154,224.00 210.00 134,946.00 252.00 161,935.20    
S-001 saw cutting concrete pavement (25 mm/meter) 1,080.0    ln m 5.00 5,400.00 4.00 4,320.00 5.00 5,400.00    
S-002 sanitary sewer pipe service connection w/cleanout 7      ea 650.00 4,550.00 1,500.00 10,500.00 300.00 2,100.00    
S-003 relocated/rebuild block planters, brick structures,
signs, brick columns w/ light and replace
vegetation in planters
6      ea 4,000.00 24,000.00 3,500.00 21,000.00 4,500.00 27,000.00    
S-004 permanent rock check dam (adjusted vehicular
measurement)
290.00   cu m 300.00 87,000.00 310.00 89,900.00 300.00 87,000.00    
                       
 ITEM TOTAL (CONSTRUCTION BID)       8,599,900.00   9,472,990.20   10,493,486.05    
 NUMBER OF DAYS BID AT $3,000 PER DAY.       1,200,000.00   1,440,000.00   960,000.00    
 TOTAL BID       9,799,900.00   10,912,990.20   11,453,486.05    