| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - F. J. BURNELL, INC. |
- 2 - SPECIALTY TRACKHOE & DOZER SERV.INC |
- 3 - BEST-YET BUILDERS, LLC |
- 4 - JAMES CONSTRUCTION GROUP LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
LUMP |
125,000.00 |
125,000.00 |
130,000.00 |
130,000.00 |
100,000.00 |
100,000.00 |
230,000.00 |
230,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
150,000.00 |
150,000.00 |
31,680.00 |
31,680.00 |
25,000.00 |
25,000.00 |
40,000.00 |
40,000.00 |
| 202-02-A |
removal of bridges(sta.134+22;31'x 57'concrete slab
span bridge) |
1   |
EACH |
7,500.00 |
7,500.00 |
13,420.00 |
13,420.00 |
15,000.00 |
15,000.00 |
25,000.00 |
25,000.00 |
| 202-02-B-01 |
removal of concrete box culvert(sta.102+82;2-3'x 4'x
42) |
1   |
EACH |
7,500.00 |
7,500.00 |
6,710.00 |
6,710.00 |
6,000.00 |
6,000.00 |
4,500.00 |
4,500.00 |
| 202-02-B-02 |
removal of concrete box culvert(sta.170+35;3'x 3'x 46)
|
1   |
EACH |
7,500.00 |
7,500.00 |
6,710.00 |
6,710.00 |
4,500.00 |
4,500.00 |
3,700.00 |
3,700.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
1,162   |
SQYD |
6.00 |
6,972.00 |
11.55 |
13,421.10 |
8.00 |
9,296.00 |
15.00 |
17,430.00 |
| 202-02-D |
removal of concrete walks & drives
|
5,681   |
SQYD |
6.00 |
34,086.00 |
6.00 |
34,086.00 |
10.00 |
56,810.00 |
10.00 |
56,810.00 |
| 202-02-E |
removal of concrete curbs
|
375.5 |
LNFT |
3.00 |
1,126.50 |
9.00 |
3,379.50 |
10.00 |
3,755.00 |
3.00 |
1,126.50 |
| 202-02-F |
removal of concrete combination curb & gutter
|
1,022.8 |
LNFT |
3.00 |
3,068.40 |
13.00 |
13,296.40 |
10.00 |
10,228.00 |
2.50 |
2,557.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
49,632.5 |
SQYD |
3.50 |
173,713.75 |
2.00 |
99,265.00 |
3.00 |
148,897.50 |
1.00 |
49,632.50 |
| 202-02-H |
removal of guard rail
|
536   |
LNFT |
3.00 |
1,608.00 |
25.00 |
13,400.00 |
4.00 |
2,144.00 |
5.00 |
2,680.00 |
| 202-02-I |
removal of existing traffic signal equipment
|
lump |
LUMP |
3,000.00 |
3,000.00 |
6,600.00 |
6,600.00 |
2,500.00 |
2,500.00 |
3,425.00 |
3,425.00 |
| 202-02-J |
removal of concrete headwall
|
170.00 |
LNFT |
25.00 |
4,250.00 |
79.00 |
13,430.00 |
10.00 |
1,700.00 |
130.00 |
22,100.00 |
| 202-02-K |
removal of concrete median & curb
|
58.00 |
SQYD |
20.00 |
1,160.00 |
58.00 |
3,364.00 |
10.00 |
580.00 |
10.00 |
580.00 |
| 202-02-L |
removal of signal mast arms
|
4.00 |
EACH |
500.00 |
2,000.00 |
1,100.00 |
4,400.00 |
400.00 |
1,600.00 |
1,350.00 |
5,400.00 |
| 202-02-M |
removal of railroad
|
100.00 |
LNFT |
50.00 |
5,000.00 |
67.00 |
6,700.00 |
100.00 |
10,000.00 |
75.00 |
7,500.00 |
| 203-01 |
general excavation
|
41,188   |
CUYD |
7.00 |
288,316.00 |
6.00 |
247,128.00 |
5.50 |
226,534.00 |
10.00 |
411,880.00 |
| 203-02 |
drainage excavation
|
445   |
CUYD |
15.00 |
6,675.00 |
27.00 |
12,015.00 |
8.00 |
3,560.00 |
15.00 |
6,675.00 |
| 203-03 |
embankment
|
29,420   |
CUYD |
11.50 |
338,330.00 |
12.00 |
353,040.00 |
12.00 |
353,040.00 |
18.00 |
529,560.00 |
| 204-02 |
temporary hay or straw bales
|
75   |
EACH |
10.00 |
750.00 |
20.00 |
1,500.00 |
10.00 |
750.00 |
30.00 |
2,250.00 |
| 204-06 |
temporary silt fencing
|
6,382   |
LNFT |
2.00 |
12,764.00 |
1.55 |
9,892.10 |
1.50 |
9,573.00 |
3.00 |
19,146.00 |
| 302-02-E |
class ii base course (10" thick)
|
96,852.0 |
SQYD |
18.00 |
1,743,336.00 |
19.00 |
1,840,188.00 |
18.83 |
1,823,723.16 |
16.00 |
1,549,632.00 |
| 302-02-F |
class ii base course (12" thick)
|
2,141.7 |
SQYD |
23.00 |
49,259.10 |
26.00 |
55,684.20 |
22.59 |
48,381.00 |
30.00 |
64,251.00 |
| 304-05 |
lime treatment (type e)
|
701.00 |
TON |
350.00 |
245,350.00 |
245.00 |
171,745.00 |
1.00 |
701.00 |
300.00 |
210,300.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
230.0 |
CUYD |
75.00 |
17,250.00 |
85.00 |
19,550.00 |
1.00 |
230.00 |
75.00 |
17,250.00 |
| 502-01 |
superpave asphaltic concrete
|
712.7 |
TON |
200.00 |
142,540.00 |
123.50 |
88,018.45 |
100.00 |
71,270.00 |
160.00 |
114,032.00 |
| 509-01 |
cold planing asphaltic pavement
|
2,246   |
SQYD |
7.00 |
15,722.00 |
6.50 |
14,599.00 |
3.00 |
6,738.00 |
3.00 |
6,738.00 |
| 601-01-K |
portland cement concrete pavement (10" thick)
|
91,433.9 |
SQYD |
54.00 |
4,937,430.60 |
49.00 |
4,480,261.10 |
50.00 |
4,571,695.00 |
52.00 |
4,754,562.80 |
| 601-02-K |
portland cement concrete pavement (10" thick)
(crossovers & turnouts) |
2,570.1 |
SQYD |
58.00 |
149,065.80 |
55.00 |
141,355.50 |
103.64 |
266,365.16 |
90.00 |
231,309.00 |
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
17,293   |
LNFT |
36.00 |
622,548.00 |
38.00 |
657,134.00 |
39.00 |
674,427.00 |
57.00 |
985,701.00 |
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
1,925   |
LNFT |
42.00 |
80,850.00 |
46.30 |
89,127.50 |
44.00 |
84,700.00 |
60.00 |
115,500.00 |
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
871   |
LNFT |
58.00 |
50,518.00 |
58.00 |
50,518.00 |
74.00 |
64,454.00 |
78.00 |
67,938.00 |
| 701-03-K |
storm drain pipe (30" rcp/pcp)
|
506   |
LNFT |
85.00 |
43,010.00 |
96.00 |
48,576.00 |
105.00 |
53,130.00 |
94.00 |
47,564.00 |
| 701-03-M |
storm drain pipe (36" rcp/pcp)
|
240   |
LNFT |
100.00 |
24,000.00 |
100.00 |
24,000.00 |
144.50 |
34,680.00 |
122.00 |
29,280.00 |
| 701-03-N |
storm drain pipe (42" rcp/pcp)
|
576   |
LNFT |
130.00 |
74,880.00 |
152.50 |
87,840.00 |
187.25 |
107,856.00 |
151.00 |
86,976.00 |
| 701-04-A |
storm drain pipe arch (15" equiv. rcpa)
|
409   |
LNFT |
48.00 |
19,632.00 |
90.00 |
36,810.00 |
74.25 |
30,368.25 |
72.00 |
29,448.00 |
| 701-04-F |
storm drain pipe arch (36" equiv. rcpa)
|
298   |
LNFT |
125.00 |
37,250.00 |
141.00 |
42,018.00 |
160.00 |
47,680.00 |
128.00 |
38,144.00 |
| 701-04-G |
storm drain pipe arch (42" equiv. rcpa)
|
305   |
LNFT |
155.00 |
47,275.00 |
165.00 |
50,325.00 |
200.00 |
61,000.00 |
151.00 |
46,055.00 |
| 701-07-C |
yard drain pipe (8")
|
262   |
LNFT |
20.00 |
5,240.00 |
32.50 |
8,515.00 |
25.00 |
6,550.00 |
19.00 |
4,978.00 |
| 701-09 |
fabricating pipe fittings
|
1   |
EACH |
2,000.00 |
2,000.00 |
2,200.00 |
2,200.00 |
2,000.00 |
2,000.00 |
480.00 |
480.00 |
| 702-02-B |
manholes (r-cb-11)
|
1   |
EACH |
4,000.00 |
4,000.00 |
8,200.00 |
8,200.00 |
3,500.00 |
3,500.00 |
3,125.00 |
3,125.00 |
| 702-02-G |
manholes (mh 12.5" x 9")
|
2   |
EACH |
10,000.00 |
20,000.00 |
11,500.00 |
23,000.00 |
3,500.00 |
7,000.00 |
8,750.00 |
17,500.00 |
| 702-03-A |
catch basins (cb-01)
|
14   |
EACH |
3,500.00 |
49,000.00 |
3,100.00 |
43,400.00 |
1,950.00 |
27,300.00 |
2,475.00 |
34,650.00 |
| 702-03-C |
catch basins (cb-06)
|
106   |
EACH |
4,000.00 |
424,000.00 |
4,200.00 |
445,200.00 |
2,550.00 |
270,300.00 |
2,825.00 |
299,450.00 |
| 702-03-D |
catch basins (cb-07)
|
49   |
EACH |
5,000.00 |
245,000.00 |
5,200.00 |
254,800.00 |
4,000.00 |
196,000.00 |
3,050.00 |
149,450.00 |
| 702-03-F |
catch basins (cb-08)
|
20   |
EACH |
6,000.00 |
120,000.00 |
7,700.00 |
154,000.00 |
5,000.00 |
100,000.00 |
5,650.00 |
113,000.00 |
| 702-03-H |
catch basins (cb-05)
|
10   |
EACH |
1,200.00 |
12,000.00 |
1,800.00 |
18,000.00 |
800.00 |
8,000.00 |
950.00 |
9,500.00 |
| 702-03-I |
catch basins (cb-sd07-02)
|
2   |
EACH |
8,000.00 |
16,000.00 |
12,000.00 |
24,000.00 |
8,000.00 |
16,000.00 |
3,125.00 |
6,250.00 |
| 702-03-J |
catch basins (cb-sd08)
|
3   |
EACH |
10,000.00 |
30,000.00 |
12,000.00 |
36,000.00 |
10,000.00 |
30,000.00 |
6,250.00 |
18,750.00 |
| 702-08-A |
side drain safety end (type 1)
|
2   |
EACH |
1,000.00 |
2,000.00 |
1,650.00 |
3,300.00 |
1,575.00 |
3,150.00 |
1,220.00 |
2,440.00 |
| 703-03 |
perforated pipe underdrain
|
26,445   |
LNFT |
12.00 |
317,340.00 |
9.50 |
251,227.50 |
12.00 |
317,340.00 |
10.00 |
264,450.00 |
| 705-01 |
barbed wire fence
|
416   |
LNFT |
6.00 |
2,496.00 |
7.50 |
3,120.00 |
5.00 |
2,080.00 |
7.50 |
3,120.00 |
| 705-04 |
single swinging driveway gates
|
1   |
EACH |
700.00 |
700.00 |
550.00 |
550.00 |
600.00 |
600.00 |
550.00 |
550.00 |
| 705-06-A |
chain link fence (4-foot height)
|
595   |
LNFT |
16.00 |
9,520.00 |
22.00 |
13,090.00 |
14.00 |
8,330.00 |
220.00 |
130,900.00 |
| 705-08-A-01 |
30-foot double gates for chain link fence (4-foot
height) |
1   |
DBGT |
900.00 |
900.00 |
1,660.00 |
1,660.00 |
800.00 |
800.00 |
1,660.00 |
1,660.00 |
| 705-08-A-02 |
22-foot double gates for chain link fence (4-foot
height) |
1   |
DBGT |
900.00 |
900.00 |
1,560.00 |
1,560.00 |
800.00 |
800.00 |
1,560.00 |
1,560.00 |
| 705-08-A-03 |
16-foot double gates for chain link fence (4-foot
height) |
1   |
DBGT |
900.00 |
900.00 |
1,460.00 |
1,460.00 |
800.00 |
800.00 |
1,460.00 |
1,460.00 |
| 705-09 |
rebuilt fence
|
774   |
LNFT |
22.00 |
17,028.00 |
28.00 |
21,672.00 |
20.00 |
15,480.00 |
16.50 |
12,771.00 |
| 706-01-A |
concrete walk (4" thick)
|
1,195.3 |
SQYD |
38.00 |
45,421.40 |
33.00 |
39,444.90 |
40.00 |
47,812.00 |
45.00 |
53,788.50 |
| 706-02-C |
concrete drive (6" thick)
|
3,832.7 |
SQYD |
43.00 |
164,806.10 |
48.00 |
183,969.60 |
50.00 |
191,635.00 |
36.00 |
137,977.20 |
| 706-03-A |
incidental concrete paving (4" thick)
|
19.2 |
SQYD |
75.00 |
1,440.00 |
200.00 |
3,840.00 |
100.00 |
1,920.00 |
155.00 |
2,976.00 |
| 706-04 |
handicap ramps
|
28   |
EACH |
800.00 |
22,400.00 |
650.00 |
18,200.00 |
1,000.00 |
28,000.00 |
500.00 |
14,000.00 |
| 707-01 |
concrete curb
|
25,512.3 |
LNFT |
6.00 |
153,073.80 |
4.00 |
102,049.20 |
6.00 |
153,073.80 |
3.00 |
76,536.90 |
| 707-03 |
combination concrete curb & gutter
|
1,024.0 |
LNFT |
17.00 |
17,408.00 |
20.00 |
20,480.00 |
35.00 |
35,840.00 |
28.00 |
28,672.00 |
| 708-01 |
right-of-way monument
|
70   |
EACH |
200.00 |
14,000.00 |
190.00 |
13,300.00 |
330.00 |
23,100.00 |
200.00 |
14,000.00 |
| 711-02-C |
riprap (30 lb)
|
220   |
CUYD |
90.00 |
19,800.00 |
124.00 |
27,280.00 |
55.00 |
12,100.00 |
135.00 |
29,700.00 |
| 711-04 |
geotextile fabric
|
668   |
SQYD |
2.00 |
1,336.00 |
1.25 |
835.00 |
2.00 |
1,336.00 |
3.50 |
2,338.00 |
| 712-04 |
flexible revetment
|
320   |
SQYD |
45.00 |
14,400.00 |
50.00 |
16,000.00 |
60.00 |
19,200.00 |
75.00 |
24,000.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
125,000.00 |
125,000.00 |
80,000.00 |
80,000.00 |
500,000.00 |
500,000.00 |
86,000.00 |
86,000.00 |
| 713-02-A |
temporary pavement markings (4" width)
|
4,550   |
LNFT |
0.30 |
1,365.00 |
0.30 |
1,365.00 |
1.00 |
4,550.00 |
0.10 |
455.00 |
| 713-02-E |
temporary pavement markings (4" width)
|
366   |
LNFT |
1.50 |
549.00 |
1.00 |
366.00 |
1.00 |
366.00 |
0.10 |
36.60 |
| 713-04-A-01 |
temporary pavement markings (solid line)(4" width)
(type 1 removable) |
2.419 |
MILE |
10,000.00 |
24,190.00 |
8,500.00 |
20,561.50 |
7,500.00 |
18,142.50 |
7,475.00 |
18,082.03 |
| 716-01-A |
mulch (vegetative)
|
18.70 |
TON |
500.00 |
9,350.00 |
850.00 |
15,895.00 |
450.00 |
8,415.00 |
650.00 |
12,155.00 |
| 717-01 |
seeding
|
321   |
LB |
10.00 |
3,210.00 |
8.00 |
2,568.00 |
8.00 |
2,568.00 |
8.50 |
2,728.50 |
| 718-01 |
fertilizer
|
10,710   |
LB |
0.60 |
6,426.00 |
0.45 |
4,819.50 |
0.50 |
5,355.00 |
0.45 |
4,819.50 |
| 725-01 |
temporary detour roads
|
4,429.2 |
SQYD |
50.00 |
221,460.00 |
66.00 |
292,327.20 |
35.00 |
155,022.00 |
40.00 |
177,168.00 |
| 726-01 |
bedding material
|
2,361.0 |
CUYD |
75.00 |
177,075.00 |
77.00 |
181,797.00 |
65.00 |
153,465.00 |
62.50 |
147,562.50 |
| 727-01 |
mobilization
|
lump |
LUMP |
630,000.00 |
630,000.00 |
850,000.00 |
850,000.00 |
1,000,000.00 |
1,000,000.00 |
1,300,000.00 |
1,300,000.00 |
| 729-01-A |
sign (type a)(24" x 30")
|
40   |
SQFT |
60.00 |
2,400.00 |
50.00 |
2,000.00 |
50.00 |
2,000.00 |
51.00 |
2,040.00 |
| 729-01-B |
sign (type a)(18" x varies)
|
36   |
SQFT |
180.00 |
6,480.00 |
150.00 |
5,400.00 |
160.00 |
5,760.00 |
60.00 |
2,160.00 |
| 729-16-C |
object marker assembly (type 3)
|
20   |
EACH |
100.00 |
2,000.00 |
110.00 |
2,200.00 |
100.00 |
2,000.00 |
83.00 |
1,660.00 |
| 731-02 |
reflectorized raised pavement markers
|
1,083   |
EACH |
6.00 |
6,498.00 |
5.00 |
5,415.00 |
5.25 |
5,685.75 |
5.25 |
5,685.75 |
| 732-01-C |
plastic pavement striping (8" width)
|
1,824   |
LNFT |
1.15 |
2,097.60 |
1.00 |
1,824.00 |
1.15 |
2,097.60 |
1.15 |
2,097.60 |
| 732-01-E |
plastic pavement striping (24" width)
|
873   |
LNFT |
3.50 |
3,055.50 |
3.00 |
2,619.00 |
4.50 |
3,928.50 |
4.50 |
3,928.50 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
9.626 |
MILE |
2,600.00 |
25,027.60 |
2,400.00 |
23,102.40 |
2,450.00 |
23,583.70 |
2,450.00 |
23,583.70 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
8.385 |
MILE |
900.00 |
7,546.50 |
750.00 |
6,288.75 |
825.00 |
6,917.63 |
825.00 |
6,917.63 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
24   |
EACH |
170.00 |
4,080.00 |
150.00 |
3,600.00 |
235.00 |
5,640.00 |
235.00 |
5,640.00 |
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
23   |
EACH |
200.00 |
4,600.00 |
175.00 |
4,025.00 |
250.00 |
5,750.00 |
250.00 |
5,750.00 |
| 735-01 |
mailboxes
|
27   |
EACH |
1.00 |
27.00 |
90.00 |
2,430.00 |
50.00 |
1,350.00 |
9.65 |
260.64 |
| 735-02 |
mailbox supports (single)
|
27   |
EACH |
150.00 |
4,050.00 |
190.00 |
5,130.00 |
100.00 |
2,700.00 |
150.00 |
4,050.00 |
| 736-01 |
trenching & backfilling
|
310   |
LNFT |
4.50 |
1,395.00 |
4.50 |
1,395.00 |
4.00 |
1,240.00 |
4.00 |
1,240.00 |
| 736-03-A |
jacked or bored conduit (3" pec, sch 80)
|
740   |
LNFT |
45.00 |
33,300.00 |
27.50 |
20,350.00 |
40.00 |
29,600.00 |
25.00 |
18,500.00 |
| 736-04-A |
signal support (mast arm standard and 45 ft. arm)
|
5   |
EACH |
12,000.00 |
60,000.00 |
12,500.00 |
62,500.00 |
10,600.00 |
53,000.00 |
9,500.00 |
47,500.00 |
| 736-04-B |
signal support (mast arm standard and 50 ft. arm)
|
2   |
EACH |
13,250.00 |
26,500.00 |
14,000.00 |
28,000.00 |
11,800.00 |
23,600.00 |
10,500.00 |
21,000.00 |
| 736-04-C |
signal support (mast arm standard and 55 ft. arm)
|
1   |
EACH |
15,000.00 |
15,000.00 |
15,500.00 |
15,500.00 |
12,950.00 |
12,950.00 |
10,820.00 |
10,820.00 |
| 736-05-A |
signal heads (3 signal r,y,g,12" led lens)
|
15   |
EACH |
1,700.00 |
25,500.00 |
1,400.00 |
21,000.00 |
1,500.00 |
22,500.00 |
1,160.00 |
17,400.00 |
| 736-05-B |
signal heads (r,y,g,lty,ltg,12" led lens)
|
8   |
EACH |
2,400.00 |
19,200.00 |
2,300.00 |
18,400.00 |
2,100.00 |
16,800.00 |
1,900.00 |
15,200.00 |
| 736-05-C |
signal heads (r,y,g,rty,rtg,12" led lens)
|
2   |
EACH |
2,400.00 |
4,800.00 |
2,300.00 |
4,600.00 |
2,100.00 |
4,200.00 |
1,900.00 |
3,800.00 |
| 736-06-A |
signal service (required pole)
|
2   |
EACH |
1,700.00 |
3,400.00 |
2,000.00 |
4,000.00 |
1,500.00 |
3,000.00 |
2,200.00 |
4,400.00 |
| 736-08-A |
signal controller (ts-2,type 2 in type 6 base mounted
cabinet) |
2   |
EACH |
22,500.00 |
45,000.00 |
23,000.00 |
46,000.00 |
20,000.00 |
40,000.00 |
20,110.00 |
40,220.00 |
| 736-09 |
loop detector
|
1,771   |
LNFT |
20.00 |
35,420.00 |
22.00 |
38,962.00 |
18.00 |
31,878.00 |
13.50 |
23,908.50 |
| 736-10-A |
underground junction box (type "d")
|
8   |
EACH |
225.00 |
1,800.00 |
250.00 |
2,000.00 |
200.00 |
1,600.00 |
450.00 |
3,600.00 |
| 736-10-B |
underground junction box (type "f")
|
6   |
EACH |
900.00 |
5,400.00 |
500.00 |
3,000.00 |
800.00 |
4,800.00 |
640.00 |
3,840.00 |
| 736-10-C |
underground junction box (type "h")
|
2   |
EACH |
1,350.00 |
2,700.00 |
1,000.00 |
2,000.00 |
1,200.00 |
2,400.00 |
1,400.00 |
2,800.00 |
| 736-11-A |
conduit (1" pec, sch 80)
|
395   |
LNFT |
5.60 |
2,212.00 |
3.00 |
1,185.00 |
5.00 |
1,975.00 |
1.40 |
553.00 |
| 736-11-B |
conduit (2" pec, sch 80)
|
150   |
LNFT |
11.00 |
1,650.00 |
5.00 |
750.00 |
9.00 |
1,350.00 |
1.90 |
285.00 |
| 736-11-C |
conduit (3" pec, sch 80)
|
60   |
LNFT |
15.00 |
900.00 |
10.00 |
600.00 |
12.00 |
720.00 |
2.60 |
156.00 |
| 736-12-A |
conductor (2c,14 awg)
|
650   |
LNFT |
2.25 |
1,462.50 |
2.00 |
1,300.00 |
2.00 |
1,300.00 |
1.00 |
650.00 |
| 736-12-B |
conductor (6c,14 awg)
|
145   |
LNFT |
4.00 |
580.00 |
3.00 |
435.00 |
3.00 |
435.00 |
1.50 |
217.50 |
| 736-12-C |
conductor (10c,14 awg)
|
2,460   |
LNFT |
4.50 |
11,070.00 |
4.00 |
9,840.00 |
4.00 |
9,840.00 |
1.80 |
4,428.00 |
| 736-12-D |
conductor (3c,6 awg)
|
20   |
LNFT |
50.00 |
1,000.00 |
10.00 |
200.00 |
20.00 |
400.00 |
3.80 |
76.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
120,000.00 |
120,000.00 |
380,000.00 |
380,000.00 |
400,000.00 |
400,000.00 |
100,000.00 |
100,000.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
71.89 |
CUYD |
1,100.00 |
79,079.00 |
1,100.00 |
79,079.00 |
600.00 |
43,134.00 |
1,000.00 |
71,890.00 |
| 805-12-M |
reinforced concrete box culverts (6'x 6')
|
534.0 |
LNFT |
470.00 |
250,980.00 |
700.00 |
373,800.00 |
700.00 |
373,800.00 |
500.00 |
267,000.00 |
| 806-01 |
deformed reinforcing steel
|
5,357   |
LB |
1.00 |
5,357.00 |
1.50 |
8,035.50 |
0.75 |
4,017.75 |
2.00 |
10,714.00 |
| S-001 |
saw cutting portland cement concrete pavement
|
1,531   |
INFT |
5.00 |
7,655.00 |
15.50 |
23,730.50 |
1.25 |
1,913.75 |
1.00 |
1,531.00 |
| S-002 |
saw cutting asphaltic concrete pavement
|
1,259   |
INFT |
5.00 |
6,295.00 |
13.50 |
16,996.50 |
1.25 |
1,573.75 |
0.50 |
629.50 |
| S-003 |
video dectector device and connection
|
8   |
EACH |
8,000.00 |
64,000.00 |
7,500.00 |
60,000.00 |
7,000.00 |
56,000.00 |
6,050.00 |
48,400.00 |
| S-004 |
video detection system
|
2   |
EACH |
5,600.00 |
11,200.00 |
5,000.00 |
10,000.00 |
5,000.00 |
10,000.00 |
4,565.00 |
9,130.00 |
| S-005 |
signal head adjustment
|
lump |
LUMP |
2,250.00 |
2,250.00 |
1,500.00 |
1,500.00 |
2,000.00 |
2,000.00 |
4,425.00 |
4,425.00 |
| S-006 |
sign adjustment
|
lump |
LUMP |
1,700.00 |
1,700.00 |
500.00 |
500.00 |
1,500.00 |
1,500.00 |
3,325.00 |
3,325.00 |
| S-007 |
video detector adjustment
|
lump |
LUMP |
2,250.00 |
2,250.00 |
3,000.00 |
3,000.00 |
2,000.00 |
2,000.00 |
4,810.00 |
4,810.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
13,328,888.15 |
|
13,413,931.90 |
|
13,543,736.80 |
|
13,851,894.85 |
| | NUMBER OF DAYS BID AT $3,000 PER DAY. |
|
|
|
1,410,000.00 |
|
1,800,000.00 |
|
1,800,000.00 |
|
1,746,000.00 |
| | TOTAL BID |
|
|
|
14,738,888.15 |
|
15,213,931.90 |
|
15,343,736.80 |
|
15,597,894.85 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - JB JAMES CONSTRUCTION LLC |
- 6 - GILCHRIST CONSTRUCTION CO. LLC |
- 7 - BLOUNT BROS. CONSTRUCTION, INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
LUMP |
800,000.00 |
800,000.00 |
650,000.00 |
650,000.00 |
40,000.00 |
40,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
50,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
300,000.00 |
300,000.00 |
|
|
| 202-02-A |
removal of bridges(sta.134+22;31'x 57'concrete slab
span bridge) |
1   |
EACH |
25,000.00 |
25,000.00 |
15,000.00 |
15,000.00 |
50,000.00 |
50,000.00 |
|
|
| 202-02-B-01 |
removal of concrete box culvert(sta.102+82;2-3'x 4'x
42) |
1   |
EACH |
6,000.00 |
6,000.00 |
5,000.00 |
5,000.00 |
20,000.00 |
20,000.00 |
|
|
| 202-02-B-02 |
removal of concrete box culvert(sta.170+35;3'x 3'x 46)
|
1   |
EACH |
3,000.00 |
3,000.00 |
5,000.00 |
5,000.00 |
20,000.00 |
20,000.00 |
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
1,162   |
SQYD |
14.00 |
16,268.00 |
12.00 |
13,944.00 |
10.00 |
11,620.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
5,681   |
SQYD |
9.00 |
51,129.00 |
5.80 |
32,949.80 |
10.00 |
56,810.00 |
|
|
| 202-02-E |
removal of concrete curbs
|
375.5 |
LNFT |
6.00 |
2,253.00 |
9.00 |
3,379.50 |
10.00 |
3,755.00 |
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
1,022.8 |
LNFT |
6.00 |
6,136.80 |
7.50 |
7,671.00 |
12.00 |
12,273.60 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
49,632.5 |
SQYD |
3.00 |
148,897.50 |
3.40 |
168,750.50 |
6.00 |
297,795.00 |
|
|
| 202-02-H |
removal of guard rail
|
536   |
LNFT |
6.00 |
3,216.00 |
10.00 |
5,360.00 |
10.00 |
5,360.00 |
|
|
| 202-02-I |
removal of existing traffic signal equipment
|
lump |
LUMP |
3,500.00 |
3,500.00 |
4,000.00 |
4,000.00 |
12,000.00 |
12,000.00 |
|
|
| 202-02-J |
removal of concrete headwall
|
170.00 |
LNFT |
70.00 |
11,900.00 |
25.00 |
4,250.00 |
100.00 |
17,000.00 |
|
|
| 202-02-K |
removal of concrete median & curb
|
58.00 |
SQYD |
25.00 |
1,450.00 |
15.00 |
870.00 |
15.00 |
870.00 |
|
|
| 202-02-L |
removal of signal mast arms
|
4.00 |
EACH |
2,000.00 |
8,000.00 |
1,600.00 |
6,400.00 |
1,500.00 |
6,000.00 |
|
|
| 202-02-M |
removal of railroad
|
100.00 |
LNFT |
64.00 |
6,400.00 |
70.00 |
7,000.00 |
100.00 |
10,000.00 |
|
|
| 203-01 |
general excavation
|
41,188   |
CUYD |
9.00 |
370,692.00 |
5.30 |
218,296.40 |
8.00 |
329,504.00 |
|
|
| 203-02 |
drainage excavation
|
445   |
CUYD |
18.00 |
8,010.00 |
8.00 |
3,560.00 |
12.00 |
5,340.00 |
|
|
| 203-03 |
embankment
|
29,420   |
CUYD |
20.00 |
588,400.00 |
15.80 |
464,836.00 |
12.00 |
353,040.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
75   |
EACH |
20.00 |
1,500.00 |
20.00 |
1,500.00 |
12.00 |
900.00 |
|
|
| 204-06 |
temporary silt fencing
|
6,382   |
LNFT |
1.50 |
9,573.00 |
3.00 |
19,146.00 |
3.00 |
19,146.00 |
|
|
| 302-02-E |
class ii base course (10" thick)
|
96,852.0 |
SQYD |
17.00 |
1,646,484.00 |
16.00 |
1,549,632.00 |
19.00 |
1,840,188.00 |
|
|
| 302-02-F |
class ii base course (12" thick)
|
2,141.7 |
SQYD |
34.00 |
72,817.80 |
30.00 |
64,251.00 |
23.00 |
49,259.10 |
|
|
| 304-05 |
lime treatment (type e)
|
701.00 |
TON |
330.00 |
231,330.00 |
185.00 |
129,685.00 |
300.00 |
210,300.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
230.0 |
CUYD |
70.00 |
16,100.00 |
100.00 |
23,000.00 |
50.00 |
11,500.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
712.7 |
TON |
200.00 |
142,540.00 |
210.00 |
149,667.00 |
180.00 |
128,286.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
2,246   |
SQYD |
6.00 |
13,476.00 |
6.00 |
13,476.00 |
7.00 |
15,722.00 |
|
|
| 601-01-K |
portland cement concrete pavement (10" thick)
|
91,433.9 |
SQYD |
50.00 |
4,571,695.00 |
49.00 |
4,480,261.10 |
60.00 |
5,486,034.00 |
|
|
| 601-02-K |
portland cement concrete pavement (10" thick)
(crossovers & turnouts) |
2,570.1 |
SQYD |
68.00 |
174,766.80 |
92.50 |
237,734.25 |
64.00 |
164,486.40 |
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
17,293   |
LNFT |
51.00 |
881,943.00 |
53.70 |
928,634.10 |
45.00 |
778,185.00 |
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
1,925   |
LNFT |
59.00 |
113,575.00 |
68.00 |
130,900.00 |
50.00 |
96,250.00 |
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
871   |
LNFT |
71.00 |
61,841.00 |
80.00 |
69,680.00 |
60.00 |
52,260.00 |
|
|
| 701-03-K |
storm drain pipe (30" rcp/pcp)
|
506   |
LNFT |
86.00 |
43,516.00 |
130.00 |
65,780.00 |
80.00 |
40,480.00 |
|
|
| 701-03-M |
storm drain pipe (36" rcp/pcp)
|
240   |
LNFT |
102.00 |
24,480.00 |
140.00 |
33,600.00 |
150.00 |
36,000.00 |
|
|
| 701-03-N |
storm drain pipe (42" rcp/pcp)
|
576   |
LNFT |
127.00 |
73,152.00 |
190.00 |
109,440.00 |
210.00 |
120,960.00 |
|
|
| 701-04-A |
storm drain pipe arch (15" equiv. rcpa)
|
409   |
LNFT |
61.00 |
24,949.00 |
88.00 |
35,992.00 |
65.00 |
26,585.00 |
|
|
| 701-04-F |
storm drain pipe arch (36" equiv. rcpa)
|
298   |
LNFT |
104.00 |
30,992.00 |
150.00 |
44,700.00 |
180.00 |
53,640.00 |
|
|
| 701-04-G |
storm drain pipe arch (42" equiv. rcpa)
|
305   |
LNFT |
144.00 |
43,920.00 |
200.00 |
61,000.00 |
230.00 |
70,150.00 |
|
|
| 701-07-C |
yard drain pipe (8")
|
262   |
LNFT |
48.00 |
12,576.00 |
29.90 |
7,833.80 |
25.00 |
6,550.00 |
|
|
| 701-09 |
fabricating pipe fittings
|
1   |
EACH |
1,700.00 |
1,700.00 |
970.00 |
970.00 |
30,000.00 |
30,000.00 |
|
|
| 702-02-B |
manholes (r-cb-11)
|
1   |
EACH |
4,500.00 |
4,500.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
|
|
| 702-02-G |
manholes (mh 12.5" x 9")
|
2   |
EACH |
5,000.00 |
10,000.00 |
11,500.00 |
23,000.00 |
6,500.00 |
13,000.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
14   |
EACH |
2,800.00 |
39,200.00 |
3,300.00 |
46,200.00 |
5,000.00 |
70,000.00 |
|
|
| 702-03-C |
catch basins (cb-06)
|
106   |
EACH |
4,500.00 |
477,000.00 |
4,000.00 |
424,000.00 |
4,500.00 |
477,000.00 |
|
|
| 702-03-D |
catch basins (cb-07)
|
49   |
EACH |
5,000.00 |
245,000.00 |
4,600.00 |
225,400.00 |
5,500.00 |
269,500.00 |
|
|
| 702-03-F |
catch basins (cb-08)
|
20   |
EACH |
5,600.00 |
112,000.00 |
6,900.00 |
138,000.00 |
6,500.00 |
130,000.00 |
|
|
| 702-03-H |
catch basins (cb-05)
|
10   |
EACH |
3,900.00 |
39,000.00 |
1,300.00 |
13,000.00 |
4,000.00 |
40,000.00 |
|
|
| 702-03-I |
catch basins (cb-sd07-02)
|
2   |
EACH |
5,600.00 |
11,200.00 |
12,300.00 |
24,600.00 |
6,500.00 |
13,000.00 |
|
|
| 702-03-J |
catch basins (cb-sd08)
|
3   |
EACH |
5,600.00 |
16,800.00 |
14,300.00 |
42,900.00 |
6,500.00 |
19,500.00 |
|
|
| 702-08-A |
side drain safety end (type 1)
|
2   |
EACH |
3,350.00 |
6,700.00 |
1,800.00 |
3,600.00 |
2,000.00 |
4,000.00 |
|
|
| 703-03 |
perforated pipe underdrain
|
26,445   |
LNFT |
9.00 |
238,005.00 |
9.90 |
261,805.50 |
15.00 |
396,675.00 |
|
|
| 705-01 |
barbed wire fence
|
416   |
LNFT |
8.00 |
3,328.00 |
7.50 |
3,120.00 |
6.00 |
2,496.00 |
|
|
| 705-04 |
single swinging driveway gates
|
1   |
EACH |
615.00 |
615.00 |
580.00 |
580.00 |
800.00 |
800.00 |
|
|
| 705-06-A |
chain link fence (4-foot height)
|
595   |
LNFT |
22.00 |
13,090.00 |
23.00 |
13,685.00 |
22.00 |
13,090.00 |
|
|
| 705-08-A-01 |
30-foot double gates for chain link fence (4-foot
height) |
1   |
DBGT |
1,700.00 |
1,700.00 |
1,700.00 |
1,700.00 |
2,000.00 |
2,000.00 |
|
|
| 705-08-A-02 |
22-foot double gates for chain link fence (4-foot
height) |
1   |
DBGT |
1,600.00 |
1,600.00 |
1,200.00 |
1,200.00 |
1,900.00 |
1,900.00 |
|
|
| 705-08-A-03 |
16-foot double gates for chain link fence (4-foot
height) |
1   |
DBGT |
1,600.00 |
1,600.00 |
875.00 |
875.00 |
1,800.00 |
1,800.00 |
|
|
| 705-09 |
rebuilt fence
|
774   |
LNFT |
45.00 |
34,830.00 |
35.00 |
27,090.00 |
20.00 |
15,480.00 |
|
|
| 706-01-A |
concrete walk (4" thick)
|
1,195.3 |
SQYD |
40.00 |
47,812.00 |
38.00 |
45,421.40 |
48.00 |
57,374.40 |
|
|
| 706-02-C |
concrete drive (6" thick)
|
3,832.7 |
SQYD |
50.00 |
191,635.00 |
60.00 |
229,962.00 |
50.00 |
191,635.00 |
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
19.2 |
SQYD |
150.00 |
2,880.00 |
43.00 |
825.60 |
48.00 |
921.60 |
|
|
| 706-04 |
handicap ramps
|
28   |
EACH |
900.00 |
25,200.00 |
730.00 |
20,440.00 |
1,800.00 |
50,400.00 |
|
|
| 707-01 |
concrete curb
|
25,512.3 |
LNFT |
4.00 |
102,049.20 |
3.80 |
96,946.74 |
6.00 |
153,073.80 |
|
|
| 707-03 |
combination concrete curb & gutter
|
1,024.0 |
LNFT |
30.00 |
30,720.00 |
22.00 |
22,528.00 |
25.00 |
25,600.00 |
|
|
| 708-01 |
right-of-way monument
|
70   |
EACH |
225.00 |
15,750.00 |
500.00 |
35,000.00 |
300.00 |
21,000.00 |
|
|
| 711-02-C |
riprap (30 lb)
|
220   |
CUYD |
155.00 |
34,100.00 |
95.00 |
20,900.00 |
80.00 |
17,600.00 |
|
|
| 711-04 |
geotextile fabric
|
668   |
SQYD |
3.00 |
2,004.00 |
2.30 |
1,536.40 |
3.00 |
2,004.00 |
|
|
| 712-04 |
flexible revetment
|
320   |
SQYD |
82.00 |
26,240.00 |
55.00 |
17,600.00 |
65.00 |
20,800.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
185,000.00 |
185,000.00 |
350,000.00 |
350,000.00 |
90,000.00 |
90,000.00 |
|
|
| 713-02-A |
temporary pavement markings (4" width)
|
4,550   |
LNFT |
2.00 |
9,100.00 |
1.00 |
4,550.00 |
0.35 |
1,592.50 |
|
|
| 713-02-E |
temporary pavement markings (4" width)
|
366   |
LNFT |
2.00 |
732.00 |
1.00 |
366.00 |
1.10 |
402.60 |
|
|
| 713-04-A-01 |
temporary pavement markings (solid line)(4" width)
(type 1 removable) |
2.419 |
MILE |
8,400.00 |
20,319.60 |
10,000.00 |
24,190.00 |
9,500.00 |
22,980.50 |
|
|
| 716-01-A |
mulch (vegetative)
|
18.70 |
TON |
670.00 |
12,529.00 |
400.00 |
7,480.00 |
700.00 |
13,090.00 |
|
|
| 717-01 |
seeding
|
321   |
LB |
10.00 |
3,210.00 |
8.20 |
2,632.20 |
12.00 |
3,852.00 |
|
|
| 718-01 |
fertilizer
|
10,710   |
LB |
0.40 |
4,284.00 |
0.65 |
6,961.50 |
1.00 |
10,710.00 |
|
|
| 725-01 |
temporary detour roads
|
4,429.2 |
SQYD |
50.00 |
221,460.00 |
75.00 |
332,190.00 |
75.00 |
332,190.00 |
|
|
| 726-01 |
bedding material
|
2,361.0 |
CUYD |
64.00 |
151,104.00 |
80.00 |
188,880.00 |
60.00 |
141,660.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
1,450,000.00 |
1,450,000.00 |
1,450,000.00 |
1,450,000.00 |
600,000.00 |
600,000.00 |
|
|
| 729-01-A |
sign (type a)(24" x 30")
|
40   |
SQFT |
51.00 |
2,040.00 |
55.00 |
2,200.00 |
100.00 |
4,000.00 |
|
|
| 729-01-B |
sign (type a)(18" x varies)
|
36   |
SQFT |
60.00 |
2,160.00 |
65.00 |
2,340.00 |
200.00 |
7,200.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
20   |
EACH |
100.00 |
2,000.00 |
85.00 |
1,700.00 |
150.00 |
3,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,083   |
EACH |
5.50 |
5,956.50 |
6.10 |
6,606.30 |
6.00 |
6,498.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
1,824   |
LNFT |
1.30 |
2,371.20 |
1.30 |
2,371.20 |
1.10 |
2,006.40 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
873   |
LNFT |
2.00 |
1,746.00 |
5.25 |
4,583.25 |
4.00 |
3,492.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
9.626 |
MILE |
2,450.00 |
23,583.70 |
2,800.00 |
26,952.80 |
2,600.00 |
25,027.60 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
8.385 |
MILE |
850.00 |
7,127.25 |
960.00 |
8,049.60 |
1,000.00 |
8,385.00 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
24   |
EACH |
235.00 |
5,640.00 |
275.00 |
6,600.00 |
175.00 |
4,200.00 |
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
23   |
EACH |
250.00 |
5,750.00 |
290.00 |
6,670.00 |
200.00 |
4,600.00 |
|
|
| 735-01 |
mailboxes
|
27   |
EACH |
1.00 |
27.00 |
10.00 |
270.00 |
100.00 |
2,700.00 |
|
|
| 735-02 |
mailbox supports (single)
|
27   |
EACH |
150.00 |
4,050.00 |
154.44 |
4,169.88 |
150.00 |
4,050.00 |
|
|
| 736-01 |
trenching & backfilling
|
310   |
LNFT |
3.70 |
1,147.00 |
4.50 |
1,395.00 |
6.00 |
1,860.00 |
|
|
| 736-03-A |
jacked or bored conduit (3" pec, sch 80)
|
740   |
LNFT |
25.65 |
18,981.00 |
30.00 |
22,200.00 |
30.00 |
22,200.00 |
|
|
| 736-04-A |
signal support (mast arm standard and 45 ft. arm)
|
5   |
EACH |
9,500.00 |
47,500.00 |
11,000.00 |
55,000.00 |
15,000.00 |
75,000.00 |
|
|
| 736-04-B |
signal support (mast arm standard and 50 ft. arm)
|
2   |
EACH |
10,500.00 |
21,000.00 |
12,000.00 |
24,000.00 |
17,000.00 |
34,000.00 |
|
|
| 736-04-C |
signal support (mast arm standard and 55 ft. arm)
|
1   |
EACH |
11,000.00 |
11,000.00 |
12,500.00 |
12,500.00 |
18,500.00 |
18,500.00 |
|
|
| 736-05-A |
signal heads (3 signal r,y,g,12" led lens)
|
15   |
EACH |
1,160.00 |
17,400.00 |
1,300.00 |
19,500.00 |
1,600.00 |
24,000.00 |
|
|
| 736-05-B |
signal heads (r,y,g,lty,ltg,12" led lens)
|
8   |
EACH |
1,882.00 |
15,056.00 |
2,100.00 |
16,800.00 |
2,500.00 |
20,000.00 |
|
|
| 736-05-C |
signal heads (r,y,g,rty,rtg,12" led lens)
|
2   |
EACH |
1,882.00 |
3,764.00 |
2,100.00 |
4,200.00 |
2,500.00 |
5,000.00 |
|
|
| 736-06-A |
signal service (required pole)
|
2   |
EACH |
2,200.00 |
4,400.00 |
2,500.00 |
5,000.00 |
2,300.00 |
4,600.00 |
|
|
| 736-08-A |
signal controller (ts-2,type 2 in type 6 base mounted
cabinet) |
2   |
EACH |
20,110.00 |
40,220.00 |
23,000.00 |
46,000.00 |
25,000.00 |
50,000.00 |
|
|
| 736-09 |
loop detector
|
1,771   |
LNFT |
13.50 |
23,908.50 |
15.50 |
27,450.50 |
24.00 |
42,504.00 |
|
|
| 736-10-A |
underground junction box (type "d")
|
8   |
EACH |
434.00 |
3,472.00 |
500.00 |
4,000.00 |
300.00 |
2,400.00 |
|
|
| 736-10-B |
underground junction box (type "f")
|
6   |
EACH |
636.00 |
3,816.00 |
740.00 |
4,440.00 |
600.00 |
3,600.00 |
|
|
| 736-10-C |
underground junction box (type "h")
|
2   |
EACH |
1,400.00 |
2,800.00 |
1,600.00 |
3,200.00 |
1,100.00 |
2,200.00 |
|
|
| 736-11-A |
conduit (1" pec, sch 80)
|
395   |
LNFT |
1.40 |
553.00 |
1.60 |
632.00 |
3.50 |
1,382.50 |
|
|
| 736-11-B |
conduit (2" pec, sch 80)
|
150   |
LNFT |
1.90 |
285.00 |
2.20 |
330.00 |
5.50 |
825.00 |
|
|
| 736-11-C |
conduit (3" pec, sch 80)
|
60   |
LNFT |
2.60 |
156.00 |
3.00 |
180.00 |
11.00 |
660.00 |
|
|
| 736-12-A |
conductor (2c,14 awg)
|
650   |
LNFT |
1.00 |
650.00 |
1.20 |
780.00 |
2.50 |
1,625.00 |
|
|
| 736-12-B |
conductor (6c,14 awg)
|
145   |
LNFT |
1.50 |
217.50 |
1.74 |
252.30 |
3.50 |
507.50 |
|
|
| 736-12-C |
conductor (10c,14 awg)
|
2,460   |
LNFT |
1.80 |
4,428.00 |
2.09 |
5,141.40 |
4.50 |
11,070.00 |
|
|
| 736-12-D |
conductor (3c,6 awg)
|
20   |
LNFT |
3.80 |
76.00 |
4.40 |
88.00 |
11.00 |
220.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
200,000.00 |
200,000.00 |
240,000.00 |
240,000.00 |
250,000.00 |
250,000.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
71.89 |
CUYD |
1,200.00 |
86,268.00 |
1,400.00 |
100,646.00 |
1,000.00 |
71,890.00 |
|
|
| 805-12-M |
reinforced concrete box culverts (6'x 6')
|
534.0 |
LNFT |
350.00 |
186,900.00 |
525.00 |
280,350.00 |
600.00 |
320,400.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
5,357   |
LB |
1.15 |
6,160.55 |
2.90 |
15,535.30 |
2.00 |
10,714.00 |
|
|
| S-001 |
saw cutting portland cement concrete pavement
|
1,531   |
INFT |
1.00 |
1,531.00 |
4.50 |
6,889.50 |
5.00 |
7,655.00 |
|
|
| S-002 |
saw cutting asphaltic concrete pavement
|
1,259   |
INFT |
1.00 |
1,259.00 |
4.00 |
5,036.00 |
4.00 |
5,036.00 |
|
|
| S-003 |
video dectector device and connection
|
8   |
EACH |
6,000.00 |
48,000.00 |
7,000.00 |
56,000.00 |
8,500.00 |
68,000.00 |
|
|
| S-004 |
video detection system
|
2   |
EACH |
5,000.00 |
10,000.00 |
5,300.00 |
10,600.00 |
6,000.00 |
12,000.00 |
|
|
| S-005 |
signal head adjustment
|
lump |
LUMP |
5,000.00 |
5,000.00 |
5,100.00 |
5,100.00 |
2,000.00 |
2,000.00 |
|
|
| S-006 |
sign adjustment
|
lump |
LUMP |
4,000.00 |
4,000.00 |
3,800.00 |
3,800.00 |
1,000.00 |
1,000.00 |
|
|
| S-007 |
video detector adjustment
|
lump |
LUMP |
5,000.00 |
5,000.00 |
5,600.00 |
5,600.00 |
4,000.00 |
4,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
14,932,875.90 |
|
14,992,473.82 |
|
15,170,384.50 |
|
|
| | NUMBER OF DAYS BID AT $3,000 PER DAY. |
|
|
|
1,860,000.00 |
|
1,650,000.00 |
|
1,860,000.00 |
|
|
| | TOTAL BID |
|
|
|
16,792,875.90 |
|
16,642,473.82 |
|
17,030,384.50 |
|
|
|