| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC. |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
22,000.00 |
22,000.00 |
1,000.00 |
1,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,000.00 |
5,000.00 |
1,000.00 |
1,000.00 |
|
|
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
2,062   |
SQYD |
15.00 |
30,930.00 |
5.00 |
10,310.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
738   |
SQYD |
15.00 |
11,070.00 |
5.00 |
3,690.00 |
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
5,479.0 |
LNFT |
7.00 |
38,353.00 |
8.00 |
43,832.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
11,473.2 |
SQYD |
7.00 |
80,312.40 |
5.00 |
57,366.00 |
|
|
|
|
| 202-02-I |
removal of existing sign faces
|
101   |
EACH |
80.00 |
8,080.00 |
80.00 |
8,080.00 |
|
|
|
|
| 202-02-J |
removal of existing sign supports
|
48   |
EACH |
200.00 |
9,600.00 |
180.00 |
8,640.00 |
|
|
|
|
| 202-02-01 |
removal of traffic signal (at us 11 and ramps a & b)
|
1   |
EACH |
3,000.00 |
3,000.00 |
2,700.00 |
2,700.00 |
|
|
|
|
| 202-02-02 |
removal of traffic signal (at us 11 and ramps c & d)
|
1   |
EACH |
3,000.00 |
3,000.00 |
2,700.00 |
2,700.00 |
|
|
|
|
| 202-02-03 |
removal of traffic signal (at us 11 & brown's vil. rd.)
|
1   |
EACH |
3,000.00 |
3,000.00 |
2,700.00 |
2,700.00 |
|
|
|
|
| 202-02-04 |
removal of plastic pipe (3" pvc)
|
19.0 |
LNFT |
8.00 |
152.00 |
3.00 |
57.00 |
|
|
|
|
| 202-02-05 |
removal of concrete pipe (15" rcp)
|
74.0 |
LNFT |
8.00 |
592.00 |
15.00 |
1,110.00 |
|
|
|
|
| 202-02-06 |
removal of concrete pipe (18" rcp)
|
75.0 |
LNFT |
8.00 |
600.00 |
18.00 |
1,350.00 |
|
|
|
|
| 202-02-07 |
removal of concrete pipe (24" rcp)
|
503.0 |
LNFT |
8.00 |
4,024.00 |
21.00 |
10,563.00 |
|
|
|
|
| 202-02-09 |
removal of catch basin
|
6   |
EACH |
300.00 |
1,800.00 |
300.00 |
1,800.00 |
|
|
|
|
| 202-02-10 |
removal of slope paving
|
113   |
SQYD |
40.00 |
4,520.00 |
5.00 |
565.00 |
|
|
|
|
| 202-03-A |
removal of vertical clearance bar standard
|
1   |
EACH |
1,000.00 |
1,000.00 |
1,500.00 |
1,500.00 |
|
|
|
|
| 203-01 |
general excavation
|
13,041   |
CUYD |
9.00 |
117,369.00 |
8.00 |
104,328.00 |
|
|
|
|
| 203-03 |
embankment
|
8,711   |
CUYD |
20.00 |
174,220.00 |
15.00 |
130,665.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
100   |
EACH |
13.00 |
1,300.00 |
13.00 |
1,300.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
300   |
EACH |
100.00 |
30,000.00 |
100.00 |
30,000.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
10,200   |
LNFT |
2.50 |
25,500.00 |
1.50 |
15,300.00 |
|
|
|
|
| 302-02-B |
class ii base course (6" thick)
|
12,361.2 |
SQYD |
15.00 |
185,418.00 |
17.00 |
210,140.40 |
|
|
|
|
| 302-02-D |
class ii base course (8 1/2" thick)
|
20,866.0 |
SQYD |
19.00 |
396,454.00 |
25.00 |
521,650.00 |
|
|
|
|
| 304-05 |
lime treatment (type e)
|
209.51 |
TON |
50.00 |
10,475.50 |
10.00 |
2,095.10 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
100.0 |
CUYD |
90.00 |
9,000.00 |
60.00 |
6,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete, wearing level 1f
|
16,022.4 |
TON |
80.00 |
1,281,792.00 |
90.00 |
1,442,016.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
38.5 |
TON |
280.00 |
10,780.00 |
300.00 |
11,550.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
34,428   |
SQYD |
1.40 |
48,199.20 |
2.00 |
68,856.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 41   |
CUYD |
0.10 |
- 4.10 |
5.00 |
- 205.00 |
|
|
|
|
| 701-01-F |
cross drain pipe (15" rcp)
|
929   |
LNFT |
95.00 |
88,255.00 |
150.00 |
139,350.00 |
|
|
|
|
| 701-05-I |
side drain pipe (24")
|
395   |
LNFT |
80.00 |
31,600.00 |
105.00 |
41,475.00 |
|
|
|
|
| 701-06-D |
side drain pipe arch (24" equiv.)
|
475   |
LNFT |
80.00 |
38,000.00 |
110.00 |
52,250.00 |
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
214   |
LNFT |
85.00 |
18,190.00 |
120.00 |
25,680.00 |
|
|
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
27   |
LNFT |
100.00 |
2,700.00 |
130.00 |
3,510.00 |
|
|
|
|
| 701-15 |
concrete collar
|
15   |
EACH |
600.00 |
9,000.00 |
900.00 |
13,500.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
5   |
EACH |
1,800.00 |
9,000.00 |
2,500.00 |
12,500.00 |
|
|
|
|
| 702-03-C |
catch basins (cb-06)
|
7   |
EACH |
2,700.00 |
18,900.00 |
5,000.00 |
35,000.00 |
|
|
|
|
| 702-05-A |
cross drain end treatment (1 barrel, 24" rcp)
|
3   |
EACH |
1,800.00 |
5,400.00 |
2,000.00 |
6,000.00 |
|
|
|
|
| 702-05-B |
cross drain end treatment (1 barrel, 30" rcp)
|
1   |
EACH |
1,900.00 |
1,900.00 |
2,000.00 |
2,000.00 |
|
|
|
|
| 702-05-C |
cross drain end treatment (2 barrel, 24" rcp)
|
2   |
EACH |
1,900.00 |
3,800.00 |
3,300.00 |
6,600.00 |
|
|
|
|
| 702-05-D |
cross drain end treatment (3 barrel, 24" rcp)
|
1   |
EACH |
2,000.00 |
2,000.00 |
4,700.00 |
4,700.00 |
|
|
|
|
| 702-07-A |
cross drain safety end (type 1)
|
4   |
EACH |
1,800.00 |
7,200.00 |
2,000.00 |
8,000.00 |
|
|
|
|
| 702-08-A |
side drain safety end (type 1)
|
2   |
EACH |
1,800.00 |
3,600.00 |
2,000.00 |
4,000.00 |
|
|
|
|
| 702-08-B |
side drain safety end (type 2)
|
1   |
EACH |
3,500.00 |
3,500.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
350.0 |
LNFT |
50.00 |
17,500.00 |
45.00 |
15,750.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
300.0 |
LNFT |
20.00 |
6,000.00 |
18.00 |
5,400.00 |
|
|
|
|
| 704-06-A |
guard rail anchor sections (trailing end))
|
31.3 |
LNFT |
90.00 |
2,817.00 |
82.00 |
2,566.60 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
25.0 |
LNFT |
60.00 |
1,500.00 |
55.00 |
1,375.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,200.00 |
8,800.00 |
2,000.00 |
8,000.00 |
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
2   |
EACH |
2,600.00 |
5,200.00 |
2,300.00 |
4,600.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
654.4 |
SQYD |
35.00 |
22,904.00 |
66.00 |
43,190.40 |
|
|
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
4,228.0 |
SQYD |
28.00 |
118,384.00 |
55.00 |
232,540.00 |
|
|
|
|
| 707-01-A |
combination concrete curb and gutter (mountable type)
|
9,385.0 |
LNFT |
15.00 |
140,775.00 |
27.00 |
253,395.00 |
|
|
|
|
| 708-01 |
right-of-way monument
|
2   |
EACH |
500.00 |
1,000.00 |
1,800.00 |
3,600.00 |
|
|
|
|
| 710-01 |
flowable fill
|
7   |
CUYD |
230.00 |
1,610.00 |
300.00 |
2,100.00 |
|
|
|
|
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
150   |
SQYD |
72.00 |
10,800.00 |
60.00 |
9,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
200,000.00 |
200,000.00 |
155,000.00 |
155,000.00 |
|
|
|
|
| 713-02-A |
temporary pavement markings (4" width)
|
26,411   |
LNFT |
0.10 |
2,641.10 |
0.10 |
2,641.10 |
|
|
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
37,253   |
LNFT |
0.20 |
7,450.60 |
0.20 |
7,450.60 |
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
415   |
LNFT |
0.50 |
207.50 |
0.45 |
186.75 |
|
|
|
|
| 715-01 |
topsoil
|
5,009   |
CUYD |
11.00 |
55,099.00 |
15.00 |
75,135.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
18.6 |
TON |
600.00 |
11,160.00 |
550.00 |
10,230.00 |
|
|
|
|
| 717-01 |
seeding
|
560   |
LB |
8.00 |
4,480.00 |
8.00 |
4,480.00 |
|
|
|
|
| 718-01 |
fertilizer
|
9,310   |
LB |
0.45 |
4,189.50 |
0.50 |
4,655.00 |
|
|
|
|
| 718-02 |
agricultural lime
|
18.6 |
TON |
110.00 |
2,046.00 |
100.00 |
1,860.00 |
|
|
|
|
| 726-01 |
bedding material
|
298.0 |
CUYD |
86.00 |
25,628.00 |
1.00 |
298.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
500,000.00 |
500,000.00 |
540,000.00 |
540,000.00 |
|
|
|
|
| 729-01 |
sign (type a)
|
485.8 |
SQFT |
20.00 |
9,716.00 |
18.00 |
8,744.40 |
|
|
|
|
| 729-02 |
sign (type b)
|
206.0 |
SQFT |
28.00 |
5,768.00 |
25.00 |
5,150.00 |
|
|
|
|
| 729-04 |
sign (type d)
|
405.5 |
SQFT |
30.00 |
12,165.00 |
26.00 |
10,543.00 |
|
|
|
|
| 729-08-B |
mounting (3 1/2" post)
|
37   |
EACH |
1,000.00 |
37,000.00 |
850.00 |
31,450.00 |
|
|
|
|
| 729-08-F |
mounting (w6 x 12)
|
16   |
EACH |
1,000.00 |
16,000.00 |
850.00 |
13,600.00 |
|
|
|
|
| 729-09 |
mounting (overhead truss)(ground mounted)
|
2   |
EACH |
90,000.00 |
180,000.00 |
83,000.00 |
166,000.00 |
|
|
|
|
| 729-13 |
mounting (bridge fascia mounted)
|
2   |
EACH |
6,500.00 |
13,000.00 |
6,000.00 |
12,000.00 |
|
|
|
|
| 729-20-A |
footing for overhead mounting
|
4   |
EACH |
22,000.00 |
88,000.00 |
21,000.00 |
84,000.00 |
|
|
|
|
| 729-21 |
u-channel post
|
1   |
EACH |
120.00 |
120.00 |
120.00 |
120.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
3,290   |
EACH |
6.00 |
19,740.00 |
5.50 |
18,095.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
5.400 |
MILE |
2,800.00 |
15,120.00 |
2,500.00 |
13,500.00 |
|
|
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
1.621 |
MILE |
6,000.00 |
9,726.00 |
5,300.00 |
8,591.30 |
|
|
|
|
| 732-02-E |
plastic pavement striping (solid line) (24" width)
|
0.278 |
MILE |
20,000.00 |
5,560.00 |
18,000.00 |
5,004.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.594 |
MILE |
1,000.00 |
1,594.00 |
850.00 |
1,354.90 |
|
|
|
|
| 732-03-C |
plastic pavement striping (broken line)(8" width)
|
0.830 |
MILE |
2,000.00 |
1,660.00 |
1,700.00 |
1,411.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
39   |
EACH |
230.00 |
8,970.00 |
210.00 |
8,190.00 |
|
|
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
2   |
EACH |
280.00 |
560.00 |
250.00 |
500.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
39   |
EACH |
240.00 |
9,360.00 |
220.00 |
8,580.00 |
|
|
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
3   |
EACH |
510.00 |
1,530.00 |
450.00 |
1,350.00 |
|
|
|
|
| 736-01 |
trenching and backfilling
|
4,451   |
LNFT |
6.00 |
26,706.00 |
5.50 |
24,480.50 |
|
|
|
|
| 736-03-D |
jacked or bored conduit (3' p.e.c.)
|
1,770   |
LNFT |
22.00 |
38,940.00 |
20.00 |
35,400.00 |
|
|
|
|
| 736-04-01 |
signal support (35' single mast arm)
|
2   |
EACH |
9,500.00 |
19,000.00 |
8,700.00 |
17,400.00 |
|
|
|
|
| 736-04-02 |
signal support (45' single mast arm)
|
3   |
EACH |
10,500.00 |
31,500.00 |
9,700.00 |
29,100.00 |
|
|
|
|
| 736-04-03 |
signal support (55' single mast arm)
|
1   |
EACH |
12,000.00 |
12,000.00 |
11,000.00 |
11,000.00 |
|
|
|
|
| 736-04-04 |
signal support (30'x 45' dual mast arm)
|
1   |
EACH |
13,500.00 |
13,500.00 |
12,500.00 |
12,500.00 |
|
|
|
|
| 736-04-05 |
signal support (55'x 55' dual mast arm)
|
1   |
EACH |
17,000.00 |
17,000.00 |
15,500.00 |
15,500.00 |
|
|
|
|
| 736-05-B |
signal head (3-section r,y,g) (12" led lenses)
|
14   |
EACH |
1,000.00 |
14,000.00 |
900.00 |
12,600.00 |
|
|
|
|
| 736-05-C |
signal head (3-section r,lt.y,lt.g) (12" led lenses)
|
11   |
EACH |
900.00 |
9,900.00 |
850.00 |
9,350.00 |
|
|
|
|
| 736-05-D |
signal head (4-section r,y,g,lt.g) (12" led lenses)
|
1   |
EACH |
1,350.00 |
1,350.00 |
1,250.00 |
1,250.00 |
|
|
|
|
| 736-05-E |
signal head (5-section r,lt.y,y,lt.g,g) (12" led
lenses) |
1   |
EACH |
400.00 |
400.00 |
375.00 |
375.00 |
|
|
|
|
| 736-06-B |
signal service (pedestal mount)
|
3   |
EACH |
1,400.00 |
4,200.00 |
1,300.00 |
3,900.00 |
|
|
|
|
| 736-08-A |
signal controller (nema ts-2, type 6 base mounted
cabinet) |
3   |
EACH |
27,000.00 |
81,000.00 |
25,000.00 |
75,000.00 |
|
|
|
|
| 736-09 |
loop detector
|
456   |
LNFT |
11.00 |
5,016.00 |
11.00 |
5,016.00 |
|
|
|
|
| 736-10-B |
underground junction box (type "e")
|
11   |
EACH |
400.00 |
4,400.00 |
370.00 |
4,070.00 |
|
|
|
|
| 736-10-C |
underground junction box (type "f")
|
11   |
EACH |
420.00 |
4,620.00 |
400.00 |
4,400.00 |
|
|
|
|
| 736-10-D |
underground junction box (type "h")
|
3   |
EACH |
900.00 |
2,700.00 |
850.00 |
2,550.00 |
|
|
|
|
| 736-10-E |
underground junction box (type "j")
|
10   |
EACH |
1,200.00 |
12,000.00 |
1,200.00 |
12,000.00 |
|
|
|
|
| 736-11-A |
conduit (1/2" p.e.c.)
|
36   |
EACH |
9.00 |
324.00 |
8.50 |
306.00 |
|
|
|
|
| 736-11-B |
conduit (1" p.e.c.)
|
1,165   |
EACH |
5.00 |
5,825.00 |
5.00 |
5,825.00 |
|
|
|
|
| 736-11-C |
conduit (2" p.e.c.)
|
2,376   |
EACH |
5.50 |
13,068.00 |
5.25 |
12,474.00 |
|
|
|
|
| 736-11-D |
conduit (3" p.e.c.)
|
265   |
EACH |
9.00 |
2,385.00 |
8.50 |
2,252.50 |
|
|
|
|
| 736-12-A |
conductor, 2c (loop lead-in, #14 awg stranded and
shielded) |
2,340   |
LNFT |
2.00 |
4,680.00 |
1.60 |
3,744.00 |
|
|
|
|
| 736-12-C |
conductor, 3c (power, #6 awg)
|
210   |
LNFT |
6.00 |
1,260.00 |
5.25 |
1,102.50 |
|
|
|
|
| 736-12-E |
conductor, 10c (signal, #4 awg stranded)
|
4,195   |
LNFT |
2.00 |
8,390.00 |
2.00 |
8,390.00 |
|
|
|
|
| 736-12-F |
fiber optic cable, 36 single mode
|
3,106   |
LNFT |
2.00 |
6,212.00 |
2.00 |
6,212.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
220,000.00 |
220,000.00 |
45,000.00 |
45,000.00 |
|
|
|
|
| S-001 |
dynamic message sign unit
|
4   |
EACH |
15,000.00 |
60,000.00 |
15,000.00 |
60,000.00 |
|
|
|
|
| S-002 |
flexible post traffic delineators
|
41   |
EACH |
80.00 |
3,280.00 |
75.00 |
3,075.00 |
|
|
|
|
| S-003 |
video detector (mvp) device
|
8   |
EACH |
7,000.00 |
56,000.00 |
6,500.00 |
52,000.00 |
|
|
|
|
| S-004 |
video detection (mvp) system
|
3   |
EACH |
4,500.00 |
13,500.00 |
4,200.00 |
12,600.00 |
|
|
|
|
| S-005 |
pier protection system
|
1   |
EACH |
60,000.00 |
60,000.00 |
140,000.00 |
140,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
5,099,518.70 |
|
5,470,733.05 |
|
|
|
|
| | NUMBER OF DAYS BID AT $3,000 PER DAY. |
|
|
|
690,000.00 |
|
675,000.00 |
|
|
|
|
| | TOTAL BID |
|
|
|
5,789,518.70 |
|
6,145,733.05 |
|
|
|
|
|