DBE GOAL FED
Lead Project: 744-45-0007
Parish: ST CHARLES
Routes:
Description: ST. CHARLES WESTBANK MULTI-USE PATH
Type Const: grading, class ii base course, superpave asphaltic concrete pavement, and related
work.
Estimated Construction Cost: $823,828.00
 
RankLicenseBidderConstruction Bid
1 02179 BOH BROS. CONSTRUCTION CO., LLC. $1,338,192.00
2 06276 BARRIERE CONSTRUCTION CO., LLC $1,428,334.00
3 00935 FLEMING CONSTRUCTION CO., INC. $1,571,786.30
 
Item Number Item Description Quantity Unit of Measure - 1 -
BOH BROS. CONSTRUCTION CO., LLC.
- 2 -
BARRIERE CONSTRUCTION CO., LLC
- 3 -
FLEMING CONSTRUCTION CO., INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 64,000.00 64,000.00 90,000.00 90,000.00 7,000.00 7,000.00    
202-01 removal of structures & obstructions (existing asphalt) lump      LUMP 2,000.00 2,000.00 17,000.00 17,000.00 4,000.00 4,000.00    
203-07 borrow (vehicular measurement) 4,770      CUYD 25.00 119,250.00 21.00 100,170.00 42.00 200,340.00    
204-06 temporary silt fencing 2,000      LNFT 2.00 4,000.00 1.70 3,400.00 3.00 6,000.00    
302-01 class ii base course 910.0    CUYD 75.00 68,250.00 85.00 77,350.00 185.00 168,350.00    
502-01 superpave asphaltic concrete 9,099.0    TON 90.00 818,910.00 83.00 755,217.00 107.00 973,593.00    
706-03-A incidental concrete paving (4" thick) 120.0    SQYD 165.00 19,800.00 55.00 6,600.00 60.00 7,200.00    
713-01 temporary signs & barricades lump      LUMP 5,000.00 5,000.00 55,000.00 55,000.00 10,000.00 10,000.00    
716-01-A mulch (vegetative) 1.5    TON 1,300.00 1,950.00 1,100.00 1,650.00 750.00 1,125.00    
717-01 seeding 31      LB 20.00 620.00 11.00 341.00 10.50 325.50    
718-01 fertilizer 1,030      LB 1.00 1,030.00 1.60 1,648.00 0.30 309.00    
727-01 mobilization lump      LUMP 130,000.00 130,000.00 140,000.00 140,000.00 25,000.00 25,000.00    
729-01 sign (type a) 132.0    SQFT 25.00 3,300.00 13.00 1,716.00 27.00 3,564.00    
729-21 u-channel post 47      EACH 75.00 3,525.00 75.00 3,525.00 90.00 4,230.00    
732-01-A-01 plastic pavement striping (4" width)(white) 510      LNFT 0.50 255.00 0.60 306.00 0.60 306.00    
732-01-A-02 plastic pavement striping (4" width)(blue) 180      LNFT 2.00 360.00 1.10 198.00 1.10 198.00    
732-01-A-03 plastic pavement striping (4" width)(yellow) 410      LNFT 0.50 205.00 0.60 246.00 0.60 246.00    
732-01-E plastic pavement striping (24" width) 515      LNFT 4.50 2,317.50 4.50 2,317.50 4.40 2,266.00    
732-03-A plastic pavement striping (broken line)(4" width) 6.570  MILE 850.00 5,584.50 850.00 5,584.50 840.00 5,518.80    
732-04-A plastic pavement legends & symbols (arrow) 20      EACH 230.00 4,600.00 210.00 4,200.00 220.00 4,400.00    
732-04-F plastic pavement legends & symbols (handicap) 3      EACH 350.00 1,050.00 300.00 900.00 300.00 900.00    
740-01 construction layout lump      LUMP 5,000.00 5,000.00 50,000.00 50,000.00 20,000.00 20,000.00    
S-001 handrail 527      LNFT 75.00 39,525.00 85.00 44,795.00 100.00 52,700.00    
S-002 precast concrete benches 6      EACH 800.00 4,800.00 850.00 5,100.00 950.00 5,700.00    
S-003 loop type bicycle rack 2      EACH 500.00 1,000.00 1,200.00 2,400.00 1,000.00 2,000.00    
S-004 precast parking stops 31      EACH 60.00 1,860.00 70.00 2,170.00 65.00 2,015.00    
S-005 concrete steps 110      LNFT 150.00 16,500.00 275.00 30,250.00 450.00 49,500.00    
S-006 concrete overlook slab 150      LNFT 90.00 13,500.00 175.00 26,250.00 100.00 15,000.00    
                       
 CONTRACTOR TOTAL       1,338,192.00   1,428,334.00   1,571,786.30    