| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BOH BROS. CONSTRUCTION CO., LLC. |
- 2 - THIGPEN CONSTRUCTION CO., INC. |
- 3 - COMMAND CONSTRUCTION INDUSTRIES LLC |
- 4 - BARRIERE CONSTRUCTION CO., LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
2,000.00 |
2,000.00 |
10,000.00 |
10,000.00 |
50,000.00 |
50,000.00 |
15,000.00 |
15,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
50,000.00 |
50,000.00 |
55,000.00 |
55,000.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
8,968   |
SQYD |
10.00 |
89,680.00 |
11.00 |
98,648.00 |
6.00 |
53,808.00 |
10.00 |
89,680.00 |
| 202-02-D |
removal of concrete walks & drives
|
891   |
SQYD |
9.00 |
8,019.00 |
9.00 |
8,019.00 |
6.00 |
5,346.00 |
30.00 |
26,730.00 |
| 203-04 |
nonplastic embankment
|
4,018   |
CUYD |
20.00 |
80,360.00 |
23.00 |
92,414.00 |
25.00 |
100,450.00 |
33.00 |
132,594.00 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
70,000.00 |
70,000.00 |
120,000.00 |
120,000.00 |
50,000.00 |
50,000.00 |
130,000.00 |
130,000.00 |
| 203-08 |
geotextile fabric
|
20,511   |
SQYD |
1.50 |
30,766.50 |
1.00 |
20,511.00 |
2.00 |
41,022.00 |
1.00 |
20,511.00 |
| 204-06 |
temporary silt fencing
|
3,950   |
LNFT |
2.00 |
7,900.00 |
2.00 |
7,900.00 |
2.00 |
7,900.00 |
2.00 |
7,900.00 |
| 302-02-C |
class ii base course (8" thick)
|
9,816.1 |
SQYD |
18.00 |
176,689.80 |
15.00 |
147,241.50 |
15.00 |
147,241.50 |
22.00 |
215,954.20 |
| 510-01-B |
pavement patching (12" minimum thickness)
|
13   |
SQYD |
350.00 |
4,550.00 |
200.00 |
2,600.00 |
100.00 |
1,300.00 |
180.00 |
2,340.00 |
| 601-01-I |
portland cement concrete pavement (9" thick)
|
9,377.0 |
SQYD |
55.00 |
515,735.00 |
81.00 |
759,537.00 |
65.00 |
609,505.00 |
62.00 |
581,374.00 |
| 601-04 |
portland cement concrete pavement coring
|
10   |
EACH |
100.00 |
1,000.00 |
200.00 |
2,000.00 |
150.00 |
1,500.00 |
100.00 |
1,000.00 |
| 602-05-E-01 |
full depth patching of jointed conc pvmt (7" thick)
(16.0 sq yds & under) |
4.0 |
SQYD |
300.00 |
1,200.00 |
200.00 |
800.00 |
250.00 |
1,000.00 |
260.00 |
1,040.00 |
| 701-03-E |
storm drain pipe (12" rcp)
|
128   |
LNFT |
115.00 |
14,720.00 |
200.00 |
25,600.00 |
90.00 |
11,520.00 |
170.00 |
21,760.00 |
| 701-03-F |
storm drain pipe (15" rcp)
|
62   |
LNFT |
120.00 |
7,440.00 |
200.00 |
12,400.00 |
100.00 |
6,200.00 |
180.00 |
11,160.00 |
| 701-03-I |
storm drain pipe (24" rcp)
|
21   |
LNFT |
160.00 |
3,360.00 |
200.00 |
4,200.00 |
130.00 |
2,730.00 |
190.00 |
3,990.00 |
| 701-03-M |
storm drain pipe (36" rcp)
|
274   |
LNFT |
190.00 |
52,060.00 |
180.00 |
49,320.00 |
175.00 |
47,950.00 |
200.00 |
54,800.00 |
| 701-03-O |
storm drain pipe (48" rcp)
|
928   |
LNFT |
280.00 |
259,840.00 |
280.00 |
259,840.00 |
300.00 |
278,400.00 |
250.00 |
232,000.00 |
| 701-03-P |
storm drain pipe (54" rcp)
|
236   |
LNFT |
290.00 |
68,440.00 |
300.00 |
70,800.00 |
350.00 |
82,600.00 |
270.00 |
63,720.00 |
| 701-03-Q |
storm drain pipe (60" rcp)
|
394   |
LNFT |
330.00 |
130,020.00 |
360.00 |
141,840.00 |
400.00 |
157,600.00 |
280.00 |
110,320.00 |
| 701-04-F |
storm drain pipe arch (36" equiv. rcpa)
|
261   |
LNFT |
230.00 |
60,030.00 |
200.00 |
52,200.00 |
250.00 |
65,250.00 |
210.00 |
54,810.00 |
| 701-09-M/E |
fabricating pipe fittings, 36"x36"x12"
|
2   |
EACH |
1,900.00 |
3,800.00 |
2,600.00 |
5,200.00 |
2,000.00 |
4,000.00 |
2,100.00 |
4,200.00 |
| 701-09-O/E |
fabricating pipe fittings, 48"x48"x12"
|
2   |
EACH |
3,200.00 |
6,400.00 |
3,700.00 |
7,400.00 |
3,000.00 |
6,000.00 |
4,000.00 |
8,000.00 |
| 701-09-P/E |
fabricating pipe fittings, 54"x54"x12"
|
1   |
EACH |
3,500.00 |
3,500.00 |
4,000.00 |
4,000.00 |
4,000.00 |
4,000.00 |
4,500.00 |
4,500.00 |
| 701-09-Q/E |
fabricating pipe fittings, 60"x60"x12"
|
1   |
EACH |
4,400.00 |
4,400.00 |
4,900.00 |
4,900.00 |
5,000.00 |
5,000.00 |
4,800.00 |
4,800.00 |
| 701-09-Q/I |
fabricating pipe fittings, 60"x60"x24"
|
1   |
EACH |
4,400.00 |
4,400.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
| 702-04-A |
adjusting manholes
|
11   |
EACH |
500.00 |
5,500.00 |
800.00 |
8,800.00 |
300.00 |
3,300.00 |
500.00 |
5,500.00 |
| 706-01-A |
concrete walk (4" thick)
|
451.8 |
SQYD |
60.00 |
27,108.00 |
35.00 |
15,813.00 |
50.00 |
22,590.00 |
105.00 |
47,439.00 |
| 706-02-C |
concrete drive (6" thick)
|
140.9 |
SQYD |
75.00 |
10,567.50 |
40.00 |
5,636.00 |
55.00 |
7,749.50 |
130.00 |
18,317.00 |
| 706-02-E |
concrete drive (8" thick)
|
112.0 |
SQYD |
80.00 |
8,960.00 |
45.00 |
5,040.00 |
60.00 |
6,720.00 |
140.00 |
15,680.00 |
| 706-03-A |
incidental concrete paving (4" thick)
|
33.0 |
SQYD |
100.00 |
3,300.00 |
40.00 |
1,320.00 |
60.00 |
1,980.00 |
500.00 |
16,500.00 |
| 707-01 |
concrete curb
|
3,895.4 |
LNFT |
8.00 |
31,163.20 |
10.00 |
38,954.00 |
5.00 |
19,477.00 |
14.00 |
54,535.60 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
50,000.00 |
50,000.00 |
55,000.00 |
55,000.00 |
55,000.00 |
55,000.00 |
88,000.00 |
88,000.00 |
| 714-01 |
slab sodding
|
798   |
SQYD |
5.00 |
3,990.00 |
6.00 |
4,788.00 |
6.00 |
4,788.00 |
8.00 |
6,384.00 |
| 715-01 |
topsoil
|
646   |
CUYD |
30.00 |
19,380.00 |
25.00 |
16,150.00 |
10.00 |
6,460.00 |
33.00 |
21,318.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
2,000.00 |
2,000.00 |
10,000.00 |
10,000.00 |
1,000.00 |
1,000.00 |
40,000.00 |
40,000.00 |
| 726-01 |
bedding material
|
1,548.1 |
CUYD |
80.00 |
123,848.00 |
60.00 |
92,886.00 |
100.00 |
154,810.00 |
57.00 |
88,241.70 |
| 727-01 |
mobilization
|
lump |
LUMP |
160,000.00 |
160,000.00 |
100,000.00 |
100,000.00 |
290,000.00 |
290,000.00 |
230,000.00 |
230,000.00 |
| 729-01 |
sign (type a)
|
144.0 |
SQFT |
25.00 |
3,600.00 |
25.00 |
3,600.00 |
22.00 |
3,168.00 |
23.00 |
3,312.00 |
| 729-21 |
u-channel post
|
22   |
EACH |
60.00 |
1,320.00 |
80.00 |
1,760.00 |
60.00 |
1,320.00 |
70.00 |
1,540.00 |
| 731-02 |
reflectorized raised pavement markers
|
150   |
EACH |
5.00 |
750.00 |
6.00 |
900.00 |
5.00 |
750.00 |
6.00 |
900.00 |
| 732-01-A |
plastic pavement striping (4" width)
|
6,243   |
LNFT |
0.50 |
3,121.50 |
1.00 |
6,243.00 |
0.50 |
3,121.50 |
0.60 |
3,745.80 |
| 732-01-B |
plastic pavement striping (6" width)
|
368   |
LNFT |
1.00 |
368.00 |
1.00 |
368.00 |
1.00 |
368.00 |
0.90 |
331.20 |
| 732-01-C |
plastic pavement striping (8" width)
|
550   |
LNFT |
1.00 |
550.00 |
1.00 |
550.00 |
2.00 |
1,100.00 |
1.00 |
550.00 |
| 732-01-D |
plastic pavement striping (12" width)
|
124   |
LNFT |
2.00 |
248.00 |
2.00 |
248.00 |
3.00 |
372.00 |
2.40 |
297.60 |
| 732-01-E |
plastic pavement striping (24" width)
|
430   |
LNFT |
4.00 |
1,720.00 |
4.00 |
1,720.00 |
4.00 |
1,720.00 |
4.00 |
1,720.00 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
3   |
EACH |
200.00 |
600.00 |
200.00 |
600.00 |
300.00 |
900.00 |
200.00 |
600.00 |
| 732-04-E |
plastic pavement legends & symbols (school crossing)
|
1   |
EACH |
400.00 |
400.00 |
400.00 |
400.00 |
400.00 |
400.00 |
440.00 |
440.00 |
| 739-01 |
hydro-seeding
|
0.94 |
ACRE |
2,000.00 |
1,880.00 |
2,000.00 |
1,880.00 |
2,500.00 |
2,350.00 |
2,000.00 |
1,880.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
25,000.00 |
25,000.00 |
30,000.00 |
30,000.00 |
30,000.00 |
30,000.00 |
90,000.00 |
90,000.00 |
| S-001 |
geogrid
|
9,816   |
SQYD |
2.00 |
19,632.00 |
2.80 |
27,484.80 |
3.00 |
29,448.00 |
3.00 |
29,448.00 |
| S-002 |
remove and replace tree with crepe myrtle
|
5   |
EACH |
500.00 |
2,500.00 |
200.00 |
1,000.00 |
1,000.00 |
5,000.00 |
1,800.00 |
9,000.00 |
| S-003 |
tree trimming and/or root pruning
|
4   |
EACH |
800.00 |
3,200.00 |
100.00 |
400.00 |
500.00 |
2,000.00 |
600.00 |
2,400.00 |
| S-004 |
manholes (s&wb of new orleans) (dwg. d-870) (type no.
2) |
1   |
EACH |
5,000.00 |
5,000.00 |
4,000.00 |
4,000.00 |
4,000.00 |
4,000.00 |
6,500.00 |
6,500.00 |
| S-005 |
manholes (s&wb of new orleans) (dwg. d-870) (type no.
3) |
4   |
EACH |
6,000.00 |
24,000.00 |
4,000.00 |
16,000.00 |
5,500.00 |
22,000.00 |
6,800.00 |
27,200.00 |
| S-006 |
manholes (s&wb of new orleans) (dwg. d-3340) (large
pipes) |
11   |
EACH |
9,000.00 |
99,000.00 |
8,000.00 |
88,000.00 |
12,000.00 |
132,000.00 |
14,000.00 |
154,000.00 |
| S-007 |
manholes, special conflict
|
1   |
EACH |
11,000.00 |
11,000.00 |
10,000.00 |
10,000.00 |
7,500.00 |
7,500.00 |
20,000.00 |
20,000.00 |
| S-008 |
catch basins (s&wb of new orleans) (dwg. d-873) (std.
no. 1) |
11   |
EACH |
3,500.00 |
38,500.00 |
3,000.00 |
33,000.00 |
4,000.00 |
44,000.00 |
5,000.00 |
55,000.00 |
| S-009 |
catch basins (s&wb of new orleans) (dwg. d-873-a)
(dbl. no.1) |
2   |
EACH |
6,000.00 |
12,000.00 |
5,000.00 |
10,000.00 |
7,831.51 |
15,663.02 |
8,000.00 |
16,000.00 |
| S-010 |
drop inlets (s&wb of new orleans) (dwg. d-3264)
|
1   |
EACH |
3,000.00 |
3,000.00 |
2,000.00 |
2,000.00 |
2,200.00 |
2,200.00 |
3,000.00 |
3,000.00 |
| S-011 |
6" water line offset
|
1   |
EACH |
3,000.00 |
3,000.00 |
8,000.00 |
8,000.00 |
4,000.00 |
4,000.00 |
7,000.00 |
7,000.00 |
| S-012 |
12" water main (pvc) with main line fittings
|
19   |
LNFT |
170.00 |
3,230.00 |
300.00 |
5,700.00 |
220.00 |
4,180.00 |
500.00 |
9,500.00 |
| S-013 |
new manhole around existing water valve
|
1   |
EACH |
3,700.00 |
3,700.00 |
6,000.00 |
6,000.00 |
3,800.00 |
3,800.00 |
3,000.00 |
3,000.00 |
| S-014 |
replace 3/4" water house connection (from main to
meter) |
4   |
EACH |
300.00 |
1,200.00 |
700.00 |
2,800.00 |
650.00 |
2,600.00 |
1,600.00 |
6,400.00 |
| S-015 |
replace 1" house connection (from main to meter)
|
3   |
EACH |
350.00 |
1,050.00 |
700.00 |
2,100.00 |
750.00 |
2,250.00 |
2,000.00 |
6,000.00 |
| S-016 |
replace sewer house connection to back of curb
|
6   |
EACH |
400.00 |
2,400.00 |
1,000.00 |
6,000.00 |
1,300.00 |
7,800.00 |
2,200.00 |
13,200.00 |
| S-017 |
replace existing sewer house connection beyond back of
curb |
45   |
LNFT |
20.00 |
900.00 |
200.00 |
9,000.00 |
30.00 |
1,350.00 |
75.00 |
3,375.00 |
| S-018 |
project sign
|
2   |
EACH |
2,500.00 |
5,000.00 |
2,000.00 |
4,000.00 |
2,200.00 |
4,400.00 |
1,400.00 |
2,800.00 |
| S-019 |
exploratory excavation
|
4   |
EACH |
1,200.00 |
4,800.00 |
3,000.00 |
12,000.00 |
1,500.00 |
6,000.00 |
2,300.00 |
9,200.00 |
| S-020 |
remove and relocate school zone sign and blinking
light |
1   |
EACH |
2,200.00 |
2,200.00 |
3,000.00 |
3,000.00 |
2,300.00 |
2,300.00 |
2,300.00 |
2,300.00 |
| S-021 |
three (3") inch conduit
|
480   |
LNFT |
7.00 |
3,360.00 |
15.00 |
7,200.00 |
7.00 |
3,360.00 |
8.00 |
3,840.00 |
| S-022 |
signal support, double mast arm (std.) incl.
foundation |
1   |
EACH |
9,500.00 |
9,500.00 |
18,000.00 |
18,000.00 |
10,000.00 |
10,000.00 |
12,000.00 |
12,000.00 |
| S-023 |
signal support, pedestal pole incl. foundation
|
3   |
EACH |
1,300.00 |
3,900.00 |
3,100.00 |
9,300.00 |
1,400.00 |
4,200.00 |
1,400.00 |
4,200.00 |
| S-024 |
signal heads, vehicular, 12" lens, 3-section
|
10   |
EACH |
900.00 |
9,000.00 |
1,000.00 |
10,000.00 |
900.00 |
9,000.00 |
1,000.00 |
10,000.00 |
| S-025 |
signal controller with type b foundation
|
1   |
EACH |
20,000.00 |
20,000.00 |
30,000.00 |
30,000.00 |
22,000.00 |
22,000.00 |
22,000.00 |
22,000.00 |
| S-026 |
optical detectors
|
2   |
EACH |
800.00 |
1,600.00 |
800.00 |
1,600.00 |
850.00 |
1,700.00 |
900.00 |
1,800.00 |
| S-027 |
phase selector
|
1   |
EACH |
3,900.00 |
3,900.00 |
3,900.00 |
3,900.00 |
4,200.00 |
4,200.00 |
4,500.00 |
4,500.00 |
| S-028 |
optical detector cable (no. 20/3c)
|
490   |
LNFT |
1.50 |
735.00 |
2.00 |
980.00 |
1.50 |
735.00 |
1.50 |
735.00 |
| S-029 |
traffic signal cable (no. 14/7c)
|
1,700   |
LNFT |
1.50 |
2,550.00 |
4.00 |
6,800.00 |
2.00 |
3,400.00 |
2.00 |
3,400.00 |
| S-030 |
traffic manholes
|
2   |
EACH |
1,400.00 |
2,800.00 |
2,200.00 |
4,400.00 |
1,500.00 |
3,000.00 |
1,600.00 |
3,200.00 |
| S-031 |
relocate existing signal pedestal, pole incl. new
foundation, demo of exist foundation, and rewiring |
2   |
EACH |
1,400.00 |
2,800.00 |
3,800.00 |
7,600.00 |
1,400.00 |
2,800.00 |
1,200.00 |
2,400.00 |
| S-032 |
relocate existing signal, double mast arm, incl. new
foundation, demo of exist. foundation and rewiring |
2   |
EACH |
3,500.00 |
7,000.00 |
11,000.00 |
22,000.00 |
4,000.00 |
8,000.00 |
3,500.00 |
7,000.00 |
| S-033 |
relocate existing signal controller, incl. new
foundation, demo of exist. foundation and rewiring |
1   |
EACH |
3,000.00 |
3,000.00 |
8,800.00 |
8,800.00 |
3,300.00 |
3,300.00 |
3,000.00 |
3,000.00 |
| S-034 |
relocate existing signal service meter and pole, incl.
new foundation, demo of exist. foundation and rewiring |
1   |
EACH |
1,300.00 |
1,300.00 |
2,000.00 |
2,000.00 |
1,400.00 |
1,400.00 |
1,200.00 |
1,200.00 |
| S-035 |
maintain traffic signals during construction
|
lump |
LUMP |
7,500.00 |
7,500.00 |
9,000.00 |
9,000.00 |
8,300.00 |
8,300.00 |
8,000.00 |
8,000.00 |
| S-036 |
saw cut existing concrete pavement (full depth)
including curb |
300   |
LNFT |
12.00 |
3,600.00 |
14.00 |
4,200.00 |
13.00 |
3,900.00 |
8.00 |
2,400.00 |
| S-037 |
saw cut, wheel cut or spade cut existing asphaltic
concrete pavement (full cut) |
70   |
LNFT |
8.00 |
560.00 |
8.00 |
560.00 |
6.00 |
420.00 |
7.00 |
490.00 |
| S-038 |
street name signs on new post or on mast arm
|
9   |
EACH |
250.00 |
2,250.00 |
250.00 |
2,250.00 |
275.00 |
2,475.00 |
250.00 |
2,250.00 |
| S-039 |
hand formed and poured in place concrete curb within
the limits of tree drip line |
50   |
LNFT |
50.00 |
2,500.00 |
20.00 |
1,000.00 |
20.00 |
1,000.00 |
30.00 |
1,500.00 |
| S-040 |
gravel bed and filter cloth over tree roots
|
12   |
SQYD |
200.00 |
2,400.00 |
40.00 |
480.00 |
30.00 |
360.00 |
40.00 |
480.00 |
| S-041 |
8" pvc drain house connection collector line
|
175   |
LNFT |
10.00 |
1,750.00 |
50.00 |
8,750.00 |
25.00 |
4,375.00 |
21.00 |
3,675.00 |
| S-042 |
replace house drain connection beyond back of curb
|
80   |
LNFT |
15.00 |
1,200.00 |
50.00 |
4,000.00 |
22.00 |
1,760.00 |
20.00 |
1,600.00 |
| S-043 |
60" rcp drain line tie-in to existing concrete box
culvert |
1   |
EACH |
4,700.00 |
4,700.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
25,000.00 |
25,000.00 |
| S-044 |
48" rcp drain line tie-in to existing concrete box
culvert |
1   |
EACH |
3,700.00 |
3,700.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
| S-045 |
36" rcp drain line tie-in to existing concrete box
culvert |
1   |
EACH |
3,300.00 |
3,300.00 |
9,000.00 |
9,000.00 |
10,000.00 |
10,000.00 |
18,000.00 |
18,000.00 |
| S-046 |
water main (8" pvc) with main line fittings
|
90   |
LNFT |
68.00 |
6,120.00 |
200.00 |
18,000.00 |
100.00 |
9,000.00 |
200.00 |
18,000.00 |
| S-047 |
adjusting water valve and/or meter box (complete to
grade) incl. removal of mud and debris inside the water meter box |
7   |
EACH |
250.00 |
1,750.00 |
400.00 |
2,800.00 |
70.00 |
490.00 |
400.00 |
2,800.00 |
| S-048 |
untreated timber for bedding materials
|
47.13 |
MFBM |
900.00 |
42,417.00 |
1,000.00 |
47,130.00 |
900.00 |
42,417.00 |
800.00 |
37,704.00 |
| S-049 |
brick sidewalk or footlap
|
9   |
SQYD |
250.00 |
2,250.00 |
80.00 |
720.00 |
250.00 |
2,250.00 |
400.00 |
3,600.00 |
| S-050 |
exposed aggregate sidewalk
|
155.3 |
SQYD |
65.00 |
10,094.50 |
80.00 |
12,424.00 |
75.00 |
11,647.50 |
90.00 |
13,977.00 |
| S-051 |
exposed aggregate driveway (6" thick)
|
53.9 |
SQYD |
80.00 |
4,312.00 |
80.00 |
4,312.00 |
80.00 |
4,312.00 |
120.00 |
6,468.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
2,528,845.00 |
|
2,867,717.30 |
|
2,917,059.02 |
|
3,225,957.10 |
| | NUMBER OF DAYS BID AT $3,000 PER DAY. |
|
|
|
330,000.00 |
|
390,000.00 |
|
390,000.00 |
|
390,000.00 |
| | TOTAL BID |
|
|
|
2,858,845.00 |
|
3,257,717.30 |
|
3,307,059.02 |
|
3,615,957.10 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - BYRON E. TALBOT CONTRACTOR, INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
140,000.00 |
140,000.00 |
|
|
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
31,000.00 |
31,000.00 |
|
|
|
|
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
8,968   |
SQYD |
11.50 |
103,132.00 |
|
|
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
891   |
SQYD |
13.00 |
11,583.00 |
|
|
|
|
|
|
| 203-04 |
nonplastic embankment
|
4,018   |
CUYD |
24.85 |
99,847.30 |
|
|
|
|
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
90,000.00 |
90,000.00 |
|
|
|
|
|
|
| 203-08 |
geotextile fabric
|
20,511   |
SQYD |
1.35 |
27,689.85 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
3,950   |
LNFT |
4.50 |
17,775.00 |
|
|
|
|
|
|
| 302-02-C |
class ii base course (8" thick)
|
9,816.1 |
SQYD |
24.15 |
237,058.82 |
|
|
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
13   |
SQYD |
200.00 |
2,600.00 |
|
|
|
|
|
|
| 601-01-I |
portland cement concrete pavement (9" thick)
|
9,377.0 |
SQYD |
73.75 |
691,553.75 |
|
|
|
|
|
|
| 601-04 |
portland cement concrete pavement coring
|
10   |
EACH |
100.00 |
1,000.00 |
|
|
|
|
|
|
| 602-05-E-01 |
full depth patching of jointed conc pvmt (7" thick)
(16.0 sq yds & under) |
4.0 |
SQYD |
200.00 |
800.00 |
|
|
|
|
|
|
| 701-03-E |
storm drain pipe (12" rcp)
|
128   |
LNFT |
162.00 |
20,736.00 |
|
|
|
|
|
|
| 701-03-F |
storm drain pipe (15" rcp)
|
62   |
LNFT |
167.00 |
10,354.00 |
|
|
|
|
|
|
| 701-03-I |
storm drain pipe (24" rcp)
|
21   |
LNFT |
245.00 |
5,145.00 |
|
|
|
|
|
|
| 701-03-M |
storm drain pipe (36" rcp)
|
274   |
LNFT |
260.00 |
71,240.00 |
|
|
|
|
|
|
| 701-03-O |
storm drain pipe (48" rcp)
|
928   |
LNFT |
361.00 |
335,008.00 |
|
|
|
|
|
|
| 701-03-P |
storm drain pipe (54" rcp)
|
236   |
LNFT |
375.00 |
88,500.00 |
|
|
|
|
|
|
| 701-03-Q |
storm drain pipe (60" rcp)
|
394   |
LNFT |
460.00 |
181,240.00 |
|
|
|
|
|
|
| 701-04-F |
storm drain pipe arch (36" equiv. rcpa)
|
261   |
LNFT |
256.00 |
66,816.00 |
|
|
|
|
|
|
| 701-09-M/E |
fabricating pipe fittings, 36"x36"x12"
|
2   |
EACH |
2,800.00 |
5,600.00 |
|
|
|
|
|
|
| 701-09-O/E |
fabricating pipe fittings, 48"x48"x12"
|
2   |
EACH |
4,300.00 |
8,600.00 |
|
|
|
|
|
|
| 701-09-P/E |
fabricating pipe fittings, 54"x54"x12"
|
1   |
EACH |
5,100.00 |
5,100.00 |
|
|
|
|
|
|
| 701-09-Q/E |
fabricating pipe fittings, 60"x60"x12"
|
1   |
EACH |
6,500.00 |
6,500.00 |
|
|
|
|
|
|
| 701-09-Q/I |
fabricating pipe fittings, 60"x60"x24"
|
1   |
EACH |
6,500.00 |
6,500.00 |
|
|
|
|
|
|
| 702-04-A |
adjusting manholes
|
11   |
EACH |
455.00 |
5,005.00 |
|
|
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
451.8 |
SQYD |
82.50 |
37,273.50 |
|
|
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
140.9 |
SQYD |
155.00 |
21,839.50 |
|
|
|
|
|
|
| 706-02-E |
concrete drive (8" thick)
|
112.0 |
SQYD |
179.00 |
20,048.00 |
|
|
|
|
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
33.0 |
SQYD |
135.00 |
4,455.00 |
|
|
|
|
|
|
| 707-01 |
concrete curb
|
3,895.4 |
LNFT |
9.50 |
37,006.30 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
100,000.00 |
100,000.00 |
|
|
|
|
|
|
| 714-01 |
slab sodding
|
798   |
SQYD |
5.50 |
4,389.00 |
|
|
|
|
|
|
| 715-01 |
topsoil
|
646   |
CUYD |
24.00 |
15,504.00 |
|
|
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
1,548.1 |
CUYD |
92.00 |
142,425.20 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
210,000.00 |
210,000.00 |
|
|
|
|
|
|
| 729-01 |
sign (type a)
|
144.0 |
SQFT |
23.00 |
3,312.00 |
|
|
|
|
|
|
| 729-21 |
u-channel post
|
22   |
EACH |
66.00 |
1,452.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
150   |
EACH |
5.45 |
817.50 |
|
|
|
|
|
|
| 732-01-A |
plastic pavement striping (4" width)
|
6,243   |
LNFT |
0.60 |
3,745.80 |
|
|
|
|
|
|
| 732-01-B |
plastic pavement striping (6" width)
|
368   |
LNFT |
0.90 |
331.20 |
|
|
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
550   |
LNFT |
1.10 |
605.00 |
|
|
|
|
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
124   |
LNFT |
2.25 |
279.00 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
430   |
LNFT |
4.15 |
1,784.50 |
|
|
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
3   |
EACH |
220.00 |
660.00 |
|
|
|
|
|
|
| 732-04-E |
plastic pavement legends & symbols (school crossing)
|
1   |
EACH |
440.00 |
440.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
0.94 |
ACRE |
2,500.00 |
2,350.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
65,000.00 |
65,000.00 |
|
|
|
|
|
|
| S-001 |
geogrid
|
9,816   |
SQYD |
3.65 |
35,828.40 |
|
|
|
|
|
|
| S-002 |
remove and replace tree with crepe myrtle
|
5   |
EACH |
1,000.00 |
5,000.00 |
|
|
|
|
|
|
| S-003 |
tree trimming and/or root pruning
|
4   |
EACH |
2,500.00 |
10,000.00 |
|
|
|
|
|
|
| S-004 |
manholes (s&wb of new orleans) (dwg. d-870) (type no.
2) |
1   |
EACH |
4,500.00 |
4,500.00 |
|
|
|
|
|
|
| S-005 |
manholes (s&wb of new orleans) (dwg. d-870) (type no.
3) |
4   |
EACH |
5,000.00 |
20,000.00 |
|
|
|
|
|
|
| S-006 |
manholes (s&wb of new orleans) (dwg. d-3340) (large
pipes) |
11   |
EACH |
6,700.00 |
73,700.00 |
|
|
|
|
|
|
| S-007 |
manholes, special conflict
|
1   |
EACH |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| S-008 |
catch basins (s&wb of new orleans) (dwg. d-873) (std.
no. 1) |
11   |
EACH |
4,500.00 |
49,500.00 |
|
|
|
|
|
|
| S-009 |
catch basins (s&wb of new orleans) (dwg. d-873-a)
(dbl. no.1) |
2   |
EACH |
6,000.00 |
12,000.00 |
|
|
|
|
|
|
| S-010 |
drop inlets (s&wb of new orleans) (dwg. d-3264)
|
1   |
EACH |
3,600.00 |
3,600.00 |
|
|
|
|
|
|
| S-011 |
6" water line offset
|
1   |
EACH |
3,500.00 |
3,500.00 |
|
|
|
|
|
|
| S-012 |
12" water main (pvc) with main line fittings
|
19   |
LNFT |
275.00 |
5,225.00 |
|
|
|
|
|
|
| S-013 |
new manhole around existing water valve
|
1   |
EACH |
1,725.00 |
1,725.00 |
|
|
|
|
|
|
| S-014 |
replace 3/4" water house connection (from main to
meter) |
4   |
EACH |
1,200.00 |
4,800.00 |
|
|
|
|
|
|
| S-015 |
replace 1" house connection (from main to meter)
|
3   |
EACH |
1,600.00 |
4,800.00 |
|
|
|
|
|
|
| S-016 |
replace sewer house connection to back of curb
|
6   |
EACH |
1,400.00 |
8,400.00 |
|
|
|
|
|
|
| S-017 |
replace existing sewer house connection beyond back of
curb |
45   |
LNFT |
60.00 |
2,700.00 |
|
|
|
|
|
|
| S-018 |
project sign
|
2   |
EACH |
1,500.00 |
3,000.00 |
|
|
|
|
|
|
| S-019 |
exploratory excavation
|
4   |
EACH |
3,200.00 |
12,800.00 |
|
|
|
|
|
|
| S-020 |
remove and relocate school zone sign and blinking
light |
1   |
EACH |
2,400.00 |
2,400.00 |
|
|
|
|
|
|
| S-021 |
three (3") inch conduit
|
480   |
LNFT |
7.50 |
3,600.00 |
|
|
|
|
|
|
| S-022 |
signal support, double mast arm (std.) incl.
foundation |
1   |
EACH |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| S-023 |
signal support, pedestal pole incl. foundation
|
3   |
EACH |
1,375.00 |
4,125.00 |
|
|
|
|
|
|
| S-024 |
signal heads, vehicular, 12" lens, 3-section
|
10   |
EACH |
925.00 |
9,250.00 |
|
|
|
|
|
|
| S-025 |
signal controller with type b foundation
|
1   |
EACH |
22,000.00 |
22,000.00 |
|
|
|
|
|
|
| S-026 |
optical detectors
|
2   |
EACH |
850.00 |
1,700.00 |
|
|
|
|
|
|
| S-027 |
phase selector
|
1   |
EACH |
4,200.00 |
4,200.00 |
|
|
|
|
|
|
| S-028 |
optical detector cable (no. 20/3c)
|
490   |
LNFT |
1.50 |
735.00 |
|
|
|
|
|
|
| S-029 |
traffic signal cable (no. 14/7c)
|
1,700   |
LNFT |
1.90 |
3,230.00 |
|
|
|
|
|
|
| S-030 |
traffic manholes
|
2   |
EACH |
1,530.00 |
3,060.00 |
|
|
|
|
|
|
| S-031 |
relocate existing signal pedestal, pole incl. new
foundation, demo of exist foundation, and rewiring |
2   |
EACH |
1,350.00 |
2,700.00 |
|
|
|
|
|
|
| S-032 |
relocate existing signal, double mast arm, incl. new
foundation, demo of exist. foundation and rewiring |
2   |
EACH |
4,000.00 |
8,000.00 |
|
|
|
|
|
|
| S-033 |
relocate existing signal controller, incl. new
foundation, demo of exist. foundation and rewiring |
1   |
EACH |
3,200.00 |
3,200.00 |
|
|
|
|
|
|
| S-034 |
relocate existing signal service meter and pole, incl.
new foundation, demo of exist. foundation and rewiring |
1   |
EACH |
1,400.00 |
1,400.00 |
|
|
|
|
|
|
| S-035 |
maintain traffic signals during construction
|
lump |
LUMP |
8,250.00 |
8,250.00 |
|
|
|
|
|
|
| S-036 |
saw cut existing concrete pavement (full depth)
including curb |
300   |
LNFT |
15.00 |
4,500.00 |
|
|
|
|
|
|
| S-037 |
saw cut, wheel cut or spade cut existing asphaltic
concrete pavement (full cut) |
70   |
LNFT |
8.50 |
595.00 |
|
|
|
|
|
|
| S-038 |
street name signs on new post or on mast arm
|
9   |
EACH |
275.00 |
2,475.00 |
|
|
|
|
|
|
| S-039 |
hand formed and poured in place concrete curb within
the limits of tree drip line |
50   |
LNFT |
24.00 |
1,200.00 |
|
|
|
|
|
|
| S-040 |
gravel bed and filter cloth over tree roots
|
12   |
SQYD |
18.00 |
216.00 |
|
|
|
|
|
|
| S-041 |
8" pvc drain house connection collector line
|
175   |
LNFT |
39.50 |
6,912.50 |
|
|
|
|
|
|
| S-042 |
replace house drain connection beyond back of curb
|
80   |
LNFT |
80.00 |
6,400.00 |
|
|
|
|
|
|
| S-043 |
60" rcp drain line tie-in to existing concrete box
culvert |
1   |
EACH |
18,000.00 |
18,000.00 |
|
|
|
|
|
|
| S-044 |
48" rcp drain line tie-in to existing concrete box
culvert |
1   |
EACH |
13,000.00 |
13,000.00 |
|
|
|
|
|
|
| S-045 |
36" rcp drain line tie-in to existing concrete box
culvert |
1   |
EACH |
13,000.00 |
13,000.00 |
|
|
|
|
|
|
| S-046 |
water main (8" pvc) with main line fittings
|
90   |
LNFT |
100.00 |
9,000.00 |
|
|
|
|
|
|
| S-047 |
adjusting water valve and/or meter box (complete to
grade) incl. removal of mud and debris inside the water meter box |
7   |
EACH |
350.00 |
2,450.00 |
|
|
|
|
|
|
| S-048 |
untreated timber for bedding materials
|
47.13 |
MFBM |
975.00 |
45,951.75 |
|
|
|
|
|
|
| S-049 |
brick sidewalk or footlap
|
9   |
SQYD |
125.00 |
1,125.00 |
|
|
|
|
|
|
| S-050 |
exposed aggregate sidewalk
|
155.3 |
SQYD |
100.00 |
15,530.00 |
|
|
|
|
|
|
| S-051 |
exposed aggregate driveway (6" thick)
|
53.9 |
SQYD |
120.00 |
6,468.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
3,474,852.87 |
|
|
|
|
|
|
| | NUMBER OF DAYS BID AT $3,000 PER DAY. |
|
|
|
390,000.00 |
|
|
|
|
|
|
| | TOTAL BID |
|
|
|
3,864,852.87 |
|
|
|
|
|
|
|