Letting of 6/17/2009 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 742-36-0008
Parish: ORLEANS
Routes:
Description: EARHART BOULEVARD (SEGMENT 1)(HAMILTON ST. TO PINE ST.)
Type Const: grad, drain stuct, class ii bc, pccp, pavement patching, concrete walks and drives,
water and sewage, signalization, signs, and related work
Estimated Construction Cost: $11,511,468.18
Maximum Number of Days Allowed for Construction: 500
Calculated Daily User Cost: $5,000.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 48896 COMMAND CONSTRUCTION INDUSTRIES LLC $11,193,055.46 380 $13,093,055.46
2 02179 BOH BROS. CONSTRUCTION CO., LLC. $11,117,457.60 400 $13,117,457.60
3 24901 HARD ROCK CONSTRUCTION CO. $14,120,359.50 365 $15,945,359.50
4 06276 BARRIERE CONSTRUCTION CO., LLC. $13,904,714.80 500 $16,404,714.80
 
Item Number Item Description Quantity Unit of Measure - 1 -
COMMAND CONSTRUCTION INDUSTRIES LLC
- 2 -
BOH BROS. CONSTRUCTION CO., LLC.
- 3 -
HARD ROCK CONSTRUCTION CO.
- 4 -
BARRIERE CONSTRUCTION CO., LLC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 400,000.00 400,000.00 15,000.00 15,000.00 120,000.00 120,000.00 62,000.00 62,000.00
202-01 removal of structures and obstructions lump      lump 400,000.00 400,000.00 230,000.00 230,000.00 300,000.00 300,000.00 180,000.00 180,000.00
202-02-C removal of portland cement concrete pavement 32,185      SQYD 7.00 225,295.00 10.00 321,850.00 14.00 450,590.00 12.00 386,220.00
202-02-D removal of concrete walks & drives 4,293      SQYD 7.00 30,051.00 8.00 34,344.00 14.00 60,102.00 25.00 107,325.00
202-02-F removal of concrete combination curb & gutter 291.5    LNFT 5.00 1,457.50 8.00 2,332.00 14.00 4,081.00 4.60 1,340.90
202-02-G removal of surfacing & stabilized base 2,732.4    SQYD 7.00 19,126.80 8.00 21,859.20 14.00 38,253.60 14.00 38,253.60
202-02-I removal of existing signal equipment lump      lump 10,000.00 10,000.00 8,000.00 8,000.00 10,000.00 10,000.00 9,000.00 9,000.00
202-02-J removal of existing railroad crossings 280      LNFT 1.00 280.00 12.00 3,360.00 20.00 5,600.00 63.00 17,640.00
203-01 general excavation 24,456      CUYD 1.00 24,456.00 16.00 391,296.00 25.00 611,400.00 25.00 611,400.00
203-03 embankment 5,126      CUYD 30.00 153,780.00 25.00 128,150.00 32.00 164,032.00 45.00 230,670.00
203-08 geotextile fabric 43,557      SQYD 3.00 130,671.00 1.50 65,335.50 1.00 43,557.00 1.40 60,979.80
204-02 temporary hay or straw bales 332      EACH 15.00 4,980.00 15.00 4,980.00 10.00 3,320.00 85.00 28,220.00
204-06 temporary silt fencing 5,312      LNFT 3.00 15,936.00 2.00 10,624.00 2.00 10,624.00 7.00 37,184.00
302-02-G class ii base course (9" thick stone or recycled
p.c.c.)
38,910.0    SQYD 20.00 778,200.00 18.00 700,380.00 23.00 894,930.00 20.00 778,200.00
402-01 traffic maintenance aggregate (vehicular measurement) 500.0    CUYD 50.00 25,000.00 40.00 20,000.00 100.00 50,000.00 74.00 37,000.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
687.0    TON 150.00 103,050.00 150.00 103,050.00 150.00 103,050.00 175.00 120,225.00
601-01-I portland cement concrete pavement (9" thick) 31,265.1    SQYD 65.00 2,032,231.50 63.00 1,969,701.30 75.00 2,344,882.50 66.00 2,063,496.60
601-02-I portland cement concrete pavement (9" thick)
(crossovers & turnouts)
5,368.5    SQYD 75.00 402,637.50 70.00 375,795.00 80.00 429,480.00 73.00 391,900.50
601-04 portland cement concrete pavement coring 45      EACH 150.00 6,750.00 100.00 4,500.00 50.00 2,250.00 118.00 5,310.00
602-05-I-03 full depth patching of jointed conc pvmt (9" thick)
(48.1 sq yds & over)
320.0    SQYD 125.00 40,000.00 120.00 38,400.00 125.00 40,000.00 124.00 39,680.00
701-03-F storm drain pipe (15" rcp) 4,770      LNFT 90.00 429,300.00 120.00 572,400.00 138.00 658,260.00 91.00 434,070.00
701-03-G storm drain pipe (18" rcp) 1,181      LNFT 120.00 141,720.00 130.00 153,530.00 110.00 129,910.00 109.00 128,729.00
701-03-I storm drain pipe (24" rcp) 1,150      LNFT 150.00 172,500.00 140.00 161,000.00 160.00 184,000.00 160.00 184,000.00
701-03-K storm drain pipe (30" rcp) 844      LNFT 175.00 147,700.00 190.00 160,360.00 225.00 189,900.00 198.00 167,112.00
701-03-M storm drain pipe (36" rcp) 333      LNFT 200.00 66,600.00 210.00 69,930.00 205.00 68,265.00 232.00 77,256.00
701-09-A fabricating pipe fittings (15"x15"x15") 26      EACH 500.00 13,000.00 470.00 12,220.00 460.00 11,960.00 500.00 13,000.00
701-09-B fabricating pipe fittings (18"x18"x15") 6      EACH 500.00 3,000.00 600.00 3,600.00 600.00 3,600.00 700.00 4,200.00
701-09-C fabricating pipe fittings (24"x24"x15") 5      EACH 1,000.00 5,000.00 1,000.00 5,000.00 1,000.00 5,000.00 700.00 3,500.00
701-09-D fabricating pipe fittings (30"x30"x15") 3      EACH 1,000.00 3,000.00 1,400.00 4,200.00 1,300.00 3,900.00 1,500.00 4,500.00
701-09-E fabricating pipe fittings (36"x36"x15") 1      EACH 2,000.00 2,000.00 2,100.00 2,100.00 2,000.00 2,000.00 2,100.00 2,100.00
701-09-F fabricating pipe fittings (18"x18"x18") 5      EACH 500.00 2,500.00 630.00 3,150.00 600.00 3,000.00 700.00 3,500.00
702-02-G-01 manholes (d-870) (standard no. 1) 54      EACH 4,000.00 216,000.00 3,500.00 189,000.00 5,000.00 270,000.00 5,400.00 291,600.00
702-02-G-02 manholes (d-870) (standard no. 2) 6      EACH 4,000.00 24,000.00 3,800.00 22,800.00 6,000.00 36,000.00 7,200.00 43,200.00
702-02-G-03 manholes (d-870) (standard no. 3) 2      EACH 4,500.00 9,000.00 4,500.00 9,000.00 9,000.00 18,000.00 8,400.00 16,800.00
702-02-H manholes (6178-b6) (sewer manhole) 1      EACH 4,500.00 4,500.00 5,500.00 5,500.00 6,000.00 6,000.00 6,400.00 6,400.00
702-02-I manholes (6179-f-2) (water valve manhole) 7      EACH 3,000.00 21,000.00 3,000.00 21,000.00 3,000.00 21,000.00 5,500.00 38,500.00
702-03-H catch basins (cb-05) 1      EACH 800.00 800.00 2,800.00 2,800.00 3,000.00 3,000.00 900.00 900.00
702-03-I catch basins (d-873) (vertical catch basin no.1) 52      EACH 3,000.00 156,000.00 3,700.00 192,400.00 4,000.00 208,000.00 4,800.00 249,600.00
702-03-J catch basins (d-873-a) (double vertical catch basin) 15      EACH 4,500.00 67,500.00 7,000.00 105,000.00 8,000.00 120,000.00 7,700.00 115,500.00
702-03-K catch basins (d-3431-a) (single drive-over catch basin) 5      EACH 2,931.24 14,656.20 4,000.00 20,000.00 4,000.00 20,000.00 4,000.00 20,000.00
702-03-L catch basins (d-3264) (drop inlet catch basin) 9      EACH 3,000.00 27,000.00 3,600.00 32,400.00 3,000.00 27,000.00 3,770.00 33,930.00
702-03-M catch basins (d-3431-b) (double drive-over catch basin) 2      EACH 5,000.00 10,000.00 6,400.00 12,800.00 6,000.00 12,000.00 6,800.00 13,600.00
702-04-A adjusting manholes 11      EACH 250.00 2,750.00 1,000.00 11,000.00 500.00 5,500.00 455.00 5,005.00
702-04-B adjusting catch basins 5      EACH 500.00 2,500.00 1,200.00 6,000.00 900.00 4,500.00 2,280.00 11,400.00
705-09 rebuilt fence 146      LNFT 15.00 2,190.00 35.00 5,110.00 30.00 4,380.00 15.00 2,190.00
706-01-A concrete walk (4" thick) 5,051.2    SQYD 40.00 202,048.00 55.00 277,816.00 75.00 378,840.00 95.00 479,864.00
706-01-C concrete walk (6" thick) 920.8    SQYD 50.00 46,040.00 120.00 110,496.00 102.00 93,921.60 255.00 234,804.00
706-02-C concrete drive (6" thick) 1,730.7    SQYD 55.00 95,188.50 75.00 129,802.50 75.00 129,802.50 120.00 207,684.00
706-03-A incidental concrete paving (4" thick) 304.9    SQYD 40.00 12,196.00 80.00 24,392.00 79.00 24,087.10 102.00 31,099.80
707-01 concrete curb 13,505.5    LNFT 4.00 54,022.00 8.00 108,044.00 12.00 162,066.00 14.00 189,077.00
707-03 combination concrete curb & gutter 961.4    LNFT 40.00 38,456.00 25.00 24,035.00 35.00 33,649.00 33.00 31,726.20
713-01 temporary signs & barricades lump      LUMP 250,000.00 250,000.00 200,000.00 200,000.00 214,000.00 214,000.00 350,000.00 350,000.00
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
2.300  MILE 500.00 1,150.00 500.00 1,150.00 540.00 1,242.00 2,500.00 5,750.00
713-04-A-01 temporary pavement markings (solid line)(4" width)
(type 1 removable)
3.100  MILE 7,000.00 21,700.00 7,500.00 23,250.00 8,400.00 26,040.00 8,800.00 27,280.00
713-05-A temporary pavement legends and symbols (arrow) 4      EACH 100.00 400.00 30.00 120.00 36.00 144.00 38.00 152.00
713-08 temporary precast barrier (dotd furnished) 380      EACH 750.00 285,000.00 25.00 9,500.00 350.00 133,000.00 174.00 66,120.00
713-10 temporary portable barrier movement 760      EACH 50.00 38,000.00 150.00 114,000.00 150.00 114,000.00 1,300.00 988,000.00
715-01 topsoil 1,012      CUYD 25.00 25,300.00 30.00 30,360.00 67.00 67,804.00 55.00 55,660.00
717-01 seeding 60      LB 20.00 1,200.00 20.00 1,200.00 22.00 1,320.00 18.00 1,080.00
718-01 fertilizer 2,000      LB 1.00 2,000.00 1.00 2,000.00 1.00 2,000.00 0.75 1,500.00
722-02 project site laboratory (equipped) 1      EACH 10,000.00 10,000.00 5,000.00 5,000.00 55,000.00 55,000.00 80,000.00 80,000.00
725-01 temporary detour roads 925.0    SQYD 125.00 115,625.00 300.00 277,500.00 300.00 277,500.00 195.00 180,375.00
726-01 bedding material 1,038.2    CUYD 75.00 77,865.00 35.00 36,337.00 85.00 88,247.00 65.00 67,483.00
727-01 mobilization lump      LUMP 1,100,000.00 1,100,000.00 650,000.00 650,000.00 1,200,000.00 1,200,000.00 300,000.00 300,000.00
729-01 sign (type a) 260.0    SQFT 35.00 9,100.00 30.00 7,800.00 40.00 10,400.00 44.00 11,440.00
731-02 reflectorized raised pavement markers 424      EACH 6.00 2,544.00 5.00 2,120.00 6.00 2,544.00 6.70 2,840.80
732-01-B plastic pavement striping (6" width) 6,490      LNFT 1.00 6,490.00 1.00 6,490.00 1.00 6,490.00 1.00 6,490.00
732-01-C plastic pavement striping (8" width) 2,072      LNFT 1.50 3,108.00 1.00 2,072.00 1.00 2,072.00 1.30 2,693.60
732-01-E plastic pavement striping (24" width) 897      LNFT 5.00 4,485.00 5.00 4,485.00 5.00 4,485.00 6.00 5,382.00
732-02-A plastic pavement striping (solid line) (4" width) 3.100  MILE 2,500.00 7,750.00 2,500.00 7,750.00 3,000.00 9,300.00 3,200.00 9,920.00
732-03-A-01 plastic pavement striping (broken line)(4"width)
preformed marking tape type v
2.300  MILE 3,000.00 6,900.00 3,000.00 6,900.00 3,600.00 8,280.00 3,800.00 8,740.00
732-04-A plastic pavement legends & symbols (arrow) 18      EACH 250.00 4,500.00 200.00 3,600.00 260.00 4,680.00 280.00 5,040.00
732-04-B plastic pavement legends & symbols (double arrow) 2      EACH 275.00 550.00 200.00 400.00 300.00 600.00 320.00 640.00
732-04-C plastic pavement legends & symbols (only) 6      EACH 225.00 1,350.00 200.00 1,200.00 260.00 1,560.00 275.00 1,650.00
732-04-E plastic pavement legends & symbols (school crossing) 1      EACH 400.00 400.00 500.00 500.00 500.00 500.00 510.00 510.00
732-05 removal of existing markings 1.100  MILE 5,500.00 6,050.00 5,000.00 5,500.00 6,000.00 6,600.00 6,330.00 6,963.00
740-01 construction layout lump      LUMP 100,000.00 100,000.00 120,000.00 120,000.00 250,000.00 250,000.00 125,000.00 125,000.00
741-01-C water main (8" pvc) 688      LNFT 100.00 68,800.00 120.00 82,560.00 280.00 192,640.00 215.00 147,920.00
741-02-C gate valve (8") 5      EACH 5,500.00 27,500.00 6,000.00 30,000.00 6,000.00 30,000.00 8,000.00 40,000.00
741-04 fire hydrant 5      EACH 4,000.00 20,000.00 4,000.00 20,000.00 5,500.00 27,500.00 6,000.00 30,000.00
741-09 adjusting water house connections 20      EACH 300.00 6,000.00 300.00 6,000.00 400.00 8,000.00 800.00 16,000.00
742-02 adjusting sanitary sewer house connections 20      EACH 300.00 6,000.00 300.00 6,000.00 1,000.00 20,000.00 900.00 18,000.00
812-01-B treated timber (coastal treatment) 82.96   MFBM 1.00 82.96 750.00 62,220.00 1,000.00 82,960.00 1,900.00 157,624.00
S-001 geogrid 38,910      SQYD 5.00 194,550.00 3.00 116,730.00 3.00 116,730.00 3.40 132,294.00
S-002 temporary construction entrance 10      EACH 1,000.00 10,000.00 4,500.00 45,000.00 3,000.00 30,000.00 8,900.00 89,000.00
S-102 saw cutting (inch/foot) 10,840      LNFT 1.50 16,260.00 2.00 21,680.00 1.00 10,840.00 1.80 19,512.00
S-103 reinforced concrete bus pad (9" thick, 4000 psi) (12'x
60')
160.0    SQYD 100.00 16,000.00 200.00 32,000.00 100.00 16,000.00 380.00 60,800.00
S-104 relocate light standard 36      EACH 2,200.00 79,200.00 2,000.00 72,000.00 2,000.00 72,000.00 1,900.00 68,400.00
S-105 exploration and location of all existing utilities 50.0    EACH 500.00 25,000.00 1,000.00 50,000.00 700.00 35,000.00 1,800.00 90,000.00
S-106 remove and salvage light standards 3      EACH 1,300.00 3,900.00 1,300.00 3,900.00 1,500.00 4,500.00 1,400.00 4,200.00
S-107 street light cable in conduit 2,500      LNFT 4.00 10,000.00 4.00 10,000.00 5.00 12,500.00 15.00 37,500.00
S-108 emergency electrical splices 10      EACH 95.00 950.00 90.00 900.00 100.00 1,000.00 2,400.00 24,000.00
S-120 signal support (pedestal, mounted) 8      EACH 1,200.00 9,600.00 1,200.00 9,600.00 1,400.00 11,200.00 2,400.00 19,200.00
S-121 signal support (25' single mast arm) 2      EACH 6,000.00 12,000.00 5,800.00 11,600.00 6,800.00 13,600.00 7,500.00 15,000.00
S-122 signal support (30' single mast arm) 2      EACH 6,000.00 12,000.00 5,800.00 11,600.00 7,000.00 14,000.00 8,000.00 16,000.00
S-123 signal support (35' single mast arm) 8      EACH 7,000.00 56,000.00 7,000.00 56,000.00 8,000.00 64,000.00 9,000.00 72,000.00
S-124 signal support (40' single mast arm) 3      EACH 7,000.00 21,000.00 7,000.00 21,000.00 8,000.00 24,000.00 9,000.00 27,000.00
S-125 signal support (45' single mast arm) 4      EACH 7,500.00 30,000.00 7,000.00 28,000.00 8,000.00 32,000.00 9,000.00 36,000.00
S-126-A signal head - horizontal, (3-section, r y g), (12" led
lens)
41      EACH 900.00 36,900.00 850.00 34,850.00 1,000.00 41,000.00 1,300.00 53,300.00
S-126-B signal head - vertical, (3-section r y g), (12" led
lens)
30      EACH 900.00 27,000.00 850.00 25,500.00 1,000.00 30,000.00 1,300.00 39,000.00
S-126-C signal head - vertical, (3-section r ylt glt), (12"
led lens)
2      EACH 800.00 1,600.00 750.00 1,500.00 900.00 1,800.00 1,500.00 3,000.00
S-126-D signal head - horizontal, (3-section r yrt grt), (12"
led lens)
3      EACH 800.00 2,400.00 750.00 2,250.00 900.00 2,700.00 1,500.00 4,500.00
S-127 signal controller - (nema ts-2, type 6 base mounted
cabinet)
3      EACH 20,000.00 60,000.00 20,000.00 60,000.00 23,000.00 69,000.00 30,000.00 90,000.00
S-128 conductor 7c (single, #14 awg stranded) traffic signal
cable
8,838      LNFT 1.50 13,257.00 1.50 13,257.00 2.00 17,676.00 1.70 15,024.60
S-129 jack or bored conduit 1,394      LNFT 15.00 20,910.00 11.00 15,334.00 14.00 19,516.00 27.00 37,638.00
S-130 signal service (pedestal mount) 3      EACH 2,000.00 6,000.00 1,700.00 5,100.00 2,000.00 6,000.00 2,300.00 6,900.00
S-131 conduit 1" pvc in earth 37      LNFT 6.00 222.00 6.00 222.00 7.00 259.00 1.70 62.90
S-132 conduit 2" pvc in earth 4,600      LNFT 7.00 32,200.00 6.00 27,600.00 7.00 32,200.00 2.30 10,580.00
S-133 conduit 3" pvc in earth 20      LNFT 8.00 160.00 7.00 140.00 8.00 160.00 3.00 60.00
S-134 conduit 3" pvc jack and bore 724      LNFT 15.00 10,860.00 11.00 7,964.00 18.00 13,032.00 3.00 2,172.00
S-135 conduit 4" pvc in earth 106      LNFT 9.00 954.00 8.00 848.00 9.00 954.00 8.00 848.00
S-136 conduit 1" (rigid) 50      LNFT 13.00 650.00 13.00 650.00 14.00 700.00 7.00 350.00
S-137 underground junction box (type d) 23      EACH 400.00 9,200.00 350.00 8,050.00 385.00 8,855.00 500.00 11,500.00
S-138 underground junction box (type f) 16      EACH 500.00 8,000.00 450.00 7,200.00 539.00 8,624.00 680.00 10,880.00
S-139 traffic manhole 3      EACH 2,000.00 6,000.00 1,700.00 5,100.00 2,000.00 6,000.00 3,300.00 9,900.00
S-140 loop detectors (saw loop slot in pavement) 628      LNFT 15.00 9,420.00 11.00 6,908.00 12.00 7,536.00 16.00 10,048.00
S-141 cable loop lead in 6,200      LNFT 1.00 6,200.00 1.00 6,200.00 1.00 6,200.00 1.00 6,200.00
S-142 optical emitter 5      EACH 2,100.00 10,500.00 2,000.00 10,000.00 2,300.00 11,500.00 3,300.00 16,500.00
S-143 conductor, 3c (signal, #14 awg stranded) optical
detector cable
1,184      LNFT 1.00 1,184.00 1.00 1,184.00 1.00 1,184.00 1.30 1,539.20
S-144 uni-directional optical detectors 8      EACH 800.00 6,400.00 800.00 6,400.00 900.00 7,200.00 1,000.00 8,000.00
S-146 conductor, 1-6pr interconnect cable 3,753      LNFT 1.50 5,629.50 1.00 3,753.00 2.00 7,506.00 2.90 10,883.70
S-148 street name signs (on new post) 30      EACH 400.00 12,000.00 350.00 10,500.00 400.00 12,000.00 500.00 15,000.00
S-149 conductor, 2c/os (loop lead-in, #14 awg stranded) loop
wire
7,276      LNFT 1.00 7,276.00 1.00 7,276.00 1.00 7,276.00 1.25 9,095.00
S-150 impact attenuator 11      EACH 20,000.00 220,000.00 15,000.00 165,000.00 20,000.00 220,000.00 17,000.00 187,000.00
S-151 police traffic control 100      HOUR 40.00 4,000.00 40.00 4,000.00 52.00 5,200.00 54.00 5,400.00
S-152 conduit 2" pvc jack and bore 400      LNFT 12.00 4,800.00 4.50 1,800.00 14.00 5,600.00 3.00 1,200.00
S-153 conduit 4" pvc jack and bore 316      LNFT 20.00 6,320.00 15.00 4,740.00 22.00 6,952.00 5.00 1,580.00
S-154 trenching and backfilling 4,750      LNFT 5.00 23,750.00 5.00 23,750.00 6.00 28,500.00 5.00 23,750.00
S-155 signs (r3-1) 40      SQFT 30.00 1,200.00 30.00 1,200.00 37.00 1,480.00 57.00 2,280.00
S-156 signs (r3-2) 4      SQFT 40.00 160.00 37.00 148.00 44.00 176.00 57.00 228.00
S-157 signs (r3-5r) 4      SQFT 40.00 160.00 37.00 148.00 44.00 176.00 57.00 228.00
S-158 signs (r3-7r) 6.3    SQFT 40.00 252.00 37.00 233.10 44.00 277.20 57.00 359.10
S-159 signs (r5-1) 12.5    SQFT 40.00 500.00 37.00 462.50 44.00 550.00 120.00 1,500.00
S-160 signs (r10-10) 8      SQFT 40.00 320.00 37.00 296.00 44.00 352.00 120.00 960.00
S-161 signs (special, yield to pedestrian) 42      SQFT 40.00 1,680.00 37.00 1,554.00 44.00 1,848.00 128.00 5,376.00
S-162 signs (special, street name) 87.5    SQFT 40.00 3,500.00 37.00 3,237.50 44.00 3,850.00 145.00 12,687.50
S-163 conductor, 3c (power, #6 awg) 31      LNFT 6.00 186.00 6.00 186.00 7.00 217.00 4.00 124.00
S-201 sewerage and water board electrical ductbank and
manholes, complete
lump      LUMP 1,000,000.00 1,000,000.00 1,426,000.00 1,426,000.00 1,550,000.00 1,550,000.00 1,445,000.00 1,445,000.00
S-202 drain house connection from new drain line to back of
curb (6" pvc)
14      EACH 250.00 3,500.00 800.00 11,200.00 1,000.00 14,000.00 1,900.00 26,600.00
S-203 drain house connection beyond back of curb (6" pvc) 200      LNFT 25.00 5,000.00 20.00 4,000.00 21.00 4,200.00 40.00 8,000.00
S-204 collector line to catch basin for drain house
connections (8" pvc)
300      LNFT 20.00 6,000.00 25.00 7,500.00 23.00 6,900.00 50.00 15,000.00
S-205 adjust drain cleanout box 4      EACH 50.00 200.00 300.00 1,200.00 135.00 540.00 290.00 1,160.00
S-206 remove mud and debris from meter box 4      EACH 0.00 0.00 200.00 800.00 20.00 80.00 121.00 484.00
S-207 replace broken water meter box 4      EACH 1,000.00 4,000.00 400.00 1,600.00 770.00 3,080.00 1,000.00 4,000.00
S-208 adjust water meter box 4      EACH 200.00 800.00 500.00 2,000.00 88.00 352.00 390.00 1,560.00
S-209 sewer point repair up to ten feet 25      LNFT 150.00 3,750.00 350.00 8,750.00 1,000.00 25,000.00 345.00 8,625.00
S-210 sewer point repair beyond ten feet 30      LNFT 150.00 4,500.00 150.00 4,500.00 500.00 15,000.00 345.00 10,350.00
S-211 remove and replace existing sewer house connection
from new main to back of curb
5      EACH 2,000.00 10,000.00 1,000.00 5,000.00 2,200.00 11,000.00 2,000.00 10,000.00
S-212 remove and replace sewer house connection beyond back
of curb
75      LNFT 25.00 1,875.00 20.00 1,500.00 140.00 10,500.00 90.00 6,750.00
S-213 replace 5/8" and 3/4" water house connection (from
main to meter)
6      EACH 500.00 3,000.00 500.00 3,000.00 830.00 4,980.00 1,500.00 9,000.00
S-214 replace 1" water house connection (from main to meter) 2      EACH 500.00 1,000.00 550.00 1,100.00 1,000.00 2,000.00 1,500.00 3,000.00
S-215 replace 3/4" or 1" water house connection (from meter
to property line)
200      LNFT 15.00 3,000.00 20.00 4,000.00 20.00 4,000.00 25.00 5,000.00
S-216 plug existing drains 15      EACH 125.00 1,875.00 300.00 4,500.00 300.00 4,500.00 1,500.00 22,500.00
S-217 fill drain with mississippi river sand 200      CUYD 167.13 33,426.00 100.00 20,000.00 40.00 8,000.00 60.00 12,000.00
S-301 tree removal (up to 10.0" dbh) 10      EACH 1,500.00 15,000.00 400.00 4,000.00 1,000.00 10,000.00 50.00 500.00
S-302 tree removal (10.1" dbh to 20.0" dbh) 4      EACH 2,000.00 8,000.00 700.00 2,800.00 1,500.00 6,000.00 120.00 480.00
S-303 tree trimming lump      LUMP 20,000.00 20,000.00 2,000.00 2,000.00 6,000.00 6,000.00 3,000.00 3,000.00
S-304 root pruning 4      EACH 250.00 1,000.00 400.00 1,600.00 300.00 1,200.00 250.00 1,000.00
S-305 root trenching 100      LNFT 20.00 2,000.00 20.00 2,000.00 30.00 3,000.00 100.00 10,000.00
S-306 restoration of existing plant and flower beds lump      LUMP 1,000.00 1,000.00 2,000.00 2,000.00 6,000.00 6,000.00 3,000.00 3,000.00
                       
 ITEM TOTAL (CONSTRUCTION BID)       11,193,055.46   11,117,457.60   14,120,359.50   13,904,714.80
 NUMBER OF DAYS BID AT $5,000 PER DAY.       1,900,000.00   2,000,000.00   1,825,000.00   2,500,000.00
 TOTAL BID       13,093,055.46   13,117,457.60   15,945,359.50   16,404,714.80

Error processing SSI file