| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - COMMAND CONSTRUCTION INDUSTRIES LLC |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
- 3 - HARD ROCK CONSTRUCTION CO. |
- 4 - BARRIERE CONSTRUCTION CO., LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
400,000.00 |
400,000.00 |
15,000.00 |
15,000.00 |
120,000.00 |
120,000.00 |
62,000.00 |
62,000.00 |
| 202-01 |
removal of structures and obstructions
|
lump |
lump |
400,000.00 |
400,000.00 |
230,000.00 |
230,000.00 |
300,000.00 |
300,000.00 |
180,000.00 |
180,000.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
32,185   |
SQYD |
7.00 |
225,295.00 |
10.00 |
321,850.00 |
14.00 |
450,590.00 |
12.00 |
386,220.00 |
| 202-02-D |
removal of concrete walks & drives
|
4,293   |
SQYD |
7.00 |
30,051.00 |
8.00 |
34,344.00 |
14.00 |
60,102.00 |
25.00 |
107,325.00 |
| 202-02-F |
removal of concrete combination curb & gutter
|
291.5 |
LNFT |
5.00 |
1,457.50 |
8.00 |
2,332.00 |
14.00 |
4,081.00 |
4.60 |
1,340.90 |
| 202-02-G |
removal of surfacing & stabilized base
|
2,732.4 |
SQYD |
7.00 |
19,126.80 |
8.00 |
21,859.20 |
14.00 |
38,253.60 |
14.00 |
38,253.60 |
| 202-02-I |
removal of existing signal equipment
|
lump |
lump |
10,000.00 |
10,000.00 |
8,000.00 |
8,000.00 |
10,000.00 |
10,000.00 |
9,000.00 |
9,000.00 |
| 202-02-J |
removal of existing railroad crossings
|
280   |
LNFT |
1.00 |
280.00 |
12.00 |
3,360.00 |
20.00 |
5,600.00 |
63.00 |
17,640.00 |
| 203-01 |
general excavation
|
24,456   |
CUYD |
1.00 |
24,456.00 |
16.00 |
391,296.00 |
25.00 |
611,400.00 |
25.00 |
611,400.00 |
| 203-03 |
embankment
|
5,126   |
CUYD |
30.00 |
153,780.00 |
25.00 |
128,150.00 |
32.00 |
164,032.00 |
45.00 |
230,670.00 |
| 203-08 |
geotextile fabric
|
43,557   |
SQYD |
3.00 |
130,671.00 |
1.50 |
65,335.50 |
1.00 |
43,557.00 |
1.40 |
60,979.80 |
| 204-02 |
temporary hay or straw bales
|
332   |
EACH |
15.00 |
4,980.00 |
15.00 |
4,980.00 |
10.00 |
3,320.00 |
85.00 |
28,220.00 |
| 204-06 |
temporary silt fencing
|
5,312   |
LNFT |
3.00 |
15,936.00 |
2.00 |
10,624.00 |
2.00 |
10,624.00 |
7.00 |
37,184.00 |
| 302-02-G |
class ii base course (9" thick stone or recycled
p.c.c.) |
38,910.0 |
SQYD |
20.00 |
778,200.00 |
18.00 |
700,380.00 |
23.00 |
894,930.00 |
20.00 |
778,200.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
50.00 |
25,000.00 |
40.00 |
20,000.00 |
100.00 |
50,000.00 |
74.00 |
37,000.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
687.0 |
TON |
150.00 |
103,050.00 |
150.00 |
103,050.00 |
150.00 |
103,050.00 |
175.00 |
120,225.00 |
| 601-01-I |
portland cement concrete pavement (9" thick)
|
31,265.1 |
SQYD |
65.00 |
2,032,231.50 |
63.00 |
1,969,701.30 |
75.00 |
2,344,882.50 |
66.00 |
2,063,496.60 |
| 601-02-I |
portland cement concrete pavement (9" thick)
(crossovers & turnouts) |
5,368.5 |
SQYD |
75.00 |
402,637.50 |
70.00 |
375,795.00 |
80.00 |
429,480.00 |
73.00 |
391,900.50 |
| 601-04 |
portland cement concrete pavement coring
|
45   |
EACH |
150.00 |
6,750.00 |
100.00 |
4,500.00 |
50.00 |
2,250.00 |
118.00 |
5,310.00 |
| 602-05-I-03 |
full depth patching of jointed conc pvmt (9" thick)
(48.1 sq yds & over) |
320.0 |
SQYD |
125.00 |
40,000.00 |
120.00 |
38,400.00 |
125.00 |
40,000.00 |
124.00 |
39,680.00 |
| 701-03-F |
storm drain pipe (15" rcp)
|
4,770   |
LNFT |
90.00 |
429,300.00 |
120.00 |
572,400.00 |
138.00 |
658,260.00 |
91.00 |
434,070.00 |
| 701-03-G |
storm drain pipe (18" rcp)
|
1,181   |
LNFT |
120.00 |
141,720.00 |
130.00 |
153,530.00 |
110.00 |
129,910.00 |
109.00 |
128,729.00 |
| 701-03-I |
storm drain pipe (24" rcp)
|
1,150   |
LNFT |
150.00 |
172,500.00 |
140.00 |
161,000.00 |
160.00 |
184,000.00 |
160.00 |
184,000.00 |
| 701-03-K |
storm drain pipe (30" rcp)
|
844   |
LNFT |
175.00 |
147,700.00 |
190.00 |
160,360.00 |
225.00 |
189,900.00 |
198.00 |
167,112.00 |
| 701-03-M |
storm drain pipe (36" rcp)
|
333   |
LNFT |
200.00 |
66,600.00 |
210.00 |
69,930.00 |
205.00 |
68,265.00 |
232.00 |
77,256.00 |
| 701-09-A |
fabricating pipe fittings (15"x15"x15")
|
26   |
EACH |
500.00 |
13,000.00 |
470.00 |
12,220.00 |
460.00 |
11,960.00 |
500.00 |
13,000.00 |
| 701-09-B |
fabricating pipe fittings (18"x18"x15")
|
6   |
EACH |
500.00 |
3,000.00 |
600.00 |
3,600.00 |
600.00 |
3,600.00 |
700.00 |
4,200.00 |
| 701-09-C |
fabricating pipe fittings (24"x24"x15")
|
5   |
EACH |
1,000.00 |
5,000.00 |
1,000.00 |
5,000.00 |
1,000.00 |
5,000.00 |
700.00 |
3,500.00 |
| 701-09-D |
fabricating pipe fittings (30"x30"x15")
|
3   |
EACH |
1,000.00 |
3,000.00 |
1,400.00 |
4,200.00 |
1,300.00 |
3,900.00 |
1,500.00 |
4,500.00 |
| 701-09-E |
fabricating pipe fittings (36"x36"x15")
|
1   |
EACH |
2,000.00 |
2,000.00 |
2,100.00 |
2,100.00 |
2,000.00 |
2,000.00 |
2,100.00 |
2,100.00 |
| 701-09-F |
fabricating pipe fittings (18"x18"x18")
|
5   |
EACH |
500.00 |
2,500.00 |
630.00 |
3,150.00 |
600.00 |
3,000.00 |
700.00 |
3,500.00 |
| 702-02-G-01 |
manholes (d-870) (standard no. 1)
|
54   |
EACH |
4,000.00 |
216,000.00 |
3,500.00 |
189,000.00 |
5,000.00 |
270,000.00 |
5,400.00 |
291,600.00 |
| 702-02-G-02 |
manholes (d-870) (standard no. 2)
|
6   |
EACH |
4,000.00 |
24,000.00 |
3,800.00 |
22,800.00 |
6,000.00 |
36,000.00 |
7,200.00 |
43,200.00 |
| 702-02-G-03 |
manholes (d-870) (standard no. 3)
|
2   |
EACH |
4,500.00 |
9,000.00 |
4,500.00 |
9,000.00 |
9,000.00 |
18,000.00 |
8,400.00 |
16,800.00 |
| 702-02-H |
manholes (6178-b6) (sewer manhole)
|
1   |
EACH |
4,500.00 |
4,500.00 |
5,500.00 |
5,500.00 |
6,000.00 |
6,000.00 |
6,400.00 |
6,400.00 |
| 702-02-I |
manholes (6179-f-2) (water valve manhole)
|
7   |
EACH |
3,000.00 |
21,000.00 |
3,000.00 |
21,000.00 |
3,000.00 |
21,000.00 |
5,500.00 |
38,500.00 |
| 702-03-H |
catch basins (cb-05)
|
1   |
EACH |
800.00 |
800.00 |
2,800.00 |
2,800.00 |
3,000.00 |
3,000.00 |
900.00 |
900.00 |
| 702-03-I |
catch basins (d-873) (vertical catch basin no.1)
|
52   |
EACH |
3,000.00 |
156,000.00 |
3,700.00 |
192,400.00 |
4,000.00 |
208,000.00 |
4,800.00 |
249,600.00 |
| 702-03-J |
catch basins (d-873-a) (double vertical catch basin)
|
15   |
EACH |
4,500.00 |
67,500.00 |
7,000.00 |
105,000.00 |
8,000.00 |
120,000.00 |
7,700.00 |
115,500.00 |
| 702-03-K |
catch basins (d-3431-a) (single drive-over catch basin)
|
5   |
EACH |
2,931.24 |
14,656.20 |
4,000.00 |
20,000.00 |
4,000.00 |
20,000.00 |
4,000.00 |
20,000.00 |
| 702-03-L |
catch basins (d-3264) (drop inlet catch basin)
|
9   |
EACH |
3,000.00 |
27,000.00 |
3,600.00 |
32,400.00 |
3,000.00 |
27,000.00 |
3,770.00 |
33,930.00 |
| 702-03-M |
catch basins (d-3431-b) (double drive-over catch basin)
|
2   |
EACH |
5,000.00 |
10,000.00 |
6,400.00 |
12,800.00 |
6,000.00 |
12,000.00 |
6,800.00 |
13,600.00 |
| 702-04-A |
adjusting manholes
|
11   |
EACH |
250.00 |
2,750.00 |
1,000.00 |
11,000.00 |
500.00 |
5,500.00 |
455.00 |
5,005.00 |
| 702-04-B |
adjusting catch basins
|
5   |
EACH |
500.00 |
2,500.00 |
1,200.00 |
6,000.00 |
900.00 |
4,500.00 |
2,280.00 |
11,400.00 |
| 705-09 |
rebuilt fence
|
146   |
LNFT |
15.00 |
2,190.00 |
35.00 |
5,110.00 |
30.00 |
4,380.00 |
15.00 |
2,190.00 |
| 706-01-A |
concrete walk (4" thick)
|
5,051.2 |
SQYD |
40.00 |
202,048.00 |
55.00 |
277,816.00 |
75.00 |
378,840.00 |
95.00 |
479,864.00 |
| 706-01-C |
concrete walk (6" thick)
|
920.8 |
SQYD |
50.00 |
46,040.00 |
120.00 |
110,496.00 |
102.00 |
93,921.60 |
255.00 |
234,804.00 |
| 706-02-C |
concrete drive (6" thick)
|
1,730.7 |
SQYD |
55.00 |
95,188.50 |
75.00 |
129,802.50 |
75.00 |
129,802.50 |
120.00 |
207,684.00 |
| 706-03-A |
incidental concrete paving (4" thick)
|
304.9 |
SQYD |
40.00 |
12,196.00 |
80.00 |
24,392.00 |
79.00 |
24,087.10 |
102.00 |
31,099.80 |
| 707-01 |
concrete curb
|
13,505.5 |
LNFT |
4.00 |
54,022.00 |
8.00 |
108,044.00 |
12.00 |
162,066.00 |
14.00 |
189,077.00 |
| 707-03 |
combination concrete curb & gutter
|
961.4 |
LNFT |
40.00 |
38,456.00 |
25.00 |
24,035.00 |
35.00 |
33,649.00 |
33.00 |
31,726.20 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
250,000.00 |
250,000.00 |
200,000.00 |
200,000.00 |
214,000.00 |
214,000.00 |
350,000.00 |
350,000.00 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
2.300 |
MILE |
500.00 |
1,150.00 |
500.00 |
1,150.00 |
540.00 |
1,242.00 |
2,500.00 |
5,750.00 |
| 713-04-A-01 |
temporary pavement markings (solid line)(4" width)
(type 1 removable) |
3.100 |
MILE |
7,000.00 |
21,700.00 |
7,500.00 |
23,250.00 |
8,400.00 |
26,040.00 |
8,800.00 |
27,280.00 |
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
4   |
EACH |
100.00 |
400.00 |
30.00 |
120.00 |
36.00 |
144.00 |
38.00 |
152.00 |
| 713-08 |
temporary precast barrier (dotd furnished)
|
380   |
EACH |
750.00 |
285,000.00 |
25.00 |
9,500.00 |
350.00 |
133,000.00 |
174.00 |
66,120.00 |
| 713-10 |
temporary portable barrier movement
|
760   |
EACH |
50.00 |
38,000.00 |
150.00 |
114,000.00 |
150.00 |
114,000.00 |
1,300.00 |
988,000.00 |
| 715-01 |
topsoil
|
1,012   |
CUYD |
25.00 |
25,300.00 |
30.00 |
30,360.00 |
67.00 |
67,804.00 |
55.00 |
55,660.00 |
| 717-01 |
seeding
|
60   |
LB |
20.00 |
1,200.00 |
20.00 |
1,200.00 |
22.00 |
1,320.00 |
18.00 |
1,080.00 |
| 718-01 |
fertilizer
|
2,000   |
LB |
1.00 |
2,000.00 |
1.00 |
2,000.00 |
1.00 |
2,000.00 |
0.75 |
1,500.00 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
55,000.00 |
55,000.00 |
80,000.00 |
80,000.00 |
| 725-01 |
temporary detour roads
|
925.0 |
SQYD |
125.00 |
115,625.00 |
300.00 |
277,500.00 |
300.00 |
277,500.00 |
195.00 |
180,375.00 |
| 726-01 |
bedding material
|
1,038.2 |
CUYD |
75.00 |
77,865.00 |
35.00 |
36,337.00 |
85.00 |
88,247.00 |
65.00 |
67,483.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
1,100,000.00 |
1,100,000.00 |
650,000.00 |
650,000.00 |
1,200,000.00 |
1,200,000.00 |
300,000.00 |
300,000.00 |
| 729-01 |
sign (type a)
|
260.0 |
SQFT |
35.00 |
9,100.00 |
30.00 |
7,800.00 |
40.00 |
10,400.00 |
44.00 |
11,440.00 |
| 731-02 |
reflectorized raised pavement markers
|
424   |
EACH |
6.00 |
2,544.00 |
5.00 |
2,120.00 |
6.00 |
2,544.00 |
6.70 |
2,840.80 |
| 732-01-B |
plastic pavement striping (6" width)
|
6,490   |
LNFT |
1.00 |
6,490.00 |
1.00 |
6,490.00 |
1.00 |
6,490.00 |
1.00 |
6,490.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
2,072   |
LNFT |
1.50 |
3,108.00 |
1.00 |
2,072.00 |
1.00 |
2,072.00 |
1.30 |
2,693.60 |
| 732-01-E |
plastic pavement striping (24" width)
|
897   |
LNFT |
5.00 |
4,485.00 |
5.00 |
4,485.00 |
5.00 |
4,485.00 |
6.00 |
5,382.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
3.100 |
MILE |
2,500.00 |
7,750.00 |
2,500.00 |
7,750.00 |
3,000.00 |
9,300.00 |
3,200.00 |
9,920.00 |
| 732-03-A-01 |
plastic pavement striping (broken line)(4"width)
preformed marking tape type v |
2.300 |
MILE |
3,000.00 |
6,900.00 |
3,000.00 |
6,900.00 |
3,600.00 |
8,280.00 |
3,800.00 |
8,740.00 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
18   |
EACH |
250.00 |
4,500.00 |
200.00 |
3,600.00 |
260.00 |
4,680.00 |
280.00 |
5,040.00 |
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
2   |
EACH |
275.00 |
550.00 |
200.00 |
400.00 |
300.00 |
600.00 |
320.00 |
640.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
6   |
EACH |
225.00 |
1,350.00 |
200.00 |
1,200.00 |
260.00 |
1,560.00 |
275.00 |
1,650.00 |
| 732-04-E |
plastic pavement legends & symbols (school crossing)
|
1   |
EACH |
400.00 |
400.00 |
500.00 |
500.00 |
500.00 |
500.00 |
510.00 |
510.00 |
| 732-05 |
removal of existing markings
|
1.100 |
MILE |
5,500.00 |
6,050.00 |
5,000.00 |
5,500.00 |
6,000.00 |
6,600.00 |
6,330.00 |
6,963.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
100,000.00 |
100,000.00 |
120,000.00 |
120,000.00 |
250,000.00 |
250,000.00 |
125,000.00 |
125,000.00 |
| 741-01-C |
water main (8" pvc)
|
688   |
LNFT |
100.00 |
68,800.00 |
120.00 |
82,560.00 |
280.00 |
192,640.00 |
215.00 |
147,920.00 |
| 741-02-C |
gate valve (8")
|
5   |
EACH |
5,500.00 |
27,500.00 |
6,000.00 |
30,000.00 |
6,000.00 |
30,000.00 |
8,000.00 |
40,000.00 |
| 741-04 |
fire hydrant
|
5   |
EACH |
4,000.00 |
20,000.00 |
4,000.00 |
20,000.00 |
5,500.00 |
27,500.00 |
6,000.00 |
30,000.00 |
| 741-09 |
adjusting water house connections
|
20   |
EACH |
300.00 |
6,000.00 |
300.00 |
6,000.00 |
400.00 |
8,000.00 |
800.00 |
16,000.00 |
| 742-02 |
adjusting sanitary sewer house connections
|
20   |
EACH |
300.00 |
6,000.00 |
300.00 |
6,000.00 |
1,000.00 |
20,000.00 |
900.00 |
18,000.00 |
| 812-01-B |
treated timber (coastal treatment)
|
82.96 |
MFBM |
1.00 |
82.96 |
750.00 |
62,220.00 |
1,000.00 |
82,960.00 |
1,900.00 |
157,624.00 |
| S-001 |
geogrid
|
38,910   |
SQYD |
5.00 |
194,550.00 |
3.00 |
116,730.00 |
3.00 |
116,730.00 |
3.40 |
132,294.00 |
| S-002 |
temporary construction entrance
|
10   |
EACH |
1,000.00 |
10,000.00 |
4,500.00 |
45,000.00 |
3,000.00 |
30,000.00 |
8,900.00 |
89,000.00 |
| S-102 |
saw cutting (inch/foot)
|
10,840   |
LNFT |
1.50 |
16,260.00 |
2.00 |
21,680.00 |
1.00 |
10,840.00 |
1.80 |
19,512.00 |
| S-103 |
reinforced concrete bus pad (9" thick, 4000 psi) (12'x
60') |
160.0 |
SQYD |
100.00 |
16,000.00 |
200.00 |
32,000.00 |
100.00 |
16,000.00 |
380.00 |
60,800.00 |
| S-104 |
relocate light standard
|
36   |
EACH |
2,200.00 |
79,200.00 |
2,000.00 |
72,000.00 |
2,000.00 |
72,000.00 |
1,900.00 |
68,400.00 |
| S-105 |
exploration and location of all existing utilities
|
50.0 |
EACH |
500.00 |
25,000.00 |
1,000.00 |
50,000.00 |
700.00 |
35,000.00 |
1,800.00 |
90,000.00 |
| S-106 |
remove and salvage light standards
|
3   |
EACH |
1,300.00 |
3,900.00 |
1,300.00 |
3,900.00 |
1,500.00 |
4,500.00 |
1,400.00 |
4,200.00 |
| S-107 |
street light cable in conduit
|
2,500   |
LNFT |
4.00 |
10,000.00 |
4.00 |
10,000.00 |
5.00 |
12,500.00 |
15.00 |
37,500.00 |
| S-108 |
emergency electrical splices
|
10   |
EACH |
95.00 |
950.00 |
90.00 |
900.00 |
100.00 |
1,000.00 |
2,400.00 |
24,000.00 |
| S-120 |
signal support (pedestal, mounted)
|
8   |
EACH |
1,200.00 |
9,600.00 |
1,200.00 |
9,600.00 |
1,400.00 |
11,200.00 |
2,400.00 |
19,200.00 |
| S-121 |
signal support (25' single mast arm)
|
2   |
EACH |
6,000.00 |
12,000.00 |
5,800.00 |
11,600.00 |
6,800.00 |
13,600.00 |
7,500.00 |
15,000.00 |
| S-122 |
signal support (30' single mast arm)
|
2   |
EACH |
6,000.00 |
12,000.00 |
5,800.00 |
11,600.00 |
7,000.00 |
14,000.00 |
8,000.00 |
16,000.00 |
| S-123 |
signal support (35' single mast arm)
|
8   |
EACH |
7,000.00 |
56,000.00 |
7,000.00 |
56,000.00 |
8,000.00 |
64,000.00 |
9,000.00 |
72,000.00 |
| S-124 |
signal support (40' single mast arm)
|
3   |
EACH |
7,000.00 |
21,000.00 |
7,000.00 |
21,000.00 |
8,000.00 |
24,000.00 |
9,000.00 |
27,000.00 |
| S-125 |
signal support (45' single mast arm)
|
4   |
EACH |
7,500.00 |
30,000.00 |
7,000.00 |
28,000.00 |
8,000.00 |
32,000.00 |
9,000.00 |
36,000.00 |
| S-126-A |
signal head - horizontal, (3-section, r y g), (12" led
lens) |
41   |
EACH |
900.00 |
36,900.00 |
850.00 |
34,850.00 |
1,000.00 |
41,000.00 |
1,300.00 |
53,300.00 |
| S-126-B |
signal head - vertical, (3-section r y g), (12" led
lens) |
30   |
EACH |
900.00 |
27,000.00 |
850.00 |
25,500.00 |
1,000.00 |
30,000.00 |
1,300.00 |
39,000.00 |
| S-126-C |
signal head - vertical, (3-section r ylt glt), (12"
led lens) |
2   |
EACH |
800.00 |
1,600.00 |
750.00 |
1,500.00 |
900.00 |
1,800.00 |
1,500.00 |
3,000.00 |
| S-126-D |
signal head - horizontal, (3-section r yrt grt), (12"
led lens) |
3   |
EACH |
800.00 |
2,400.00 |
750.00 |
2,250.00 |
900.00 |
2,700.00 |
1,500.00 |
4,500.00 |
| S-127 |
signal controller - (nema ts-2, type 6 base mounted
cabinet) |
3   |
EACH |
20,000.00 |
60,000.00 |
20,000.00 |
60,000.00 |
23,000.00 |
69,000.00 |
30,000.00 |
90,000.00 |
| S-128 |
conductor 7c (single, #14 awg stranded) traffic signal
cable |
8,838   |
LNFT |
1.50 |
13,257.00 |
1.50 |
13,257.00 |
2.00 |
17,676.00 |
1.70 |
15,024.60 |
| S-129 |
jack or bored conduit
|
1,394   |
LNFT |
15.00 |
20,910.00 |
11.00 |
15,334.00 |
14.00 |
19,516.00 |
27.00 |
37,638.00 |
| S-130 |
signal service (pedestal mount)
|
3   |
EACH |
2,000.00 |
6,000.00 |
1,700.00 |
5,100.00 |
2,000.00 |
6,000.00 |
2,300.00 |
6,900.00 |
| S-131 |
conduit 1" pvc in earth
|
37   |
LNFT |
6.00 |
222.00 |
6.00 |
222.00 |
7.00 |
259.00 |
1.70 |
62.90 |
| S-132 |
conduit 2" pvc in earth
|
4,600   |
LNFT |
7.00 |
32,200.00 |
6.00 |
27,600.00 |
7.00 |
32,200.00 |
2.30 |
10,580.00 |
| S-133 |
conduit 3" pvc in earth
|
20   |
LNFT |
8.00 |
160.00 |
7.00 |
140.00 |
8.00 |
160.00 |
3.00 |
60.00 |
| S-134 |
conduit 3" pvc jack and bore
|
724   |
LNFT |
15.00 |
10,860.00 |
11.00 |
7,964.00 |
18.00 |
13,032.00 |
3.00 |
2,172.00 |
| S-135 |
conduit 4" pvc in earth
|
106   |
LNFT |
9.00 |
954.00 |
8.00 |
848.00 |
9.00 |
954.00 |
8.00 |
848.00 |
| S-136 |
conduit 1" (rigid)
|
50   |
LNFT |
13.00 |
650.00 |
13.00 |
650.00 |
14.00 |
700.00 |
7.00 |
350.00 |
| S-137 |
underground junction box (type d)
|
23   |
EACH |
400.00 |
9,200.00 |
350.00 |
8,050.00 |
385.00 |
8,855.00 |
500.00 |
11,500.00 |
| S-138 |
underground junction box (type f)
|
16   |
EACH |
500.00 |
8,000.00 |
450.00 |
7,200.00 |
539.00 |
8,624.00 |
680.00 |
10,880.00 |
| S-139 |
traffic manhole
|
3   |
EACH |
2,000.00 |
6,000.00 |
1,700.00 |
5,100.00 |
2,000.00 |
6,000.00 |
3,300.00 |
9,900.00 |
| S-140 |
loop detectors (saw loop slot in pavement)
|
628   |
LNFT |
15.00 |
9,420.00 |
11.00 |
6,908.00 |
12.00 |
7,536.00 |
16.00 |
10,048.00 |
| S-141 |
cable loop lead in
|
6,200   |
LNFT |
1.00 |
6,200.00 |
1.00 |
6,200.00 |
1.00 |
6,200.00 |
1.00 |
6,200.00 |
| S-142 |
optical emitter
|
5   |
EACH |
2,100.00 |
10,500.00 |
2,000.00 |
10,000.00 |
2,300.00 |
11,500.00 |
3,300.00 |
16,500.00 |
| S-143 |
conductor, 3c (signal, #14 awg stranded) optical
detector cable |
1,184   |
LNFT |
1.00 |
1,184.00 |
1.00 |
1,184.00 |
1.00 |
1,184.00 |
1.30 |
1,539.20 |
| S-144 |
uni-directional optical detectors
|
8   |
EACH |
800.00 |
6,400.00 |
800.00 |
6,400.00 |
900.00 |
7,200.00 |
1,000.00 |
8,000.00 |
| S-146 |
conductor, 1-6pr interconnect cable
|
3,753   |
LNFT |
1.50 |
5,629.50 |
1.00 |
3,753.00 |
2.00 |
7,506.00 |
2.90 |
10,883.70 |
| S-148 |
street name signs (on new post)
|
30   |
EACH |
400.00 |
12,000.00 |
350.00 |
10,500.00 |
400.00 |
12,000.00 |
500.00 |
15,000.00 |
| S-149 |
conductor, 2c/os (loop lead-in, #14 awg stranded) loop
wire |
7,276   |
LNFT |
1.00 |
7,276.00 |
1.00 |
7,276.00 |
1.00 |
7,276.00 |
1.25 |
9,095.00 |
| S-150 |
impact attenuator
|
11   |
EACH |
20,000.00 |
220,000.00 |
15,000.00 |
165,000.00 |
20,000.00 |
220,000.00 |
17,000.00 |
187,000.00 |
| S-151 |
police traffic control
|
100   |
HOUR |
40.00 |
4,000.00 |
40.00 |
4,000.00 |
52.00 |
5,200.00 |
54.00 |
5,400.00 |
| S-152 |
conduit 2" pvc jack and bore
|
400   |
LNFT |
12.00 |
4,800.00 |
4.50 |
1,800.00 |
14.00 |
5,600.00 |
3.00 |
1,200.00 |
| S-153 |
conduit 4" pvc jack and bore
|
316   |
LNFT |
20.00 |
6,320.00 |
15.00 |
4,740.00 |
22.00 |
6,952.00 |
5.00 |
1,580.00 |
| S-154 |
trenching and backfilling
|
4,750   |
LNFT |
5.00 |
23,750.00 |
5.00 |
23,750.00 |
6.00 |
28,500.00 |
5.00 |
23,750.00 |
| S-155 |
signs (r3-1)
|
40   |
SQFT |
30.00 |
1,200.00 |
30.00 |
1,200.00 |
37.00 |
1,480.00 |
57.00 |
2,280.00 |
| S-156 |
signs (r3-2)
|
4   |
SQFT |
40.00 |
160.00 |
37.00 |
148.00 |
44.00 |
176.00 |
57.00 |
228.00 |
| S-157 |
signs (r3-5r)
|
4   |
SQFT |
40.00 |
160.00 |
37.00 |
148.00 |
44.00 |
176.00 |
57.00 |
228.00 |
| S-158 |
signs (r3-7r)
|
6.3 |
SQFT |
40.00 |
252.00 |
37.00 |
233.10 |
44.00 |
277.20 |
57.00 |
359.10 |
| S-159 |
signs (r5-1)
|
12.5 |
SQFT |
40.00 |
500.00 |
37.00 |
462.50 |
44.00 |
550.00 |
120.00 |
1,500.00 |
| S-160 |
signs (r10-10)
|
8   |
SQFT |
40.00 |
320.00 |
37.00 |
296.00 |
44.00 |
352.00 |
120.00 |
960.00 |
| S-161 |
signs (special, yield to pedestrian)
|
42   |
SQFT |
40.00 |
1,680.00 |
37.00 |
1,554.00 |
44.00 |
1,848.00 |
128.00 |
5,376.00 |
| S-162 |
signs (special, street name)
|
87.5 |
SQFT |
40.00 |
3,500.00 |
37.00 |
3,237.50 |
44.00 |
3,850.00 |
145.00 |
12,687.50 |
| S-163 |
conductor, 3c (power, #6 awg)
|
31   |
LNFT |
6.00 |
186.00 |
6.00 |
186.00 |
7.00 |
217.00 |
4.00 |
124.00 |
| S-201 |
sewerage and water board electrical ductbank and
manholes, complete |
lump |
LUMP |
1,000,000.00 |
1,000,000.00 |
1,426,000.00 |
1,426,000.00 |
1,550,000.00 |
1,550,000.00 |
1,445,000.00 |
1,445,000.00 |
| S-202 |
drain house connection from new drain line to back of
curb (6" pvc) |
14   |
EACH |
250.00 |
3,500.00 |
800.00 |
11,200.00 |
1,000.00 |
14,000.00 |
1,900.00 |
26,600.00 |
| S-203 |
drain house connection beyond back of curb (6" pvc)
|
200   |
LNFT |
25.00 |
5,000.00 |
20.00 |
4,000.00 |
21.00 |
4,200.00 |
40.00 |
8,000.00 |
| S-204 |
collector line to catch basin for drain house
connections (8" pvc) |
300   |
LNFT |
20.00 |
6,000.00 |
25.00 |
7,500.00 |
23.00 |
6,900.00 |
50.00 |
15,000.00 |
| S-205 |
adjust drain cleanout box
|
4   |
EACH |
50.00 |
200.00 |
300.00 |
1,200.00 |
135.00 |
540.00 |
290.00 |
1,160.00 |
| S-206 |
remove mud and debris from meter box
|
4   |
EACH |
0.00 |
0.00 |
200.00 |
800.00 |
20.00 |
80.00 |
121.00 |
484.00 |
| S-207 |
replace broken water meter box
|
4   |
EACH |
1,000.00 |
4,000.00 |
400.00 |
1,600.00 |
770.00 |
3,080.00 |
1,000.00 |
4,000.00 |
| S-208 |
adjust water meter box
|
4   |
EACH |
200.00 |
800.00 |
500.00 |
2,000.00 |
88.00 |
352.00 |
390.00 |
1,560.00 |
| S-209 |
sewer point repair up to ten feet
|
25   |
LNFT |
150.00 |
3,750.00 |
350.00 |
8,750.00 |
1,000.00 |
25,000.00 |
345.00 |
8,625.00 |
| S-210 |
sewer point repair beyond ten feet
|
30   |
LNFT |
150.00 |
4,500.00 |
150.00 |
4,500.00 |
500.00 |
15,000.00 |
345.00 |
10,350.00 |
| S-211 |
remove and replace existing sewer house connection
from new main to back of curb |
5   |
EACH |
2,000.00 |
10,000.00 |
1,000.00 |
5,000.00 |
2,200.00 |
11,000.00 |
2,000.00 |
10,000.00 |
| S-212 |
remove and replace sewer house connection beyond back
of curb |
75   |
LNFT |
25.00 |
1,875.00 |
20.00 |
1,500.00 |
140.00 |
10,500.00 |
90.00 |
6,750.00 |
| S-213 |
replace 5/8" and 3/4" water house connection (from
main to meter) |
6   |
EACH |
500.00 |
3,000.00 |
500.00 |
3,000.00 |
830.00 |
4,980.00 |
1,500.00 |
9,000.00 |
| S-214 |
replace 1" water house connection (from main to meter)
|
2   |
EACH |
500.00 |
1,000.00 |
550.00 |
1,100.00 |
1,000.00 |
2,000.00 |
1,500.00 |
3,000.00 |
| S-215 |
replace 3/4" or 1" water house connection (from meter
to property line) |
200   |
LNFT |
15.00 |
3,000.00 |
20.00 |
4,000.00 |
20.00 |
4,000.00 |
25.00 |
5,000.00 |
| S-216 |
plug existing drains
|
15   |
EACH |
125.00 |
1,875.00 |
300.00 |
4,500.00 |
300.00 |
4,500.00 |
1,500.00 |
22,500.00 |
| S-217 |
fill drain with mississippi river sand
|
200   |
CUYD |
167.13 |
33,426.00 |
100.00 |
20,000.00 |
40.00 |
8,000.00 |
60.00 |
12,000.00 |
| S-301 |
tree removal (up to 10.0" dbh)
|
10   |
EACH |
1,500.00 |
15,000.00 |
400.00 |
4,000.00 |
1,000.00 |
10,000.00 |
50.00 |
500.00 |
| S-302 |
tree removal (10.1" dbh to 20.0" dbh)
|
4   |
EACH |
2,000.00 |
8,000.00 |
700.00 |
2,800.00 |
1,500.00 |
6,000.00 |
120.00 |
480.00 |
| S-303 |
tree trimming
|
lump |
LUMP |
20,000.00 |
20,000.00 |
2,000.00 |
2,000.00 |
6,000.00 |
6,000.00 |
3,000.00 |
3,000.00 |
| S-304 |
root pruning
|
4   |
EACH |
250.00 |
1,000.00 |
400.00 |
1,600.00 |
300.00 |
1,200.00 |
250.00 |
1,000.00 |
| S-305 |
root trenching
|
100   |
LNFT |
20.00 |
2,000.00 |
20.00 |
2,000.00 |
30.00 |
3,000.00 |
100.00 |
10,000.00 |
| S-306 |
restoration of existing plant and flower beds
|
lump |
LUMP |
1,000.00 |
1,000.00 |
2,000.00 |
2,000.00 |
6,000.00 |
6,000.00 |
3,000.00 |
3,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
11,193,055.46 |
|
11,117,457.60 |
|
14,120,359.50 |
|
13,904,714.80 |
| | NUMBER OF DAYS BID AT $5,000 PER DAY. |
|
|
|
1,900,000.00 |
|
2,000,000.00 |
|
1,825,000.00 |
|
2,500,000.00 |
| | TOTAL BID |
|
|
|
13,093,055.46 |
|
13,117,457.60 |
|
15,945,359.50 |
|
16,404,714.80 |
|