| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JAMES CONSTRUCTION GROUP LLC |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
400,000.00 |
400,000.00 |
|
|
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
185,000.00 |
185,000.00 |
|
|
|
|
|
|
| 202-02-A |
removal of bridges (ramp ve)
|
1   |
EACH |
155,000.00 |
155,000.00 |
|
|
|
|
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
6,654   |
SQYD |
9.00 |
59,886.00 |
|
|
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
1,163   |
SQYD |
4.00 |
4,652.00 |
|
|
|
|
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
3,104.0 |
LNFT |
3.00 |
9,312.00 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
17,772.2 |
SQYD |
11.00 |
195,494.20 |
|
|
|
|
|
|
| 202-02-H |
removal of guard rail
|
104   |
LNFT |
11.00 |
1,144.00 |
|
|
|
|
|
|
| 202-02-I |
removal of existing sign supports
|
29   |
EACH |
100.00 |
2,900.00 |
|
|
|
|
|
|
| 202-02-K |
removal of catch basins
|
23   |
EACH |
725.00 |
16,675.00 |
|
|
|
|
|
|
| 202-02-M |
removal of existing sign faces
|
62   |
EACH |
100.00 |
6,200.00 |
|
|
|
|
|
|
| 202-02-N |
removal of existing signal equipment
|
lump |
LUMP |
8,000.00 |
8,000.00 |
|
|
|
|
|
|
| 202-02-O |
removal of manholes
|
8   |
EACH |
800.00 |
6,400.00 |
|
|
|
|
|
|
| 202-02-O-01 |
removal of traffic manholes
|
9   |
EACH |
800.00 |
7,200.00 |
|
|
|
|
|
|
| 202-02-P |
removal of incidental concrete pavement
|
381   |
SQYD |
11.00 |
4,191.00 |
|
|
|
|
|
|
| 202-02-Q |
removal of fence
|
1,565   |
LNFT |
10.00 |
15,650.00 |
|
|
|
|
|
|
| 202-02-R |
removal of truss and footings
|
2   |
EACH |
8,000.00 |
16,000.00 |
|
|
|
|
|
|
| 202-02-R-01 |
removal of cantilever and footings
|
1   |
EACH |
12,000.00 |
12,000.00 |
|
|
|
|
|
|
| 203-01 |
general excavation
|
20,680   |
CUYD |
15.00 |
310,200.00 |
|
|
|
|
|
|
| 203-03 |
embankment
|
11,836   |
CUYD |
30.00 |
355,080.00 |
|
|
|
|
|
|
| 203-08 |
geotextile fabric
|
31,014   |
SQYD |
4.00 |
124,056.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
198   |
EACH |
200.00 |
39,600.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
4,081   |
LNFT |
6.00 |
24,486.00 |
|
|
|
|
|
|
| 204-07 |
temporary stone construction entrance
|
2   |
EACH |
4,700.00 |
9,400.00 |
|
|
|
|
|
|
| 302-02-G |
class ii base course (11" thick)
|
18,965.0 |
SQYD |
25.00 |
474,125.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
5,420.3 |
TON |
132.00 |
715,479.60 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
942.9 |
TON |
200.00 |
188,580.00 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
3,539   |
SQYD |
10.00 |
35,390.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 98   |
CUYD |
5.00 |
- 490.00 |
|
|
|
|
|
|
| 601-01-K |
portland cement concrete pavement (10" thick)
|
6,504.0 |
SQYD |
125.00 |
813,000.00 |
|
|
|
|
|
|
| 601-04 |
portland cement concrete pavement coring
|
8   |
EACH |
90.00 |
720.00 |
|
|
|
|
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
412   |
LNFT |
115.00 |
47,380.00 |
|
|
|
|
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
452   |
LNFT |
180.00 |
81,360.00 |
|
|
|
|
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
582   |
LNFT |
180.00 |
104,760.00 |
|
|
|
|
|
|
| 701-03-K |
storm drain pipe (30" rcp/pcp)
|
84   |
LNFT |
205.00 |
17,220.00 |
|
|
|
|
|
|
| 701-03-M |
storm drain pipe (36" rcp/pcp)
|
305   |
LNFT |
240.00 |
73,200.00 |
|
|
|
|
|
|
| 701-03-O |
storm drain pipe (48" rcp/pcp)
|
442   |
LNFT |
300.00 |
132,600.00 |
|
|
|
|
|
|
| 701-03-P |
storm drain pipe (54" rcp/pcp)
|
360   |
LNFT |
320.00 |
115,200.00 |
|
|
|
|
|
|
| 701-04-E |
storm drain pipe arch (30" equiv. rcpa)
|
103   |
LNFT |
215.00 |
22,145.00 |
|
|
|
|
|
|
| 701-04-J |
storm drain pipe arch (60" equiv. rcpa)
|
234   |
LNFT |
480.00 |
112,320.00 |
|
|
|
|
|
|
| 701-04-L |
storm drain pipe arch (72" equiv. rcpa)
|
600   |
LNFT |
780.00 |
468,000.00 |
|
|
|
|
|
|
| 702-02-B |
manholes (r-cb-11)
|
6   |
EACH |
5,000.00 |
30,000.00 |
|
|
|
|
|
|
| 702-02-E |
manholes (r-cb-32)
|
3   |
EACH |
8,900.00 |
26,700.00 |
|
|
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
13   |
EACH |
4,200.00 |
54,600.00 |
|
|
|
|
|
|
| 702-03-B |
catch basins (cb-02)
|
1   |
EACH |
5,000.00 |
5,000.00 |
|
|
|
|
|
|
| 702-03-D |
catch basins (cb-07)
|
7   |
EACH |
8,000.00 |
56,000.00 |
|
|
|
|
|
|
| 702-03-G |
catch basins (cb-09)
|
12   |
EACH |
10,600.00 |
127,200.00 |
|
|
|
|
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
37.5 |
LNFT |
80.00 |
3,000.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
62.5 |
LNFT |
25.00 |
1,562.50 |
|
|
|
|
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
6.3 |
LNFT |
100.00 |
630.00 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
75.0 |
LNFT |
35.00 |
2,625.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
1,800.00 |
7,200.00 |
|
|
|
|
|
|
| 705-06-B |
chain link fence (5-foot height)
|
688   |
LNFT |
30.00 |
20,640.00 |
|
|
|
|
|
|
| 705-06-E |
chain link fence (2.5-foot height)(barrier mounted)
|
765   |
LNFT |
25.00 |
19,125.00 |
|
|
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
754.2 |
SQYD |
85.00 |
64,107.00 |
|
|
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
477.9 |
SQYD |
102.00 |
48,745.80 |
|
|
|
|
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
3,306.5 |
SQYD |
75.00 |
247,987.50 |
|
|
|
|
|
|
| 707-01 |
concrete curb
|
3,125.3 |
LNFT |
5.00 |
15,626.50 |
|
|
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
1,558.0 |
LNFT |
52.00 |
81,016.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
600,000.00 |
600,000.00 |
|
|
|
|
|
|
| 713-03-B-01 |
temporary pvmt. markings (broken line)(4" w)(10' l)
(type i removable) |
0.096 |
MILE |
4,500.00 |
432.00 |
|
|
|
|
|
|
| 713-04-A-01 |
temporary pvmt. markings (solid line)(4" w)(type i
removable) |
0.396 |
MILE |
10,000.00 |
3,960.00 |
|
|
|
|
|
|
| 713-04-B-01 |
temporary pvmt. markings (solid line)(12" w)(type i
removable) |
0.039 |
MILE |
25,000.00 |
975.00 |
|
|
|
|
|
|
| 713-08 |
temporary precast concrete barrier (department
furnished) |
186   |
EACH |
600.00 |
111,600.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
47   |
LB |
20.00 |
940.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
1,546   |
LB |
1.50 |
2,319.00 |
|
|
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| 725-01 |
temporary detour roads
|
1,009.0 |
SQYD |
150.00 |
151,350.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
2,101.3 |
CUYD |
80.00 |
168,104.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
5,100,000.00 |
5,100,000.00 |
|
|
|
|
|
|
| 729-01 |
sign (type a)
|
359.9 |
SQFT |
30.00 |
10,797.00 |
|
|
|
|
|
|
| 729-02 |
sign (type b)
|
114.2 |
SQFT |
32.00 |
3,654.40 |
|
|
|
|
|
|
| 729-04 |
sign (type d)
|
422.8 |
SQFT |
45.00 |
19,026.00 |
|
|
|
|
|
|
| 729-06 |
sign (overhead mounted)
|
698.0 |
SQFT |
35.00 |
24,430.00 |
|
|
|
|
|
|
| 729-08-B |
mounting (3 1/2" size post)
|
45   |
EACH |
635.00 |
28,575.00 |
|
|
|
|
|
|
| 729-08-F |
mounting (w6 x 12)
|
12   |
EACH |
850.00 |
10,200.00 |
|
|
|
|
|
|
| 729-09 |
mounting (overhead truss)(ground mounted)
|
1   |
EACH |
54,500.00 |
54,500.00 |
|
|
|
|
|
|
| 729-10 |
mounting (overhead truss)(structure mounted)
|
1   |
EACH |
44,500.00 |
44,500.00 |
|
|
|
|
|
|
| 729-11 |
mounting (overhead cantilever)(ground mounted)
|
3   |
EACH |
31,000.00 |
93,000.00 |
|
|
|
|
|
|
| 729-20-A |
footings for overhead mountings (truss)
|
2   |
EACH |
35,000.00 |
70,000.00 |
|
|
|
|
|
|
| 729-20-B |
footings for overhead mountings (cantilever)
|
2   |
EACH |
40,000.00 |
80,000.00 |
|
|
|
|
|
|
| 729-21 |
u-channel post
|
3   |
EACH |
390.00 |
1,170.00 |
|
|
|
|
|
|
| 730-01 |
trenching and backfilling
|
1,040   |
LNFT |
4.60 |
4,784.00 |
|
|
|
|
|
|
| 730-02-A |
conduit with conductors (1-1/2" pvc sch. 40 in trench,
w/(3) 1/c #6 xhhw-2, (1) 1/c #6 bare solid grnd) |
1,000   |
LNFT |
9.90 |
9,900.00 |
|
|
|
|
|
|
| 730-02-B |
conduit with conductors (1-1/2" rigid aluminum exposed
w/(3) 1/c #6 xhhw-2, (1) 1/c #6 xhhw-2 green grnd.) |
1,000   |
LNFT |
19.70 |
19,700.00 |
|
|
|
|
|
|
| 730-02-C |
conduit with conductors (1-1/2" pvc sch 40 in trench
w/(2) 1/c #2 xhhw-2, (1) 1/c #2 bare solid grnd.) |
40   |
LNFT |
11.00 |
440.00 |
|
|
|
|
|
|
| 730-02-D |
conduit with conductors (1-1/2" rigid steel exposed
w/(2) 1/c #2 xhhw-2, (1 ) 1/c #2 xhhw-2 green grnd.) |
40   |
LNFT |
22.00 |
880.00 |
|
|
|
|
|
|
| 730-02-E |
conduit with conductors (1" rigid aluminum exposed
w/(2) 1/c #8 xhhw-2, (1) 1/c #8 xhhw-2 green grnd.) |
650   |
LNFT |
13.00 |
8,450.00 |
|
|
|
|
|
|
| 730-04 |
jacking or bored casing (6" schedule 80 pvc.)
|
400   |
LNFT |
32.00 |
12,800.00 |
|
|
|
|
|
|
| 730-05 |
light pole (steel, overpass structure mounted 4' arm
with bridge fitter) |
4   |
EACH |
1,060.00 |
4,240.00 |
|
|
|
|
|
|
| 730-06 |
high mast pole (steel, 110' nominal mounting height
from cluster to roadway, 6 ring, internal lowering device) |
5   |
EACH |
26,000.00 |
130,000.00 |
|
|
|
|
|
|
| 730-07-A |
luminaire (1000w hps high mast, type a)
|
30   |
EACH |
1,000.00 |
30,000.00 |
|
|
|
|
|
|
| 730-07-B |
luminaire (250w hps, lowmast, type b)
|
4   |
EACH |
120.00 |
480.00 |
|
|
|
|
|
|
| 730-07-C |
luminaire (150w hps, underpass, weatherproof, type c)
|
4   |
EACH |
450.00 |
1,800.00 |
|
|
|
|
|
|
| 730-08 |
electrical service point (pedestal)
|
2   |
EACH |
6,100.00 |
12,200.00 |
|
|
|
|
|
|
| 730-11 |
removal and disposal of electrical equipment
|
lump |
LUMP |
6,270.00 |
6,270.00 |
|
|
|
|
|
|
| 730-12 |
removal and storage of light poles
|
47   |
EACH |
180.00 |
8,460.00 |
|
|
|
|
|
|
| 730-13 |
removal and disposal of light poles foundations
|
47   |
EACH |
610.00 |
28,670.00 |
|
|
|
|
|
|
| 730-14 |
removal and disposal of luminaires
|
47   |
EACH |
58.00 |
2,726.00 |
|
|
|
|
|
|
| 730-16 |
underground junction box (13"x24")
|
2   |
EACH |
1,050.00 |
2,100.00 |
|
|
|
|
|
|
| 730-17 |
structure junction box (8"x8"x4")
|
9   |
EACH |
790.00 |
7,110.00 |
|
|
|
|
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
748   |
EACH |
12.00 |
8,976.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,670   |
EACH |
5.25 |
8,767.50 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
6.106 |
MILE |
2,500.00 |
15,265.00 |
|
|
|
|
|
|
| 732-02-B |
plastic pavement striping (solid line) (6" width)
|
0.116 |
MILE |
4,200.00 |
487.20 |
|
|
|
|
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
0.935 |
MILE |
5,900.00 |
5,516.50 |
|
|
|
|
|
|
| 732-02-D |
plastic pavement striping (solid line) (12" width)
|
0.038 |
MILE |
9,200.00 |
349.60 |
|
|
|
|
|
|
| 732-02-E |
plastic pavement striping (solid line) (24" width)
|
0.298 |
MILE |
23,200.00 |
6,913.60 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.472 |
MILE |
825.00 |
1,214.40 |
|
|
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
4   |
EACH |
215.00 |
860.00 |
|
|
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
3   |
EACH |
235.00 |
705.00 |
|
|
|
|
|
|
| 732-05 |
removal of existing markings
|
0.669 |
MILE |
5,010.00 |
3,351.69 |
|
|
|
|
|
|
| 733-01-A |
concrete roadway barrier (32")
|
647.9 |
LNFT |
170.00 |
110,143.00 |
|
|
|
|
|
|
| 733-01-B |
concrete roadway barrier (32")(slotted)
|
227.8 |
LNFT |
200.00 |
45,560.00 |
|
|
|
|
|
|
| 733-01-C |
concrete roadway barrier/retaining wall (32")
|
1,269.4 |
LNFT |
210.00 |
266,574.00 |
|
|
|
|
|
|
| 733-01-D |
concrete roadway barrier/retaining wall (32")(slotted)
|
1,758.9 |
LNFT |
215.00 |
378,163.50 |
|
|
|
|
|
|
| 736-01 |
trenching and backfilling
|
1,370   |
LNFT |
4.60 |
6,302.00 |
|
|
|
|
|
|
| 736-03-A |
jacked or bored conduit (3" rmc)
|
435   |
LNFT |
13.00 |
5,655.00 |
|
|
|
|
|
|
| 736-04-B |
signal support (mast arm pole, twin arms, 30' & 45')
|
1   |
EACH |
14,000.00 |
14,000.00 |
|
|
|
|
|
|
| 736-04-C |
signal support (mast arm pole, 30' arm)
|
1   |
EACH |
9,200.00 |
9,200.00 |
|
|
|
|
|
|
| 736-04-D |
signal support (mast arm pole, twin arms, 25' & 35')
|
1   |
EACH |
12,000.00 |
12,000.00 |
|
|
|
|
|
|
| 736-04-E |
signal support (mast arm pole, 25' arm)
|
1   |
EACH |
9,000.00 |
9,000.00 |
|
|
|
|
|
|
| 736-04-F |
signal support (mast arm pole, twin arms, 25' & 30')
|
1   |
EACH |
11,400.00 |
11,400.00 |
|
|
|
|
|
|
| 736-06 |
signal service
|
2   |
EACH |
1,600.00 |
3,200.00 |
|
|
|
|
|
|
| 736-10-A |
underground junction box (type d)
|
16   |
EACH |
590.00 |
9,440.00 |
|
|
|
|
|
|
| 736-12-A |
conductor (1c, #6 awg, 600v, service)
|
285   |
LNFT |
1.80 |
513.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
500,000.00 |
500,000.00 |
|
|
|
|
|
|
| 802-02 |
structural excavation for intermediate bents
|
3,910.2 |
CUYD |
200.00 |
782,040.00 |
|
|
|
|
|
|
| 803-03 |
steel sheet pile wall
|
37,990   |
SQFT |
10.50 |
398,895.00 |
|
|
|
|
|
|
| 804-01-B |
precast concrete piles (14")
|
46,549   |
LNFT |
42.00 |
1,955,058.00 |
|
|
|
|
|
|
| 804-01-C |
precast concrete piles (16")
|
8,010   |
LNFT |
55.00 |
440,550.00 |
|
|
|
|
|
|
| 804-02-A |
treated timber piles (noncoastal treatment)
|
8,640   |
LNFT |
30.00 |
259,200.00 |
|
|
|
|
|
|
| 804-05 |
precast concrete test piles
|
7   |
EACH |
45,000.00 |
315,000.00 |
|
|
|
|
|
|
| 804-09 |
loading test piles
|
7   |
EACH |
5,000.00 |
35,000.00 |
|
|
|
|
|
|
| 804-10 |
reloading test piles
|
7   |
EACH |
2,500.00 |
17,500.00 |
|
|
|
|
|
|
| 804-11 |
redriving test piles
|
7   |
EACH |
2,000.00 |
14,000.00 |
|
|
|
|
|
|
| 804-12 |
loading permanent piles
|
5   |
EACH |
15,000.00 |
75,000.00 |
|
|
|
|
|
|
| 804-17 |
dynamic monitoring
|
21   |
EACH |
1,250.00 |
26,250.00 |
|
|
|
|
|
|
| 805-01-C |
class a concrete (retaining walls)
|
355.07 |
CUYD |
850.00 |
301,809.50 |
|
|
|
|
|
|
| 805-01-D |
class a concrete (footings)
|
1,509.18 |
CUYD |
400.00 |
603,672.00 |
|
|
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
1,765.63 |
CUYD |
1,000.00 |
1,765,630.00 |
|
|
|
|
|
|
| 805-02-F |
class a(m) concrete (bents)
|
284.45 |
CUYD |
1,100.00 |
312,895.00 |
|
|
|
|
|
|
| 805-03 |
class aa concrete
|
5,492.73 |
CUYD |
800.00 |
4,394,184.00 |
|
|
|
|
|
|
| 805-08-C |
precast-prestressed concrete girders (type iii)
|
9,622.6 |
LNFT |
100.00 |
962,260.00 |
|
|
|
|
|
|
| 805-08-D |
precast-prestressed concrete girders (type iv)
|
378.0 |
LNFT |
130.00 |
49,140.00 |
|
|
|
|
|
|
| 805-08-G |
precast-prestressed concrete girders (type bt-72)
|
476.7 |
LNFT |
220.00 |
104,874.00 |
|
|
|
|
|
|
| 805-11 |
strip seal joints
|
646.33 |
LNFT |
165.00 |
106,644.45 |
|
|
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
2,096,782   |
LB |
0.75 |
1,572,586.50 |
|
|
|
|
|
|
| 807-08 |
structural metalwork
|
lump |
LUMP |
18,150,000.00 |
18,150,000.00 |
|
|
|
|
|
|
| 810-01-A |
concrete railing (32" barrier)
|
11,406.88 |
LNFT |
40.00 |
456,275.20 |
|
|
|
|
|
|
| 810-01-B |
concrete railing (42" barrier)
|
471.13 |
LNFT |
65.00 |
30,623.45 |
|
|
|
|
|
|
| 810-05 |
pipe & concrete railing
|
154.92 |
LNFT |
180.00 |
27,885.60 |
|
|
|
|
|
|
| 812-01-C |
treated timber (noncoastal treatment)
|
78.68 |
MFBM |
1,375.00 |
108,185.00 |
|
|
|
|
|
|
| 813-01 |
concrete approach slabs
|
78.45 |
SQYD |
200.00 |
15,690.00 |
|
|
|
|
|
|
| 813-02 |
concrete approach slabs (pile supported)
|
1,241.04 |
SQYD |
350.00 |
434,364.00 |
|
|
|
|
|
|
| S-001 |
impact attenuators (construction zone)(dotd furnished)
|
2   |
EACH |
16,000.00 |
32,000.00 |
|
|
|
|
|
|
| S-002 |
cleaning existing culverts
|
1,450   |
LNFT |
15.00 |
21,750.00 |
|
|
|
|
|
|
| S-003 |
vibration monitoring
|
2,000   |
HOUR |
150.00 |
300,000.00 |
|
|
|
|
|
|
| S-004 |
saw cutting (1" depth)
|
3,679   |
LNFT |
8.50 |
31,271.50 |
|
|
|
|
|
|
| S-005 |
dynamic message sign unit
|
6   |
EACH |
25,000.00 |
150,000.00 |
|
|
|
|
|
|
| S-006 |
exposed aggregate surface
|
1,156   |
SQYD |
150.00 |
173,400.00 |
|
|
|
|
|
|
| S-007 |
testing existing loop detectors
|
5   |
EACH |
460.00 |
2,300.00 |
|
|
|
|
|
|
| S-008-A |
conduit (1" pvc)
|
965   |
LNFT |
2.50 |
2,412.50 |
|
|
|
|
|
|
| S-008-B |
conduit (2" pvc)
|
265   |
LNFT |
3.30 |
874.50 |
|
|
|
|
|
|
| S-008-C |
conduit (3" pvc)
|
150   |
LNFT |
4.50 |
675.00 |
|
|
|
|
|
|
| S-009 |
traffic manhole
|
2   |
EACH |
2,100.00 |
4,200.00 |
|
|
|
|
|
|
| S-010-A |
cable (2c #14 awg, 600v. with outer shield)
|
1,060   |
LNFT |
1.50 |
1,590.00 |
|
|
|
|
|
|
| S-010-B |
cable (5c #14 awg, 600v.)
|
685   |
LNFT |
3.00 |
2,055.00 |
|
|
|
|
|
|
| S-010-C |
cable (7c #14 awg, 600v.)
|
615   |
LNFT |
3.20 |
1,968.00 |
|
|
|
|
|
|
| S-010-D |
cable (12c #19 awg, with outer shield)
|
840   |
LNFT |
3.40 |
2,856.00 |
|
|
|
|
|
|
| S-011 |
loop detector
|
335   |
LNFT |
16.00 |
5,360.00 |
|
|
|
|
|
|
| S-012-A |
signal head (type a)(mast arm mount)
|
17   |
EACH |
1,000.00 |
17,000.00 |
|
|
|
|
|
|
| S-012-B |
signal head (type b)(mast arm mount)
|
1   |
EACH |
900.00 |
900.00 |
|
|
|
|
|
|
| S-012-C |
signal head (type a)(pedestal mount)
|
3   |
EACH |
900.00 |
2,700.00 |
|
|
|
|
|
|
| S-013 |
priority control equipment
|
lump |
LUMP |
8,000.00 |
8,000.00 |
|
|
|
|
|
|
| S-014 |
sign support (pedestal pole)
|
3   |
EACH |
2,800.00 |
8,400.00 |
|
|
|
|
|
|
| S-015 |
signal controller
|
2   |
EACH |
13,020.00 |
26,040.00 |
|
|
|
|
|
|
| S-016 |
saw cutting (3/4" depth)
|
481   |
LNFT |
8.00 |
3,848.00 |
|
|
|
|
|
|
| S-017 |
circuit breaker disconnect (underpass)
|
2   |
EACH |
1,400.00 |
2,800.00 |
|
|
|
|
|
|
| S-018 |
underground duct marker (concrete)
|
8   |
EACH |
180.00 |
1,440.00 |
|
|
|
|
|
|
| S-019 |
marker tape (underground)
|
1,040   |
LNFT |
0.30 |
312.00 |
|
|
|
|
|
|
| S-020 |
service disconnect (secondary power controller)
|
4   |
EACH |
2,120.00 |
8,480.00 |
|
|
|
|
|
|
| S-101-A |
deck drainage system (type a)
|
23   |
EACH |
8,500.00 |
195,500.00 |
|
|
|
|
|
|
| S-101-B |
deck drainage system (type b)
|
lump |
LUMP |
190,000.00 |
190,000.00 |
|
|
|
|
|
|
| S-103-A |
sign support base (small)
|
2   |
EACH |
2,180.00 |
4,360.00 |
|
|
|
|
|
|
| S-103-B |
sign support base (overhead truss)
|
2   |
EACH |
25,000.00 |
50,000.00 |
|
|
|
|
|
|
| S-104 |
impact attenuator (kinetic)
|
5   |
EACH |
18,000.00 |
90,000.00 |
|
|
|
|
|
|
| S-105 |
brick vneer (columns)
|
lump |
LUMP |
120,000.00 |
120,000.00 |
|
|
|
|
|
|
| S-106 |
temporary precast concrete barriers (anchored)
|
58.5 |
LNFT |
350.00 |
20,475.00 |
|
|
|
|
|
|
| S-150 |
8" pvc (sdr35) sewer pipe at 4'- 6' of cover
|
415.0 |
LNFT |
90.00 |
37,350.00 |
|
|
|
|
|
|
| S-151 |
type iv standard trench (4'- 6')
|
415   |
LNFT |
130.00 |
53,950.00 |
|
|
|
|
|
|
| S-152 |
standard manholes less than 6' deep
|
3   |
EACH |
3,200.00 |
9,600.00 |
|
|
|
|
|
|
| S-153 |
standard manholes at 6'- 8'deep
|
1   |
EACH |
4,000.00 |
4,000.00 |
|
|
|
|
|
|
| S-154 |
granular material backfill for sewer line
|
270   |
CUYD |
40.00 |
10,800.00 |
|
|
|
|
|
|
| S-155 |
sewer line marking tape
|
4.20 |
100' |
10.00 |
42.00 |
|
|
|
|
|
|
| S-156 |
demolition of existing sewer line
|
375   |
LNFT |
20.00 |
7,500.00 |
|
|
|
|
|
|
| S-157 |
demolition of existing manhole
|
3   |
EACH |
1,900.00 |
5,700.00 |
|
|
|
|
|
|
| S-170 |
8" pvc pipe (c-900)
|
300   |
LNFT |
100.00 |
30,000.00 |
|
|
|
|
|
|
| S-171 |
8" pvc pipe (c-900) with restrained joints
|
100   |
LNFT |
180.00 |
18,000.00 |
|
|
|
|
|
|
| S-172 |
8" ductile iron pipe with restrained joints
|
540   |
LNFT |
200.00 |
108,000.00 |
|
|
|
|
|
|
| S-173 |
ductile iron fittings with restrained joints
|
1.4 |
TON |
4,000.00 |
5,600.00 |
|
|
|
|
|
|
| S-174 |
air valve installations
|
8   |
EACH |
600.00 |
4,800.00 |
|
|
|
|
|
|
| S-175 |
8" valve (with restrained joints)
|
6   |
EACH |
1,800.00 |
10,800.00 |
|
|
|
|
|
|
| S-176 |
2" meter relocation
|
3   |
EACH |
1,800.00 |
5,400.00 |
|
|
|
|
|
|
| S-177 |
2" p.e. service line
|
30   |
LNFT |
40.00 |
1,200.00 |
|
|
|
|
|
|
| S-178 |
2" service tap
|
3   |
EACH |
1,500.00 |
4,500.00 |
|
|
|
|
|
|
| S-179 |
timber thrust blocking
|
2.5 |
MFBM |
2,000.00 |
5,000.00 |
|
|
|
|
|
|
| S-180 |
granular material for water line foundation
|
145   |
CUYD |
40.00 |
5,800.00 |
|
|
|
|
|
|
| S-181 |
granular material backfill for water line
|
520   |
CUYD |
38.00 |
19,760.00 |
|
|
|
|
|
|
| S-182 |
water line marking tape
|
4.00 |
100' |
10.00 |
40.00 |
|
|
|
|
|
|
| S-183 |
abandonment & removal of all water pipe along causeway
blvd. |
lump |
LUMP |
6,000.00 |
6,000.00 |
|
|
|
|
|
|
| S-184 |
police detail for i-10 westbound closure
|
120   |
HOUR |
200.00 |
24,000.00 |
|
|
|
|
|
|
| S-185 |
police detail for i-10 eastbound closure
|
60   |
HOUR |
200.00 |
12,000.00 |
|
|
|
|
|
|
| S-190 |
i-10 westbound closure
|
lump |
LUMP |
500,000.00 |
500,000.00 |
|
|
|
|
|
|
| S-191 |
i-10 eastbound closure
|
lump |
LUMP |
400,000.00 |
400,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
50,988,401.69 |
|
|
|
|
|
|
| | NUMBER OF DAYS BID AT $5,000 PER DAY. |
|
|
|
4,500,000.00 |
|
|
|
|
|
|
| | TOTAL BID |
|
|
|
55,488,401.69 |
|
|
|
|
|
|
|