| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC. |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
20,000.00 |
20,000.00 |
2,000.00 |
2,000.00 |
|
|
|
|
| 202-02 |
removal of existing signal equipment & related items
|
1   |
EACH |
3,000.00 |
3,000.00 |
2,700.00 |
2,700.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
1,322   |
SQYD |
12.00 |
15,864.00 |
14.00 |
18,508.00 |
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
2,845.0 |
LNFT |
10.00 |
28,450.00 |
8.00 |
22,760.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
12,404.2 |
SQYD |
3.00 |
37,212.60 |
9.00 |
111,637.80 |
|
|
|
|
| 202-02-I |
removal of headwalls
|
9   |
EACH |
1,800.00 |
16,200.00 |
500.00 |
4,500.00 |
|
|
|
|
| 202-02-J |
removal of asphalt islands
|
690.0 |
SQYD |
9.00 |
6,210.00 |
14.00 |
9,660.00 |
|
|
|
|
| 202-03-A |
relocation of signs
|
12   |
EACH |
3,000.00 |
36,000.00 |
2,700.00 |
32,400.00 |
|
|
|
|
| 203-01 |
general excavation
|
7,976   |
CUYD |
7.00 |
55,832.00 |
15.00 |
119,640.00 |
|
|
|
|
| 203-03 |
embankment
|
3,033   |
CUYD |
22.00 |
66,726.00 |
25.00 |
75,825.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
56   |
EACH |
14.00 |
784.00 |
12.00 |
672.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
2,185   |
LNFT |
1.50 |
3,277.50 |
1.50 |
3,277.50 |
|
|
|
|
| 302-02-C |
class ii base course (8" thick)
|
823.7 |
SQYD |
30.00 |
24,711.00 |
25.00 |
20,592.50 |
|
|
|
|
| 304-01 |
lime
|
31.10 |
TON |
175.00 |
5,442.50 |
100.00 |
3,110.00 |
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
2,300   |
SQYD |
3.50 |
8,050.00 |
3.50 |
8,050.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
19,758.6 |
TON |
70.00 |
1,383,102.00 |
85.00 |
1,679,481.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
16,978   |
SQYD |
2.00 |
33,956.00 |
3.00 |
50,934.00 |
|
|
|
|
| 510-01-A |
pavement patching (6" minimum thickness)
|
200   |
SQYD |
50.00 |
10,000.00 |
75.00 |
15,000.00 |
|
|
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
32   |
LNFT |
100.00 |
3,200.00 |
80.00 |
2,560.00 |
|
|
|
|
| 701-01-K |
cross drain pipe (30" rcp/pcp)
|
50   |
LNFT |
125.00 |
6,250.00 |
100.00 |
5,000.00 |
|
|
|
|
| 701-01-N |
cross drain pipe (42" rcp/pcp)
|
78   |
LNFT |
175.00 |
13,650.00 |
120.00 |
9,360.00 |
|
|
|
|
| 701-05-K |
side drain pipe (30")
|
120   |
LNFT |
125.00 |
15,000.00 |
100.00 |
12,000.00 |
|
|
|
|
| 701-15 |
concrete collar
|
15   |
EACH |
2,000.00 |
30,000.00 |
600.00 |
9,000.00 |
|
|
|
|
| 702-07-B |
cross drain safety end (type 2)
|
13   |
EACH |
2,500.00 |
32,500.00 |
4,250.00 |
55,250.00 |
|
|
|
|
| 702-08-B |
side drain safety end (type 2)
|
2   |
EACH |
4,000.00 |
8,000.00 |
3,250.00 |
6,500.00 |
|
|
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
354.0 |
LNFT |
55.00 |
19,470.00 |
47.00 |
16,638.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
50.0 |
LNFT |
21.00 |
1,050.00 |
21.00 |
1,050.00 |
|
|
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
12.5 |
LNFT |
100.00 |
1,250.00 |
120.00 |
1,500.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
2,000.00 |
4,000.00 |
2,300.00 |
4,600.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
512.7 |
SQYD |
60.00 |
30,762.00 |
60.00 |
30,762.00 |
|
|
|
|
| 706-02-D |
concrete drive (8" thick)
|
823.7 |
SQYD |
70.00 |
57,659.00 |
65.00 |
53,540.50 |
|
|
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
1,166.9 |
SQYD |
40.00 |
46,676.00 |
45.00 |
52,510.50 |
|
|
|
|
| 707-01 |
concrete curb
|
2,962.4 |
LNFT |
16.20 |
47,990.88 |
10.00 |
29,624.00 |
|
|
|
|
| 707-01-A |
concrete divider
|
307.5 |
LNFT |
20.00 |
6,150.00 |
45.00 |
13,837.50 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
125,000.00 |
125,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| 713-02-A |
temporary pavement markings (4" width)
|
7,925   |
LNFT |
0.25 |
1,981.25 |
0.10 |
792.50 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
5.4 |
TON |
650.00 |
3,510.00 |
600.00 |
3,240.00 |
|
|
|
|
| 717-01 |
seeding
|
164   |
LB |
9.25 |
1,517.00 |
9.00 |
1,476.00 |
|
|
|
|
| 718-01 |
fertilizer
|
5,400   |
LB |
0.50 |
2,700.00 |
0.45 |
2,430.00 |
|
|
|
|
| 726-01 |
bedding material
|
32.0 |
CUYD |
150.00 |
4,800.00 |
75.00 |
2,400.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
200,000.00 |
200,000.00 |
230,000.00 |
230,000.00 |
|
|
|
|
| 729-01 |
sign (type a)
|
96.0 |
SQFT |
45.00 |
4,320.00 |
38.00 |
3,648.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
38   |
EACH |
80.00 |
3,040.00 |
80.00 |
3,040.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
521   |
EACH |
6.00 |
3,126.00 |
5.50 |
2,865.50 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
4,010   |
LNFT |
1.50 |
6,015.00 |
1.40 |
5,614.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
1,905   |
LNFT |
4.00 |
7,620.00 |
4.50 |
8,572.50 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
2.842 |
MILE |
3,000.00 |
8,526.00 |
2,500.00 |
7,105.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.345 |
MILE |
900.00 |
1,210.50 |
830.00 |
1,116.35 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
77   |
EACH |
225.00 |
17,325.00 |
210.00 |
16,170.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
45   |
EACH |
225.00 |
10,125.00 |
240.00 |
10,800.00 |
|
|
|
|
| 736-01 |
trenching and backfilling
|
2,823   |
LNFT |
7.00 |
19,761.00 |
6.50 |
18,349.50 |
|
|
|
|
| 736-03-A |
jacked or bored conduit (1" p.e.c., schedule 80)
|
534   |
LNFT |
15.00 |
8,010.00 |
15.00 |
8,010.00 |
|
|
|
|
| 736-03-B |
jacked or bored conduit (2" p.e.c., schedule 80)
|
225   |
LNFT |
15.00 |
3,375.00 |
15.50 |
3,487.50 |
|
|
|
|
| 736-03-C |
jacked or bored conduit (3" p.e.c., schedule 80)
|
623   |
LNFT |
22.00 |
13,706.00 |
22.00 |
13,706.00 |
|
|
|
|
| 736-04-A |
signal support, 45' & 45' dual mast arm
|
2   |
EACH |
15,000.00 |
30,000.00 |
13,400.00 |
26,800.00 |
|
|
|
|
| 736-04-B |
signal support, 45' signal mast arm
|
1   |
EACH |
10,000.00 |
10,000.00 |
9,400.00 |
9,400.00 |
|
|
|
|
| 736-04-C |
signal support, 40' & 45' dual mast arm
|
1   |
EACH |
13,000.00 |
13,000.00 |
13,000.00 |
13,000.00 |
|
|
|
|
| 736-04-D |
signal support, 50' signal mast arm
|
1   |
EACH |
10,000.00 |
10,000.00 |
10,400.00 |
10,400.00 |
|
|
|
|
| 736-04-E |
signal support, 40' & 50' dual mast arm
|
1   |
EACH |
14,000.00 |
14,000.00 |
14,000.00 |
14,000.00 |
|
|
|
|
| 736-05-A |
signal head (3-section, r,y,g) l.e.d.
|
16   |
EACH |
800.00 |
12,800.00 |
850.00 |
13,600.00 |
|
|
|
|
| 736-05-B |
signal head (3-section, r,lt.y,lt.g) l.e.d.
|
4   |
EACH |
800.00 |
3,200.00 |
800.00 |
3,200.00 |
|
|
|
|
| 736-05-C |
signal head (4-section, r,y,lt.g,g) l.e.d.
|
2   |
EACH |
1,300.00 |
2,600.00 |
1,300.00 |
2,600.00 |
|
|
|
|
| 736-05-D |
signal head (5-section, r,y,lt.g,lt.y,g) l.e.d.
|
5   |
EACH |
1,300.00 |
6,500.00 |
1,300.00 |
6,500.00 |
|
|
|
|
| 736-06 |
signal service
|
2   |
EACH |
1,900.00 |
3,800.00 |
1,900.00 |
3,800.00 |
|
|
|
|
| 736-08 |
signal controller
|
3   |
EACH |
25,000.00 |
75,000.00 |
23,000.00 |
69,000.00 |
|
|
|
|
| 736-09 |
loop detector
|
360   |
LNFT |
10.00 |
3,600.00 |
10.00 |
3,600.00 |
|
|
|
|
| 736-10-A |
underground junction box (type f)
|
27   |
EACH |
400.00 |
10,800.00 |
400.00 |
10,800.00 |
|
|
|
|
| 736-10-B |
underground junction box (type h)
|
3   |
EACH |
900.00 |
2,700.00 |
800.00 |
2,400.00 |
|
|
|
|
| 736-11-A |
trenched conduit (1/2" p.e.c., schedule 80)
|
85   |
LNFT |
7.00 |
595.00 |
6.00 |
510.00 |
|
|
|
|
| 736-11-B |
trenched conduit (1" p.e.c., schedule 80)
|
1,305   |
LNFT |
5.00 |
6,525.00 |
4.00 |
5,220.00 |
|
|
|
|
| 736-11-C |
trenched conduit (2" p.e.c., schedule 80)
|
1,200   |
LNFT |
5.00 |
6,000.00 |
4.25 |
5,100.00 |
|
|
|
|
| 736-11-D |
trenched conduit (3" p.e.c., schedule 80)
|
234   |
LNFT |
8.00 |
1,872.00 |
7.00 |
1,638.00 |
|
|
|
|
| 736-12-A |
conductor, 2c (loop lead-in / #16 awg)
|
2,415   |
LNFT |
1.25 |
3,018.75 |
1.00 |
2,415.00 |
|
|
|
|
| 736-12-B |
conductor, 3c (power, 6 gauge / #6 awg)
|
138   |
LNFT |
5.00 |
690.00 |
4.25 |
586.50 |
|
|
|
|
| 736-12-C |
conductor, 6c (signal / #14 awg)
|
1,100   |
LNFT |
1.50 |
1,650.00 |
1.40 |
1,540.00 |
|
|
|
|
| 736-12-D |
conductor, 10c (signal / #14 awg)
|
3,175   |
LNFT |
2.00 |
6,350.00 |
1.80 |
5,715.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
30,000.00 |
30,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| S-001 |
video detection device and connection
|
10   |
EACH |
6,300.00 |
63,000.00 |
6,300.00 |
63,000.00 |
|
|
|
|
| S-002 |
video detection camera system
|
3   |
EACH |
4,000.00 |
12,000.00 |
4,000.00 |
12,000.00 |
|
|
|
|
| S-003 |
dynamic message signs
|
2   |
EACH |
2,000.00 |
4,000.00 |
9,000.00 |
18,000.00 |
|
|
|
|
| S-004 |
median paddles (l104) with curb unit
|
50   |
EACH |
250.00 |
12,500.00 |
60.00 |
3,000.00 |
|
|
|
|
| S-005 |
sawcutting (asphalt)
|
6,907   |
LNFT |
6.00 |
41,442.00 |
5.50 |
37,988.50 |
|
|
|
|
| S-006 |
sawcutting (concrete)
|
151   |
LNFT |
12.00 |
1,812.00 |
10.00 |
1,510.00 |
|
|
|
|
| S-201 |
fiber optic trunk cable,36 fiber, single mode
|
1,200   |
LNFT |
2.00 |
2,400.00 |
1.80 |
2,160.00 |
|
|
|
|
| S-202 |
fiber optic drop cable, 12 fiber, single mode
|
165   |
LNFT |
6.00 |
990.00 |
5.75 |
948.75 |
|
|
|
|
| S-203 |
fiber optic splice closure
|
3   |
EACH |
425.00 |
1,275.00 |
400.00 |
1,200.00 |
|
|
|
|
| S-204 |
preterminated patch panel, 12f, sc duplex sm
|
3   |
EACH |
575.00 |
1,725.00 |
525.00 |
1,575.00 |
|
|
|
|
| S-205 |
fiber optic fusion splice
|
5   |
EACH |
1,200.00 |
6,000.00 |
1,000.00 |
5,000.00 |
|
|
|
|
| S-206 |
ethernet switch
|
3   |
EACH |
4,000.00 |
12,000.00 |
3,600.00 |
10,800.00 |
|
|
|
|
| S-208 |
pull box type gg (24"x36"x36")
|
8   |
EACH |
900.00 |
7,200.00 |
800.00 |
6,400.00 |
|
|
|
|
| S-209 |
burried traffic fiber optics cable sign (4"x12")
|
4   |
EACH |
80.00 |
320.00 |
70.00 |
280.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,945,457.98 |
|
3,267,989.90 |
|
|
|
|
|