| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - RMD HOLDINGS LTD |
- 2 - T-MAC, INC. |
- 3 - COMMAND CONSTRUCTION INDUSTRIES LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
20,000.00 |
20,000.00 |
3,000.00 |
3,000.00 |
70,000.00 |
70,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
20,000.00 |
20,000.00 |
10,000.00 |
10,000.00 |
70,000.00 |
70,000.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
2,409   |
SQYD |
12.00 |
28,908.00 |
8.00 |
19,272.00 |
10.00 |
24,090.00 |
|
|
| 202-02-E-01 |
removal of concrete curbs
|
2,869.0 |
LNFT |
15.00 |
43,035.00 |
4.00 |
11,476.00 |
5.00 |
14,345.00 |
|
|
| 202-02-E-02 |
removal of asphalt curbs
|
1,183.0 |
LNFT |
9.00 |
10,647.00 |
4.00 |
4,732.00 |
5.00 |
5,915.00 |
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
1,384.0 |
LNFT |
15.00 |
20,760.00 |
4.00 |
5,536.00 |
5.00 |
6,920.00 |
|
|
| 202-02-I |
removal of bollards
|
80   |
EACH |
30.00 |
2,400.00 |
25.00 |
2,000.00 |
5.00 |
400.00 |
|
|
| 202-02-J |
removal of parking meters
|
24   |
EACH |
500.00 |
12,000.00 |
50.00 |
1,200.00 |
5.00 |
120.00 |
|
|
| 203-08 |
geotextile fabric
|
2,900   |
SQYD |
1.00 |
2,900.00 |
1.50 |
4,350.00 |
2.00 |
5,800.00 |
|
|
| 302-01 |
class ii base course
|
214.0 |
CUYD |
90.00 |
19,260.00 |
125.00 |
26,750.00 |
50.00 |
10,700.00 |
|
|
| 510-01-C |
pavement patching (2" asp surface)
|
100   |
SQYD |
60.00 |
6,000.00 |
35.00 |
3,500.00 |
100.00 |
10,000.00 |
|
|
| 510-01-D |
pavement patching (surface and base)
|
100   |
SQYD |
120.00 |
12,000.00 |
82.00 |
8,200.00 |
100.00 |
10,000.00 |
|
|
| 701-07-E |
yard drain pipe (12" rcp)
|
19   |
LNFT |
120.00 |
2,280.00 |
55.00 |
1,045.00 |
100.00 |
1,900.00 |
|
|
| 702-03-C |
catch basins (cb-06)
|
5   |
EACH |
4,500.00 |
22,500.00 |
4,000.00 |
20,000.00 |
5,000.00 |
25,000.00 |
|
|
| 702-04-A |
adjusting manholes
|
8   |
EACH |
1,200.00 |
9,600.00 |
500.00 |
4,000.00 |
300.00 |
2,400.00 |
|
|
| 702-04-B |
adjusting catch basins
|
18   |
EACH |
900.00 |
16,200.00 |
500.00 |
9,000.00 |
500.00 |
9,000.00 |
|
|
| 705-09 |
rebuilt fence
|
306   |
LNFT |
8.93 |
2,732.58 |
50.00 |
15,300.00 |
25.00 |
7,650.00 |
|
|
| 706-02-D |
concrete drive (7" thick)
|
290.0 |
SQYD |
60.00 |
17,400.00 |
65.00 |
18,850.00 |
60.00 |
17,400.00 |
|
|
| 707-03 |
combination concrete curb & gutter
|
4,620.0 |
LNFT |
18.00 |
83,160.00 |
35.00 |
161,700.00 |
50.00 |
231,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
24,000.00 |
24,000.00 |
26,000.00 |
26,000.00 |
4,066.00 |
4,066.00 |
|
|
| 718-01 |
fertilizer
|
160   |
LB |
3.50 |
560.00 |
0.75 |
120.00 |
1.00 |
160.00 |
|
|
| 719-01-A |
plants (ilex s attenuata, "savannah holly", 3" cal.,
3'-10' ht., 2" d.b.h., 30 gal. container) |
28   |
EACH |
450.00 |
12,600.00 |
280.00 |
7,840.00 |
250.00 |
7,000.00 |
|
|
| 719-01-B |
plants (pisatacia chinensis, "chinese pistache", 4"
cal., 12'-14' ht., 2" d.b.h., 30 gal. container) |
27   |
EACH |
495.00 |
13,365.00 |
350.00 |
9,450.00 |
300.00 |
8,100.00 |
|
|
| 719-01-C |
plants (lagerstroemia indica x fauriei, "crape mytle
tuskegee", 12'-14' ht, trunk size 1" min., 30 gal. container) |
7   |
EACH |
225.00 |
1,575.00 |
325.00 |
2,275.00 |
200.00 |
1,400.00 |
|
|
| 719-01-D |
plants (trachelospermum asiaticum, "asian jasmine",
1 gal., 48 per tree opening) |
2,784   |
EACH |
3.50 |
9,744.00 |
3.00 |
8,352.00 |
3.00 |
8,352.00 |
|
|
| 719-02 |
top dressing mulch (3" depth)(crushed pine straw)
|
380   |
SQYD |
4.00 |
1,520.00 |
7.00 |
2,660.00 |
4.00 |
1,520.00 |
|
|
| 719-03 |
bed preparation (24" depth)
|
45   |
SQYD |
12.00 |
540.00 |
40.00 |
1,800.00 |
50.00 |
2,250.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
183,750.00 |
183,750.00 |
140,000.00 |
140,000.00 |
225,000.00 |
225,000.00 |
|
|
| 730-01 |
trenching and backfilling
|
3,000   |
LNFT |
2.95 |
8,850.00 |
7.00 |
21,000.00 |
3.00 |
9,000.00 |
|
|
| 730-02 |
conduit with conductors (1 1/2" pvc with 4-#4 stranded
single conductors) |
3,000   |
LNFT |
9.20 |
27,600.00 |
19.00 |
57,000.00 |
9.00 |
27,000.00 |
|
|
| 730-04 |
jacking or bored casing (1 1/2" pvc with 4-#4 stranded
single conductors) |
375   |
LNFT |
29.20 |
10,950.00 |
28.00 |
10,500.00 |
30.00 |
11,250.00 |
|
|
| 730-05 |
light pole (13' ht., ornamental cast ductile iron
incl. handhole) |
56   |
EACH |
5,220.00 |
292,320.00 |
5,500.00 |
308,000.00 |
5,000.00 |
280,000.00 |
|
|
| 730-07 |
luminaire (washington postlight, 175 watt metal halide,
120 volts, type ii distribution) |
56   |
EACH |
1,325.00 |
74,200.00 |
1,650.00 |
92,400.00 |
1,500.00 |
84,000.00 |
|
|
| 730-08 |
electrical service point (type)
|
2   |
EACH |
8,375.00 |
16,750.00 |
2,500.00 |
5,000.00 |
20,000.00 |
40,000.00 |
|
|
| 730-16 |
underground junction box (20" x 12")
|
6   |
EACH |
385.00 |
2,310.00 |
600.00 |
3,600.00 |
400.00 |
2,400.00 |
|
|
| 732-01-A |
plastic pavement striping (4" width)
|
870   |
LNFT |
0.55 |
478.50 |
0.60 |
522.00 |
0.50 |
435.00 |
|
|
| 732-01-B |
plastic pavement striping (6" width)
|
1,780   |
LNFT |
0.80 |
1,424.00 |
0.85 |
1,513.00 |
1.00 |
1,780.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
445   |
LNFT |
3.75 |
1,668.75 |
4.00 |
1,780.00 |
4.00 |
1,780.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
7,500.00 |
7,500.00 |
25,000.00 |
25,000.00 |
1,000.00 |
1,000.00 |
|
|
| 805-01-C |
class a concrete (retaining walls)
|
322.00 |
CUYD |
330.00 |
106,260.00 |
400.00 |
128,800.00 |
300.00 |
96,600.00 |
|
|
| S-001 |
full depth saw cut concrete curb, pavement sidewalk,
driveway, etc. |
58,100   |
INLF |
0.75 |
43,575.00 |
0.70 |
40,670.00 |
1.00 |
58,100.00 |
|
|
| S-002 |
brick paver sidewalk with 5" thick concrete base and
sand sub-base |
2,500   |
SQYD |
75.00 |
187,500.00 |
115.00 |
287,500.00 |
125.00 |
312,500.00 |
|
|
| S-003 |
decorative concrete sidewalk, 5" thick with sand base
|
2,870   |
SQYD |
70.00 |
200,900.00 |
115.00 |
330,050.00 |
100.00 |
287,000.00 |
|
|
| S-004 |
handicapped ramps (concrete & pavers)(type "a")
|
10   |
EACH |
600.00 |
6,000.00 |
1,600.00 |
16,000.00 |
1,000.00 |
10,000.00 |
|
|
| S-005 |
handicapped ramps (concrete & pavers)(type "b")
|
24   |
EACH |
600.00 |
14,400.00 |
1,600.00 |
38,400.00 |
1,000.00 |
24,000.00 |
|
|
| S-006 |
ornamental fence
|
745   |
LNFT |
91.59 |
68,234.55 |
120.00 |
89,400.00 |
90.00 |
67,050.00 |
|
|
| S-006-A |
ornamental fence (non-participating)
|
800   |
LNFT |
91.57 |
73,256.00 |
120.00 |
96,000.00 |
90.00 |
72,000.00 |
|
|
| S-007 |
relocate ornamental fence (non-participating)
|
460   |
LNFT |
34.03 |
15,653.80 |
50.00 |
23,000.00 |
25.00 |
11,500.00 |
|
|
| S-008 |
remove and reset ornamental fence
|
130   |
LNFT |
34.03 |
4,423.90 |
50.00 |
6,500.00 |
25.00 |
3,250.00 |
|
|
| S-009 |
ornamental walk through gate and hardware
|
8   |
EACH |
1,500.00 |
12,000.00 |
2,500.00 |
20,000.00 |
1,100.00 |
8,800.00 |
|
|
| S-010 |
relocated ornamental walk through gate and hardware
(non-participating) |
1   |
EACH |
920.00 |
920.00 |
1,200.00 |
1,200.00 |
250.00 |
250.00 |
|
|
| S-011 |
ornamental sliding gate and hardware
(non-participating) |
1   |
EACH |
6,367.00 |
6,367.00 |
8,000.00 |
8,000.00 |
6,000.00 |
6,000.00 |
|
|
| S-012 |
relocate ornamental sliding gate and hardware
(non-participating) |
1   |
EACH |
3,802.00 |
3,802.00 |
3,000.00 |
3,000.00 |
1,200.00 |
1,200.00 |
|
|
| S-013 |
wheel stop (non-participating)
|
90   |
EACH |
30.00 |
2,700.00 |
75.00 |
6,750.00 |
40.00 |
3,600.00 |
|
|
| S-014 |
project sign
|
2   |
EACH |
1,200.00 |
2,400.00 |
750.00 |
1,500.00 |
1,000.00 |
2,000.00 |
|
|
| S-015 |
iron bench
|
4   |
EACH |
1,200.00 |
4,800.00 |
1,200.00 |
4,800.00 |
1,250.00 |
5,000.00 |
|
|
| S-016 |
trash receptacle
|
2   |
EACH |
900.00 |
1,800.00 |
500.00 |
1,000.00 |
400.00 |
800.00 |
|
|
| S-017 |
adjusting sewer clean outs
|
3   |
EACH |
450.00 |
1,350.00 |
200.00 |
600.00 |
150.00 |
450.00 |
|
|
| S-018 |
adjusting traffic control box
|
13   |
EACH |
300.00 |
3,900.00 |
500.00 |
6,500.00 |
150.00 |
1,950.00 |
|
|
| S-019 |
adjusting electrical box
|
1   |
EACH |
1,200.00 |
1,200.00 |
1,200.00 |
1,200.00 |
150.00 |
150.00 |
|
|
| S-020 |
drop inlet (24" x 30")
|
1   |
EACH |
7,000.00 |
7,000.00 |
1,600.00 |
1,600.00 |
4,000.00 |
4,000.00 |
|
|
| S-021 |
abandon utilities
|
15   |
EACH |
450.00 |
6,750.00 |
100.00 |
1,500.00 |
1,000.00 |
15,000.00 |
|
|
| S-022 |
handicapped ramps (concrete and pavers) (type "c")
|
2   |
EACH |
600.00 |
1,200.00 |
1,500.00 |
3,000.00 |
1,500.00 |
3,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,819,880.08 |
|
2,171,693.00 |
|
2,233,333.00 |
|
|
|