| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - COMMAND CONSTRUCTION INDUSTRIES LLC |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
- 3 - GUINN BROTHERS, LLC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
50,000.00 |
50,000.00 |
30,000.00 |
30,000.00 |
150,000.00 |
150,000.00 |
|
|
| 202-02-A-01 |
removal of bridges (sta. 9+990.400; 7.3m x 9.4m timber
bridge) |
1   |
ea |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
12,500.00 |
12,500.00 |
|
|
| 202-02-A-02 |
removal of bridges (sta. 10+150; 6.2m x 17.6m timber
bridge) |
1   |
ea |
10,000.00 |
10,000.00 |
30,000.00 |
30,000.00 |
15,000.00 |
15,000.00 |
|
|
| 202-02-A-03 |
removal of bridges (sta. 10+150.160; 4.9m x 14.1m
timber bridge) |
1   |
ea |
10,000.00 |
10,000.00 |
30,000.00 |
30,000.00 |
12,500.00 |
12,500.00 |
|
|
| 202-02-A-04 |
removal of bridges (sta. 10+150.024; 6.8m x 9.5m
timber bridge) |
1   |
ea |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
12,000.00 |
12,000.00 |
|
|
| 203-05 |
excavation and embankment
|
lump |
lump |
30,000.00 |
30,000.00 |
100,000.00 |
100,000.00 |
90,000.00 |
90,000.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
8   |
ea |
20.00 |
160.00 |
22.00 |
176.00 |
100.00 |
800.00 |
|
|
| 204-03 |
temporary slope drains
|
47   |
ln m |
40.00 |
1,880.00 |
75.00 |
3,525.00 |
30.00 |
1,410.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
13   |
ea |
150.00 |
1,950.00 |
270.00 |
3,510.00 |
200.00 |
2,600.00 |
|
|
| 204-06 |
temporary silt fencing
|
109   |
ln m |
10.00 |
1,090.00 |
14.25 |
1,553.25 |
10.00 |
1,090.00 |
|
|
| 302-01 |
class ii base course
|
764.4 |
cu m |
120.00 |
91,728.00 |
116.00 |
88,670.40 |
140.00 |
107,016.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
4   |
cu m |
250.00 |
1,000.00 |
126.00 |
504.00 |
500.00 |
2,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
523.7 |
Mg |
210.00 |
109,977.00 |
175.00 |
91,647.50 |
400.00 |
209,480.00 |
|
|
| 510-02 |
pavement widening
|
59.2 |
sq m |
125.00 |
7,400.00 |
100.00 |
5,920.00 |
100.00 |
5,920.00 |
|
|
| 701-05-I |
side drain pipe (600 mm)
|
44.0 |
ln m |
350.00 |
15,400.00 |
133.00 |
5,852.00 |
300.00 |
13,200.00 |
|
|
| 701-05-I-01 |
side drain pipe (600 mm) (erosion)
|
9.0 |
ln m |
350.00 |
3,150.00 |
210.00 |
1,890.00 |
300.00 |
2,700.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
1   |
ea |
3,500.00 |
3,500.00 |
4,500.00 |
4,500.00 |
6,000.00 |
6,000.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
30.48 |
ln m |
225.00 |
6,858.00 |
220.00 |
6,705.60 |
260.00 |
7,924.80 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
ea |
2,500.00 |
10,000.00 |
2,500.00 |
10,000.00 |
3,200.00 |
12,800.00 |
|
|
| 711-01-D |
riprap (25 kg, 460mm thick )
|
595   |
sq m |
40.00 |
23,800.00 |
110.00 |
65,450.00 |
100.00 |
59,500.00 |
|
|
| 711-04 |
geotextile fabric
|
595   |
sq m |
2.50 |
1,487.50 |
2.75 |
1,636.25 |
5.00 |
2,975.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
50,000.00 |
50,000.00 |
40,000.00 |
40,000.00 |
50,000.00 |
50,000.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
1,861.5 |
kg |
0.50 |
930.75 |
1.50 |
2,792.25 |
4.30 |
8,004.45 |
|
|
| 717-01 |
seeding
|
19   |
kg |
20.00 |
380.00 |
50.00 |
950.00 |
40.00 |
760.00 |
|
|
| 718-01 |
fertilizer
|
465   |
kg |
1.00 |
465.00 |
3.75 |
1,743.75 |
2.00 |
930.00 |
|
|
| 725-03 |
low profile runaround
|
1   |
each |
35,000.00 |
35,000.00 |
37,000.00 |
37,000.00 |
55,000.00 |
55,000.00 |
|
|
| 726-01 |
bedding material
|
150.8 |
cu m |
100.00 |
15,080.00 |
125.00 |
18,850.00 |
110.00 |
16,588.00 |
|
|
| 727-01 |
mobilization
|
lump |
lump |
180,000.00 |
180,000.00 |
165,000.00 |
165,000.00 |
350,000.00 |
350,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
8   |
ea |
60.00 |
480.00 |
70.00 |
560.00 |
100.00 |
800.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
ea |
80.00 |
640.00 |
80.00 |
640.00 |
150.00 |
1,200.00 |
|
|
| 740-01 |
construction layout
|
lump |
lump |
30,000.00 |
30,000.00 |
50,000.00 |
50,000.00 |
15,000.00 |
15,000.00 |
|
|
| 804-01-B |
precast concrete piles (350 mm)
|
708.0 |
ln m |
250.00 |
177,000.00 |
235.00 |
166,380.00 |
200.00 |
141,600.00 |
|
|
| 804-12 |
loading permanent piles
|
2   |
ea |
5,000.00 |
10,000.00 |
5,000.00 |
10,000.00 |
1.00 |
2.00 |
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
42.54 |
cu m |
600.00 |
25,524.00 |
2,500.00 |
106,350.00 |
1,750.00 |
74,445.00 |
|
|
| 805-10-A |
bridge superstructure & substructure(90deg. xing 7.30m
rdwy. with sidewalk) (c.i.p.) |
3   |
span |
55,000.00 |
165,000.00 |
65,000.00 |
195,000.00 |
70,000.00 |
210,000.00 |
|
|
| 805-10-B |
bridge superstructure & substructure (90deg. xing
8.50m rdwy.) (c.i.p.) |
4   |
span |
40,000.00 |
160,000.00 |
60,000.00 |
240,000.00 |
58,000.00 |
232,000.00 |
|
|
| 805-12-I-01 |
reinforced concrete box culverts (1500 mm x 1500 mm)
(precast only, astm c- 850m) |
50.00 |
ln m |
2,200.00 |
110,000.00 |
600.00 |
30,000.00 |
1,775.00 |
88,750.00 |
|
|
| 805-12-M |
reinforced concrete box culverts (1800 mm x 1800 mm)
|
50.00 |
ln m |
2,400.00 |
120,000.00 |
650.00 |
32,500.00 |
1,875.00 |
93,750.00 |
|
|
| 806-01 |
deformed reinforcing steel
|
2,463   |
kg |
1.50 |
3,694.50 |
2.25 |
5,541.75 |
3.00 |
7,389.00 |
|
|
| S-001 |
vibration monitoring
|
lump |
lump |
2,500.00 |
2,500.00 |
14,000.00 |
14,000.00 |
15,000.00 |
15,000.00 |
|
|
| S-101 |
concrete approach slabs (90deg xing 8.5m rdwy.)
(c.i.p.) |
2   |
each |
25,000.00 |
50,000.00 |
13,000.00 |
26,000.00 |
13,000.00 |
26,000.00 |
|
|
| S-102 |
concrete approach slabs (90deg xing 7.3m rdwy. with
1.525m sidewalk & tapered concrete barrier rail) (c.i.p.) |
2   |
each |
30,000.00 |
60,000.00 |
13,500.00 |
27,000.00 |
16,000.00 |
32,000.00 |
|
|
| |
(c.i.p.) |
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,596,074.75 |
|
1,691,847.75 |
|
2,146,634.25 |
|
|
|