Letting of 5/20/2009 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 713-59-0211
Parish: WASHINGTON
Routes:
Description: BRIDGES IN WASHINGTON PARISH
Type Const: drainage structures, superpave asphaltic concrete pavement, pavement widening,
concrete slab span bridges and related work.
Estimated Construction Cost: $1,606,781.90
 
RankLicenseBidderConstruction Bid
1 48896 COMMAND CONSTRUCTION INDUSTRIES LLC $1,596,074.75
2 02179 BOH BROS. CONSTRUCTION CO., LLC. $1,691,847.75
3 09090 GUINN BROTHERS, LLC. $2,146,634.25
 
Item Number Item Description Quantity Unit of Measure - 1 -
COMMAND CONSTRUCTION INDUSTRIES LLC
- 2 -
BOH BROS. CONSTRUCTION CO., LLC.
- 3 -
GUINN BROTHERS, LLC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 50,000.00 50,000.00 30,000.00 30,000.00 150,000.00 150,000.00    
202-02-A-01 removal of bridges (sta. 9+990.400; 7.3m x 9.4m timber
bridge)
1      ea 10,000.00 10,000.00 20,000.00 20,000.00 12,500.00 12,500.00    
202-02-A-02 removal of bridges (sta. 10+150; 6.2m x 17.6m timber
bridge)
1      ea 10,000.00 10,000.00 30,000.00 30,000.00 15,000.00 15,000.00    
202-02-A-03 removal of bridges (sta. 10+150.160; 4.9m x 14.1m
timber bridge)
1      ea 10,000.00 10,000.00 30,000.00 30,000.00 12,500.00 12,500.00    
202-02-A-04 removal of bridges (sta. 10+150.024; 6.8m x 9.5m
timber bridge)
1      ea 10,000.00 10,000.00 20,000.00 20,000.00 12,000.00 12,000.00    
203-05 excavation and embankment lump      lump 30,000.00 30,000.00 100,000.00 100,000.00 90,000.00 90,000.00    
204-02 temporary hay or straw bales 8      ea 20.00 160.00 22.00 176.00 100.00 800.00    
204-03 temporary slope drains 47      ln m 40.00 1,880.00 75.00 3,525.00 30.00 1,410.00    
204-05-A temporary sediment check dams (hay) 13      ea 150.00 1,950.00 270.00 3,510.00 200.00 2,600.00    
204-06 temporary silt fencing 109      ln m 10.00 1,090.00 14.25 1,553.25 10.00 1,090.00    
302-01 class ii base course 764.4    cu m 120.00 91,728.00 116.00 88,670.40 140.00 107,016.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
4      cu m 250.00 1,000.00 126.00 504.00 500.00 2,000.00    
502-01 superpave asphaltic concrete 523.7    Mg 210.00 109,977.00 175.00 91,647.50 400.00 209,480.00    
510-02 pavement widening 59.2    sq m 125.00 7,400.00 100.00 5,920.00 100.00 5,920.00    
701-05-I side drain pipe (600 mm) 44.0    ln m 350.00 15,400.00 133.00 5,852.00 300.00 13,200.00    
701-05-I-01 side drain pipe (600 mm) (erosion) 9.0    ln m 350.00 3,150.00 210.00 1,890.00 300.00 2,700.00    
702-03-A catch basins (cb-01) 1      ea 3,500.00 3,500.00 4,500.00 4,500.00 6,000.00 6,000.00    
704-08-B guard rail transitions (double thrie beam) 30.48   ln m 225.00 6,858.00 220.00 6,705.60 260.00 7,924.80    
704-11-A guard rail end treatment (flared) 4      ea 2,500.00 10,000.00 2,500.00 10,000.00 3,200.00 12,800.00    
711-01-D riprap (25 kg, 460mm thick ) 595      sq m 40.00 23,800.00 110.00 65,450.00 100.00 59,500.00    
711-04 geotextile fabric 595      sq m 2.50 1,487.50 2.75 1,636.25 5.00 2,975.00    
713-01 temporary signs & barricades lump      lump 50,000.00 50,000.00 40,000.00 40,000.00 50,000.00 50,000.00    
716-01-A mulch (vegetative) 1,861.5    kg 0.50 930.75 1.50 2,792.25 4.30 8,004.45    
717-01 seeding 19      kg 20.00 380.00 50.00 950.00 40.00 760.00    
718-01 fertilizer 465      kg 1.00 465.00 3.75 1,743.75 2.00 930.00    
725-03 low profile runaround 1      each 35,000.00 35,000.00 37,000.00 37,000.00 55,000.00 55,000.00    
726-01 bedding material 150.8    cu m 100.00 15,080.00 125.00 18,850.00 110.00 16,588.00    
727-01 mobilization lump      lump 180,000.00 180,000.00 165,000.00 165,000.00 350,000.00 350,000.00    
729-16-B object marker assembly (type 2) 8      ea 60.00 480.00 70.00 560.00 100.00 800.00    
729-16-C object marker assembly (type 3) 8      ea 80.00 640.00 80.00 640.00 150.00 1,200.00    
740-01 construction layout lump      lump 30,000.00 30,000.00 50,000.00 50,000.00 15,000.00 15,000.00    
804-01-B precast concrete piles (350 mm) 708.0    ln m 250.00 177,000.00 235.00 166,380.00 200.00 141,600.00    
804-12 loading permanent piles 2      ea 5,000.00 10,000.00 5,000.00 10,000.00 1.00 2.00    
805-01-B class a concrete (box culvert headwalls) 42.54   cu m 600.00 25,524.00 2,500.00 106,350.00 1,750.00 74,445.00    
805-10-A bridge superstructure & substructure(90deg. xing 7.30m
rdwy. with sidewalk) (c.i.p.)
3      span 55,000.00 165,000.00 65,000.00 195,000.00 70,000.00 210,000.00    
805-10-B bridge superstructure & substructure (90deg. xing
8.50m rdwy.) (c.i.p.)
4      span 40,000.00 160,000.00 60,000.00 240,000.00 58,000.00 232,000.00    
805-12-I-01 reinforced concrete box culverts (1500 mm x 1500 mm)
(precast only, astm c- 850m)
50.00   ln m 2,200.00 110,000.00 600.00 30,000.00 1,775.00 88,750.00    
805-12-M reinforced concrete box culverts (1800 mm x 1800 mm) 50.00   ln m 2,400.00 120,000.00 650.00 32,500.00 1,875.00 93,750.00    
806-01 deformed reinforcing steel 2,463      kg 1.50 3,694.50 2.25 5,541.75 3.00 7,389.00    
S-001 vibration monitoring lump      lump 2,500.00 2,500.00 14,000.00 14,000.00 15,000.00 15,000.00    
S-101 concrete approach slabs (90deg xing 8.5m rdwy.)
(c.i.p.)
2      each 25,000.00 50,000.00 13,000.00 26,000.00 13,000.00 26,000.00    
S-102 concrete approach slabs (90deg xing 7.3m rdwy. with
1.525m sidewalk & tapered concrete barrier rail)
(c.i.p.)
2      each 30,000.00 60,000.00 13,500.00 27,000.00 16,000.00 32,000.00    
    (c.i.p.)                    
 CONTRACTOR TOTAL       1,596,074.75   1,691,847.75   2,146,634.25    