| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - KEY CONSTRUCTORS, INC. |
- 2 - COASTAL BRIDGE CO., L.L.C. |
- 3 - GUINN BROTHERS, LLC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
100,000.00 |
100,000.00 |
10,000.00 |
10,000.00 |
112,500.00 |
112,500.00 |
|
|
| 202-02-A-01 |
removal of bridge(sta. 3+020,7.07m x 40.56m.7 span
concrete bridge) |
1   |
ea |
100,000.00 |
100,000.00 |
150,000.00 |
150,000.00 |
50,000.00 |
50,000.00 |
|
|
| 203-05 |
excavation and embankment
|
lump |
lump |
50,000.00 |
50,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
7   |
ea |
20.00 |
140.00 |
15.00 |
105.00 |
100.00 |
700.00 |
|
|
| 204-03 |
temporary slope drains
|
40   |
ln m |
80.00 |
3,200.00 |
100.00 |
4,000.00 |
30.00 |
1,200.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
ea |
200.00 |
800.00 |
25.00 |
100.00 |
200.00 |
800.00 |
|
|
| 204-06 |
temporary silt fencing
|
212   |
ln m |
20.00 |
4,240.00 |
15.00 |
3,180.00 |
10.00 |
2,120.00 |
|
|
| 302-01-A |
class ii base course (stone or recycled portland
cement concrete) |
36.1 |
cu m |
200.00 |
7,220.00 |
400.00 |
14,440.00 |
200.00 |
7,220.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
6   |
cu m |
165.00 |
990.00 |
300.00 |
1,800.00 |
500.00 |
3,000.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
50.0 |
cu m |
85.00 |
4,250.00 |
100.00 |
5,000.00 |
100.00 |
5,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
132.8 |
Mg |
305.00 |
40,504.00 |
400.00 |
53,120.00 |
500.00 |
66,400.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
69   |
sq m |
80.00 |
5,520.00 |
100.00 |
6,900.00 |
218.00 |
15,042.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 6   |
cu m |
1.00 |
- 6.00 |
1.00 |
- 6.00 |
0.00 |
0.00 |
|
|
| 510-02 |
pavement widening
|
77.1 |
sq m |
115.00 |
8,866.50 |
150.00 |
11,565.00 |
150.00 |
11,565.00 |
|
|
| 701-05-G |
side drain pipe (450 mm)
|
7.9 |
ln m |
225.00 |
1,777.50 |
300.00 |
2,370.00 |
500.00 |
3,950.00 |
|
|
| 704-03 |
blocked out guard rail
|
20.95 |
ln m |
100.00 |
2,095.00 |
120.00 |
2,514.00 |
125.00 |
2,618.75 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
22.86 |
ln m |
215.00 |
4,914.90 |
225.00 |
5,143.50 |
250.00 |
5,715.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
3   |
ea |
2,600.00 |
7,800.00 |
4,000.00 |
12,000.00 |
3,000.00 |
9,000.00 |
|
|
| 705-01 |
barbed wire fence
|
50   |
ln m |
45.00 |
2,250.00 |
65.00 |
3,250.00 |
50.00 |
2,500.00 |
|
|
| 711-01-D |
riprap (25 kg, 460 mm thick)
|
585   |
sq m |
110.00 |
64,350.00 |
100.00 |
58,500.00 |
155.00 |
90,675.00 |
|
|
| 711-04 |
geotextile fabric
|
585   |
sq m |
4.00 |
2,340.00 |
5.00 |
2,925.00 |
10.00 |
5,850.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
50,000.00 |
50,000.00 |
100,000.00 |
100,000.00 |
25,000.00 |
25,000.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
450.0 |
kg |
3.00 |
1,350.00 |
4.00 |
1,800.00 |
7.00 |
3,150.00 |
|
|
| 717-01 |
seeding
|
4   |
kg |
50.00 |
200.00 |
65.00 |
260.00 |
50.00 |
200.00 |
|
|
| 718-01 |
fertilizer
|
95   |
kg |
6.00 |
570.00 |
1.00 |
95.00 |
2.00 |
190.00 |
|
|
| 725-01 |
temporary detour roads
|
346.9 |
sq m |
515.00 |
178,653.50 |
350.00 |
121,415.00 |
195.00 |
67,645.50 |
|
|
| 725-02 |
temporary detour bridging
|
60.00 |
ln m |
7,775.00 |
466,500.00 |
7,500.00 |
450,000.00 |
14,668.00 |
880,080.00 |
|
|
| 727-01 |
mobilization
|
lump |
lump |
400,000.00 |
400,000.00 |
220,000.00 |
220,000.00 |
375,000.00 |
375,000.00 |
|
|
| 729-01 |
sign (type a)
|
0.58 |
sq m |
2,500.00 |
1,450.00 |
3,000.00 |
1,740.00 |
1,500.00 |
870.00 |
|
|
| 729-08-A |
mounting (63.5 mm post)
|
1   |
ea |
250.00 |
250.00 |
500.00 |
500.00 |
1,500.00 |
1,500.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
ea |
85.00 |
340.00 |
100.00 |
400.00 |
100.00 |
400.00 |
|
|
| 730-09 |
electrical system
|
lump |
lump |
25,000.00 |
25,000.00 |
150,000.00 |
150,000.00 |
35,000.00 |
35,000.00 |
|
|
| 740-01 |
construction layout
|
lump |
lump |
35,000.00 |
35,000.00 |
90,000.00 |
90,000.00 |
45,000.00 |
45,000.00 |
|
|
| 804-01-B |
precast concrete piles (350 mm)
|
954.0 |
ln m |
275.00 |
262,350.00 |
220.00 |
209,880.00 |
275.00 |
262,350.00 |
|
|
| 804-12 |
loading permanent piles
|
1   |
ea |
10,000.00 |
10,000.00 |
3,500.00 |
3,500.00 |
1.00 |
1.00 |
|
|
| 805-10-A |
bridge superstructure & substructure(9.0m clr. rdwy.;
90 deg. crossing; cast-in-place) |
8   |
span |
60,000.00 |
480,000.00 |
85,000.00 |
680,000.00 |
70,000.00 |
560,000.00 |
|
|
| S-001 |
impact attenuators (construction zone)
|
2   |
each |
12,500.00 |
25,000.00 |
20,000.00 |
40,000.00 |
15,000.00 |
30,000.00 |
|
|
| S-101 |
concrete approach slab(9.0m clr. rdwy.;90 degree
crossing, cast-in-place; tapered barrier rail - lt.) |
1   |
ea |
25,500.00 |
25,500.00 |
35,000.00 |
35,000.00 |
28,500.00 |
28,500.00 |
|
|
| |
lt.) |
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,373,415.40 |
|
2,471,496.50 |
|
2,730,742.25 |
|
|
|