| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GERACE CONSTRUCTION LLC |
- 2 - C W & W CONTRACTORS, INC. |
- 3 - TERRAL CONSTRUCTION L.L.C.� |
- 4 - BEN ALLEN, INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
8,500.00 |
8,500.00 |
20,000.00 |
20,000.00 |
7,205.00 |
7,205.00 |
20,000.00 |
20,000.00 |
| 202-02-A-01 |
removal of bridge (sta. 100+00, 23.04' wide x 62.11'
long timber bridge wit h wingwalls) |
1   |
EACH |
8,500.00 |
8,500.00 |
7,500.00 |
7,500.00 |
5,780.00 |
5,780.00 |
5,000.00 |
5,000.00 |
| 202-02-A-02 |
removal of bridge (sta. 100+00, 19.06' wide x 45.80'
long timber bridge) |
1   |
EACH |
6,500.00 |
6,500.00 |
7,500.00 |
7,500.00 |
5,780.00 |
5,780.00 |
5,000.00 |
5,000.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
928.4 |
SQYD |
10.00 |
9,284.00 |
5.00 |
4,642.00 |
10.24 |
9,506.82 |
8.00 |
7,427.20 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
55,000.00 |
55,000.00 |
35,000.00 |
35,000.00 |
45,000.00 |
45,000.00 |
65,000.00 |
65,000.00 |
| 204-02 |
temporary hay or straw bales
|
30   |
EACH |
20.00 |
600.00 |
10.00 |
300.00 |
10.00 |
300.00 |
0.00 |
0.00 |
| 204-03 |
temporary slope drains
|
200   |
LNFT |
5.00 |
1,000.00 |
10.00 |
2,000.00 |
1.00 |
200.00 |
0.00 |
0.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
EACH |
100.00 |
800.00 |
100.00 |
800.00 |
100.00 |
800.00 |
0.00 |
0.00 |
| 204-06 |
temporary silt fencing
|
535   |
LNFT |
2.50 |
1,337.50 |
3.00 |
1,605.00 |
2.00 |
1,070.00 |
3.00 |
1,605.00 |
| 302-01 |
class ii base course
|
276.3 |
CUYD |
125.00 |
34,537.50 |
100.00 |
27,630.00 |
112.36 |
31,045.07 |
130.00 |
35,919.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
9   |
CUYD |
100.00 |
900.00 |
100.00 |
900.00 |
112.36 |
1,011.24 |
130.00 |
1,170.00 |
| 502-01 |
superpave asphaltic concrete
|
215.8 |
TON |
250.00 |
53,950.00 |
200.00 |
43,160.00 |
290.00 |
62,582.00 |
200.00 |
43,160.00 |
| 704-03 |
blocked out guard rail
|
50.0 |
LNFT |
25.00 |
1,250.00 |
30.00 |
1,500.00 |
25.00 |
1,250.00 |
25.00 |
1,250.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
55.00 |
5,500.00 |
80.00 |
8,000.00 |
60.00 |
6,000.00 |
66.00 |
6,600.00 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,500.00 |
10,000.00 |
3,000.00 |
12,000.00 |
2,500.00 |
10,000.00 |
2,500.00 |
10,000.00 |
| 705-01 |
barbed wire fence
|
145   |
LNFT |
10.00 |
1,450.00 |
15.00 |
2,175.00 |
12.00 |
1,740.00 |
15.00 |
2,175.00 |
| 711-01-C |
riprap (30 lb, 14" thick)
|
546   |
SQYD |
75.00 |
40,950.00 |
90.00 |
49,140.00 |
60.00 |
32,760.00 |
85.00 |
46,410.00 |
| 711-04 |
geotextile fabric
|
546   |
SQYD |
1.00 |
546.00 |
3.00 |
1,638.00 |
2.00 |
1,092.00 |
3.00 |
1,638.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
15,000.00 |
15,000.00 |
18,000.00 |
18,000.00 |
12,000.00 |
12,000.00 |
12,000.00 |
12,000.00 |
| 716-01-A |
mulch (vegetative)
|
0.7 |
TON |
1,000.00 |
700.00 |
4,000.00 |
2,800.00 |
1,500.00 |
1,050.00 |
1,000.00 |
700.00 |
| 717-01 |
seeding
|
16   |
LB |
10.00 |
160.00 |
50.00 |
800.00 |
12.00 |
192.00 |
25.00 |
400.00 |
| 718-01 |
fertilizer
|
360   |
LB |
0.50 |
180.00 |
5.00 |
1,800.00 |
1.00 |
360.00 |
2.00 |
720.00 |
| 726-01 |
bedding material
|
110.6 |
CUYD |
100.00 |
11,060.00 |
125.00 |
13,825.00 |
300.00 |
33,180.00 |
130.00 |
14,378.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
75,000.00 |
75,000.00 |
60,000.00 |
60,000.00 |
50,000.00 |
50,000.00 |
75,000.00 |
75,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
80.00 |
320.00 |
100.00 |
400.00 |
100.00 |
400.00 |
75.00 |
300.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
80.00 |
320.00 |
100.00 |
400.00 |
100.00 |
400.00 |
95.00 |
380.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
25,000.00 |
25,000.00 |
12,000.00 |
12,000.00 |
8,000.00 |
8,000.00 |
10,000.00 |
10,000.00 |
| 804-01-B |
precast concrete piles (14")
|
840   |
LNFT |
75.00 |
63,000.00 |
105.00 |
88,200.00 |
78.00 |
65,520.00 |
75.00 |
63,000.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
500.00 |
500.00 |
1.00 |
1.00 |
1.00 |
1.00 |
0.00 |
0.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
54.97 |
CUYD |
1,200.00 |
65,964.00 |
1,200.00 |
65,964.00 |
720.00 |
39,578.40 |
1,300.00 |
71,461.00 |
| 805-10-A |
bridge superstructure & substructure (28' clr. rdwy;
90 deg. xing, precast only) |
4   |
SPAN |
34,000.00 |
136,000.00 |
30,000.00 |
120,000.00 |
44,750.00 |
179,000.00 |
39,000.00 |
156,000.00 |
| 805-12-W-01 |
reinforced concrete box culverts (10'x 9')
|
120.0 |
LNFT |
1,100.00 |
132,000.00 |
1,300.00 |
156,000.00 |
1,342.00 |
161,040.00 |
1,152.00 |
138,240.00 |
| 806-01 |
deformed reinforcing steel
|
4,292   |
LB |
2.00 |
8,584.00 |
3.00 |
12,876.00 |
1.20 |
5,150.40 |
3.00 |
12,876.00 |
| S-101 |
concrete approach slabs (28' clr. rdwy; 90 deg. xing,
without asphalt) |
2   |
EACH |
12,000.00 |
24,000.00 |
10,000.00 |
20,000.00 |
10,500.00 |
21,000.00 |
11,500.00 |
23,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
798,393.00 |
|
798,556.00 |
|
799,993.93 |
|
830,809.20 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - SHILOH CONTRACTORS, INC. |
- 6 - GUINN BROTHERS, LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
20,000.00 |
20,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| 202-02-A-01 |
removal of bridge (sta. 100+00, 23.04' wide x 62.11'
long timber bridge wit h wingwalls) |
1   |
EACH |
8,000.00 |
8,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 202-02-A-02 |
removal of bridge (sta. 100+00, 19.06' wide x 45.80'
long timber bridge) |
1   |
EACH |
7,000.00 |
7,000.00 |
18,500.00 |
18,500.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
928.4 |
SQYD |
5.00 |
4,642.00 |
10.00 |
9,284.00 |
|
|
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
72,000.00 |
72,000.00 |
55,000.00 |
55,000.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
30   |
EACH |
10.00 |
300.00 |
50.00 |
1,500.00 |
|
|
|
|
| 204-03 |
temporary slope drains
|
200   |
LNFT |
1.00 |
200.00 |
10.00 |
2,000.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
EACH |
40.00 |
320.00 |
250.00 |
2,000.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
535   |
LNFT |
3.00 |
1,605.00 |
5.00 |
2,675.00 |
|
|
|
|
| 302-01 |
class ii base course
|
276.3 |
CUYD |
85.00 |
23,485.50 |
130.00 |
35,919.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
9   |
CUYD |
100.00 |
900.00 |
250.00 |
2,250.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
215.8 |
TON |
185.00 |
39,923.00 |
400.00 |
86,320.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
50.0 |
LNFT |
20.00 |
1,000.00 |
30.00 |
1,500.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
60.00 |
6,000.00 |
70.00 |
7,000.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,250.00 |
9,000.00 |
3,000.00 |
12,000.00 |
|
|
|
|
| 705-01 |
barbed wire fence
|
145   |
LNFT |
12.00 |
1,740.00 |
25.00 |
3,625.00 |
|
|
|
|
| 711-01-C |
riprap (30 lb, 14" thick)
|
546   |
SQYD |
65.00 |
35,490.00 |
100.00 |
54,600.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
546   |
SQYD |
3.00 |
1,638.00 |
5.00 |
2,730.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
15,000.00 |
15,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
0.7 |
TON |
1,000.00 |
700.00 |
7,200.00 |
5,040.00 |
|
|
|
|
| 717-01 |
seeding
|
16   |
LB |
1.00 |
16.00 |
25.00 |
400.00 |
|
|
|
|
| 718-01 |
fertilizer
|
360   |
LB |
1.00 |
360.00 |
1.00 |
360.00 |
|
|
|
|
| 726-01 |
bedding material
|
110.6 |
CUYD |
85.00 |
9,401.00 |
130.00 |
14,378.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
146,000.00 |
146,000.00 |
148,000.00 |
148,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
85.00 |
340.00 |
100.00 |
400.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
85.00 |
340.00 |
100.00 |
400.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
9,000.00 |
9,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 804-01-B |
precast concrete piles (14")
|
840   |
LNFT |
65.00 |
54,600.00 |
68.00 |
57,120.00 |
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
1.00 |
1.00 |
1.00 |
1.00 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
54.97 |
CUYD |
1,600.00 |
87,952.00 |
1,875.00 |
103,068.75 |
|
|
|
|
| 805-10-A |
bridge superstructure & substructure (28' clr. rdwy;
90 deg. xing, precast only) |
4   |
SPAN |
26,000.00 |
104,000.00 |
45,000.00 |
180,000.00 |
|
|
|
|
| 805-12-W-01 |
reinforced concrete box culverts (10'x 9')
|
120.0 |
LNFT |
1,600.00 |
192,000.00 |
1,485.00 |
178,200.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
4,292   |
LB |
3.00 |
12,876.00 |
2.00 |
8,584.00 |
|
|
|
|
| S-101 |
concrete approach slabs (28' clr. rdwy; 90 deg. xing,
without asphalt) |
2   |
EACH |
6,000.00 |
12,000.00 |
15,000.00 |
30,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
877,829.50 |
|
1,132,854.75 |
|
|
|
|
|