| 201-01 |
clearing & grubbing
|
lump |
LUMP |
500,000.00 |
500,000.00 |
225,000.00 |
225,000.00 |
600,000.00 |
600,000.00 |
135,000.00 |
135,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
90,000.00 |
90,000.00 |
25,000.00 |
25,000.00 |
52,000.00 |
52,000.00 |
35,000.00 |
35,000.00 |
| 202-02-D |
removal of concrete walks & drives
|
1,243   |
SQYD |
6.00 |
7,458.00 |
8.00 |
9,944.00 |
10.00 |
12,430.00 |
3.00 |
3,729.00 |
| 202-02-F |
removal of combination curb & gutter
|
202.0 |
LNFT |
5.00 |
1,010.00 |
14.00 |
2,828.00 |
7.00 |
1,414.00 |
3.75 |
757.50 |
| 202-02-G |
removal of surfacing & stabilized base
|
7,394.7 |
SQYD |
1.10 |
8,134.17 |
7.00 |
51,762.90 |
3.40 |
25,141.98 |
5.00 |
36,973.50 |
| 202-02-01 |
removal of building (wood frame residence on piers;
lt.of sta.117+56; 25'x 40' |
1   |
EACH |
1,800.00 |
1,800.00 |
100.00 |
100.00 |
1.00 |
1.00 |
5,000.00 |
5,000.00 |
| 202-02-02 |
removal of building (wood frame shed on dirt; lt. of
sta. 118+00;10'x10') |
1   |
EACH |
150.00 |
150.00 |
100.00 |
100.00 |
1.00 |
1.00 |
600.00 |
600.00 |
| 202-02-03 |
removal of building (wood frame residence on piers;lt.
of sta.122+00; 35'x50') |
1   |
EACH |
3,000.00 |
3,000.00 |
100.00 |
100.00 |
1.00 |
1.00 |
5,000.00 |
5,000.00 |
| 202-02-04 |
removal of building (wood frame garage on dirt;lt. of
sta.122+25; 20'x 28') |
1   |
EACH |
800.00 |
800.00 |
100.00 |
100.00 |
1.00 |
1.00 |
1,500.00 |
1,500.00 |
| 202-02-05 |
removal of sign (rt. of sta. 52+50; 1'x2' metal drug
free zone sign) |
1   |
EACH |
50.00 |
50.00 |
50.00 |
50.00 |
1.00 |
1.00 |
50.00 |
50.00 |
| 202-02-06 |
removal of sign (rt. of sta. 52+50; 1'x 2' metal fire
arm free zone sign) |
1   |
EACH |
50.00 |
50.00 |
50.00 |
50.00 |
1.00 |
1.00 |
50.00 |
50.00 |
| 202-02-07 |
removal of sign (rt. of sta. 52+55; 8' x 10' on slab
foundation) |
1   |
EACH |
400.00 |
400.00 |
50.00 |
50.00 |
1.00 |
1.00 |
1,500.00 |
1,500.00 |
| 202-02-08 |
removal of sign (rt. of sta. 52+60; 1'x 2' metal no
parking sign) |
1   |
EACH |
50.00 |
50.00 |
50.00 |
50.00 |
1.00 |
1.00 |
50.00 |
50.00 |
| 202-02-09 |
removal of sign (lt. of sta. 141+60; 1' x 2' metal
sign) |
1   |
EACH |
50.00 |
50.00 |
50.00 |
50.00 |
1.00 |
1.00 |
50.00 |
50.00 |
| 203-01 |
general excavation
|
8,674   |
CUYD |
6.00 |
52,044.00 |
7.25 |
62,886.50 |
12.00 |
104,088.00 |
7.25 |
62,886.50 |
| 203-03 |
embankment
|
33,719   |
CUYD |
12.00 |
404,628.00 |
17.25 |
581,652.75 |
15.00 |
505,785.00 |
17.75 |
598,512.25 |
| 204-02 |
temporary hay or straw bales
|
200   |
EACH |
15.00 |
3,000.00 |
22.00 |
4,400.00 |
10.00 |
2,000.00 |
21.25 |
4,250.00 |
| 204-03 |
temporary slope drains
|
400   |
LNFT |
12.00 |
4,800.00 |
15.00 |
6,000.00 |
20.00 |
8,000.00 |
4.75 |
1,900.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
3   |
EACH |
170.00 |
510.00 |
400.00 |
1,200.00 |
150.00 |
450.00 |
176.50 |
529.50 |
| 204-05-B |
temporary sediment check dams (stone)
|
2   |
EACH |
315.00 |
630.00 |
650.00 |
1,300.00 |
800.00 |
1,600.00 |
1,265.00 |
2,530.00 |
| 204-06 |
temporary silt fencing
|
4,000   |
LNFT |
2.40 |
9,600.00 |
2.00 |
8,000.00 |
2.00 |
8,000.00 |
1.75 |
7,000.00 |
| 204-07 |
temporary stone construction entrance
|
2   |
EACH |
4,000.00 |
8,000.00 |
2,500.00 |
5,000.00 |
2,500.00 |
5,000.00 |
5,882.00 |
11,764.00 |
| 302-02-C |
class ii base course (8" thick)
|
18,327.7 |
SQYD |
20.00 |
366,554.00 |
20.00 |
366,554.00 |
22.00 |
403,209.40 |
33.00 |
604,814.10 |
| 302-02-D |
class ii base course (8 1/2" thick)
|
4,038.7 |
SQYD |
23.00 |
92,890.10 |
22.00 |
88,851.40 |
24.00 |
96,928.80 |
34.25 |
138,325.48 |
| 304-01 |
lime
|
259.80 |
TON |
165.00 |
42,867.00 |
100.00 |
25,980.00 |
150.00 |
38,970.00 |
200.00 |
51,960.00 |
| 304-04-D |
lime treatment (type d)(12" thick)
|
18,328   |
SQYD |
1.00 |
18,328.00 |
2.00 |
36,656.00 |
1.50 |
27,492.00 |
4.75 |
87,058.00 |
| 401-01 |
aggregate surface course(net section)
|
123.2 |
CUYD |
40.00 |
4,928.00 |
90.00 |
11,088.00 |
80.00 |
9,856.00 |
176.50 |
21,744.80 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
1,000.0 |
CUYD |
26.00 |
26,000.00 |
30.00 |
30,000.00 |
60.00 |
60,000.00 |
64.75 |
64,750.00 |
| 502-01 |
superpave asphaltic concrete
|
563.5 |
TON |
108.00 |
60,858.00 |
135.00 |
76,072.50 |
130.00 |
73,255.00 |
159.00 |
89,596.50 |
| 502-01-A |
superpave asphaltic concrete drives, turnouts and
miscellaneous |
94.5 |
TON |
136.00 |
12,852.00 |
300.00 |
28,350.00 |
250.00 |
23,625.00 |
235.50 |
22,254.75 |
| 601-01-K |
portland cement concrete pavement (10" thick)
|
14,797.0 |
SQYD |
63.00 |
932,211.00 |
65.00 |
961,805.00 |
60.00 |
887,820.00 |
64.00 |
947,008.00 |
| 601-02-K |
portland cement concrete pavement (10" thick)
(crossovers & turnouts) |
2,770.3 |
SQYD |
75.00 |
207,772.50 |
95.00 |
263,178.50 |
70.00 |
193,921.00 |
90.50 |
250,712.15 |
| 601-04 |
portland cement concrete pavement coring
|
30   |
EACH |
90.00 |
2,700.00 |
130.00 |
3,900.00 |
100.00 |
3,000.00 |
77.25 |
2,317.50 |
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
48   |
LNFT |
117.00 |
5,616.00 |
200.00 |
9,600.00 |
110.00 |
5,280.00 |
147.25 |
7,068.00 |
| 701-01-K |
cross drain pipe (30" rcp/pcp)
|
49   |
LNFT |
144.00 |
7,056.00 |
225.00 |
11,025.00 |
130.00 |
6,370.00 |
194.25 |
9,518.25 |
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
4,257   |
LNFT |
42.00 |
178,794.00 |
62.00 |
263,934.00 |
49.00 |
208,593.00 |
80.00 |
340,560.00 |
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
1,619   |
LNFT |
47.00 |
76,093.00 |
72.00 |
116,568.00 |
55.00 |
89,045.00 |
86.00 |
139,234.00 |
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
127   |
LNFT |
67.00 |
8,509.00 |
88.00 |
11,176.00 |
80.00 |
10,160.00 |
100.00 |
12,700.00 |
| 701-03-K |
storm drain pipe (30" rcp/pcp)
|
153   |
LNFT |
82.00 |
12,546.00 |
125.00 |
19,125.00 |
95.00 |
14,535.00 |
129.50 |
19,813.50 |
| 701-03-M-01 |
storm drain pipe (36" pcp)(outfall)
|
10   |
LNFT |
120.00 |
1,200.00 |
250.00 |
2,500.00 |
200.00 |
2,000.00 |
206.00 |
2,060.00 |
| 702-03-A |
catch basins (cb-01)
|
23   |
EACH |
2,430.00 |
55,890.00 |
2,800.00 |
64,400.00 |
2,500.00 |
57,500.00 |
3,883.00 |
89,309.00 |
| 702-03-B |
catch basins (cb-02)
|
1   |
EACH |
5,540.00 |
5,540.00 |
3,000.00 |
3,000.00 |
3,800.00 |
3,800.00 |
6,471.00 |
6,471.00 |
| 702-03-C |
catch basins (cb-06)
|
33   |
EACH |
4,800.00 |
158,400.00 |
4,000.00 |
132,000.00 |
4,000.00 |
132,000.00 |
6,471.00 |
213,543.00 |
| 702-03-D |
catch basins (cb-07)
|
11   |
EACH |
5,200.00 |
57,200.00 |
5,500.00 |
60,500.00 |
4,500.00 |
49,500.00 |
7,647.00 |
84,117.00 |
| 702-03-F |
catch basins (cb-08)
|
11   |
EACH |
9,660.00 |
106,260.00 |
8,500.00 |
93,500.00 |
6,000.00 |
66,000.00 |
9,176.00 |
100,936.00 |
| 702-03-G |
catch basins (cb-09)
|
1   |
EACH |
4,960.00 |
4,960.00 |
8,600.00 |
8,600.00 |
4,000.00 |
4,000.00 |
7,294.00 |
7,294.00 |
| 705-01 |
barbed wire fence
|
165   |
LNFT |
8.75 |
1,443.75 |
8.00 |
1,320.00 |
9.00 |
1,485.00 |
7.25 |
1,196.25 |
| 705-06-A |
chain link fence (4-foot height)
|
1,448   |
LNFT |
24.00 |
34,752.00 |
21.00 |
30,408.00 |
24.00 |
34,752.00 |
21.25 |
30,770.00 |
| 705-06-B |
chain link fence (5-foot height)
|
90   |
LNFT |
26.00 |
2,340.00 |
25.00 |
2,250.00 |
26.00 |
2,340.00 |
23.75 |
2,137.50 |
| 705-06-C |
chain link fence (6-foot height)
|
487   |
LNFT |
32.00 |
15,584.00 |
30.00 |
14,610.00 |
32.00 |
15,584.00 |
28.25 |
13,757.75 |
| 705-06-D |
chain link fence (7-foot height)
|
652   |
LNFT |
73.00 |
47,596.00 |
32.00 |
20,864.00 |
70.00 |
45,640.00 |
33.00 |
21,516.00 |
| 705-07-A |
4-foot single gates for chain link fence (4-foot
height) |
1   |
EACH |
950.00 |
950.00 |
800.00 |
800.00 |
1,000.00 |
1,000.00 |
588.25 |
588.25 |
| 705-08-A |
8-foot double gates for chain link fence (4-foot
height) |
2   |
DBGT |
1,450.00 |
2,900.00 |
1,000.00 |
2,000.00 |
1,500.00 |
3,000.00 |
941.25 |
1,882.50 |
| 705-09-A |
rebuilt fence (wooden 5-foot height)
|
311   |
LNFT |
20.00 |
6,220.00 |
35.00 |
10,885.00 |
20.00 |
6,220.00 |
29.50 |
9,174.50 |
| 705-09-B |
rebuilt fence (pipe 2-foot height)
|
219   |
LNFT |
15.00 |
3,285.00 |
58.00 |
12,702.00 |
15.00 |
3,285.00 |
59.00 |
12,921.00 |
| 706-01-A |
concrete walk (4" thick)
|
4,237.6 |
SQYD |
41.00 |
173,741.60 |
45.00 |
190,692.00 |
40.00 |
169,504.00 |
37.00 |
156,791.20 |
| 706-02-C |
concrete drive (6" thick)
|
1,714.7 |
SQYD |
45.00 |
77,161.50 |
70.00 |
120,029.00 |
50.00 |
85,735.00 |
54.00 |
92,593.80 |
| 706-04 |
handicapped curb ramps
|
12.0 |
EACH |
675.00 |
8,100.00 |
800.00 |
9,600.00 |
1,000.00 |
12,000.00 |
965.50 |
11,586.00 |
| 707-01 |
concrete curb
|
6,697.3 |
LNFT |
1.00 |
6,697.30 |
6.25 |
41,858.13 |
6.00 |
40,183.80 |
8.50 |
56,927.05 |
| 708-01 |
right-of-way monument
|
62   |
EACH |
204.55 |
12,682.35 |
350.00 |
21,700.00 |
200.00 |
12,400.00 |
223.75 |
13,872.50 |
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
645   |
SQYD |
70.00 |
45,150.00 |
72.00 |
46,440.00 |
65.00 |
41,925.00 |
79.50 |
51,277.50 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
30,000.00 |
30,000.00 |
180,000.00 |
180,000.00 |
150,000.00 |
150,000.00 |
16,000.00 |
16,000.00 |
| 713-02-A |
temporary pavement markings (4" width)
|
21,100   |
LNFT |
0.25 |
5,275.00 |
0.25 |
5,275.00 |
0.25 |
5,275.00 |
0.30 |
6,330.00 |
| 716-01-A |
mulch (vegetative)
|
14.00 |
TON |
490.00 |
6,860.00 |
500.00 |
7,000.00 |
500.00 |
7,000.00 |
530.00 |
7,420.00 |
| 717-01 |
seeding
|
140   |
LB |
7.00 |
980.00 |
10.00 |
1,400.00 |
7.00 |
980.00 |
10.00 |
1,400.00 |
| 718-01 |
fertilizer
|
1,050   |
LB |
0.80 |
840.00 |
0.80 |
840.00 |
0.80 |
840.00 |
0.40 |
420.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
15,000.00 |
15,000.00 |
35,000.00 |
35,000.00 |
10,000.00 |
10,000.00 |
13,500.00 |
13,500.00 |
| 726-01 |
bedding material
|
300.0 |
CUYD |
74.90 |
22,472.82 |
120.00 |
36,000.00 |
70.00 |
21,000.00 |
105.00 |
31,500.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
720,000.00 |
720,000.00 |
820,000.00 |
820,000.00 |
890,000.00 |
890,000.00 |
800,000.00 |
800,000.00 |
| 729-01 |
sign (type a)
|
12.5 |
SQFT |
40.00 |
500.00 |
45.00 |
562.50 |
80.00 |
1,000.00 |
47.25 |
590.63 |
| 729-16-C |
object marker assembly (type 3)
|
2   |
EACH |
75.00 |
150.00 |
95.00 |
190.00 |
100.00 |
200.00 |
88.25 |
176.50 |
| 729-19-B |
dead end road installations(type b)(turn installations)
|
2   |
EACH |
2,200.00 |
4,400.00 |
3,500.00 |
7,000.00 |
2,500.00 |
5,000.00 |
2,600.00 |
5,200.00 |
| 731-02 |
reflectorized raised pavement markers
|
375   |
EACH |
5.00 |
1,875.00 |
5.80 |
2,175.00 |
5.00 |
1,875.00 |
6.00 |
2,250.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
1,261   |
LNFT |
1.00 |
1,261.00 |
1.25 |
1,576.25 |
1.00 |
1,261.00 |
1.25 |
1,576.25 |
| 732-01-D |
plastic pavement striping (12" width)
|
363   |
LNFT |
1.50 |
544.50 |
2.20 |
798.60 |
1.50 |
544.50 |
2.00 |
726.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
191   |
LNFT |
3.00 |
573.00 |
4.50 |
859.50 |
3.00 |
573.00 |
3.75 |
716.25 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
3.341 |
MILE |
2,700.00 |
9,020.70 |
3,500.00 |
11,693.50 |
2,700.00 |
9,020.70 |
3,177.00 |
10,614.36 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.270 |
MILE |
800.00 |
1,016.00 |
960.00 |
1,219.20 |
800.00 |
1,016.00 |
941.25 |
1,195.39 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
25   |
EACH |
200.00 |
5,000.00 |
230.00 |
5,750.00 |
200.00 |
5,000.00 |
235.50 |
5,887.50 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
5   |
EACH |
200.00 |
1,000.00 |
240.00 |
1,200.00 |
200.00 |
1,000.00 |
235.50 |
1,177.50 |
| 735-01 |
mailboxes
|
32   |
EACH |
1.00 |
32.00 |
5.00 |
160.00 |
1.00 |
32.00 |
1.25 |
40.00 |
| 735-02 |
mailbox supports (single)
|
32   |
EACH |
110.00 |
3,520.00 |
130.00 |
4,160.00 |
150.00 |
4,800.00 |
129.50 |
4,144.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
90,000.00 |
90,000.00 |
165,000.00 |
165,000.00 |
250,000.00 |
250,000.00 |
105,522.00 |
105,522.00 |
| 805-01-F |
class a concrete (bents)
|
533.08 |
CUYD |
560.00 |
298,524.80 |
900.00 |
479,772.00 |
660.00 |
351,832.80 |
950.00 |
506,426.00 |
| 805-03 |
class aa concrete
|
1,032.60 |
CUYD |
570.00 |
588,582.00 |
680.00 |
702,168.00 |
650.00 |
671,190.00 |
800.00 |
826,080.00 |
| 805-08-C |
precast-prestressed concrete girders (type iii)
|
4,021.3 |
LNFT |
160.00 |
643,408.00 |
90.00 |
361,917.00 |
90.00 |
361,917.00 |
99.50 |
400,119.35 |
| 805-11 |
strip seal joints
|
224.00 |
LNFT |
190.00 |
42,560.00 |
145.00 |
32,480.00 |
160.00 |
35,840.00 |
147.25 |
32,984.00 |
| 806-01 |
deformed reinforcing steel
|
404,578   |
LB |
0.80 |
323,662.40 |
0.60 |
242,746.80 |
1.10 |
445,035.80 |
0.90 |
364,120.20 |
| 807-08 |
structural metalwork
|
lump |
LUMP |
6,000.00 |
6,000.00 |
15,000.00 |
15,000.00 |
6,000.00 |
6,000.00 |
5,200.00 |
5,200.00 |
| 810-05 |
pipe & concrete railing
|
1,350.00 |
LNFT |
200.00 |
270,000.00 |
130.00 |
175,500.00 |
200.00 |
270,000.00 |
199.00 |
268,650.00 |
| 813-01 |
concrete approach slabs
|
480.00 |
SQYD |
220.00 |
105,600.00 |
250.00 |
120,000.00 |
240.00 |
115,200.00 |
235.50 |
113,040.00 |
| 814-01-B |
drilled shaft (24")
|
172.0 |
LNFT |
100.00 |
17,200.00 |
155.00 |
26,660.00 |
135.00 |
23,220.00 |
110.00 |
18,920.00 |
| 814-01-M |
drilled shaft (42")
|
1,216.0 |
LNFT |
300.00 |
364,800.00 |
300.00 |
364,800.00 |
360.00 |
437,760.00 |
300.00 |
364,800.00 |
| 814-02-M |
trial shaft (42")
|
61.0 |
LNFT |
380.00 |
23,180.00 |
800.00 |
48,800.00 |
400.00 |
24,400.00 |
300.00 |
18,300.00 |
| 814-04-M |
crosshole sonic logging (42")
|
22   |
EACH |
3,000.00 |
66,000.00 |
2,000.00 |
44,000.00 |
2,000.00 |
44,000.00 |
2,941.00 |
64,702.00 |
| S-001 |
1-1/2" h.d.p.e. dr11 sewer force main (p.e. 3408)(with
14 gauge locator wire) |
413   |
LNFT |
5.80 |
2,395.40 |
11.50 |
4,749.50 |
5.00 |
2,065.00 |
7.00 |
2,891.00 |
| S-002 |
2" h.d.p.e. dr11 sewer force main (p.e. 3408)(with
14 gauge locator wire) |
3,104   |
LNFT |
7.50 |
23,280.00 |
11.50 |
35,696.00 |
8.00 |
24,832.00 |
9.00 |
27,936.00 |
| S-003 |
3" h.d.p.e. dr11 sewer force main (p.e. 3408)(with
14 gauge locator wire) |
999   |
LNFT |
10.55 |
10,539.45 |
12.50 |
12,487.50 |
11.00 |
10,989.00 |
12.50 |
12,487.50 |
| S-004 |
sewage combination air/vacuum release valve assembly
|
1   |
EACH |
5,580.00 |
5,580.00 |
5,200.00 |
5,200.00 |
3,000.00 |
3,000.00 |
6,565.00 |
6,565.00 |
| S-005 |
2" flushing assembly (dead end)
|
1   |
EACH |
1,460.00 |
1,460.00 |
1,800.00 |
1,800.00 |
1,200.00 |
1,200.00 |
1,718.00 |
1,718.00 |
| S-006 |
3" flushing assembly (dead end)
|
1   |
EACH |
1,610.00 |
1,610.00 |
2,000.00 |
2,000.00 |
1,500.00 |
1,500.00 |
1,894.00 |
1,894.00 |
| S-007 |
2"x 2"x 2" h.d.p.e. dr11 tee
|
1   |
EACH |
120.00 |
120.00 |
57.00 |
57.00 |
300.00 |
300.00 |
141.25 |
141.25 |
| S-008 |
3"x 2" h.d.p.e. dr11 reducer
|
1   |
EACH |
120.00 |
120.00 |
50.00 |
50.00 |
200.00 |
200.00 |
141.25 |
141.25 |
| S-009 |
1 1/2" lateral connection assembly
|
8   |
EACH |
565.00 |
4,520.00 |
750.00 |
6,000.00 |
600.00 |
4,800.00 |
664.75 |
5,318.00 |
| S-010 |
2" h.d.p.e. dr11 sewer force main connection to
existing city of pineville sewer manhole |
1   |
EACH |
3,110.00 |
3,110.00 |
2,000.00 |
2,000.00 |
1,200.00 |
1,200.00 |
3,659.00 |
3,659.00 |
| S-011 |
p.e. sewer force main testing
|
lump |
LUMP |
5,250.00 |
5,250.00 |
5,000.00 |
5,000.00 |
500.00 |
500.00 |
6,177.00 |
6,177.00 |
| S-012 |
warning signs
|
14   |
each |
56.50 |
791.00 |
75.00 |
1,050.00 |
300.00 |
4,200.00 |
66.50 |
931.00 |
| S-013 |
furnish and install by bore and jack 6" x 0.25" w.t.
steel casing under r/r (incl insulators,casing spcrs,endseal,etc.) |
275   |
LNFT |
57.65 |
15,853.75 |
120.00 |
33,000.00 |
90.00 |
24,750.00 |
68.00 |
18,700.00 |
| S-014 |
simplex residential sewer grinder pumping unit
(simplex pre-packaged pump unit complete) |
8   |
EACH |
13,000.00 |
104,000.00 |
10,000.00 |
80,000.00 |
15,000.00 |
120,000.00 |
15,294.00 |
122,352.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
7,829,259.09 |
|
8,290,939.03 |
|
8,620,180.78 |
|
8,915,428.01 |
|