Letting of 5/20/2009 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 023-06-0066
Parish: JACKSON
Routes: US 167
Description: QUITMAN TO ONE MILE SOUTH OF LINCOLN PARISH LINE
Type Const: grading, cold planing asphaltic concrete, pavement patching, superpave asphaltic
concrete pavement, and related work.
Estimated Construction Cost: $4,218,004.47
 
RankLicenseBidderConstruction Bid
1 05789 D & J CONSTRUCTION CO., INC. $2,997,651.66
2 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $3,069,780.84
3 12312 GILCHRIST CONSTRUCTION CO. LLC $3,655,072.63
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 1.00 1.00 1.00 1.00 5,000.00 5,000.00    
202-02-H removal of guard rail 3,832      LNFT 6.00 22,992.00 5.00 19,160.00 11.00 42,152.00    
203-01 general excavation 97      CUYD 28.00 2,716.00 30.00 2,910.00 15.00 1,455.00    
203-04-A nonplastic embankment (stone only) 97      CUYD 118.00 11,446.00 118.00 11,446.00 120.00 11,640.00    
203-07 borrow (vehicular measurement) 3,011      CUYD 17.00 51,187.00 11.00 33,121.00 16.00 48,176.00    
203-08 geotextile fabric 100      SQYD 10.00 1,000.00 11.00 1,100.00 5.00 500.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
232      CUYD 36.00 8,352.00 24.00 5,568.00 40.00 9,280.00    
502-01 superpave asphaltic concrete 22,598.3    TON 72.00 1,627,077.60 70.00 1,581,881.00 85.00 1,920,855.50    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
864.1    TON 104.00 89,866.40 130.00 112,333.00 220.00 190,102.00    
507-01-A asphaltic material (crs-2p emulsion) 58,070      GAL 3.10 180,017.00 3.15 182,920.50 3.00 174,210.00    
507-02-B aggregate (s2) 85,396      SQYD 0.80 68,316.80 0.85 72,586.60 0.90 76,856.40    
507-02-C aggregate (s3) 85,396      SQYD 0.66 56,361.36 0.70 59,777.20 0.90 76,856.40    
509-01 cold planing asphaltic pavement 92,024      SQYD 1.30 119,631.20 1.65 151,839.60 0.75 69,018.00    
509-02 contractor retained reclaimed asphaltic pavement - 3,834      CUYD 0.01 - 38.34 0.10 - 383.40 1.00 - 3,834.00    
510-01-C pavement patching (18" minimum thickness) 515      SQYD 110.00 56,650.00 88.00 45,320.00 128.00 65,920.00    
510-01-D pavement patching (24" minimum thickness) 1,858      SQYD 125.00 232,250.00 110.00 204,380.00 152.00 282,416.00    
510-03 pavement joint repair 814.3    TON 104.00 84,687.20 135.00 109,930.50 165.00 134,359.50    
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 250.0    LNFT 55.00 13,750.00 55.00 13,750.00 58.00 14,500.00    
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 720.0    LNFT 30.00 21,600.00 30.00 21,600.00 30.00 21,600.00    
704-03 blocked out guard rail 2,994.0    LNFT 18.50 55,389.00 18.50 55,389.00 20.00 59,880.00    
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
18.9    LNFT 85.00 1,606.50 85.00 1,606.50 94.00 1,776.60    
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 55.00 11,000.00 55.00 11,000.00 60.00 12,000.00    
704-11-A guard rail end treatment (flared) 13      EACH 1,900.00 24,700.00 2,000.00 26,000.00 2,000.00 26,000.00    
713-01 temporary signs & barricades lump      LUMP 48,000.00 48,000.00 45,000.00 45,000.00 50,000.00 50,000.00    
713-02-C temporary pavement markings (8" width) 1,676      LNFT 0.15 251.40 0.20 335.20 0.35 586.60    
713-02-D temporary pavement markings (12" width) 3,948      LNFT 0.25 987.00 0.30 1,184.40 0.70 2,763.60    
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
18.177  MILE 225.00 4,089.83 140.00 2,544.78 295.00 5,362.22    
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
24.236  MILE 1.00 24.24 1.00 24.24 300.00 7,270.80    
713-04-A temporary pavement markings (solid line)(4" width) 48.472  MILE 1.00 48.47 1.00 48.47 150.00 7,270.80    
713-06-A temporary reflectorized raised pavement markers (tabs) 1,600      EACH 1.75 2,800.00 1.00 1,600.00 1.65 2,640.00    
716-01-A mulch (vegetative) 23.5    TON 400.00 9,400.00 400.00 9,400.00 425.00 9,987.50    
717-01 seeding 705      LB 8.00 5,640.00 8.25 5,816.25 8.25 5,816.25    
718-01 fertilizer 11,750      LB 0.45 5,287.50 0.50 5,875.00 0.50 5,875.00    
727-01 mobilization lump      LUMP 40,000.00 40,000.00 125,000.00 125,000.00 140,000.00 140,000.00    
729-16-C object marker assembly (type 3) 24      EACH 75.00 1,800.00 75.00 1,800.00 82.00 1,968.00    
731-02 reflectorized raised pavement markers 1,608      EACH 5.00 8,040.00 4.75 7,638.00 5.50 8,844.00    
732-01-C plastic pavement striping (8" width) 419      LNFT 5.00 2,095.00 1.00 419.00 1.30 544.70    
732-01-D plastic pavement striping (12" width) 987      LNFT 6.00 5,922.00 1.50 1,480.50 2.50 2,467.50    
732-02-A plastic pavement striping (solid line) (4" width) 12.118  MILE 2,700.00 32,718.60 2,500.00 30,295.00 2,600.00 31,506.80    
732-03-A plastic pavement striping (broken line)(4" width) 6.059  MILE 1,200.00 7,270.80 850.00 5,150.15 850.00 5,150.15    
732-04-A plastic pavement legends & symbols (arrow) 4      EACH 300.00 1,200.00 210.00 840.00 225.00 900.00    
732-04-C plastic pavement legends & symbols (only) 2      EACH 600.00 1,200.00 210.00 420.00 260.00 520.00    
735-01 mailboxes 7      EACH 10.00 70.00 1.00 7.00 100.00 700.00    
735-02 mailbox supports (single) 7      EACH 125.00 875.00 205.00 1,435.00 220.00 1,540.00    
740-01 construction layout lump      LUMP 6,700.00 6,700.00 12,000.00 12,000.00 10,000.00 10,000.00    
S-001 rumble strips (ground-in) 12.1    MILE 900.00 10,890.00 850.00 10,285.00 650.00 7,865.00    
S-002 tree trimming lump      LUMP 25,000.00 25,000.00 40,000.00 40,000.00 15,000.00 15,000.00    
S-003 sawing and sealing longitudinal joints in asphaltic
concrete overlay
5,959      LNFT 1.50 8,938.50 1.55 9,236.45 1.79 10,666.61    
S-004 sawing and sealing transverse joints in asphaltic
concrete overlay
3,141      LNFT 1.50 4,711.50 1.55 4,868.55 1.90 5,967.90    
S-005 sawcuts in asphaltic concrete lifts 9,100      LNFT 1.25 11,375.00 0.95 8,645.00 1.00 9,100.00    
S-006 saw cutting asphaltic concrete pavements 16,272      INFT 0.20 3,254.40 0.15 2,440.80 0.80 13,017.60    
S-007 saw cutting asphaltic concrete pavement over portland
cement concrete composite pavement
85,037      INFT 0.10 8,503.70 0.15 12,755.55 0.60 51,022.20    
                       
 CONTRACTOR TOTAL       2,997,651.66   3,069,780.84   3,655,072.63    