| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
1.00 |
1.00 |
1.00 |
1.00 |
5,000.00 |
5,000.00 |
|
|
| 202-02-H |
removal of guard rail
|
3,832   |
LNFT |
6.00 |
22,992.00 |
5.00 |
19,160.00 |
11.00 |
42,152.00 |
|
|
| 203-01 |
general excavation
|
97   |
CUYD |
28.00 |
2,716.00 |
30.00 |
2,910.00 |
15.00 |
1,455.00 |
|
|
| 203-04-A |
nonplastic embankment (stone only)
|
97   |
CUYD |
118.00 |
11,446.00 |
118.00 |
11,446.00 |
120.00 |
11,640.00 |
|
|
| 203-07 |
borrow (vehicular measurement)
|
3,011   |
CUYD |
17.00 |
51,187.00 |
11.00 |
33,121.00 |
16.00 |
48,176.00 |
|
|
| 203-08 |
geotextile fabric
|
100   |
SQYD |
10.00 |
1,000.00 |
11.00 |
1,100.00 |
5.00 |
500.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
232   |
CUYD |
36.00 |
8,352.00 |
24.00 |
5,568.00 |
40.00 |
9,280.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
22,598.3 |
TON |
72.00 |
1,627,077.60 |
70.00 |
1,581,881.00 |
85.00 |
1,920,855.50 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
864.1 |
TON |
104.00 |
89,866.40 |
130.00 |
112,333.00 |
220.00 |
190,102.00 |
|
|
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
58,070   |
GAL |
3.10 |
180,017.00 |
3.15 |
182,920.50 |
3.00 |
174,210.00 |
|
|
| 507-02-B |
aggregate (s2)
|
85,396   |
SQYD |
0.80 |
68,316.80 |
0.85 |
72,586.60 |
0.90 |
76,856.40 |
|
|
| 507-02-C |
aggregate (s3)
|
85,396   |
SQYD |
0.66 |
56,361.36 |
0.70 |
59,777.20 |
0.90 |
76,856.40 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
92,024   |
SQYD |
1.30 |
119,631.20 |
1.65 |
151,839.60 |
0.75 |
69,018.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 3,834   |
CUYD |
0.01 |
- 38.34 |
0.10 |
- 383.40 |
1.00 |
- 3,834.00 |
|
|
| 510-01-C |
pavement patching (18" minimum thickness)
|
515   |
SQYD |
110.00 |
56,650.00 |
88.00 |
45,320.00 |
128.00 |
65,920.00 |
|
|
| 510-01-D |
pavement patching (24" minimum thickness)
|
1,858   |
SQYD |
125.00 |
232,250.00 |
110.00 |
204,380.00 |
152.00 |
282,416.00 |
|
|
| 510-03 |
pavement joint repair
|
814.3 |
TON |
104.00 |
84,687.20 |
135.00 |
109,930.50 |
165.00 |
134,359.50 |
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
250.0 |
LNFT |
55.00 |
13,750.00 |
55.00 |
13,750.00 |
58.00 |
14,500.00 |
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
720.0 |
LNFT |
30.00 |
21,600.00 |
30.00 |
21,600.00 |
30.00 |
21,600.00 |
|
|
| 704-03 |
blocked out guard rail
|
2,994.0 |
LNFT |
18.50 |
55,389.00 |
18.50 |
55,389.00 |
20.00 |
59,880.00 |
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
18.9 |
LNFT |
85.00 |
1,606.50 |
85.00 |
1,606.50 |
94.00 |
1,776.60 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
55.00 |
11,000.00 |
55.00 |
11,000.00 |
60.00 |
12,000.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
13   |
EACH |
1,900.00 |
24,700.00 |
2,000.00 |
26,000.00 |
2,000.00 |
26,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
48,000.00 |
48,000.00 |
45,000.00 |
45,000.00 |
50,000.00 |
50,000.00 |
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
1,676   |
LNFT |
0.15 |
251.40 |
0.20 |
335.20 |
0.35 |
586.60 |
|
|
| 713-02-D |
temporary pavement markings (12" width)
|
3,948   |
LNFT |
0.25 |
987.00 |
0.30 |
1,184.40 |
0.70 |
2,763.60 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
18.177 |
MILE |
225.00 |
4,089.83 |
140.00 |
2,544.78 |
295.00 |
5,362.22 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
24.236 |
MILE |
1.00 |
24.24 |
1.00 |
24.24 |
300.00 |
7,270.80 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
48.472 |
MILE |
1.00 |
48.47 |
1.00 |
48.47 |
150.00 |
7,270.80 |
|
|
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
1,600   |
EACH |
1.75 |
2,800.00 |
1.00 |
1,600.00 |
1.65 |
2,640.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
23.5 |
TON |
400.00 |
9,400.00 |
400.00 |
9,400.00 |
425.00 |
9,987.50 |
|
|
| 717-01 |
seeding
|
705   |
LB |
8.00 |
5,640.00 |
8.25 |
5,816.25 |
8.25 |
5,816.25 |
|
|
| 718-01 |
fertilizer
|
11,750   |
LB |
0.45 |
5,287.50 |
0.50 |
5,875.00 |
0.50 |
5,875.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
40,000.00 |
40,000.00 |
125,000.00 |
125,000.00 |
140,000.00 |
140,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
24   |
EACH |
75.00 |
1,800.00 |
75.00 |
1,800.00 |
82.00 |
1,968.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,608   |
EACH |
5.00 |
8,040.00 |
4.75 |
7,638.00 |
5.50 |
8,844.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
419   |
LNFT |
5.00 |
2,095.00 |
1.00 |
419.00 |
1.30 |
544.70 |
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
987   |
LNFT |
6.00 |
5,922.00 |
1.50 |
1,480.50 |
2.50 |
2,467.50 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
12.118 |
MILE |
2,700.00 |
32,718.60 |
2,500.00 |
30,295.00 |
2,600.00 |
31,506.80 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
6.059 |
MILE |
1,200.00 |
7,270.80 |
850.00 |
5,150.15 |
850.00 |
5,150.15 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
4   |
EACH |
300.00 |
1,200.00 |
210.00 |
840.00 |
225.00 |
900.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
EACH |
600.00 |
1,200.00 |
210.00 |
420.00 |
260.00 |
520.00 |
|
|
| 735-01 |
mailboxes
|
7   |
EACH |
10.00 |
70.00 |
1.00 |
7.00 |
100.00 |
700.00 |
|
|
| 735-02 |
mailbox supports (single)
|
7   |
EACH |
125.00 |
875.00 |
205.00 |
1,435.00 |
220.00 |
1,540.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
6,700.00 |
6,700.00 |
12,000.00 |
12,000.00 |
10,000.00 |
10,000.00 |
|
|
| S-001 |
rumble strips (ground-in)
|
12.1 |
MILE |
900.00 |
10,890.00 |
850.00 |
10,285.00 |
650.00 |
7,865.00 |
|
|
| S-002 |
tree trimming
|
lump |
LUMP |
25,000.00 |
25,000.00 |
40,000.00 |
40,000.00 |
15,000.00 |
15,000.00 |
|
|
| S-003 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
5,959   |
LNFT |
1.50 |
8,938.50 |
1.55 |
9,236.45 |
1.79 |
10,666.61 |
|
|
| S-004 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
3,141   |
LNFT |
1.50 |
4,711.50 |
1.55 |
4,868.55 |
1.90 |
5,967.90 |
|
|
| S-005 |
sawcuts in asphaltic concrete lifts
|
9,100   |
LNFT |
1.25 |
11,375.00 |
0.95 |
8,645.00 |
1.00 |
9,100.00 |
|
|
| S-006 |
saw cutting asphaltic concrete pavements
|
16,272   |
INFT |
0.20 |
3,254.40 |
0.15 |
2,440.80 |
0.80 |
13,017.60 |
|
|
| S-007 |
saw cutting asphaltic concrete pavement over portland
cement concrete composite pavement |
85,037   |
INFT |
0.10 |
8,503.70 |
0.15 |
12,755.55 |
0.60 |
51,022.20 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,997,651.66 |
|
3,069,780.84 |
|
3,655,072.63 |
|
|
|