| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
30   |
SQYD |
150.00 |
4,500.00 |
40.00 |
1,200.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
30   |
EACH |
2.00 |
60.00 |
10.00 |
300.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
300   |
LNFT |
2.00 |
600.00 |
3.00 |
900.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
13,901.0 |
TON |
92.00 |
1,278,892.00 |
100.00 |
1,390,100.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,223.9 |
TON |
120.00 |
146,868.00 |
100.00 |
122,390.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
93,891   |
SQYD |
1.50 |
140,836.50 |
3.50 |
328,618.50 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
5,565   |
SQYD |
120.00 |
667,800.00 |
150.00 |
834,750.00 |
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
36,000   |
LNFT |
1.50 |
54,000.00 |
1.50 |
54,000.00 |
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
21,930   |
LNFT |
1.75 |
38,377.50 |
1.80 |
39,474.00 |
|
|
|
|
| 602-03 |
cleaning and sealing cracks
|
10,000   |
LNFT |
3.50 |
35,000.00 |
4.00 |
40,000.00 |
|
|
|
|
| 701-03-F |
storm drain pipe (15" rcp)
|
269   |
LNFT |
100.00 |
26,900.00 |
140.00 |
37,660.00 |
|
|
|
|
| 701-03-G |
storm drain pipe (18" rcp)
|
84   |
LNFT |
100.00 |
8,400.00 |
155.00 |
13,020.00 |
|
|
|
|
| 701-03-I |
storm drain pipe (24" rcp)
|
114   |
LNFT |
110.00 |
12,540.00 |
200.00 |
22,800.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
30.0 |
SQYD |
65.00 |
1,950.00 |
140.00 |
4,200.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
300.0 |
SQYD |
58.00 |
17,400.00 |
95.00 |
28,500.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
450,000.00 |
450,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| 713-02-B |
temporary pavement markings (6" width)
|
6,800   |
LNFT |
0.26 |
1,768.00 |
0.30 |
2,040.00 |
|
|
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
575   |
LNFT |
0.36 |
207.00 |
0.40 |
230.00 |
|
|
|
|
| 713-02-D |
temporary pavement markings (12" width)
|
1,700   |
LNFT |
0.41 |
697.00 |
0.45 |
765.00 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
5.140 |
MILE |
280.00 |
1,439.20 |
300.00 |
1,542.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
9.430 |
MILE |
330.00 |
3,111.90 |
360.00 |
3,394.80 |
|
|
|
|
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
10   |
EACH |
76.00 |
760.00 |
80.00 |
800.00 |
|
|
|
|
| 713-05-C |
temporary pavement legends and symbols (only)
|
2   |
EACH |
76.00 |
152.00 |
80.00 |
160.00 |
|
|
|
|
| 713-05-E |
temporary pavement legends and symbols (school
crossing) |
2   |
EACH |
127.00 |
254.00 |
140.00 |
280.00 |
|
|
|
|
| 714-01 |
slab sodding
|
300   |
SQYD |
6.60 |
1,980.00 |
20.00 |
6,000.00 |
|
|
|
|
| 717-01 |
seeding
|
150   |
LB |
9.50 |
1,425.00 |
25.00 |
3,750.00 |
|
|
|
|
| 718-01 |
fertilizer
|
3,000   |
LB |
1.20 |
3,600.00 |
1.00 |
3,000.00 |
|
|
|
|
| 723-02 |
granular material (vehicular measurement)
|
900   |
CUYD |
46.00 |
41,400.00 |
30.00 |
27,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
580,000.00 |
580,000.00 |
600,000.00 |
600,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
760   |
EACH |
5.75 |
4,370.00 |
6.00 |
4,560.00 |
|
|
|
|
| 732-01-B |
plastic pavement striping (6" width)
|
6,800   |
LNFT |
0.80 |
5,440.00 |
0.80 |
5,440.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
575   |
LNFT |
1.10 |
632.50 |
1.00 |
575.00 |
|
|
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
1,700   |
LNFT |
2.10 |
3,570.00 |
2.00 |
3,400.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
10.880 |
MILE |
2,500.00 |
27,200.00 |
2,700.00 |
29,376.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.140 |
MILE |
820.00 |
4,214.80 |
880.00 |
4,523.20 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
5   |
EACH |
227.00 |
1,135.00 |
250.00 |
1,250.00 |
|
|
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
5   |
EACH |
280.00 |
1,400.00 |
300.00 |
1,500.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
EACH |
230.00 |
460.00 |
250.00 |
500.00 |
|
|
|
|
| 732-04-E |
plastic pavement legends & symbols (school crossing)
|
2   |
EACH |
505.00 |
1,010.00 |
550.00 |
1,100.00 |
|
|
|
|
| 732-04-F |
plastic pavement legends & symbols (handicap parking)
|
1   |
EACH |
525.00 |
525.00 |
550.00 |
550.00 |
|
|
|
|
| 736-09 |
loop detector
|
600   |
LNFT |
13.00 |
7,800.00 |
14.00 |
8,400.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
25,000.00 |
25,000.00 |
30,000.00 |
30,000.00 |
|
|
|
|
| 741-11 |
adjusting water valve and meter box
|
1   |
EACH |
800.00 |
800.00 |
700.00 |
700.00 |
|
|
|
|
| S-001 |
concrete walks (handicapped ramp - type a)
|
84   |
EACH |
2,100.00 |
176,400.00 |
1,900.00 |
159,600.00 |
|
|
|
|
| S-002 |
concrete walks (handicapped ramps -type b)
|
76   |
EACH |
2,100.00 |
159,600.00 |
1,900.00 |
144,400.00 |
|
|
|
|
| S-003 |
resetting existing stone curbs
|
2,200   |
LNFT |
145.00 |
319,000.00 |
85.00 |
187,000.00 |
|
|
|
|
| S-004 |
reconstruction of concrete curb and gutterbottom
(barrier curb) |
1,900   |
LNFT |
85.00 |
161,500.00 |
68.00 |
129,200.00 |
|
|
|
|
| S-006 |
drilled doweled barrier concrete curb
|
1,422   |
LNFT |
43.00 |
61,146.00 |
50.00 |
71,100.00 |
|
|
|
|
| S-006C |
drilled doweled mountable concrete curb
|
156   |
LNFT |
37.00 |
5,772.00 |
63.00 |
9,828.00 |
|
|
|
|
| S-007 |
doweled barrier concrete curb
|
2,467   |
LNFT |
37.00 |
91,279.00 |
33.00 |
81,411.00 |
|
|
|
|
| S-007B |
doweled mountable concrete curb
|
1,773   |
LNFT |
37.00 |
65,601.00 |
35.00 |
62,055.00 |
|
|
|
|
| S-008 |
concrete pavement repair (18.0 sq. yd. and under)
|
801.8 |
SQYD |
200.00 |
160,360.00 |
216.00 |
173,188.80 |
|
|
|
|
| S-009 |
concrete pavement repair (18.1 sq. yd. to 48.0 sq. yd.)
|
2,541.6 |
SQYD |
130.00 |
330,408.00 |
191.00 |
485,445.60 |
|
|
|
|
| S-010 |
concrete pavement repair (48.1 sq. yd. and over)
|
5,041.4 |
SQYD |
107.00 |
539,429.80 |
166.00 |
836,872.40 |
|
|
|
|
| S-011 |
tree protection
|
lump |
LUMP |
6,500.00 |
6,500.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| S-012 |
tree trimming
|
lump |
LUMP |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| S-013 |
root pruning
|
lump |
LUMP |
8,100.00 |
8,100.00 |
3,000.00 |
3,000.00 |
|
|
|
|
| S-014 |
hand formed and poured in-place concrete curb within
the limits of the tree dripline |
400   |
LNFT |
86.00 |
34,400.00 |
50.00 |
20,000.00 |
|
|
|
|
| S-015 |
gravel bed and filter cloth over tree roots
|
400   |
SQYD |
21.00 |
8,400.00 |
16.00 |
6,400.00 |
|
|
|
|
| S-016 |
catch basin frame and cover
|
6   |
EACH |
1,650.00 |
9,900.00 |
2,200.00 |
13,200.00 |
|
|
|
|
| S-017 |
inlet grate cover
|
1   |
EACH |
1,350.00 |
1,350.00 |
1,900.00 |
1,900.00 |
|
|
|
|
| S-018A |
catch basin adjustment type a
|
12   |
EACH |
850.00 |
10,200.00 |
1,000.00 |
12,000.00 |
|
|
|
|
| S-018B |
catch basin adjustment type b
|
15   |
EACH |
850.00 |
12,750.00 |
2,300.00 |
34,500.00 |
|
|
|
|
| S-018C |
catch basin gutter grate adjustment
|
5   |
EACH |
1,450.00 |
7,250.00 |
1,400.00 |
7,000.00 |
|
|
|
|
| S-018D |
rollover grate frame adjustment
|
1   |
EACH |
1,650.00 |
1,650.00 |
1,500.00 |
1,500.00 |
|
|
|
|
| S-018E |
drop inlet grate frame adjustment
|
1   |
EACH |
1,650.00 |
1,650.00 |
600.00 |
600.00 |
|
|
|
|
| S-019 |
manhole no.1
|
2   |
EACH |
6,500.00 |
13,000.00 |
4,000.00 |
8,000.00 |
|
|
|
|
| S-020 |
manhole cover
|
2   |
EACH |
850.00 |
1,700.00 |
300.00 |
600.00 |
|
|
|
|
| S-021 |
manhole frame and cover
|
1   |
EACH |
2,000.00 |
2,000.00 |
900.00 |
900.00 |
|
|
|
|
| S-022 |
manhole adjustment with rings
|
14   |
EACH |
110.00 |
1,540.00 |
400.00 |
5,600.00 |
|
|
|
|
| S-024 |
manhole adjustment
|
19   |
EACH |
875.00 |
16,625.00 |
1,400.00 |
26,600.00 |
|
|
|
|
| S-025 |
bus pad repair
|
176   |
SQYD |
200.00 |
35,200.00 |
250.00 |
44,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
5,862,186.20 |
|
6,259,649.30 |
|
|
|
|
|