| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BOH BROS. CONSTRUCTION CO., LLC. |
- 2 - BARRIERE CONSTRUCTION CO., LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
140   |
SQYD |
20.00 |
2,800.00 |
15.00 |
2,100.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,000   |
LNFT |
1.00 |
1,000.00 |
1.50 |
1,500.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
300.0 |
CUYD |
15.00 |
4,500.00 |
40.00 |
12,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
6,019.3 |
TON |
110.00 |
662,123.00 |
111.00 |
668,142.30 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
325.9 |
TON |
110.00 |
35,849.00 |
175.00 |
57,032.50 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
41,203   |
SQYD |
3.00 |
123,609.00 |
4.00 |
164,812.00 |
|
|
|
|
| 602-02 |
cleaning and resealing existing longitudinal and
transverse pavement joints |
200   |
LNFT |
15.00 |
3,000.00 |
11.00 |
2,200.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
140.0 |
SQYD |
100.00 |
14,000.00 |
100.00 |
14,000.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
50,000.00 |
50,000.00 |
300,000.00 |
300,000.00 |
|
|
|
|
| 713-02-D |
temporary pavement markings (12" width)
|
629   |
LNFT |
1.00 |
629.00 |
0.80 |
503.20 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
2.721 |
MILE |
400.00 |
1,088.40 |
370.00 |
1,006.77 |
|
|
|
|
| 714-01 |
slab sodding
|
40   |
SQYD |
15.00 |
600.00 |
7.00 |
280.00 |
|
|
|
|
| 717-01 |
seeding
|
200   |
LB |
15.00 |
3,000.00 |
10.00 |
2,000.00 |
|
|
|
|
| 718-01 |
fertilizer
|
200   |
LB |
1.00 |
200.00 |
1.00 |
200.00 |
|
|
|
|
| 723-01 |
granular material (net section)
|
400   |
CUYD |
35.00 |
14,000.00 |
50.00 |
20,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
250,000.00 |
250,000.00 |
304,000.00 |
304,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
370   |
EACH |
6.00 |
2,220.00 |
6.00 |
2,220.00 |
|
|
|
|
| 732-01-B |
plastic pavement striping (6" width)
|
7,401   |
LNFT |
1.00 |
7,401.00 |
0.85 |
6,290.85 |
|
|
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
629   |
LNFT |
3.00 |
1,887.00 |
1.75 |
1,100.75 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
2.710 |
MILE |
2,500.00 |
6,775.00 |
2,500.00 |
6,775.00 |
|
|
|
|
| 732-04-E |
plastic pavement legends & symbols (school crossing)
|
2   |
EACH |
500.00 |
1,000.00 |
550.00 |
1,100.00 |
|
|
|
|
| 736-09 |
loop detector
|
140   |
LNFT |
15.00 |
2,100.00 |
13.00 |
1,820.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
30,000.00 |
30,000.00 |
200,000.00 |
200,000.00 |
|
|
|
|
| S-001 |
concrete walks (handicapped ramp -type a)
|
52   |
EACH |
1,900.00 |
98,800.00 |
2,200.00 |
114,400.00 |
|
|
|
|
| S-002 |
concrete walks (handicapped ramp-type b)
|
94   |
EACH |
1,900.00 |
178,600.00 |
2,200.00 |
206,800.00 |
|
|
|
|
| S-004 |
reconstruction of concrete curb and gutterbottom
(barrier curb) |
269   |
LNFT |
60.00 |
16,140.00 |
110.00 |
29,590.00 |
|
|
|
|
| S-006 |
drilled doweled barrier concrete curb
|
100   |
LNFT |
90.00 |
9,000.00 |
42.00 |
4,200.00 |
|
|
|
|
| S-007 |
doweled barrier concrete curb
|
1,472   |
LNFT |
27.00 |
39,744.00 |
42.00 |
61,824.00 |
|
|
|
|
| S-008 |
concrete pavement repair (18.0 sq.yd. and under)
|
483.4 |
SQYD |
240.00 |
116,016.00 |
240.00 |
116,016.00 |
|
|
|
|
| S-009 |
concret pavement repair (18.1 sq.yd. to 48.0 sq.yd.)
|
1,692.2 |
SQYD |
210.00 |
355,362.00 |
155.00 |
262,291.00 |
|
|
|
|
| S-010 |
concret pavement repair (48.1 sq. yd. and over)
|
2,328.4 |
SQYD |
185.00 |
430,754.00 |
130.00 |
302,692.00 |
|
|
|
|
| S-011 |
tree protection
|
lump |
LUMP |
1,000.00 |
1,000.00 |
8,000.00 |
8,000.00 |
|
|
|
|
| S-012 |
tree triming
|
lump |
LUMP |
40,000.00 |
40,000.00 |
50,000.00 |
50,000.00 |
|
|
|
|
| S-013 |
root pruning
|
lump |
LUMP |
4,500.00 |
4,500.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| S-014 |
hand formed and poured in-place concrete curb within
the limits of the tree dripline |
45   |
LNFT |
90.00 |
4,050.00 |
90.00 |
4,050.00 |
|
|
|
|
| S-015 |
gravel bed and filter cloth over tree roots
|
12.5 |
SQYD |
16.00 |
200.00 |
20.00 |
250.00 |
|
|
|
|
| S-016 |
catch basin adjustment type a
|
4   |
EACH |
500.00 |
2,000.00 |
900.00 |
3,600.00 |
|
|
|
|
| S-017 |
manhole adjustment
|
2   |
EACH |
3,000.00 |
6,000.00 |
1,800.00 |
3,600.00 |
|
|
|
|
| S-018 |
manhole adjustment with rings
|
6   |
EACH |
300.00 |
1,800.00 |
120.00 |
720.00 |
|
|
|
|
| S-023 |
catch basin frame and cover
|
4   |
EACH |
1,500.00 |
6,000.00 |
1,600.00 |
6,400.00 |
|
|
|
|
| S-024 |
grate inlet frame and cover
|
5   |
EACH |
2,000.00 |
10,000.00 |
1,400.00 |
7,000.00 |
|
|
|
|
| S-025 |
resetting existing stone curb
|
951   |
LNFT |
84.00 |
79,884.00 |
150.00 |
142,650.00 |
|
|
|
|
| S-026 |
resetting tile street names
|
13   |
EACH |
1,100.00 |
14,300.00 |
500.00 |
6,500.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,631,931.40 |
|
3,104,666.37 |
|
|
|
|
|