Letting of 3/18/2009 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 455-09-0024
Parish: CADDO
Routes: I-49
Description: I-49 NORTH (MIRA-MYRTIS ROAD TO LA 168)
Type Const: grading, drainage structures, class ii base course, superpave asphaltic concrete
pavement, precast concrete girder spans bridge and related work.
Estimated Construction Cost: $35,859,348.70
Maximum Number of Days Allowed for Construction: 500
Calculated Daily User Cost: $3,000.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Life Cycle
Cost
Total Bid
1 42076 AUSTIN BRIDGE & ROAD, LP $31,126,131.00 450 $968,300.00 $33,444,431.00
2 34567 JAMES CONSTRUCTION GROUP LLC $33,057,973.12 500 $968,300.00 $35,526,273.12
3 39462 JB JAMES CONSTRUCTION LLC $33,883,714.12 500 $968,300.00 $36,352,014.12
4 12312 GILCHRIST CONSTRUCTION CO. LLC $34,069,972.90 500 $968,300.00 $36,538,272.90
5 36374 BEST-YET BUILDERS, LLC $34,166,725.71 500 $968,300.00 $36,635,025.71
6 38936 SOUTHERN INDUSTRIAL CONTRACTORS LLC $35,636,415.36 500 $968,300.00 $38,104,715.36
 
Item Number Item Description Quantity Unit of Measure - 1 -
AUSTIN BRIDGE & ROAD, LP
- 2 -
JAMES CONSTRUCTION GROUP LLC
- 3 -
JB JAMES CONSTRUCTION LLC
- 4 -
GILCHRIST CONSTRUCTION CO. LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 200,000.00 200,000.00 25,000.00 25,000.00 820,000.00 820,000.00 100,000.00 100,000.00
202-01 removal of structures & obstructions lump      LUMP 5,450.00 5,450.00 25,000.00 25,000.00 70,000.00 70,000.00 50,000.00 50,000.00
202-02-D removal of concrete walks & drives 348      SQYD 10.75 3,741.00 5.50 1,914.00 6.00 2,088.00 10.00 3,480.00
202-02-G removal of surfacing & stabilized base 22,998.1    SQYD 2.20 50,595.82 3.40 78,193.54 3.60 82,793.16 5.00 114,990.50
203-01 general excavation 854,431      CUYD 1.90 1,623,418.90 2.50 2,136,077.50 2.80 2,392,406.80 2.00 1,708,862.00
203-02 drainage excavation 5,788      CUYD 8.70 50,355.60 3.50 20,258.00 7.00 40,516.00 9.00 52,092.00
203-03 embankment 347,383      CUYD 2.30 798,980.90 3.00 1,042,149.00 3.00 1,042,149.00 2.00 694,766.00
203-04-01 nonplastic embankment (stone) 3,732      CUYD 82.00 306,024.00 120.00 447,840.00 70.00 261,240.00 100.00 373,200.00
203-07-B borrow (vehicular meas.)(plastic soils) 3,000      CUYD 12.00 36,000.00 4.04 12,120.00 12.00 36,000.00 4.00 12,000.00
204-02 temporary hay or straw bales 238      EACH 10.75 2,558.50 17.50 4,165.00 10.00 2,380.00 20.00 4,760.00
204-05-A temporary sediment check dams (hay) 352      EACH 118.00 41,536.00 185.00 65,120.00 110.00 38,720.00 285.00 100,320.00
204-05-B temporary sediment check dams (stone) 40      EACH 591.00 23,640.00 335.00 13,400.00 800.00 32,000.00 485.00 19,400.00
204-06 temporary silt fencing 77,850      LNFT 1.60 124,560.00 2.35 182,947.50 1.70 132,345.00 1.10 85,635.00
204-07 temporary stone construction entrance 2      EACH 2,150.00 4,300.00 3,700.00 7,400.00 2,500.00 5,000.00 3,000.00 6,000.00
302-01-01 class ii base course (stone or recycled pcc) 26,507.2    CUYD 75.50 2,001,293.60 80.00 2,120,576.00 75.00 1,988,040.00 80.00 2,120,576.00
302-02-B-01 class ii base course (6" thick) (soil cement) 190,836.6    SQYD 4.70 896,932.02 4.50 858,764.70 5.50 1,049,601.30 6.00 1,145,019.60
302-02-D-01 class ii base course (8 1/2" thick) (soil cement) 23,942.1    SQYD 6.00 143,652.60 7.70 184,354.17 7.00 167,594.70 10.00 239,421.00
302-02-F-01 class ii base course (12" thick) (soil cement) 34,464.3    SQYD 7.90 272,267.97 13.00 448,035.90 9.50 327,410.85 11.50 396,339.45
304-05 lime treatment (type e) 413.96   TON 100.00 41,396.00 162.00 67,061.52 230.00 95,210.80 240.00 99,350.40
305-01-D subgrade layer (12" thick) 190,837      SQYD 9.90 1,889,286.30 8.30 1,583,947.10 8.70 1,660,281.90 8.00 1,526,696.00
401-02 aggregate surface course (adjusted vehicular
measurement)
217      CUYD 80.00 17,360.00 34.00 7,378.00 100.00 21,700.00 75.00 16,275.00
402-01 traffic maintenance aggregate (vehicular measurement) 500.0    CUYD 80.00 40,000.00 55.00 27,500.00 75.00 37,500.00 50.00 25,000.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
3,336.5    TON 124.50 415,394.25 115.00 383,697.50 120.00 400,380.00 120.00 400,380.00
507-01-A asphaltic material (crs-2p emulsion) 34,686      GAL 3.50 121,401.00 3.25 112,729.50 3.40 117,932.40 3.50 121,401.00
507-02-B aggregate (s2) 51,010      SQYD 1.80 91,818.00 1.65 84,166.50 1.70 86,717.00 1.80 91,818.00
507-02-C aggregate (s3) 51,010      SQYD 1.60 81,616.00 1.45 73,964.50 1.50 76,515.00 1.60 81,616.00
701-01-I cross drain pipe (24" rcp/pcp) 2,256      LNFT 61.00 137,616.00 52.00 117,312.00 75.00 169,200.00 95.00 214,320.00
701-01-K cross drain pipe (30" rcp) 174      LNFT 98.00 17,052.00 72.00 12,528.00 90.00 15,660.00 115.00 20,010.00
701-01-N cross drain pipe (42" rcp) 370      LNFT 152.50 56,425.00 135.00 49,950.00 150.00 55,500.00 215.00 79,550.00
701-01-P cross drain pipe (54" rcp) 130      LNFT 234.50 30,485.00 200.00 26,000.00 250.00 32,500.00 260.00 33,800.00
701-01-S cross drain pipe (72" rcp) 152      LNFT 392.00 59,584.00 350.00 53,200.00 390.00 59,280.00 375.00 57,000.00
701-02-G cross drain pipe arch (42" equiv. rcpa) 384      LNFT 152.50 58,560.00 150.00 57,600.00 180.00 69,120.00 175.00 67,200.00
701-05-G side drain pipe (18") 1,085      LNFT 65.50 71,067.50 36.00 39,060.00 50.00 54,250.00 60.00 65,100.00
701-05-I side drain pipe (24") 238      LNFT 76.50 18,207.00 45.00 10,710.00 58.00 13,804.00 70.00 16,660.00
701-05-K side drain pipe (30") 370      LNFT 83.00 30,710.00 65.00 24,050.00 75.00 27,750.00 76.00 28,120.00
701-05-Q-01 side drain pipe (60")(erosion) 70      LNFT 256.00 17,920.00 130.00 9,100.00 210.00 14,700.00 235.00 16,450.00
701-15 concrete collar 8      EACH 1,060.00 8,480.00 400.00 3,200.00 500.00 4,000.00 1,200.00 9,600.00
702-03-A catch basins (cb-01) 31      EACH 2,180.00 67,580.00 2,880.00 89,280.00 2,600.00 80,600.00 2,500.00 77,500.00
702-04-B adjusting catch basins 5      EACH 5,450.00 27,250.00 2,370.00 11,850.00 2,500.00 12,500.00 3,000.00 15,000.00
702-05-A cross drain end treatment (2 barrels, 42" rcp) 1      EACH 8,180.00 8,180.00 7,300.00 7,300.00 4,200.00 4,200.00 6,000.00 6,000.00
702-05-B cross drain end treatment (2 barrels, 42" equiv. rcpa) 1      EACH 9,270.00 9,270.00 7,800.00 7,800.00 5,200.00 5,200.00 8,500.00 8,500.00
703-03 perforated pipe underdrains 500      LNFT 20.00 10,000.00 12.50 6,250.00 15.00 7,500.00 8.00 4,000.00
703-04 nonperforated pipe underdrains 500      LNFT 10.50 5,250.00 12.50 6,250.00 30.00 15,000.00 15.00 7,500.00
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 137.5    LNFT 29.00 3,987.50 27.00 3,712.50 27.00 3,712.50 30.00 4,125.00
704-01-C guard rail (double thrie beam)(3'-1 1/2" post spacing) 518.8    LNFT 53.50 27,755.80 50.00 25,940.00 50.00 25,940.00 55.00 28,534.00
704-03 blocked out guard rail 1,581.3    LNFT 19.25 30,440.03 18.00 28,463.40 18.00 28,463.40 20.00 31,626.00
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
25.0    LNFT 102.00 2,550.00 95.00 2,375.00 95.00 2,375.00 110.00 2,750.00
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 59.00 11,800.00 55.00 11,000.00 55.00 11,000.00 60.00 12,000.00
704-11-A guard rail end treatment (flared) 12      EACH 2,040.00 24,480.00 1,900.00 22,800.00 1,900.00 22,800.00 2,200.00 26,400.00
704-11-C guard rail end treatment (bi-directional) 2      EACH 4,840.00 9,680.00 4,500.00 9,000.00 4,500.00 9,000.00 5,000.00 10,000.00
705-01 barbed wire fence 5,733      LNFT 5.40 30,958.20 5.00 28,665.00 5.00 28,665.00 5.70 32,678.10
705-02 combination mesh & barbed wire fence 10,766      LNFT 5.70 61,366.20 5.30 57,059.80 5.30 57,059.80 6.90 74,285.40
705-04 single swinging driveway gates 11      EACH 591.00 6,501.00 550.00 6,050.00 550.00 6,050.00 700.00 7,700.00
705-05 double swinging driveway gates 3      DBGT 747.00 2,241.00 695.00 2,085.00 700.00 2,100.00 900.00 2,700.00
705-09 rebuilt fence 48      LNFT 50.00 2,400.00 110.00 5,280.00 100.00 4,800.00 25.00 1,200.00
706-02-C concrete drive (6" thick) 200.7    SQYD 55.00 11,038.50 57.00 11,439.90 66.00 13,246.20 85.00 17,059.50
706-03-A incidental concrete paving (4" thick) 1,291.5    SQYD 39.75 51,337.13 45.00 58,117.50 50.00 64,575.00 65.00 83,947.50
711-01-B riprap (10 lb, 12" thick) 140      SQYD 65.50 9,170.00 44.00 6,160.00 56.00 7,840.00 60.00 8,400.00
711-01-C riprap (30 lb, 14" thick) 5,943      SQYD 71.00 421,953.00 45.00 267,435.00 56.00 332,808.00 65.00 386,295.00
711-01-D riprap (55 lb, 18" thick) 870      SQYD 76.50 66,555.00 65.00 56,550.00 62.00 53,940.00 70.00 60,900.00
711-04 geotextile fabric 6,953      SQYD 2.20 15,296.60 3.00 20,859.00 3.00 20,859.00 2.00 13,906.00
712-01-A concrete cast-in-place revetment (4" thick) 3,920      SQYD 75.50 295,960.00 63.00 246,960.00 62.00 243,040.00 62.00 243,040.00
713-01 temporary signs & barricades lump      LUMP 32,000.00 32,000.00 50,000.00 50,000.00 200,000.00 200,000.00 100,000.00 100,000.00
716-01-A mulch (vegetative) 119.8    TON 478.00 57,264.40 445.00 53,311.00 450.00 53,910.00 440.00 52,712.00
717-01 seeding 2,397      LB 8.60 20,614.20 8.00 19,176.00 8.00 19,176.00 6.70 16,059.90
718-01 fertilizer 59,920      LB 0.50 29,960.00 0.45 26,964.00 0.45 26,964.00 0.53 31,757.60
720-01-A erosion control system, slope protection (type a) 28,669      SQYD 1.20 34,402.80 1.15 32,969.35 1.20 34,402.80 1.20 34,402.80
720-01-C erosion control system, flexible channel liner (type c) 5,781      SQYD 1.70 9,827.70 1.60 9,249.60 1.60 9,249.60 1.75 10,116.75
720-01-D erosion control system, flexible channel liner (type d) 16,612      SQYD 1.80 29,901.60 1.65 27,409.80 1.70 28,240.40 1.75 29,071.00
720-01-E erosion control system, flexible channel liner (type e) 1,794      SQYD 3.00 5,382.00 2.75 4,933.50 2.80 5,023.20 3.35 6,009.90
720-01-F erosion control system, flexible channel liner (type f) 577      SQYD 3.50 2,019.50 3.25 1,875.25 3.30 1,904.10 4.50 2,596.50
722-02 project site laboratory (equipped) 1      EACH 20,000.00 20,000.00 25,000.00 25,000.00 5,000.00 5,000.00 65,000.00 65,000.00
726-01 bedding material 663.0    CUYD 92.50 61,327.50 100.00 66,300.00 90.00 59,670.00 90.00 59,670.00
727-01 mobilization lump      LUMP 2,200,000.00 2,200,000.00 3,150,000.00 3,150,000.00 3,300,000.00 3,300,000.00 3,000,000.00 3,000,000.00
729-16-B object marker assembly (type 2) 60      EACH 70.00 4,200.00 65.00 3,900.00 65.00 3,900.00 70.00 4,200.00
729-16-C object marker assembly (type 3) 14      EACH 80.50 1,127.00 75.00 1,050.00 75.00 1,050.00 85.00 1,190.00
729-19-A dead end road installations(type a) 1      EACH 1,452.92 1,452.92 1,350.00 1,350.00 1,400.00 1,400.00 1,500.00 1,500.00
731-01 nonreflectorized raised pavement markers 234      EACH 18.25 4,270.50 17.00 3,978.00 12.00 2,808.00 18.00 4,212.00
731-02 reflectorized raised pavement markers 2,195      EACH 5.90 12,950.50 5.50 12,072.50 5.10 11,194.50 6.00 13,170.00
732-02-A plastic pavement striping (solid line) (4" width) 25.301  MILE 2,630.00 66,541.63 2,450.00 61,987.45 3,000.00 75,903.00 2,700.00 68,312.70
732-02-C plastic pavement striping (solid line) (8" width) 0.714  MILE 5,270.00 3,762.78 4,875.00 3,480.75 6,300.00 4,498.20 5,400.00 3,855.60
732-02-E plastic pavement striping (solid line) (24" width) 0.238  MILE 15,590.00 3,710.42 14,625.00 3,480.75 22,000.00 5,236.00 16,000.00 3,808.00
732-04-A plastic pavement legends & symbols (arrow) 5      EACH 242.00 1,210.00 225.00 1,125.00 210.00 1,050.00 250.00 1,250.00
732-04-C plastic pavement legends & symbols (only) 5      EACH 253.00 1,265.00 235.00 1,175.00 220.00 1,100.00 260.00 1,300.00
735-01 mailboxes 16      EACH 107.50 1,720.00 10.00 160.00 1.00 16.00 5.50 88.00
735-02 mailbox supports (single) 16      EACH 107.50 1,720.00 150.00 2,400.00 200.00 3,200.00 165.00 2,640.00
740-01 construction layout lump      LUMP 400,000.00 400,000.00 300,000.00 300,000.00 240,000.00 240,000.00 500,000.00 500,000.00
740-02 utility oversight and coordination lump      LUMP 1.00 1.00 10,000.00 10,000.00 10,000.00 10,000.00 15,000.00 15,000.00
805-01-B class a concrete (box culvert headwalls) 128.68   CUYD 1,140.00 146,695.20 1,200.00 154,416.00 1,200.00 154,416.00 1,200.00 154,416.00
805-01-F class a concrete (bents) 1,142.55   CUYD 576.00 658,108.80 580.00 662,679.00 650.00 742,657.50 850.00 971,167.50
805-03 class aa concrete 68.32   CUYD 1,010.00 69,003.20 1,000.00 68,320.00 550.00 37,576.00 1,500.00 102,480.00
805-04 class aa(m) concrete 1,897.81   CUYD 564.00 1,070,364.84 800.00 1,518,248.00 600.00 1,138,686.00 850.00 1,613,138.50
805-08-C precast-prestressed concrete girders (type iii) 1,101.4    LNFT 100.50 110,690.70 95.00 104,633.00 112.00 123,356.80 115.00 126,661.00
805-08-D precast-prestressed concrete girders (type iv) 3,000.0    LNFT 158.00 474,000.00 155.00 465,000.00 155.00 465,000.00 148.00 444,000.00
805-08-G precast-prestressed concrete girders (type bt-72) 1,803.6    LNFT 171.00 308,415.60 175.00 315,630.00 190.00 342,684.00 175.00 315,630.00
805-11 strip seal joints 537.55   LNFT 174.00 93,533.70 151.52 81,454.31 155.00 83,320.25 180.00 96,759.00
805-12-M reinforced concrete box culverts (6'x 6') 98.4    LNFT 600.00 59,040.00 550.00 54,120.00 500.00 49,200.00 550.00 54,120.00
805-12-P reinforced concrete box culverts (7'x 7') 251.6    LNFT 676.00 170,081.60 600.00 150,960.00 650.00 163,540.00 645.00 162,282.00
805-12-Q reinforced concrete box culverts (8'x 7') 174.6    LNFT 796.00 138,981.60 650.00 113,490.00 700.00 122,220.00 750.00 130,950.00
805-12-X reinforced concrete box culverts (10'x 10') 530.0    LNFT 1,200.00 636,000.00 900.00 477,000.00 1,250.00 662,500.00 1,200.00 636,000.00
806-01 deformed reinforcing steel 303,374      LB 0.65 197,193.10 0.85 257,867.90 0.80 242,699.20 0.70 212,361.80
806-02 deformed reinforcing steel (epoxy coated) 569,139      LB 0.85 483,768.15 1.00 569,139.00 1.00 569,139.00 0.80 455,311.20
807-08 structural metalwork lump      LUMP 1,406,770.00 1,406,770.00 1,550,000.00 1,550,000.00 1,550,000.00 1,550,000.00 1,400,000.00 1,400,000.00
810-01 concrete railing (barrier) 3,934.61   LNFT 61.50 241,978.52 57.00 224,272.77 56.00 220,338.16 50.00 196,730.50
813-01 concrete approach slabs 1,111.08   SQYD 183.50 203,883.18 235.00 261,103.80 220.00 244,437.60 200.00 222,216.00
814-01-B drilled shaft (24") 328.0    LNFT 61.50 20,172.00 220.00 72,160.00 240.00 78,720.00 250.00 82,000.00
814-01-F drilled shaft (60") 693.0    LNFT 385.00 266,805.00 245.00 169,785.00 340.00 235,620.00 270.00 187,110.00
814-01-J drilled shaft (66") 2,325.0    LNFT 474.00 1,102,050.00 315.00 732,375.00 400.00 930,000.00 360.00 837,000.00
814-02-J trial shaft (66") 115.0    LNFT 484.00 55,660.00 350.00 40,250.00 340.00 39,100.00 350.00 40,250.00
814-04-F crosshole sonic logging (60") 12      EACH 1,390.00 16,680.00 4,000.00 48,000.00 1,000.00 12,000.00 2,100.00 25,200.00
814-04-J crosshole sonic logging (66") 45      EACH 1,390.00 62,550.00 4,100.00 184,500.00 1,000.00 45,000.00 2,500.00 112,500.00
S-002 concrete cast-in-place revetment (catch basin) 464.1    SQYD 85.00 39,448.50 60.00 27,846.00 76.00 35,271.60 80.00 37,128.00
S-101 test drilled shaft (66") 2      EACH 19,740.00 39,480.00 85,000.00 170,000.00 85,000.00 170,000.00 100,000.00 200,000.00
S-102 load testing a drilled shaft 2      EACH 84,180.00 168,360.00 115,000.00 230,000.00 110,000.00 220,000.00 135,000.00 270,000.00
S-103 deck drainage systems lump      LUMP 22,160.00 22,160.00 80,000.00 80,000.00 70,000.00 70,000.00 15,000.00 15,000.00
 SUBTOTAL GENERAL       22,271,190.06   24,071,749.76   25,417,937.72   24,491,588.70
                       
ALTERNATE A                      
                       
ALTERNATE A1 jointed plain concrete pavement                    
502-01 superpave asphaltic concrete 32,164.4    TON 95.00 3,055,618.00 89.00 2,862,631.60 80.00 2,573,152.00 99.00 3,184,275.60
601-01-M portland cement concrete pavement (11" thick) 129,104.2    SQYD 44.50 5,745,136.90 47.00 6,067,897.40 45.00 5,809,689.00 49.00 6,326,105.80
601-04 portland cement concrete pavement coring 165      EACH 110.00 18,150.00 90.00 14,850.00 120.00 19,800.00 115.00 18,975.00
707-01 concrete curb 1,258.6    LNFT 2.60 3,272.36 5.00 6,293.00 16.00 20,137.60 9.00 11,327.40
732-03-A plastic pavement striping (broken line)(4" width) 0.076  MILE 1,070.00 81.32 1,050.00 79.80 850.00 64.60 1,100.00 83.60
732-03-A-01 plastic pvmt striping (broken line)(4"width)preformed
marking tape-type v)
7.556  MILE 3,760.00 28,410.56 3,510.00 26,521.56 4,700.00 35,513.20 3,800.00 28,712.80
S-001 rumble strips (ground-in) 10.6    MILE 403.00 4,271.80 750.00 7,950.00 700.00 7,420.00 840.00 8,904.00
 SUBTOTAL ALT A1       8,854,940.94   8,986,223.36   8,465,776.40   9,578,384.20
                       
ALTERNATE A2 superpave asphaltic concrete                    
502-01 superpave asphaltic concrete 110,191.7    TON 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
707-01 concrete curb 678.0    LNFT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
707-03 combination concrete curb & gutter 580.6    LNFT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
732-03-A plastic pavement striping (broken line)(4" width) 7.632  MILE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
S-001 rumble strips (ground-in) 17.7    MILE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
                       
 ITEM TOTAL (CONSTRUCTION BID)       31,126,131.00   33,057,973.12   33,883,714.12   34,069,972.90
 NUMBER OF DAYS BID AT $3,000 PER DAY.       1,350,000.00   1,500,000.00   1,500,000.00   1,500,000.00
 LIFE CYCLE COST       968,300.00   968,300.00   968,300.00   968,300.00
 TOTAL BID       33,444,431.00   35,526,273.12   36,352,014.12   36,538,272.90
 
Item Number Item Description Quantity Unit of Measure - 5 -
BEST-YET BUILDERS, LLC
- 6 -
SOUTHERN INDUSTRIAL CONTRACTORS LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 150,000.00 150,000.00 2,091,957.00 2,091,957.00        
202-01 removal of structures & obstructions lump      LUMP 50,000.00 50,000.00 41,076.85 41,076.85        
202-02-D removal of concrete walks & drives 348      SQYD 10.00 3,480.00 21.04 7,321.92        
202-02-G removal of surfacing & stabilized base 22,998.1    SQYD 4.00 91,992.40 1.52 34,957.11        
203-01 general excavation 854,431      CUYD 3.75 3,204,116.25 2.54 2,170,254.74        
203-02 drainage excavation 5,788      CUYD 7.50 43,410.00 5.00 28,940.00        
203-03 embankment 347,383      CUYD 4.50 1,563,223.50 2.54 882,352.82        
203-04-01 nonplastic embankment (stone) 3,732      CUYD 63.00 235,116.00 75.50 281,766.00        
203-07-B borrow (vehicular meas.)(plastic soils) 3,000      CUYD 10.00 30,000.00 13.64 40,920.00        
204-02 temporary hay or straw bales 238      EACH 10.00 2,380.00 11.50 2,737.00        
204-05-A temporary sediment check dams (hay) 352      EACH 100.00 35,200.00 115.00 40,480.00        
204-05-B temporary sediment check dams (stone) 40      EACH 500.00 20,000.00 740.00 29,600.00        
204-06 temporary silt fencing 77,850      LNFT 1.65 128,452.50 1.35 105,097.50        
204-07 temporary stone construction entrance 2      EACH 1,000.00 2,000.00 14,500.00 29,000.00        
302-01-01 class ii base course (stone or recycled pcc) 26,507.2    CUYD 63.00 1,669,953.60 67.77 1,796,392.94        
302-02-B-01 class ii base course (6" thick) (soil cement) 190,836.6    SQYD 5.65 1,078,226.79 4.72 900,748.75        
302-02-D-01 class ii base course (8 1/2" thick) (soil cement) 23,942.1    SQYD 7.00 167,594.70 5.75 137,667.08        
302-02-F-01 class ii base course (12" thick) (soil cement) 34,464.3    SQYD 8.75 301,562.63 7.79 268,476.90        
304-05 lime treatment (type e) 413.96   TON 286.00 118,392.56 295.00 122,118.20        
305-01-D subgrade layer (12" thick) 190,837      SQYD 8.00 1,526,696.00 13.83 2,639,275.71        
401-02 aggregate surface course (adjusted vehicular
measurement)
217      CUYD 60.00 13,020.00 72.70 15,775.90        
402-01 traffic maintenance aggregate (vehicular measurement) 500.0    CUYD 0.10 50.00 44.85 22,425.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
3,336.5    TON 100.00 333,650.00 132.25 441,252.13        
507-01-A asphaltic material (crs-2p emulsion) 34,686      GAL 3.00 104,058.00 3.74 129,725.64        
507-02-B aggregate (s2) 51,010      SQYD 1.75 89,267.50 1.89 96,408.90        
507-02-C aggregate (s3) 51,010      SQYD 1.75 89,267.50 1.66 84,676.60        
701-01-I cross drain pipe (24" rcp/pcp) 2,256      LNFT 63.00 142,128.00 54.67 123,335.52        
701-01-K cross drain pipe (30" rcp) 174      LNFT 90.00 15,660.00 75.51 13,138.74        
701-01-N cross drain pipe (42" rcp) 370      LNFT 175.00 64,750.00 115.73 42,820.10        
701-01-P cross drain pipe (54" rcp) 130      LNFT 250.00 32,500.00 184.66 24,005.80        
701-01-S cross drain pipe (72" rcp) 152      LNFT 465.00 70,680.00 306.18 46,539.36        
701-02-G cross drain pipe arch (42" equiv. rcpa) 384      LNFT 210.00 80,640.00 152.00 58,368.00        
701-05-G side drain pipe (18") 1,085      LNFT 37.50 40,687.50 36.50 39,602.50        
701-05-I side drain pipe (24") 238      LNFT 60.00 14,280.00 54.68 13,013.84        
701-05-K side drain pipe (30") 370      LNFT 80.00 29,600.00 75.51 27,938.70        
701-05-Q-01 side drain pipe (60")(erosion) 70      LNFT 265.00 18,550.00 237.00 16,590.00        
701-15 concrete collar 8      EACH 1,000.00 8,000.00 670.00 5,360.00        
702-03-A catch basins (cb-01) 31      EACH 3,000.00 93,000.00 3,312.00 102,672.00        
702-04-B adjusting catch basins 5      EACH 1,500.00 7,500.00 3,000.00 15,000.00        
702-05-A cross drain end treatment (2 barrels, 42" rcp) 1      EACH 5,000.00 5,000.00 9,775.00 9,775.00        
702-05-B cross drain end treatment (2 barrels, 42" equiv. rcpa) 1      EACH 5,000.00 5,000.00 9,890.00 9,890.00        
703-03 perforated pipe underdrains 500      LNFT 10.00 5,000.00 11.50 5,750.00        
703-04 nonperforated pipe underdrains 500      LNFT 10.00 5,000.00 28.75 14,375.00        
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 137.5    LNFT 38.50 5,293.75 40.25 5,534.38        
704-01-C guard rail (double thrie beam)(3'-1 1/2" post spacing) 518.8    LNFT 53.00 27,496.40 63.25 32,814.10        
704-03 blocked out guard rail 1,581.3    LNFT 22.00 34,788.60 23.00 36,369.90        
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
25.0    LNFT 110.00 2,750.00 97.75 2,443.75        
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 71.50 14,300.00 69.00 13,800.00        
704-11-A guard rail end treatment (flared) 12      EACH 2,310.00 27,720.00 2,588.00 31,056.00        
704-11-C guard rail end treatment (bi-directional) 2      EACH 4,950.00 9,900.00 5,750.00 11,500.00        
705-01 barbed wire fence 5,733      LNFT 5.50 31,531.50 7.48 42,882.84        
705-02 combination mesh & barbed wire fence 10,766      LNFT 6.60 71,055.60 8.63 92,910.58        
705-04 single swinging driveway gates 11      EACH 660.00 7,260.00 794.00 8,734.00        
705-05 double swinging driveway gates 3      DBGT 880.00 2,640.00 1,093.00 3,279.00        
705-09 rebuilt fence 48      LNFT 22.00 1,056.00 115.00 5,520.00        
706-02-C concrete drive (6" thick) 200.7    SQYD 70.00 14,049.00 80.00 16,056.00        
706-03-A incidental concrete paving (4" thick) 1,291.5    SQYD 60.00 77,490.00 64.50 83,301.75        
711-01-B riprap (10 lb, 12" thick) 140      SQYD 40.00 5,600.00 24.40 3,416.00        
711-01-C riprap (30 lb, 14" thick) 5,943      SQYD 50.00 297,150.00 28.36 168,543.48        
711-01-D riprap (55 lb, 18" thick) 870      SQYD 62.00 53,940.00 36.65 31,885.50        
711-04 geotextile fabric 6,953      SQYD 2.00 13,906.00 0.98 6,813.94        
712-01-A concrete cast-in-place revetment (4" thick) 3,920      SQYD 63.00 246,960.00 64.40 252,448.00        
713-01 temporary signs & barricades lump      LUMP 200,000.00 200,000.00 171,032.00 171,032.00        
716-01-A mulch (vegetative) 119.8    TON 522.50 62,595.50 512.00 61,337.60        
717-01 seeding 2,397      LB 7.65 18,337.05 9.20 22,052.40        
718-01 fertilizer 59,920      LB 0.55 32,956.00 0.52 31,158.40        
720-01-A erosion control system, slope protection (type a) 28,669      SQYD 1.15 32,969.35 1.33 38,129.77        
720-01-C erosion control system, flexible channel liner (type c) 5,781      SQYD 1.60 9,249.60 1.84 10,637.04        
720-01-D erosion control system, flexible channel liner (type d) 16,612      SQYD 1.60 26,579.20 1.90 31,562.80        
720-01-E erosion control system, flexible channel liner (type e) 1,794      SQYD 1.60 2,870.40 3.16 5,669.04        
720-01-F erosion control system, flexible channel liner (type f) 577      SQYD 1.60 923.20 3.74 2,157.98        
722-02 project site laboratory (equipped) 1      EACH 25,000.00 25,000.00 35,000.00 35,000.00        
726-01 bedding material 663.0    CUYD 70.00 46,410.00 81.75 54,200.25        
727-01 mobilization lump      LUMP 3,000,000.00 3,000,000.00 2,127,946.00 2,127,946.00        
729-16-B object marker assembly (type 2) 60      EACH 71.50 4,290.00 74.75 4,485.00        
729-16-C object marker assembly (type 3) 14      EACH 120.00 1,680.00 86.25 1,207.50        
729-19-A dead end road installations(type a) 1      EACH 2,100.00 2,100.00 2,300.00 2,300.00        
731-01 nonreflectorized raised pavement markers 234      EACH 18.70 4,375.80 13.80 3,229.20        
731-02 reflectorized raised pavement markers 2,195      EACH 6.00 13,170.00 5.88 12,906.60        
732-02-A plastic pavement striping (solid line) (4" width) 25.301  MILE 2,695.00 68,186.20 3,340.00 84,505.34        
732-02-C plastic pavement striping (solid line) (8" width) 0.714  MILE 5,390.00 3,848.46 7,287.00 5,202.92        
732-02-E plastic pavement striping (solid line) (24" width) 0.238  MILE 15,950.00 3,796.10 24,288.00 5,780.54        
732-04-A plastic pavement legends & symbols (arrow) 5      EACH 247.50 1,237.50 242.00 1,210.00        
732-04-C plastic pavement legends & symbols (only) 5      EACH 258.50 1,292.50 253.00 1,265.00        
735-01 mailboxes 16      EACH 50.00 800.00 50.00 800.00        
735-02 mailbox supports (single) 16      EACH 150.00 2,400.00 100.00 1,600.00        
740-01 construction layout lump      LUMP 500,000.00 500,000.00 1,087,000.00 1,087,000.00        
740-02 utility oversight and coordination lump      LUMP 20,000.00 20,000.00 27,600.00 27,600.00        
805-01-B class a concrete (box culvert headwalls) 128.68   CUYD 600.00 77,208.00 700.00 90,076.00        
805-01-F class a concrete (bents) 1,142.55   CUYD 560.00 639,828.00 560.00 639,828.00        
805-03 class aa concrete 68.32   CUYD 750.00 51,240.00 750.00 51,240.00        
805-04 class aa(m) concrete 1,897.81   CUYD 590.00 1,119,707.90 600.00 1,138,686.00        
805-08-C precast-prestressed concrete girders (type iii) 1,101.4    LNFT 111.50 122,806.10 112.00 123,356.80        
805-08-D precast-prestressed concrete girders (type iv) 3,000.0    LNFT 166.25 498,750.00 170.00 510,000.00        
805-08-G precast-prestressed concrete girders (type bt-72) 1,803.6    LNFT 192.75 347,643.90 190.00 342,684.00        
805-11 strip seal joints 537.55   LNFT 138.00 74,181.90 140.00 75,257.00        
805-12-M reinforced concrete box culverts (6'x 6') 98.4    LNFT 540.00 53,136.00 600.00 59,040.00        
805-12-P reinforced concrete box culverts (7'x 7') 251.6    LNFT 600.00 150,960.00 750.00 188,700.00        
805-12-Q reinforced concrete box culverts (8'x 7') 174.6    LNFT 630.00 109,998.00 800.00 139,680.00        
805-12-X reinforced concrete box culverts (10'x 10') 530.0    LNFT 1,123.00 595,190.00 1,200.00 636,000.00        
806-01 deformed reinforcing steel 303,374      LB 0.73 221,463.02 0.75 227,530.50        
806-02 deformed reinforcing steel (epoxy coated) 569,139      LB 0.81 461,002.59 0.82 466,693.98        
807-08 structural metalwork lump      LUMP 1,685,000.00 1,685,000.00 1,685,000.00 1,685,000.00        
810-01 concrete railing (barrier) 3,934.61   LNFT 80.00 314,768.80 80.00 314,768.80        
813-01 concrete approach slabs 1,111.08   SQYD 27.00 29,999.16 50.00 55,554.00        
814-01-B drilled shaft (24") 328.0    LNFT 73.00 23,944.00 75.00 24,600.00        
814-01-F drilled shaft (60") 693.0    LNFT 431.00 298,683.00 450.00 311,850.00        
814-01-J drilled shaft (66") 2,325.0    LNFT 525.00 1,220,625.00 525.00 1,220,625.00        
814-02-J trial shaft (66") 115.0    LNFT 415.00 47,725.00 415.00 47,725.00        
814-04-F crosshole sonic logging (60") 12      EACH 1,500.00 18,000.00 2,000.00 24,000.00        
814-04-J crosshole sonic logging (66") 45      EACH 1,500.00 67,500.00 2,000.00 90,000.00        
S-002 concrete cast-in-place revetment (catch basin) 464.1    SQYD 60.00 27,846.00 100.00 46,410.00        
S-101 test drilled shaft (66") 2      EACH 20,000.00 40,000.00 20,000.00 40,000.00        
S-102 load testing a drilled shaft 2      EACH 90,000.00 180,000.00 90,000.00 180,000.00        
S-103 deck drainage systems lump      LUMP 15,000.00 15,000.00 15,000.00 15,000.00        
 SUBTOTAL GENERAL       25,211,245.51   26,433,168.93        
                       
ALTERNATE A                      
                       
ALTERNATE A1 jointed plain concrete pavement                    
502-01 superpave asphaltic concrete 32,164.4    TON 75.00 2,412,330.00 102.00 3,280,768.80        
601-01-M portland cement concrete pavement (11" thick) 129,104.2    SQYD 50.00 6,455,210.00 45.00 5,809,689.00        
601-04 portland cement concrete pavement coring 165      EACH 100.00 16,500.00 120.00 19,800.00        
707-01 concrete curb 1,258.6    LNFT 10.00 12,586.00 30.00 37,758.00        
732-03-A plastic pavement striping (broken line)(4" width) 0.076  MILE 1,100.00 83.60 1,000.00 76.00        
732-03-A-01 plastic pvmt striping (broken line)(4"width)preformed
marking tape-type v)
7.556  MILE 3,850.00 29,090.60 5,313.00 40,145.03        
S-001 rumble strips (ground-in) 10.6    MILE 2,800.00 29,680.00 1,416.00 15,009.60        
 SUBTOTAL ALT A1       8,955,480.20   9,203,246.43        
                       
ALTERNATE A2 superpave asphaltic concrete                    
502-01 superpave asphaltic concrete 110,191.7    TON 0.00 0.00 0.00 0.00        
707-01 concrete curb 678.0    LNFT 0.00 0.00 0.00 0.00        
707-03 combination concrete curb & gutter 580.6    LNFT 0.00 0.00 0.00 0.00        
732-03-A plastic pavement striping (broken line)(4" width) 7.632  MILE 0.00 0.00 0.00 0.00        
S-001 rumble strips (ground-in) 17.7    MILE 0.00 0.00 0.00 0.00        
                       
 ITEM TOTAL (CONSTRUCTION BID)       34,166,725.71   35,636,415.36        
 NUMBER OF DAYS BID AT $3,000 PER DAY.       1,500,000.00   1,500,000.00        
 LIFE CYCLE COST       968,300.00   968,300.00        
 TOTAL BID       36,635,025.71   38,104,715.36        