| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - AUSTIN BRIDGE & ROAD, LP |
- 2 - JAMES CONSTRUCTION GROUP LLC |
- 3 - JB JAMES CONSTRUCTION LLC |
- 4 - GILCHRIST CONSTRUCTION CO. LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
200,000.00 |
200,000.00 |
25,000.00 |
25,000.00 |
820,000.00 |
820,000.00 |
100,000.00 |
100,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
5,450.00 |
5,450.00 |
25,000.00 |
25,000.00 |
70,000.00 |
70,000.00 |
50,000.00 |
50,000.00 |
| 202-02-D |
removal of concrete walks & drives
|
348   |
SQYD |
10.75 |
3,741.00 |
5.50 |
1,914.00 |
6.00 |
2,088.00 |
10.00 |
3,480.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
22,998.1 |
SQYD |
2.20 |
50,595.82 |
3.40 |
78,193.54 |
3.60 |
82,793.16 |
5.00 |
114,990.50 |
| 203-01 |
general excavation
|
854,431   |
CUYD |
1.90 |
1,623,418.90 |
2.50 |
2,136,077.50 |
2.80 |
2,392,406.80 |
2.00 |
1,708,862.00 |
| 203-02 |
drainage excavation
|
5,788   |
CUYD |
8.70 |
50,355.60 |
3.50 |
20,258.00 |
7.00 |
40,516.00 |
9.00 |
52,092.00 |
| 203-03 |
embankment
|
347,383   |
CUYD |
2.30 |
798,980.90 |
3.00 |
1,042,149.00 |
3.00 |
1,042,149.00 |
2.00 |
694,766.00 |
| 203-04-01 |
nonplastic embankment (stone)
|
3,732   |
CUYD |
82.00 |
306,024.00 |
120.00 |
447,840.00 |
70.00 |
261,240.00 |
100.00 |
373,200.00 |
| 203-07-B |
borrow (vehicular meas.)(plastic soils)
|
3,000   |
CUYD |
12.00 |
36,000.00 |
4.04 |
12,120.00 |
12.00 |
36,000.00 |
4.00 |
12,000.00 |
| 204-02 |
temporary hay or straw bales
|
238   |
EACH |
10.75 |
2,558.50 |
17.50 |
4,165.00 |
10.00 |
2,380.00 |
20.00 |
4,760.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
352   |
EACH |
118.00 |
41,536.00 |
185.00 |
65,120.00 |
110.00 |
38,720.00 |
285.00 |
100,320.00 |
| 204-05-B |
temporary sediment check dams (stone)
|
40   |
EACH |
591.00 |
23,640.00 |
335.00 |
13,400.00 |
800.00 |
32,000.00 |
485.00 |
19,400.00 |
| 204-06 |
temporary silt fencing
|
77,850   |
LNFT |
1.60 |
124,560.00 |
2.35 |
182,947.50 |
1.70 |
132,345.00 |
1.10 |
85,635.00 |
| 204-07 |
temporary stone construction entrance
|
2   |
EACH |
2,150.00 |
4,300.00 |
3,700.00 |
7,400.00 |
2,500.00 |
5,000.00 |
3,000.00 |
6,000.00 |
| 302-01-01 |
class ii base course (stone or recycled pcc)
|
26,507.2 |
CUYD |
75.50 |
2,001,293.60 |
80.00 |
2,120,576.00 |
75.00 |
1,988,040.00 |
80.00 |
2,120,576.00 |
| 302-02-B-01 |
class ii base course (6" thick) (soil cement)
|
190,836.6 |
SQYD |
4.70 |
896,932.02 |
4.50 |
858,764.70 |
5.50 |
1,049,601.30 |
6.00 |
1,145,019.60 |
| 302-02-D-01 |
class ii base course (8 1/2" thick) (soil cement)
|
23,942.1 |
SQYD |
6.00 |
143,652.60 |
7.70 |
184,354.17 |
7.00 |
167,594.70 |
10.00 |
239,421.00 |
| 302-02-F-01 |
class ii base course (12" thick) (soil cement)
|
34,464.3 |
SQYD |
7.90 |
272,267.97 |
13.00 |
448,035.90 |
9.50 |
327,410.85 |
11.50 |
396,339.45 |
| 304-05 |
lime treatment (type e)
|
413.96 |
TON |
100.00 |
41,396.00 |
162.00 |
67,061.52 |
230.00 |
95,210.80 |
240.00 |
99,350.40 |
| 305-01-D |
subgrade layer (12" thick)
|
190,837   |
SQYD |
9.90 |
1,889,286.30 |
8.30 |
1,583,947.10 |
8.70 |
1,660,281.90 |
8.00 |
1,526,696.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
217   |
CUYD |
80.00 |
17,360.00 |
34.00 |
7,378.00 |
100.00 |
21,700.00 |
75.00 |
16,275.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
80.00 |
40,000.00 |
55.00 |
27,500.00 |
75.00 |
37,500.00 |
50.00 |
25,000.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
3,336.5 |
TON |
124.50 |
415,394.25 |
115.00 |
383,697.50 |
120.00 |
400,380.00 |
120.00 |
400,380.00 |
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
34,686   |
GAL |
3.50 |
121,401.00 |
3.25 |
112,729.50 |
3.40 |
117,932.40 |
3.50 |
121,401.00 |
| 507-02-B |
aggregate (s2)
|
51,010   |
SQYD |
1.80 |
91,818.00 |
1.65 |
84,166.50 |
1.70 |
86,717.00 |
1.80 |
91,818.00 |
| 507-02-C |
aggregate (s3)
|
51,010   |
SQYD |
1.60 |
81,616.00 |
1.45 |
73,964.50 |
1.50 |
76,515.00 |
1.60 |
81,616.00 |
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
2,256   |
LNFT |
61.00 |
137,616.00 |
52.00 |
117,312.00 |
75.00 |
169,200.00 |
95.00 |
214,320.00 |
| 701-01-K |
cross drain pipe (30" rcp)
|
174   |
LNFT |
98.00 |
17,052.00 |
72.00 |
12,528.00 |
90.00 |
15,660.00 |
115.00 |
20,010.00 |
| 701-01-N |
cross drain pipe (42" rcp)
|
370   |
LNFT |
152.50 |
56,425.00 |
135.00 |
49,950.00 |
150.00 |
55,500.00 |
215.00 |
79,550.00 |
| 701-01-P |
cross drain pipe (54" rcp)
|
130   |
LNFT |
234.50 |
30,485.00 |
200.00 |
26,000.00 |
250.00 |
32,500.00 |
260.00 |
33,800.00 |
| 701-01-S |
cross drain pipe (72" rcp)
|
152   |
LNFT |
392.00 |
59,584.00 |
350.00 |
53,200.00 |
390.00 |
59,280.00 |
375.00 |
57,000.00 |
| 701-02-G |
cross drain pipe arch (42" equiv. rcpa)
|
384   |
LNFT |
152.50 |
58,560.00 |
150.00 |
57,600.00 |
180.00 |
69,120.00 |
175.00 |
67,200.00 |
| 701-05-G |
side drain pipe (18")
|
1,085   |
LNFT |
65.50 |
71,067.50 |
36.00 |
39,060.00 |
50.00 |
54,250.00 |
60.00 |
65,100.00 |
| 701-05-I |
side drain pipe (24")
|
238   |
LNFT |
76.50 |
18,207.00 |
45.00 |
10,710.00 |
58.00 |
13,804.00 |
70.00 |
16,660.00 |
| 701-05-K |
side drain pipe (30")
|
370   |
LNFT |
83.00 |
30,710.00 |
65.00 |
24,050.00 |
75.00 |
27,750.00 |
76.00 |
28,120.00 |
| 701-05-Q-01 |
side drain pipe (60")(erosion)
|
70   |
LNFT |
256.00 |
17,920.00 |
130.00 |
9,100.00 |
210.00 |
14,700.00 |
235.00 |
16,450.00 |
| 701-15 |
concrete collar
|
8   |
EACH |
1,060.00 |
8,480.00 |
400.00 |
3,200.00 |
500.00 |
4,000.00 |
1,200.00 |
9,600.00 |
| 702-03-A |
catch basins (cb-01)
|
31   |
EACH |
2,180.00 |
67,580.00 |
2,880.00 |
89,280.00 |
2,600.00 |
80,600.00 |
2,500.00 |
77,500.00 |
| 702-04-B |
adjusting catch basins
|
5   |
EACH |
5,450.00 |
27,250.00 |
2,370.00 |
11,850.00 |
2,500.00 |
12,500.00 |
3,000.00 |
15,000.00 |
| 702-05-A |
cross drain end treatment (2 barrels, 42" rcp)
|
1   |
EACH |
8,180.00 |
8,180.00 |
7,300.00 |
7,300.00 |
4,200.00 |
4,200.00 |
6,000.00 |
6,000.00 |
| 702-05-B |
cross drain end treatment (2 barrels, 42" equiv. rcpa)
|
1   |
EACH |
9,270.00 |
9,270.00 |
7,800.00 |
7,800.00 |
5,200.00 |
5,200.00 |
8,500.00 |
8,500.00 |
| 703-03 |
perforated pipe underdrains
|
500   |
LNFT |
20.00 |
10,000.00 |
12.50 |
6,250.00 |
15.00 |
7,500.00 |
8.00 |
4,000.00 |
| 703-04 |
nonperforated pipe underdrains
|
500   |
LNFT |
10.50 |
5,250.00 |
12.50 |
6,250.00 |
30.00 |
15,000.00 |
15.00 |
7,500.00 |
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
137.5 |
LNFT |
29.00 |
3,987.50 |
27.00 |
3,712.50 |
27.00 |
3,712.50 |
30.00 |
4,125.00 |
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
518.8 |
LNFT |
53.50 |
27,755.80 |
50.00 |
25,940.00 |
50.00 |
25,940.00 |
55.00 |
28,534.00 |
| 704-03 |
blocked out guard rail
|
1,581.3 |
LNFT |
19.25 |
30,440.03 |
18.00 |
28,463.40 |
18.00 |
28,463.40 |
20.00 |
31,626.00 |
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
25.0 |
LNFT |
102.00 |
2,550.00 |
95.00 |
2,375.00 |
95.00 |
2,375.00 |
110.00 |
2,750.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
59.00 |
11,800.00 |
55.00 |
11,000.00 |
55.00 |
11,000.00 |
60.00 |
12,000.00 |
| 704-11-A |
guard rail end treatment (flared)
|
12   |
EACH |
2,040.00 |
24,480.00 |
1,900.00 |
22,800.00 |
1,900.00 |
22,800.00 |
2,200.00 |
26,400.00 |
| 704-11-C |
guard rail end treatment (bi-directional)
|
2   |
EACH |
4,840.00 |
9,680.00 |
4,500.00 |
9,000.00 |
4,500.00 |
9,000.00 |
5,000.00 |
10,000.00 |
| 705-01 |
barbed wire fence
|
5,733   |
LNFT |
5.40 |
30,958.20 |
5.00 |
28,665.00 |
5.00 |
28,665.00 |
5.70 |
32,678.10 |
| 705-02 |
combination mesh & barbed wire fence
|
10,766   |
LNFT |
5.70 |
61,366.20 |
5.30 |
57,059.80 |
5.30 |
57,059.80 |
6.90 |
74,285.40 |
| 705-04 |
single swinging driveway gates
|
11   |
EACH |
591.00 |
6,501.00 |
550.00 |
6,050.00 |
550.00 |
6,050.00 |
700.00 |
7,700.00 |
| 705-05 |
double swinging driveway gates
|
3   |
DBGT |
747.00 |
2,241.00 |
695.00 |
2,085.00 |
700.00 |
2,100.00 |
900.00 |
2,700.00 |
| 705-09 |
rebuilt fence
|
48   |
LNFT |
50.00 |
2,400.00 |
110.00 |
5,280.00 |
100.00 |
4,800.00 |
25.00 |
1,200.00 |
| 706-02-C |
concrete drive (6" thick)
|
200.7 |
SQYD |
55.00 |
11,038.50 |
57.00 |
11,439.90 |
66.00 |
13,246.20 |
85.00 |
17,059.50 |
| 706-03-A |
incidental concrete paving (4" thick)
|
1,291.5 |
SQYD |
39.75 |
51,337.13 |
45.00 |
58,117.50 |
50.00 |
64,575.00 |
65.00 |
83,947.50 |
| 711-01-B |
riprap (10 lb, 12" thick)
|
140   |
SQYD |
65.50 |
9,170.00 |
44.00 |
6,160.00 |
56.00 |
7,840.00 |
60.00 |
8,400.00 |
| 711-01-C |
riprap (30 lb, 14" thick)
|
5,943   |
SQYD |
71.00 |
421,953.00 |
45.00 |
267,435.00 |
56.00 |
332,808.00 |
65.00 |
386,295.00 |
| 711-01-D |
riprap (55 lb, 18" thick)
|
870   |
SQYD |
76.50 |
66,555.00 |
65.00 |
56,550.00 |
62.00 |
53,940.00 |
70.00 |
60,900.00 |
| 711-04 |
geotextile fabric
|
6,953   |
SQYD |
2.20 |
15,296.60 |
3.00 |
20,859.00 |
3.00 |
20,859.00 |
2.00 |
13,906.00 |
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
3,920   |
SQYD |
75.50 |
295,960.00 |
63.00 |
246,960.00 |
62.00 |
243,040.00 |
62.00 |
243,040.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
32,000.00 |
32,000.00 |
50,000.00 |
50,000.00 |
200,000.00 |
200,000.00 |
100,000.00 |
100,000.00 |
| 716-01-A |
mulch (vegetative)
|
119.8 |
TON |
478.00 |
57,264.40 |
445.00 |
53,311.00 |
450.00 |
53,910.00 |
440.00 |
52,712.00 |
| 717-01 |
seeding
|
2,397   |
LB |
8.60 |
20,614.20 |
8.00 |
19,176.00 |
8.00 |
19,176.00 |
6.70 |
16,059.90 |
| 718-01 |
fertilizer
|
59,920   |
LB |
0.50 |
29,960.00 |
0.45 |
26,964.00 |
0.45 |
26,964.00 |
0.53 |
31,757.60 |
| 720-01-A |
erosion control system, slope protection (type a)
|
28,669   |
SQYD |
1.20 |
34,402.80 |
1.15 |
32,969.35 |
1.20 |
34,402.80 |
1.20 |
34,402.80 |
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
5,781   |
SQYD |
1.70 |
9,827.70 |
1.60 |
9,249.60 |
1.60 |
9,249.60 |
1.75 |
10,116.75 |
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
16,612   |
SQYD |
1.80 |
29,901.60 |
1.65 |
27,409.80 |
1.70 |
28,240.40 |
1.75 |
29,071.00 |
| 720-01-E |
erosion control system, flexible channel liner (type e)
|
1,794   |
SQYD |
3.00 |
5,382.00 |
2.75 |
4,933.50 |
2.80 |
5,023.20 |
3.35 |
6,009.90 |
| 720-01-F |
erosion control system, flexible channel liner (type f)
|
577   |
SQYD |
3.50 |
2,019.50 |
3.25 |
1,875.25 |
3.30 |
1,904.10 |
4.50 |
2,596.50 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
5,000.00 |
5,000.00 |
65,000.00 |
65,000.00 |
| 726-01 |
bedding material
|
663.0 |
CUYD |
92.50 |
61,327.50 |
100.00 |
66,300.00 |
90.00 |
59,670.00 |
90.00 |
59,670.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
2,200,000.00 |
2,200,000.00 |
3,150,000.00 |
3,150,000.00 |
3,300,000.00 |
3,300,000.00 |
3,000,000.00 |
3,000,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
60   |
EACH |
70.00 |
4,200.00 |
65.00 |
3,900.00 |
65.00 |
3,900.00 |
70.00 |
4,200.00 |
| 729-16-C |
object marker assembly (type 3)
|
14   |
EACH |
80.50 |
1,127.00 |
75.00 |
1,050.00 |
75.00 |
1,050.00 |
85.00 |
1,190.00 |
| 729-19-A |
dead end road installations(type a)
|
1   |
EACH |
1,452.92 |
1,452.92 |
1,350.00 |
1,350.00 |
1,400.00 |
1,400.00 |
1,500.00 |
1,500.00 |
| 731-01 |
nonreflectorized raised pavement markers
|
234   |
EACH |
18.25 |
4,270.50 |
17.00 |
3,978.00 |
12.00 |
2,808.00 |
18.00 |
4,212.00 |
| 731-02 |
reflectorized raised pavement markers
|
2,195   |
EACH |
5.90 |
12,950.50 |
5.50 |
12,072.50 |
5.10 |
11,194.50 |
6.00 |
13,170.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
25.301 |
MILE |
2,630.00 |
66,541.63 |
2,450.00 |
61,987.45 |
3,000.00 |
75,903.00 |
2,700.00 |
68,312.70 |
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
0.714 |
MILE |
5,270.00 |
3,762.78 |
4,875.00 |
3,480.75 |
6,300.00 |
4,498.20 |
5,400.00 |
3,855.60 |
| 732-02-E |
plastic pavement striping (solid line) (24" width)
|
0.238 |
MILE |
15,590.00 |
3,710.42 |
14,625.00 |
3,480.75 |
22,000.00 |
5,236.00 |
16,000.00 |
3,808.00 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
5   |
EACH |
242.00 |
1,210.00 |
225.00 |
1,125.00 |
210.00 |
1,050.00 |
250.00 |
1,250.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
5   |
EACH |
253.00 |
1,265.00 |
235.00 |
1,175.00 |
220.00 |
1,100.00 |
260.00 |
1,300.00 |
| 735-01 |
mailboxes
|
16   |
EACH |
107.50 |
1,720.00 |
10.00 |
160.00 |
1.00 |
16.00 |
5.50 |
88.00 |
| 735-02 |
mailbox supports (single)
|
16   |
EACH |
107.50 |
1,720.00 |
150.00 |
2,400.00 |
200.00 |
3,200.00 |
165.00 |
2,640.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
400,000.00 |
400,000.00 |
300,000.00 |
300,000.00 |
240,000.00 |
240,000.00 |
500,000.00 |
500,000.00 |
| 740-02 |
utility oversight and coordination
|
lump |
LUMP |
1.00 |
1.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
128.68 |
CUYD |
1,140.00 |
146,695.20 |
1,200.00 |
154,416.00 |
1,200.00 |
154,416.00 |
1,200.00 |
154,416.00 |
| 805-01-F |
class a concrete (bents)
|
1,142.55 |
CUYD |
576.00 |
658,108.80 |
580.00 |
662,679.00 |
650.00 |
742,657.50 |
850.00 |
971,167.50 |
| 805-03 |
class aa concrete
|
68.32 |
CUYD |
1,010.00 |
69,003.20 |
1,000.00 |
68,320.00 |
550.00 |
37,576.00 |
1,500.00 |
102,480.00 |
| 805-04 |
class aa(m) concrete
|
1,897.81 |
CUYD |
564.00 |
1,070,364.84 |
800.00 |
1,518,248.00 |
600.00 |
1,138,686.00 |
850.00 |
1,613,138.50 |
| 805-08-C |
precast-prestressed concrete girders (type iii)
|
1,101.4 |
LNFT |
100.50 |
110,690.70 |
95.00 |
104,633.00 |
112.00 |
123,356.80 |
115.00 |
126,661.00 |
| 805-08-D |
precast-prestressed concrete girders (type iv)
|
3,000.0 |
LNFT |
158.00 |
474,000.00 |
155.00 |
465,000.00 |
155.00 |
465,000.00 |
148.00 |
444,000.00 |
| 805-08-G |
precast-prestressed concrete girders (type bt-72)
|
1,803.6 |
LNFT |
171.00 |
308,415.60 |
175.00 |
315,630.00 |
190.00 |
342,684.00 |
175.00 |
315,630.00 |
| 805-11 |
strip seal joints
|
537.55 |
LNFT |
174.00 |
93,533.70 |
151.52 |
81,454.31 |
155.00 |
83,320.25 |
180.00 |
96,759.00 |
| 805-12-M |
reinforced concrete box culverts (6'x 6')
|
98.4 |
LNFT |
600.00 |
59,040.00 |
550.00 |
54,120.00 |
500.00 |
49,200.00 |
550.00 |
54,120.00 |
| 805-12-P |
reinforced concrete box culverts (7'x 7')
|
251.6 |
LNFT |
676.00 |
170,081.60 |
600.00 |
150,960.00 |
650.00 |
163,540.00 |
645.00 |
162,282.00 |
| 805-12-Q |
reinforced concrete box culverts (8'x 7')
|
174.6 |
LNFT |
796.00 |
138,981.60 |
650.00 |
113,490.00 |
700.00 |
122,220.00 |
750.00 |
130,950.00 |
| 805-12-X |
reinforced concrete box culverts (10'x 10')
|
530.0 |
LNFT |
1,200.00 |
636,000.00 |
900.00 |
477,000.00 |
1,250.00 |
662,500.00 |
1,200.00 |
636,000.00 |
| 806-01 |
deformed reinforcing steel
|
303,374   |
LB |
0.65 |
197,193.10 |
0.85 |
257,867.90 |
0.80 |
242,699.20 |
0.70 |
212,361.80 |
| 806-02 |
deformed reinforcing steel (epoxy coated)
|
569,139   |
LB |
0.85 |
483,768.15 |
1.00 |
569,139.00 |
1.00 |
569,139.00 |
0.80 |
455,311.20 |
| 807-08 |
structural metalwork
|
lump |
LUMP |
1,406,770.00 |
1,406,770.00 |
1,550,000.00 |
1,550,000.00 |
1,550,000.00 |
1,550,000.00 |
1,400,000.00 |
1,400,000.00 |
| 810-01 |
concrete railing (barrier)
|
3,934.61 |
LNFT |
61.50 |
241,978.52 |
57.00 |
224,272.77 |
56.00 |
220,338.16 |
50.00 |
196,730.50 |
| 813-01 |
concrete approach slabs
|
1,111.08 |
SQYD |
183.50 |
203,883.18 |
235.00 |
261,103.80 |
220.00 |
244,437.60 |
200.00 |
222,216.00 |
| 814-01-B |
drilled shaft (24")
|
328.0 |
LNFT |
61.50 |
20,172.00 |
220.00 |
72,160.00 |
240.00 |
78,720.00 |
250.00 |
82,000.00 |
| 814-01-F |
drilled shaft (60")
|
693.0 |
LNFT |
385.00 |
266,805.00 |
245.00 |
169,785.00 |
340.00 |
235,620.00 |
270.00 |
187,110.00 |
| 814-01-J |
drilled shaft (66")
|
2,325.0 |
LNFT |
474.00 |
1,102,050.00 |
315.00 |
732,375.00 |
400.00 |
930,000.00 |
360.00 |
837,000.00 |
| 814-02-J |
trial shaft (66")
|
115.0 |
LNFT |
484.00 |
55,660.00 |
350.00 |
40,250.00 |
340.00 |
39,100.00 |
350.00 |
40,250.00 |
| 814-04-F |
crosshole sonic logging (60")
|
12   |
EACH |
1,390.00 |
16,680.00 |
4,000.00 |
48,000.00 |
1,000.00 |
12,000.00 |
2,100.00 |
25,200.00 |
| 814-04-J |
crosshole sonic logging (66")
|
45   |
EACH |
1,390.00 |
62,550.00 |
4,100.00 |
184,500.00 |
1,000.00 |
45,000.00 |
2,500.00 |
112,500.00 |
| S-002 |
concrete cast-in-place revetment (catch basin)
|
464.1 |
SQYD |
85.00 |
39,448.50 |
60.00 |
27,846.00 |
76.00 |
35,271.60 |
80.00 |
37,128.00 |
| S-101 |
test drilled shaft (66")
|
2   |
EACH |
19,740.00 |
39,480.00 |
85,000.00 |
170,000.00 |
85,000.00 |
170,000.00 |
100,000.00 |
200,000.00 |
| S-102 |
load testing a drilled shaft
|
2   |
EACH |
84,180.00 |
168,360.00 |
115,000.00 |
230,000.00 |
110,000.00 |
220,000.00 |
135,000.00 |
270,000.00 |
| S-103 |
deck drainage systems
|
lump |
LUMP |
22,160.00 |
22,160.00 |
80,000.00 |
80,000.00 |
70,000.00 |
70,000.00 |
15,000.00 |
15,000.00 |
| | SUBTOTAL GENERAL |
|
|
|
22,271,190.06 |
|
24,071,749.76 |
|
25,417,937.72 |
|
24,491,588.70 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
jointed plain concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
32,164.4 |
TON |
95.00 |
3,055,618.00 |
89.00 |
2,862,631.60 |
80.00 |
2,573,152.00 |
99.00 |
3,184,275.60 |
| 601-01-M |
portland cement concrete pavement (11" thick)
|
129,104.2 |
SQYD |
44.50 |
5,745,136.90 |
47.00 |
6,067,897.40 |
45.00 |
5,809,689.00 |
49.00 |
6,326,105.80 |
| 601-04 |
portland cement concrete pavement coring
|
165   |
EACH |
110.00 |
18,150.00 |
90.00 |
14,850.00 |
120.00 |
19,800.00 |
115.00 |
18,975.00 |
| 707-01 |
concrete curb
|
1,258.6 |
LNFT |
2.60 |
3,272.36 |
5.00 |
6,293.00 |
16.00 |
20,137.60 |
9.00 |
11,327.40 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.076 |
MILE |
1,070.00 |
81.32 |
1,050.00 |
79.80 |
850.00 |
64.60 |
1,100.00 |
83.60 |
| 732-03-A-01 |
plastic pvmt striping (broken line)(4"width)preformed
marking tape-type v) |
7.556 |
MILE |
3,760.00 |
28,410.56 |
3,510.00 |
26,521.56 |
4,700.00 |
35,513.20 |
3,800.00 |
28,712.80 |
| S-001 |
rumble strips (ground-in)
|
10.6 |
MILE |
403.00 |
4,271.80 |
750.00 |
7,950.00 |
700.00 |
7,420.00 |
840.00 |
8,904.00 |
| | SUBTOTAL ALT A1 |
|
|
|
8,854,940.94 |
|
8,986,223.36 |
|
8,465,776.40 |
|
9,578,384.20 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
superpave asphaltic concrete
|
|
|
|
|
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
110,191.7 |
TON |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 707-01 |
concrete curb
|
678.0 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 707-03 |
combination concrete curb & gutter
|
580.6 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
7.632 |
MILE |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| S-001 |
rumble strips (ground-in)
|
17.7 |
MILE |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
31,126,131.00 |
|
33,057,973.12 |
|
33,883,714.12 |
|
34,069,972.90 |
| | NUMBER OF DAYS BID AT $3,000 PER DAY. |
|
|
|
1,350,000.00 |
|
1,500,000.00 |
|
1,500,000.00 |
|
1,500,000.00 |
| | LIFE CYCLE COST |
|
|
|
968,300.00 |
|
968,300.00 |
|
968,300.00 |
|
968,300.00 |
| | TOTAL BID |
|
|
|
33,444,431.00 |
|
35,526,273.12 |
|
36,352,014.12 |
|
36,538,272.90 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - BEST-YET BUILDERS, LLC |
- 6 - SOUTHERN INDUSTRIAL CONTRACTORS LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
150,000.00 |
150,000.00 |
2,091,957.00 |
2,091,957.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
50,000.00 |
50,000.00 |
41,076.85 |
41,076.85 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
348   |
SQYD |
10.00 |
3,480.00 |
21.04 |
7,321.92 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
22,998.1 |
SQYD |
4.00 |
91,992.40 |
1.52 |
34,957.11 |
|
|
|
|
| 203-01 |
general excavation
|
854,431   |
CUYD |
3.75 |
3,204,116.25 |
2.54 |
2,170,254.74 |
|
|
|
|
| 203-02 |
drainage excavation
|
5,788   |
CUYD |
7.50 |
43,410.00 |
5.00 |
28,940.00 |
|
|
|
|
| 203-03 |
embankment
|
347,383   |
CUYD |
4.50 |
1,563,223.50 |
2.54 |
882,352.82 |
|
|
|
|
| 203-04-01 |
nonplastic embankment (stone)
|
3,732   |
CUYD |
63.00 |
235,116.00 |
75.50 |
281,766.00 |
|
|
|
|
| 203-07-B |
borrow (vehicular meas.)(plastic soils)
|
3,000   |
CUYD |
10.00 |
30,000.00 |
13.64 |
40,920.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
238   |
EACH |
10.00 |
2,380.00 |
11.50 |
2,737.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
352   |
EACH |
100.00 |
35,200.00 |
115.00 |
40,480.00 |
|
|
|
|
| 204-05-B |
temporary sediment check dams (stone)
|
40   |
EACH |
500.00 |
20,000.00 |
740.00 |
29,600.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
77,850   |
LNFT |
1.65 |
128,452.50 |
1.35 |
105,097.50 |
|
|
|
|
| 204-07 |
temporary stone construction entrance
|
2   |
EACH |
1,000.00 |
2,000.00 |
14,500.00 |
29,000.00 |
|
|
|
|
| 302-01-01 |
class ii base course (stone or recycled pcc)
|
26,507.2 |
CUYD |
63.00 |
1,669,953.60 |
67.77 |
1,796,392.94 |
|
|
|
|
| 302-02-B-01 |
class ii base course (6" thick) (soil cement)
|
190,836.6 |
SQYD |
5.65 |
1,078,226.79 |
4.72 |
900,748.75 |
|
|
|
|
| 302-02-D-01 |
class ii base course (8 1/2" thick) (soil cement)
|
23,942.1 |
SQYD |
7.00 |
167,594.70 |
5.75 |
137,667.08 |
|
|
|
|
| 302-02-F-01 |
class ii base course (12" thick) (soil cement)
|
34,464.3 |
SQYD |
8.75 |
301,562.63 |
7.79 |
268,476.90 |
|
|
|
|
| 304-05 |
lime treatment (type e)
|
413.96 |
TON |
286.00 |
118,392.56 |
295.00 |
122,118.20 |
|
|
|
|
| 305-01-D |
subgrade layer (12" thick)
|
190,837   |
SQYD |
8.00 |
1,526,696.00 |
13.83 |
2,639,275.71 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
217   |
CUYD |
60.00 |
13,020.00 |
72.70 |
15,775.90 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
0.10 |
50.00 |
44.85 |
22,425.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
3,336.5 |
TON |
100.00 |
333,650.00 |
132.25 |
441,252.13 |
|
|
|
|
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
34,686   |
GAL |
3.00 |
104,058.00 |
3.74 |
129,725.64 |
|
|
|
|
| 507-02-B |
aggregate (s2)
|
51,010   |
SQYD |
1.75 |
89,267.50 |
1.89 |
96,408.90 |
|
|
|
|
| 507-02-C |
aggregate (s3)
|
51,010   |
SQYD |
1.75 |
89,267.50 |
1.66 |
84,676.60 |
|
|
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
2,256   |
LNFT |
63.00 |
142,128.00 |
54.67 |
123,335.52 |
|
|
|
|
| 701-01-K |
cross drain pipe (30" rcp)
|
174   |
LNFT |
90.00 |
15,660.00 |
75.51 |
13,138.74 |
|
|
|
|
| 701-01-N |
cross drain pipe (42" rcp)
|
370   |
LNFT |
175.00 |
64,750.00 |
115.73 |
42,820.10 |
|
|
|
|
| 701-01-P |
cross drain pipe (54" rcp)
|
130   |
LNFT |
250.00 |
32,500.00 |
184.66 |
24,005.80 |
|
|
|
|
| 701-01-S |
cross drain pipe (72" rcp)
|
152   |
LNFT |
465.00 |
70,680.00 |
306.18 |
46,539.36 |
|
|
|
|
| 701-02-G |
cross drain pipe arch (42" equiv. rcpa)
|
384   |
LNFT |
210.00 |
80,640.00 |
152.00 |
58,368.00 |
|
|
|
|
| 701-05-G |
side drain pipe (18")
|
1,085   |
LNFT |
37.50 |
40,687.50 |
36.50 |
39,602.50 |
|
|
|
|
| 701-05-I |
side drain pipe (24")
|
238   |
LNFT |
60.00 |
14,280.00 |
54.68 |
13,013.84 |
|
|
|
|
| 701-05-K |
side drain pipe (30")
|
370   |
LNFT |
80.00 |
29,600.00 |
75.51 |
27,938.70 |
|
|
|
|
| 701-05-Q-01 |
side drain pipe (60")(erosion)
|
70   |
LNFT |
265.00 |
18,550.00 |
237.00 |
16,590.00 |
|
|
|
|
| 701-15 |
concrete collar
|
8   |
EACH |
1,000.00 |
8,000.00 |
670.00 |
5,360.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
31   |
EACH |
3,000.00 |
93,000.00 |
3,312.00 |
102,672.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
5   |
EACH |
1,500.00 |
7,500.00 |
3,000.00 |
15,000.00 |
|
|
|
|
| 702-05-A |
cross drain end treatment (2 barrels, 42" rcp)
|
1   |
EACH |
5,000.00 |
5,000.00 |
9,775.00 |
9,775.00 |
|
|
|
|
| 702-05-B |
cross drain end treatment (2 barrels, 42" equiv. rcpa)
|
1   |
EACH |
5,000.00 |
5,000.00 |
9,890.00 |
9,890.00 |
|
|
|
|
| 703-03 |
perforated pipe underdrains
|
500   |
LNFT |
10.00 |
5,000.00 |
11.50 |
5,750.00 |
|
|
|
|
| 703-04 |
nonperforated pipe underdrains
|
500   |
LNFT |
10.00 |
5,000.00 |
28.75 |
14,375.00 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
137.5 |
LNFT |
38.50 |
5,293.75 |
40.25 |
5,534.38 |
|
|
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
518.8 |
LNFT |
53.00 |
27,496.40 |
63.25 |
32,814.10 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
1,581.3 |
LNFT |
22.00 |
34,788.60 |
23.00 |
36,369.90 |
|
|
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
25.0 |
LNFT |
110.00 |
2,750.00 |
97.75 |
2,443.75 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
71.50 |
14,300.00 |
69.00 |
13,800.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
12   |
EACH |
2,310.00 |
27,720.00 |
2,588.00 |
31,056.00 |
|
|
|
|
| 704-11-C |
guard rail end treatment (bi-directional)
|
2   |
EACH |
4,950.00 |
9,900.00 |
5,750.00 |
11,500.00 |
|
|
|
|
| 705-01 |
barbed wire fence
|
5,733   |
LNFT |
5.50 |
31,531.50 |
7.48 |
42,882.84 |
|
|
|
|
| 705-02 |
combination mesh & barbed wire fence
|
10,766   |
LNFT |
6.60 |
71,055.60 |
8.63 |
92,910.58 |
|
|
|
|
| 705-04 |
single swinging driveway gates
|
11   |
EACH |
660.00 |
7,260.00 |
794.00 |
8,734.00 |
|
|
|
|
| 705-05 |
double swinging driveway gates
|
3   |
DBGT |
880.00 |
2,640.00 |
1,093.00 |
3,279.00 |
|
|
|
|
| 705-09 |
rebuilt fence
|
48   |
LNFT |
22.00 |
1,056.00 |
115.00 |
5,520.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
200.7 |
SQYD |
70.00 |
14,049.00 |
80.00 |
16,056.00 |
|
|
|
|
| 706-03-A |
incidental concrete paving (4" thick)
|
1,291.5 |
SQYD |
60.00 |
77,490.00 |
64.50 |
83,301.75 |
|
|
|
|
| 711-01-B |
riprap (10 lb, 12" thick)
|
140   |
SQYD |
40.00 |
5,600.00 |
24.40 |
3,416.00 |
|
|
|
|
| 711-01-C |
riprap (30 lb, 14" thick)
|
5,943   |
SQYD |
50.00 |
297,150.00 |
28.36 |
168,543.48 |
|
|
|
|
| 711-01-D |
riprap (55 lb, 18" thick)
|
870   |
SQYD |
62.00 |
53,940.00 |
36.65 |
31,885.50 |
|
|
|
|
| 711-04 |
geotextile fabric
|
6,953   |
SQYD |
2.00 |
13,906.00 |
0.98 |
6,813.94 |
|
|
|
|
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
3,920   |
SQYD |
63.00 |
246,960.00 |
64.40 |
252,448.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
200,000.00 |
200,000.00 |
171,032.00 |
171,032.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
119.8 |
TON |
522.50 |
62,595.50 |
512.00 |
61,337.60 |
|
|
|
|
| 717-01 |
seeding
|
2,397   |
LB |
7.65 |
18,337.05 |
9.20 |
22,052.40 |
|
|
|
|
| 718-01 |
fertilizer
|
59,920   |
LB |
0.55 |
32,956.00 |
0.52 |
31,158.40 |
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
28,669   |
SQYD |
1.15 |
32,969.35 |
1.33 |
38,129.77 |
|
|
|
|
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
5,781   |
SQYD |
1.60 |
9,249.60 |
1.84 |
10,637.04 |
|
|
|
|
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
16,612   |
SQYD |
1.60 |
26,579.20 |
1.90 |
31,562.80 |
|
|
|
|
| 720-01-E |
erosion control system, flexible channel liner (type e)
|
1,794   |
SQYD |
1.60 |
2,870.40 |
3.16 |
5,669.04 |
|
|
|
|
| 720-01-F |
erosion control system, flexible channel liner (type f)
|
577   |
SQYD |
1.60 |
923.20 |
3.74 |
2,157.98 |
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
25,000.00 |
25,000.00 |
35,000.00 |
35,000.00 |
|
|
|
|
| 726-01 |
bedding material
|
663.0 |
CUYD |
70.00 |
46,410.00 |
81.75 |
54,200.25 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
3,000,000.00 |
3,000,000.00 |
2,127,946.00 |
2,127,946.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
60   |
EACH |
71.50 |
4,290.00 |
74.75 |
4,485.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
14   |
EACH |
120.00 |
1,680.00 |
86.25 |
1,207.50 |
|
|
|
|
| 729-19-A |
dead end road installations(type a)
|
1   |
EACH |
2,100.00 |
2,100.00 |
2,300.00 |
2,300.00 |
|
|
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
234   |
EACH |
18.70 |
4,375.80 |
13.80 |
3,229.20 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,195   |
EACH |
6.00 |
13,170.00 |
5.88 |
12,906.60 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
25.301 |
MILE |
2,695.00 |
68,186.20 |
3,340.00 |
84,505.34 |
|
|
|
|
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
0.714 |
MILE |
5,390.00 |
3,848.46 |
7,287.00 |
5,202.92 |
|
|
|
|
| 732-02-E |
plastic pavement striping (solid line) (24" width)
|
0.238 |
MILE |
15,950.00 |
3,796.10 |
24,288.00 |
5,780.54 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
5   |
EACH |
247.50 |
1,237.50 |
242.00 |
1,210.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
5   |
EACH |
258.50 |
1,292.50 |
253.00 |
1,265.00 |
|
|
|
|
| 735-01 |
mailboxes
|
16   |
EACH |
50.00 |
800.00 |
50.00 |
800.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
16   |
EACH |
150.00 |
2,400.00 |
100.00 |
1,600.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
500,000.00 |
500,000.00 |
1,087,000.00 |
1,087,000.00 |
|
|
|
|
| 740-02 |
utility oversight and coordination
|
lump |
LUMP |
20,000.00 |
20,000.00 |
27,600.00 |
27,600.00 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
128.68 |
CUYD |
600.00 |
77,208.00 |
700.00 |
90,076.00 |
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
1,142.55 |
CUYD |
560.00 |
639,828.00 |
560.00 |
639,828.00 |
|
|
|
|
| 805-03 |
class aa concrete
|
68.32 |
CUYD |
750.00 |
51,240.00 |
750.00 |
51,240.00 |
|
|
|
|
| 805-04 |
class aa(m) concrete
|
1,897.81 |
CUYD |
590.00 |
1,119,707.90 |
600.00 |
1,138,686.00 |
|
|
|
|
| 805-08-C |
precast-prestressed concrete girders (type iii)
|
1,101.4 |
LNFT |
111.50 |
122,806.10 |
112.00 |
123,356.80 |
|
|
|
|
| 805-08-D |
precast-prestressed concrete girders (type iv)
|
3,000.0 |
LNFT |
166.25 |
498,750.00 |
170.00 |
510,000.00 |
|
|
|
|
| 805-08-G |
precast-prestressed concrete girders (type bt-72)
|
1,803.6 |
LNFT |
192.75 |
347,643.90 |
190.00 |
342,684.00 |
|
|
|
|
| 805-11 |
strip seal joints
|
537.55 |
LNFT |
138.00 |
74,181.90 |
140.00 |
75,257.00 |
|
|
|
|
| 805-12-M |
reinforced concrete box culverts (6'x 6')
|
98.4 |
LNFT |
540.00 |
53,136.00 |
600.00 |
59,040.00 |
|
|
|
|
| 805-12-P |
reinforced concrete box culverts (7'x 7')
|
251.6 |
LNFT |
600.00 |
150,960.00 |
750.00 |
188,700.00 |
|
|
|
|
| 805-12-Q |
reinforced concrete box culverts (8'x 7')
|
174.6 |
LNFT |
630.00 |
109,998.00 |
800.00 |
139,680.00 |
|
|
|
|
| 805-12-X |
reinforced concrete box culverts (10'x 10')
|
530.0 |
LNFT |
1,123.00 |
595,190.00 |
1,200.00 |
636,000.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
303,374   |
LB |
0.73 |
221,463.02 |
0.75 |
227,530.50 |
|
|
|
|
| 806-02 |
deformed reinforcing steel (epoxy coated)
|
569,139   |
LB |
0.81 |
461,002.59 |
0.82 |
466,693.98 |
|
|
|
|
| 807-08 |
structural metalwork
|
lump |
LUMP |
1,685,000.00 |
1,685,000.00 |
1,685,000.00 |
1,685,000.00 |
|
|
|
|
| 810-01 |
concrete railing (barrier)
|
3,934.61 |
LNFT |
80.00 |
314,768.80 |
80.00 |
314,768.80 |
|
|
|
|
| 813-01 |
concrete approach slabs
|
1,111.08 |
SQYD |
27.00 |
29,999.16 |
50.00 |
55,554.00 |
|
|
|
|
| 814-01-B |
drilled shaft (24")
|
328.0 |
LNFT |
73.00 |
23,944.00 |
75.00 |
24,600.00 |
|
|
|
|
| 814-01-F |
drilled shaft (60")
|
693.0 |
LNFT |
431.00 |
298,683.00 |
450.00 |
311,850.00 |
|
|
|
|
| 814-01-J |
drilled shaft (66")
|
2,325.0 |
LNFT |
525.00 |
1,220,625.00 |
525.00 |
1,220,625.00 |
|
|
|
|
| 814-02-J |
trial shaft (66")
|
115.0 |
LNFT |
415.00 |
47,725.00 |
415.00 |
47,725.00 |
|
|
|
|
| 814-04-F |
crosshole sonic logging (60")
|
12   |
EACH |
1,500.00 |
18,000.00 |
2,000.00 |
24,000.00 |
|
|
|
|
| 814-04-J |
crosshole sonic logging (66")
|
45   |
EACH |
1,500.00 |
67,500.00 |
2,000.00 |
90,000.00 |
|
|
|
|
| S-002 |
concrete cast-in-place revetment (catch basin)
|
464.1 |
SQYD |
60.00 |
27,846.00 |
100.00 |
46,410.00 |
|
|
|
|
| S-101 |
test drilled shaft (66")
|
2   |
EACH |
20,000.00 |
40,000.00 |
20,000.00 |
40,000.00 |
|
|
|
|
| S-102 |
load testing a drilled shaft
|
2   |
EACH |
90,000.00 |
180,000.00 |
90,000.00 |
180,000.00 |
|
|
|
|
| S-103 |
deck drainage systems
|
lump |
LUMP |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| | SUBTOTAL GENERAL |
|
|
|
25,211,245.51 |
|
26,433,168.93 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
jointed plain concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
32,164.4 |
TON |
75.00 |
2,412,330.00 |
102.00 |
3,280,768.80 |
|
|
|
|
| 601-01-M |
portland cement concrete pavement (11" thick)
|
129,104.2 |
SQYD |
50.00 |
6,455,210.00 |
45.00 |
5,809,689.00 |
|
|
|
|
| 601-04 |
portland cement concrete pavement coring
|
165   |
EACH |
100.00 |
16,500.00 |
120.00 |
19,800.00 |
|
|
|
|
| 707-01 |
concrete curb
|
1,258.6 |
LNFT |
10.00 |
12,586.00 |
30.00 |
37,758.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.076 |
MILE |
1,100.00 |
83.60 |
1,000.00 |
76.00 |
|
|
|
|
| 732-03-A-01 |
plastic pvmt striping (broken line)(4"width)preformed
marking tape-type v) |
7.556 |
MILE |
3,850.00 |
29,090.60 |
5,313.00 |
40,145.03 |
|
|
|
|
| S-001 |
rumble strips (ground-in)
|
10.6 |
MILE |
2,800.00 |
29,680.00 |
1,416.00 |
15,009.60 |
|
|
|
|
| | SUBTOTAL ALT A1 |
|
|
|
8,955,480.20 |
|
9,203,246.43 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
superpave asphaltic concrete
|
|
|
|
|
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
110,191.7 |
TON |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 707-01 |
concrete curb
|
678.0 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 707-03 |
combination concrete curb & gutter
|
580.6 |
LNFT |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
7.632 |
MILE |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| S-001 |
rumble strips (ground-in)
|
17.7 |
MILE |
0.00 |
0.00 |
0.00 |
0.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
34,166,725.71 |
|
35,636,415.36 |
|
|
|
|
| | NUMBER OF DAYS BID AT $3,000 PER DAY. |
|
|
|
1,500,000.00 |
|
1,500,000.00 |
|
|
|
|
| | LIFE CYCLE COST |
|
|
|
968,300.00 |
|
968,300.00 |
|
|
|
|
| | TOTAL BID |
|
|
|
36,635,025.71 |
|
38,104,715.36 |
|
|
|
|
|