Letting of 3/18/2009 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 268-02-0018
Parish: LIVINGSTON
Routes: LA 447
Description: JCT. ROUTE US 190 - JCT. ROUTE LA 1019
Type Const: grading, cold planing asphaltic concrete pavement, superpave asphaltic concrete
pavement, pavement patching, and related work.
Estimated Construction Cost: $4,683,740.15
 
RankLicenseBidderConstruction Bid
1 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $3,188,506.94
2 00046 BARBER BROS. CONTRACTING CO., L.L.C $3,623,424.80
3 06276 BARRIERE CONSTRUCTION CO., LLC. $3,632,126.68
4 00849 F.G. SULLIVAN, JR. CONTRACTOR LLC $3,757,906.00
5 00481 COASTAL BRIDGE CO., L.L.C. $4,078,973.10
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
BARBER BROS. CONTRACTING CO., L.L.C
- 3 -
BARRIERE CONSTRUCTION CO., LLC.
- 4 -
F.G. SULLIVAN, JR. CONTRACTOR LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-07 borrow (vehicular measurement) 200      CUYD 40.00 8,000.00 25.00 5,000.00 60.00 12,000.00 15.00 3,000.00
401-02 aggregate surface course (adjusted vehicular
measurement)
865      CUYD 60.00 51,900.00 75.00 64,875.00 50.00 43,250.00 70.00 60,550.00
502-01 superpave asphaltic concrete 30,719.6    TON 69.00 2,119,652.40 85.00 2,611,166.00 77.00 2,365,409.20 80.00 2,457,568.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,933.1    TON 143.00 276,433.30 130.00 251,303.00 120.00 231,972.00 100.00 193,310.00
509-01 cold planing asphaltic pavement 103,980      SQYD 1.60 166,368.00 1.00 103,980.00 1.25 129,975.00 2.00 207,960.00
509-02 contractor retained reclaimed asphaltic pavement - 2,166      CUYD 0.10 - 216.60 0.00 0.00 0.10 - 216.60 0.00 0.00
510-01-B pavement patching (12" minimum thickness) 3,000      SQYD 75.00 225,000.00 70.00 210,000.00 50.00 150,000.00 70.00 210,000.00
712-02 sacked concrete revetment 22      SQYD 120.00 2,640.00 120.00 2,640.00 375.00 8,250.00 100.00 2,200.00
713-01 temporary signs & barricades lump      LUMP 25,000.00 25,000.00 60,000.00 60,000.00 115,000.00 115,000.00 200,000.00 200,000.00
713-02-C temporary pavement markings (8" width) 704      LNFT 0.20 140.80 0.25 176.00 0.15 105.60 0.10 70.40
713-02-E temporary pavement markings (24" width) 988      LNFT 0.60 592.80 0.60 592.80 0.05 49.40 0.20 197.60
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
19.890  MILE 140.00 2,784.60 300.00 5,967.00 157.00 3,122.73 400.00 7,956.00
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
8.790  MILE 1.00 8.79 350.00 3,076.50 275.00 2,417.25 100.00 879.00
713-04-A temporary pavement markings (solid line)(4" width) 69.600  MILE 1.00 69.60 300.00 20,880.00 435.00 30,276.00 100.00 6,960.00
713-05-A temporary pavement legends and symbols (arrow) 36      EACH 1.00 36.00 90.00 3,240.00 45.50 1,638.00 30.00 1,080.00
713-05-C temporary pavement legends and symbols (only) 21      EACH 1.00 21.00 90.00 1,890.00 45.00 945.00 30.00 630.00
713-05-D temporary pavement legends and symbols (rr crossing) 6      EACH 1.00 6.00 120.00 720.00 110.00 660.00 30.00 180.00
727-01 mobilization lump      LUMP 148,650.00 148,650.00 100,000.00 100,000.00 325,000.00 325,000.00 200,000.00 200,000.00
731-02 reflectorized raised pavement markers 2,419      EACH 4.75 11,490.25 6.50 15,723.50 5.65 13,667.35 6.00 14,514.00
732-01-A plastic pavement striping (4" width) 1,235      LNFT 0.50 617.50 0.60 741.00 0.75 926.25 1.00 1,235.00
732-01-C plastic pavement striping (8" width) 504      LNFT 1.00 504.00 1.25 630.00 0.75 378.00 1.50 756.00
732-01-E plastic pavement striping (24" width) 768      LNFT 3.25 2,496.00 6.00 4,608.00 3.50 2,688.00 5.00 3,840.00
732-02-A plastic pavement striping (solid line) (4" width) 23.200  MILE 2,500.00 58,000.00 2,800.00 64,960.00 2,650.00 61,480.00 2,700.00 62,640.00
732-03-A plastic pavement striping (broken line)(4" width) 2.930  MILE 750.00 2,197.50 1,000.00 2,930.00 1,200.00 3,516.00 900.00 2,637.00
732-04-A plastic pavement legends & symbols (arrow) 12      EACH 205.00 2,460.00 250.00 3,000.00 255.00 3,060.00 250.00 3,000.00
732-04-C plastic pavement legends & symbols (only) 7      EACH 205.00 1,435.00 250.00 1,750.00 245.00 1,715.00 250.00 1,750.00
732-04-D plastic pavement legends & symbols (rr crossing) 2      EACH 410.00 820.00 500.00 1,000.00 435.00 870.00 450.00 900.00
735-01 mailboxes 220      EACH 1.00 220.00 2.00 440.00 10.00 2,200.00 5.00 1,100.00
735-02 mailbox supports (single) 198      EACH 95.00 18,810.00 110.00 21,780.00 85.00 16,830.00 125.00 24,750.00
735-03 mailbox supports (double) 11      EACH 130.00 1,430.00 150.00 1,650.00 197.50 2,172.50 175.00 1,925.00
739-01 hydro-seeding 5.38   ACRE 1,000.00 5,380.00 1,200.00 6,456.00 1,500.00 8,070.00 1,100.00 5,918.00
740-01 construction layout lump      LUMP 29,000.00 29,000.00 28,000.00 28,000.00 38,000.00 38,000.00 50,500.00 50,500.00
S-001 centerline rumble strips (ground-in) 6.6    MILE 1,600.00 10,560.00 1,250.00 8,250.00 1,500.00 9,900.00 1,500.00 9,900.00
S-002 saw cutting asphaltic concrete patches (4 1/2" deep) 4,000      LNFT 4.00 16,000.00 4.00 16,000.00 11.70 46,800.00 5.00 20,000.00
                       
 CONTRACTOR TOTAL       3,188,506.94   3,623,424.80   3,632,126.68   3,757,906.00
 
Item Number Item Description Quantity Unit of Measure - 5 -
COASTAL BRIDGE CO., L.L.C.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-07 borrow (vehicular measurement) 200      CUYD 20.00 4,000.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
865      CUYD 25.00 21,625.00            
502-01 superpave asphaltic concrete 30,719.6    TON 88.00 2,703,324.80            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,933.1    TON 150.00 289,965.00            
509-01 cold planing asphaltic pavement 103,980      SQYD 1.35 140,373.00            
509-02 contractor retained reclaimed asphaltic pavement - 2,166      CUYD 0.00 0.00            
510-01-B pavement patching (12" minimum thickness) 3,000      SQYD 80.00 240,000.00            
712-02 sacked concrete revetment 22      SQYD 100.00 2,200.00            
713-01 temporary signs & barricades lump      LUMP 65,000.00 65,000.00            
713-02-C temporary pavement markings (8" width) 704      LNFT 0.20 140.80            
713-02-E temporary pavement markings (24" width) 988      LNFT 0.50 494.00            
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
19.890  MILE 400.00 7,956.00            
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
8.790  MILE 300.00 2,637.00            
713-04-A temporary pavement markings (solid line)(4" width) 69.600  MILE 400.00 27,840.00            
713-05-A temporary pavement legends and symbols (arrow) 36      EACH 75.00 2,700.00            
713-05-C temporary pavement legends and symbols (only) 21      EACH 75.00 1,575.00            
713-05-D temporary pavement legends and symbols (rr crossing) 6      EACH 100.00 600.00            
727-01 mobilization lump      LUMP 410,000.00 410,000.00            
731-02 reflectorized raised pavement markers 2,419      EACH 5.50 13,304.50            
732-01-A plastic pavement striping (4" width) 1,235      LNFT 0.50 617.50            
732-01-C plastic pavement striping (8" width) 504      LNFT 1.00 504.00            
732-01-E plastic pavement striping (24" width) 768      LNFT 4.50 3,456.00            
732-02-A plastic pavement striping (solid line) (4" width) 23.200  MILE 2,450.00 56,840.00            
732-03-A plastic pavement striping (broken line)(4" width) 2.930  MILE 850.00 2,490.50            
732-04-A plastic pavement legends & symbols (arrow) 12      EACH 215.00 2,580.00            
732-04-C plastic pavement legends & symbols (only) 7      EACH 215.00 1,505.00            
732-04-D plastic pavement legends & symbols (rr crossing) 2      EACH 425.00 850.00            
735-01 mailboxes 220      EACH 1.00 220.00            
735-02 mailbox supports (single) 198      EACH 90.00 17,820.00            
735-03 mailbox supports (double) 11      EACH 125.00 1,375.00            
739-01 hydro-seeding 5.38   ACRE 1,000.00 5,380.00            
740-01 construction layout lump      LUMP 25,000.00 25,000.00            
S-001 centerline rumble strips (ground-in) 6.6    MILE 1,000.00 6,600.00            
S-002 saw cutting asphaltic concrete patches (4 1/2" deep) 4,000      LNFT 5.00 20,000.00            
                       
 CONTRACTOR TOTAL       4,078,973.10            