DBE GOAL FED
Lead Project: 194-02-0061
Parish: CAMERON
Routes: LA 82
Description: MERMENTAU RIVER BRIDGE REHABILITATION
Type Const: structural steel, concrete, earthwork, mechanical, electrical, painting, operator
house renovations, and related work.
Estimated Construction Cost: $4,866,178.48
 
RankLicenseBidderConstruction Bid
1 26435 C.E.C., INC. $3,891,939.30
2 00060 F. MILLER CONSTRUCTION LLC $3,924,927.65
3 01012 CECIL D. GASSIOTT LLC $4,130,444.96
4 39452 M&J CONST CO OF PINELLAS COUNTY INC $4,619,253.70
5 25652 TOPCOR SERVICES, INC $4,791,114.30
 
Item Number Item Description Quantity Unit of Measure - 1 -
C.E.C., INC.
- 2 -
F. MILLER CONSTRUCTION LLC
- 3 -
CECIL D. GASSIOTT LLC
- 4 -
M&J CONST CO OF PINELLAS COUNTY INC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
710-01 flowable fill 8      CUYD 650.00 5,200.00 520.00 4,160.00 300.00 2,400.00 350.00 2,800.00
712-01 concrete cast-in-place revetment (4 " thick) 123      SQYD 135.00 16,605.00 300.00 36,900.00 225.00 27,675.00 500.00 61,500.00
713-01 temporary signs & barricades lump      LUMP 100,000.00 100,000.00 40,000.00 40,000.00 15,000.00 15,000.00 67,500.00 67,500.00
713-08 temporary precast concrete barrier (department
furnished)
18      EACH 450.00 8,100.00 780.00 14,040.00 1.00 18.00 833.33 14,999.94
713-10 temporary precast concrete barrier movement 720      EACH 20.00 14,400.00 78.00 56,160.00 100.00 72,000.00 156.95 113,004.00
727-01 mobilization lump      LUMP 250,000.00 250,000.00 340,000.00 340,000.00 200,000.00 200,000.00 384,051.00 384,051.00
730-09 electrical system lump      LUMP 520,000.00 520,000.00 560,000.00 560,000.00 875,000.00 875,000.00 596,275.00 596,275.00
731-02 reflectorized raised pavement markers 58      EACH 7.00 406.00 6.10 353.80 10.00 580.00 7.02 407.16
732-01 plastic pavement striping ( 4" width) 3,381      LNFT 0.80 2,704.80 0.70 2,366.70 1.00 3,381.00 0.81 2,738.61
737-03 painted traffic striping (solid line) 816      LNFT 0.25 204.00 0.20 163.20 3.00 2,448.00 0.23 187.68
804-03 steel piles (hp 12 x 53) 1,050      LNFT 155.00 162,750.00 80.00 84,000.00 185.00 194,250.00 163.59 171,769.50
805-01 class a concrete 11.54   CUYD 1,250.00 14,425.00 1,000.00 11,540.00 500.00 5,770.00 984.40 11,359.98
808-01 steel grid flooring 4,938.7    SQFT 85.00 419,789.50 98.00 483,992.60 150.00 740,805.00 86.71 428,234.68
809-01 movable bridge machinery lump      LUMP 700,000.00 700,000.00 650,000.00 650,000.00 600,000.00 600,000.00 1,058,930.00 1,058,930.00
812-01 treated timber (coastal treatment) 12.00   MFBM 12,000.00 144,000.00 10,400.00 124,800.00 11,290.00 135,480.00 15,266.25 183,195.00
S-01 install platform at warning gates 4      EACH 4,000.00 16,000.00 20,000.00 80,000.00 18,000.00 72,000.00 13,800.00 55,200.00
S-02 repair roof of operator's house lump      LUMP 10,000.00 10,000.00 20,000.00 20,000.00 5,000.00 5,000.00 22,817.00 22,817.00
S-03 repair concrete spalls on underside of roadway deck 1,443      SQFT 130.00 187,590.00 125.00 180,375.00 25.72 37,113.96 95.00 137,085.00
S-04 repair concrete deck spalls 33      SQFT 250.00 8,250.00 120.00 3,960.00 25.00 825.00 95.00 3,135.00
S-05 repair concrete railing support spalls 3      SQFT 2,000.00 6,000.00 10,000.00 30,000.00 300.00 900.00 500.00 1,500.00
S-06 replace damaged railing channel 20      LNFT 220.00 4,400.00 90.00 1,800.00 100.00 2,000.00 172.50 3,450.00
S-07 remove channel at northwest barrier column lump      LUMP 3,200.00 3,200.00 900.00 900.00 2,000.00 2,000.00 1,380.00 1,380.00
S-08 replace nuts and washers at northwest barrier column lump      LUMP 2,500.00 2,500.00 1,400.00 1,400.00 500.00 500.00 345.00 345.00
S-09 repair/replace anchor bolts 12      EACH 100.00 1,200.00 500.00 6,000.00 50.00 600.00 382.95 4,595.40
S-10 replace bolts in lateral connection plate 36      EACH 300.00 10,800.00 130.00 4,680.00 40.00 1,440.00 86.25 3,105.00
S-11 install platforms at barrier gates 4      EACH 17,000.00 68,000.00 21,000.00 84,000.00 18,000.00 72,000.00 20,700.00 82,800.00
S-12 install new water line 765      LNFT 25.00 19,125.00 60.00 45,900.00 10.00 7,650.00 25.56 19,553.40
S-13 replace sidewalk checkered plate 418      LNFT 210.00 87,780.00 240.00 100,320.00 187.00 78,166.00 287.50 120,175.00
S-14 replace ladders 5      EACH 3,500.00 17,500.00 3,000.00 15,000.00 3,300.00 16,500.00 1,150.00 5,750.00
S-15 replace navigation light support platform lump      LUMP 15,000.00 15,000.00 9,500.00 9,500.00 15,000.00 15,000.00 9,200.00 9,200.00
S-16 replace deteriorated bolts 264      EACH 100.00 26,400.00 70.00 18,480.00 36.00 9,504.00 69.00 18,216.00
S-17 install rest pier fender access platform lump      LUMP 30,000.00 30,000.00 24,000.00 24,000.00 21,000.00 21,000.00 11,500.00 11,500.00
S-18 install walkway grating and handrail on top of fender
system
400      LNFT 400.00 160,000.00 350.00 140,000.00 225.00 90,000.00 540.50 216,200.00
S-19 field paint existing bridge metalwork lump      LUMP 560,000.00 560,000.00 550,000.00 550,000.00 650,000.00 650,000.00 590,000.00 590,000.00
S-20 replace anchor bolt nuts and washers 34      EACH 250.00 8,500.00 90.00 3,060.00 37.00 1,258.00 69.00 2,346.00
S-21 replace operator house doors 2      EACH 3,500.00 7,000.00 3,700.00 7,400.00 1,500.00 3,000.00 2,058.50 4,117.00
S-22 replace operator house window blinds 8      EACH 350.00 2,800.00 110.00 880.00 200.00 1,600.00 345.00 2,760.00
S-23 repair exterior wall cracks and paint exterior walls
of operator's house
lump      LUMP 2,300.00 2,300.00 4,000.00 4,000.00 3,500.00 3,500.00 3,800.00 3,800.00
S-24 remodel bathroom fixtures inside operator's house lump      LUMP 7,000.00 7,000.00 600.00 600.00 3,000.00 3,000.00 2,530.00 2,530.00
S-25 repair and install new floor and wall tiles inside
operator's house
lump      LUMP 20,000.00 20,000.00 3,500.00 3,500.00 3,500.00 3,500.00 12,696.00 12,696.00
S-26 remove and replace operator house windows lump      LUMP 30,000.00 30,000.00 17,500.35 17,500.35 2,500.00 2,500.00 20,573.52 20,573.52
S-27 paint interior of operator's house lump      LUMP 3,000.00 3,000.00 2,000.00 2,000.00 2,500.00 2,500.00 1,725.00 1,725.00
S-28 install miscellaneous items at operator's house lump      LUMP 15,000.00 15,000.00 14,600.00 14,600.00 2,500.00 2,500.00 10,247.00 10,247.00
S-29 remove abandoned conduit 398      LNFT 15.00 5,970.00 7.00 2,786.00 37.00 14,726.00 7.23 2,877.54
S-30 remove abandoned conduit hangers 28      EACH 230.00 6,440.00 105.00 2,940.00 75.00 2,100.00 102.68 2,875.04
S-31 lateral bracing repairs lump      LUMP 7,000.00 7,000.00 2,500.00 2,500.00 7,500.00 7,500.00 4,140.00 4,140.00
S-32 replace roadway stringers 357      LNFT 300.00 107,100.00 210.00 74,970.00 215.00 76,755.00 224.25 80,057.25
S-33 repair holes in chord web 6      EACH 2,250.00 13,500.00 1,200.00 7,200.00 1,000.00 6,000.00 862.50 5,175.00
S-34 install walkway around operator's house lump      LUMP 50,000.00 50,000.00 46,500.00 46,500.00 36,500.00 36,500.00 52,900.00 52,900.00
S-35 install air compressor platform and deck drain pipe 1      EACH 6,000.00 6,000.00 5,500.00 5,500.00 1,500.00 1,500.00 4,600.00 4,600.00
S-36 modify suspended platform hangers/supports lump      LUMP 8,000.00 8,000.00 4,200.00 4,200.00 5,000.00 5,000.00 2,875.00 2,875.00
                       
 CONTRACTOR TOTAL       3,891,939.30   3,924,927.65   4,130,444.96   4,619,253.70
 
Item Number Item Description Quantity Unit of Measure - 5 -
TOPCOR SERVICES, INC

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
710-01 flowable fill 8      CUYD 1,500.00 12,000.00            
712-01 concrete cast-in-place revetment (4 " thick) 123      SQYD 185.00 22,755.00            
713-01 temporary signs & barricades lump      LUMP 83,925.00 83,925.00            
713-08 temporary precast concrete barrier (department
furnished)
18      EACH 4,665.00 83,970.00            
713-10 temporary precast concrete barrier movement 720      EACH 115.00 82,800.00            
727-01 mobilization lump      LUMP 348,000.00 348,000.00            
730-09 electrical system lump      LUMP 914,450.00 914,450.00            
731-02 reflectorized raised pavement markers 58      EACH 10.00 580.00            
732-01 plastic pavement striping ( 4" width) 3,381      LNFT 2.00 6,762.00            
737-03 painted traffic striping (solid line) 816      LNFT 1.50 1,224.00            
804-03 steel piles (hp 12 x 53) 1,050      LNFT 70.00 73,500.00            
805-01 class a concrete 11.54   CUYD 550.00 6,347.00            
808-01 steel grid flooring 4,938.7    SQFT 79.00 390,157.30            
809-01 movable bridge machinery lump      LUMP 828,500.00 828,500.00            
812-01 treated timber (coastal treatment) 12.00   MFBM 8,575.00 102,900.00            
S-01 install platform at warning gates 4      EACH 10,500.00 42,000.00            
S-02 repair roof of operator's house lump      LUMP 14,600.00 14,600.00            
S-03 repair concrete spalls on underside of roadway deck 1,443      SQFT 92.00 132,756.00            
S-04 repair concrete deck spalls 33      SQFT 70.00 2,310.00            
S-05 repair concrete railing support spalls 3      SQFT 85.00 255.00            
S-06 replace damaged railing channel 20      LNFT 300.00 6,000.00            
S-07 remove channel at northwest barrier column lump      LUMP 4,000.00 4,000.00            
S-08 replace nuts and washers at northwest barrier column lump      LUMP 5,200.00 5,200.00            
S-09 repair/replace anchor bolts 12      EACH 450.00 5,400.00            
S-10 replace bolts in lateral connection plate 36      EACH 150.00 5,400.00            
S-11 install platforms at barrier gates 4      EACH 10,500.00 42,000.00            
S-12 install new water line 765      LNFT 19.00 14,535.00            
S-13 replace sidewalk checkered plate 418      LNFT 225.00 94,050.00            
S-14 replace ladders 5      EACH 8,350.00 41,750.00            
S-15 replace navigation light support platform lump      LUMP 40,000.00 40,000.00            
S-16 replace deteriorated bolts 264      EACH 20.00 5,280.00            
S-17 install rest pier fender access platform lump      LUMP 75,000.00 75,000.00            
S-18 install walkway grating and handrail on top of fender
system
400      LNFT 100.00 40,000.00            
S-19 field paint existing bridge metalwork lump      LUMP 764,000.00 764,000.00            
S-20 replace anchor bolt nuts and washers 34      EACH 150.00 5,100.00            
S-21 replace operator house doors 2      EACH 7,300.00 14,600.00            
S-22 replace operator house window blinds 8      EACH 1,850.00 14,800.00            
S-23 repair exterior wall cracks and paint exterior walls
of operator's house
lump      LUMP 1,500.00 1,500.00            
S-24 remodel bathroom fixtures inside operator's house lump      LUMP 14,600.00 14,600.00            
S-25 repair and install new floor and wall tiles inside
operator's house
lump      LUMP 14,500.00 14,500.00            
S-26 remove and replace operator house windows lump      LUMP 14,600.00 14,600.00            
S-27 paint interior of operator's house lump      LUMP 14,500.00 14,500.00            
S-28 install miscellaneous items at operator's house lump      LUMP 14,600.00 14,600.00            
S-29 remove abandoned conduit 398      LNFT 21.00 8,358.00            
S-30 remove abandoned conduit hangers 28      EACH 300.00 8,400.00            
S-31 lateral bracing repairs lump      LUMP 5,000.00 5,000.00            
S-32 replace roadway stringers 357      LNFT 750.00 267,750.00            
S-33 repair holes in chord web 6      EACH 900.00 5,400.00            
S-34 install walkway around operator's house lump      LUMP 50,000.00 50,000.00            
S-35 install air compressor platform and deck drain pipe 1      EACH 25,000.00 25,000.00            
S-36 modify suspended platform hangers/supports lump      LUMP 20,000.00 20,000.00            
                       
 CONTRACTOR TOTAL       4,791,114.30            