| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - C.E.C., INC. |
- 2 - F. MILLER CONSTRUCTION LLC |
- 3 - CECIL D. GASSIOTT LLC |
- 4 - M&J CONST CO OF PINELLAS COUNTY INC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 710-01 |
flowable fill
|
8   |
CUYD |
650.00 |
5,200.00 |
520.00 |
4,160.00 |
300.00 |
2,400.00 |
350.00 |
2,800.00 |
| 712-01 |
concrete cast-in-place revetment (4 " thick)
|
123   |
SQYD |
135.00 |
16,605.00 |
300.00 |
36,900.00 |
225.00 |
27,675.00 |
500.00 |
61,500.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
100,000.00 |
100,000.00 |
40,000.00 |
40,000.00 |
15,000.00 |
15,000.00 |
67,500.00 |
67,500.00 |
| 713-08 |
temporary precast concrete barrier (department
furnished) |
18   |
EACH |
450.00 |
8,100.00 |
780.00 |
14,040.00 |
1.00 |
18.00 |
833.33 |
14,999.94 |
| 713-10 |
temporary precast concrete barrier movement
|
720   |
EACH |
20.00 |
14,400.00 |
78.00 |
56,160.00 |
100.00 |
72,000.00 |
156.95 |
113,004.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
250,000.00 |
250,000.00 |
340,000.00 |
340,000.00 |
200,000.00 |
200,000.00 |
384,051.00 |
384,051.00 |
| 730-09 |
electrical system
|
lump |
LUMP |
520,000.00 |
520,000.00 |
560,000.00 |
560,000.00 |
875,000.00 |
875,000.00 |
596,275.00 |
596,275.00 |
| 731-02 |
reflectorized raised pavement markers
|
58   |
EACH |
7.00 |
406.00 |
6.10 |
353.80 |
10.00 |
580.00 |
7.02 |
407.16 |
| 732-01 |
plastic pavement striping ( 4" width)
|
3,381   |
LNFT |
0.80 |
2,704.80 |
0.70 |
2,366.70 |
1.00 |
3,381.00 |
0.81 |
2,738.61 |
| 737-03 |
painted traffic striping (solid line)
|
816   |
LNFT |
0.25 |
204.00 |
0.20 |
163.20 |
3.00 |
2,448.00 |
0.23 |
187.68 |
| 804-03 |
steel piles (hp 12 x 53)
|
1,050   |
LNFT |
155.00 |
162,750.00 |
80.00 |
84,000.00 |
185.00 |
194,250.00 |
163.59 |
171,769.50 |
| 805-01 |
class a concrete
|
11.54 |
CUYD |
1,250.00 |
14,425.00 |
1,000.00 |
11,540.00 |
500.00 |
5,770.00 |
984.40 |
11,359.98 |
| 808-01 |
steel grid flooring
|
4,938.7 |
SQFT |
85.00 |
419,789.50 |
98.00 |
483,992.60 |
150.00 |
740,805.00 |
86.71 |
428,234.68 |
| 809-01 |
movable bridge machinery
|
lump |
LUMP |
700,000.00 |
700,000.00 |
650,000.00 |
650,000.00 |
600,000.00 |
600,000.00 |
1,058,930.00 |
1,058,930.00 |
| 812-01 |
treated timber (coastal treatment)
|
12.00 |
MFBM |
12,000.00 |
144,000.00 |
10,400.00 |
124,800.00 |
11,290.00 |
135,480.00 |
15,266.25 |
183,195.00 |
| S-01 |
install platform at warning gates
|
4   |
EACH |
4,000.00 |
16,000.00 |
20,000.00 |
80,000.00 |
18,000.00 |
72,000.00 |
13,800.00 |
55,200.00 |
| S-02 |
repair roof of operator's house
|
lump |
LUMP |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
5,000.00 |
5,000.00 |
22,817.00 |
22,817.00 |
| S-03 |
repair concrete spalls on underside of roadway deck
|
1,443   |
SQFT |
130.00 |
187,590.00 |
125.00 |
180,375.00 |
25.72 |
37,113.96 |
95.00 |
137,085.00 |
| S-04 |
repair concrete deck spalls
|
33   |
SQFT |
250.00 |
8,250.00 |
120.00 |
3,960.00 |
25.00 |
825.00 |
95.00 |
3,135.00 |
| S-05 |
repair concrete railing support spalls
|
3   |
SQFT |
2,000.00 |
6,000.00 |
10,000.00 |
30,000.00 |
300.00 |
900.00 |
500.00 |
1,500.00 |
| S-06 |
replace damaged railing channel
|
20   |
LNFT |
220.00 |
4,400.00 |
90.00 |
1,800.00 |
100.00 |
2,000.00 |
172.50 |
3,450.00 |
| S-07 |
remove channel at northwest barrier column
|
lump |
LUMP |
3,200.00 |
3,200.00 |
900.00 |
900.00 |
2,000.00 |
2,000.00 |
1,380.00 |
1,380.00 |
| S-08 |
replace nuts and washers at northwest barrier column
|
lump |
LUMP |
2,500.00 |
2,500.00 |
1,400.00 |
1,400.00 |
500.00 |
500.00 |
345.00 |
345.00 |
| S-09 |
repair/replace anchor bolts
|
12   |
EACH |
100.00 |
1,200.00 |
500.00 |
6,000.00 |
50.00 |
600.00 |
382.95 |
4,595.40 |
| S-10 |
replace bolts in lateral connection plate
|
36   |
EACH |
300.00 |
10,800.00 |
130.00 |
4,680.00 |
40.00 |
1,440.00 |
86.25 |
3,105.00 |
| S-11 |
install platforms at barrier gates
|
4   |
EACH |
17,000.00 |
68,000.00 |
21,000.00 |
84,000.00 |
18,000.00 |
72,000.00 |
20,700.00 |
82,800.00 |
| S-12 |
install new water line
|
765   |
LNFT |
25.00 |
19,125.00 |
60.00 |
45,900.00 |
10.00 |
7,650.00 |
25.56 |
19,553.40 |
| S-13 |
replace sidewalk checkered plate
|
418   |
LNFT |
210.00 |
87,780.00 |
240.00 |
100,320.00 |
187.00 |
78,166.00 |
287.50 |
120,175.00 |
| S-14 |
replace ladders
|
5   |
EACH |
3,500.00 |
17,500.00 |
3,000.00 |
15,000.00 |
3,300.00 |
16,500.00 |
1,150.00 |
5,750.00 |
| S-15 |
replace navigation light support platform
|
lump |
LUMP |
15,000.00 |
15,000.00 |
9,500.00 |
9,500.00 |
15,000.00 |
15,000.00 |
9,200.00 |
9,200.00 |
| S-16 |
replace deteriorated bolts
|
264   |
EACH |
100.00 |
26,400.00 |
70.00 |
18,480.00 |
36.00 |
9,504.00 |
69.00 |
18,216.00 |
| S-17 |
install rest pier fender access platform
|
lump |
LUMP |
30,000.00 |
30,000.00 |
24,000.00 |
24,000.00 |
21,000.00 |
21,000.00 |
11,500.00 |
11,500.00 |
| S-18 |
install walkway grating and handrail on top of fender
system |
400   |
LNFT |
400.00 |
160,000.00 |
350.00 |
140,000.00 |
225.00 |
90,000.00 |
540.50 |
216,200.00 |
| S-19 |
field paint existing bridge metalwork
|
lump |
LUMP |
560,000.00 |
560,000.00 |
550,000.00 |
550,000.00 |
650,000.00 |
650,000.00 |
590,000.00 |
590,000.00 |
| S-20 |
replace anchor bolt nuts and washers
|
34   |
EACH |
250.00 |
8,500.00 |
90.00 |
3,060.00 |
37.00 |
1,258.00 |
69.00 |
2,346.00 |
| S-21 |
replace operator house doors
|
2   |
EACH |
3,500.00 |
7,000.00 |
3,700.00 |
7,400.00 |
1,500.00 |
3,000.00 |
2,058.50 |
4,117.00 |
| S-22 |
replace operator house window blinds
|
8   |
EACH |
350.00 |
2,800.00 |
110.00 |
880.00 |
200.00 |
1,600.00 |
345.00 |
2,760.00 |
| S-23 |
repair exterior wall cracks and paint exterior walls
of operator's house |
lump |
LUMP |
2,300.00 |
2,300.00 |
4,000.00 |
4,000.00 |
3,500.00 |
3,500.00 |
3,800.00 |
3,800.00 |
| S-24 |
remodel bathroom fixtures inside operator's house
|
lump |
LUMP |
7,000.00 |
7,000.00 |
600.00 |
600.00 |
3,000.00 |
3,000.00 |
2,530.00 |
2,530.00 |
| S-25 |
repair and install new floor and wall tiles inside
operator's house |
lump |
LUMP |
20,000.00 |
20,000.00 |
3,500.00 |
3,500.00 |
3,500.00 |
3,500.00 |
12,696.00 |
12,696.00 |
| S-26 |
remove and replace operator house windows
|
lump |
LUMP |
30,000.00 |
30,000.00 |
17,500.35 |
17,500.35 |
2,500.00 |
2,500.00 |
20,573.52 |
20,573.52 |
| S-27 |
paint interior of operator's house
|
lump |
LUMP |
3,000.00 |
3,000.00 |
2,000.00 |
2,000.00 |
2,500.00 |
2,500.00 |
1,725.00 |
1,725.00 |
| S-28 |
install miscellaneous items at operator's house
|
lump |
LUMP |
15,000.00 |
15,000.00 |
14,600.00 |
14,600.00 |
2,500.00 |
2,500.00 |
10,247.00 |
10,247.00 |
| S-29 |
remove abandoned conduit
|
398   |
LNFT |
15.00 |
5,970.00 |
7.00 |
2,786.00 |
37.00 |
14,726.00 |
7.23 |
2,877.54 |
| S-30 |
remove abandoned conduit hangers
|
28   |
EACH |
230.00 |
6,440.00 |
105.00 |
2,940.00 |
75.00 |
2,100.00 |
102.68 |
2,875.04 |
| S-31 |
lateral bracing repairs
|
lump |
LUMP |
7,000.00 |
7,000.00 |
2,500.00 |
2,500.00 |
7,500.00 |
7,500.00 |
4,140.00 |
4,140.00 |
| S-32 |
replace roadway stringers
|
357   |
LNFT |
300.00 |
107,100.00 |
210.00 |
74,970.00 |
215.00 |
76,755.00 |
224.25 |
80,057.25 |
| S-33 |
repair holes in chord web
|
6   |
EACH |
2,250.00 |
13,500.00 |
1,200.00 |
7,200.00 |
1,000.00 |
6,000.00 |
862.50 |
5,175.00 |
| S-34 |
install walkway around operator's house
|
lump |
LUMP |
50,000.00 |
50,000.00 |
46,500.00 |
46,500.00 |
36,500.00 |
36,500.00 |
52,900.00 |
52,900.00 |
| S-35 |
install air compressor platform and deck drain pipe
|
1   |
EACH |
6,000.00 |
6,000.00 |
5,500.00 |
5,500.00 |
1,500.00 |
1,500.00 |
4,600.00 |
4,600.00 |
| S-36 |
modify suspended platform hangers/supports
|
lump |
LUMP |
8,000.00 |
8,000.00 |
4,200.00 |
4,200.00 |
5,000.00 |
5,000.00 |
2,875.00 |
2,875.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,891,939.30 |
|
3,924,927.65 |
|
4,130,444.96 |
|
4,619,253.70 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - TOPCOR SERVICES, INC |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 710-01 |
flowable fill
|
8   |
CUYD |
1,500.00 |
12,000.00 |
|
|
|
|
|
|
| 712-01 |
concrete cast-in-place revetment (4 " thick)
|
123   |
SQYD |
185.00 |
22,755.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
83,925.00 |
83,925.00 |
|
|
|
|
|
|
| 713-08 |
temporary precast concrete barrier (department
furnished) |
18   |
EACH |
4,665.00 |
83,970.00 |
|
|
|
|
|
|
| 713-10 |
temporary precast concrete barrier movement
|
720   |
EACH |
115.00 |
82,800.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
348,000.00 |
348,000.00 |
|
|
|
|
|
|
| 730-09 |
electrical system
|
lump |
LUMP |
914,450.00 |
914,450.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
58   |
EACH |
10.00 |
580.00 |
|
|
|
|
|
|
| 732-01 |
plastic pavement striping ( 4" width)
|
3,381   |
LNFT |
2.00 |
6,762.00 |
|
|
|
|
|
|
| 737-03 |
painted traffic striping (solid line)
|
816   |
LNFT |
1.50 |
1,224.00 |
|
|
|
|
|
|
| 804-03 |
steel piles (hp 12 x 53)
|
1,050   |
LNFT |
70.00 |
73,500.00 |
|
|
|
|
|
|
| 805-01 |
class a concrete
|
11.54 |
CUYD |
550.00 |
6,347.00 |
|
|
|
|
|
|
| 808-01 |
steel grid flooring
|
4,938.7 |
SQFT |
79.00 |
390,157.30 |
|
|
|
|
|
|
| 809-01 |
movable bridge machinery
|
lump |
LUMP |
828,500.00 |
828,500.00 |
|
|
|
|
|
|
| 812-01 |
treated timber (coastal treatment)
|
12.00 |
MFBM |
8,575.00 |
102,900.00 |
|
|
|
|
|
|
| S-01 |
install platform at warning gates
|
4   |
EACH |
10,500.00 |
42,000.00 |
|
|
|
|
|
|
| S-02 |
repair roof of operator's house
|
lump |
LUMP |
14,600.00 |
14,600.00 |
|
|
|
|
|
|
| S-03 |
repair concrete spalls on underside of roadway deck
|
1,443   |
SQFT |
92.00 |
132,756.00 |
|
|
|
|
|
|
| S-04 |
repair concrete deck spalls
|
33   |
SQFT |
70.00 |
2,310.00 |
|
|
|
|
|
|
| S-05 |
repair concrete railing support spalls
|
3   |
SQFT |
85.00 |
255.00 |
|
|
|
|
|
|
| S-06 |
replace damaged railing channel
|
20   |
LNFT |
300.00 |
6,000.00 |
|
|
|
|
|
|
| S-07 |
remove channel at northwest barrier column
|
lump |
LUMP |
4,000.00 |
4,000.00 |
|
|
|
|
|
|
| S-08 |
replace nuts and washers at northwest barrier column
|
lump |
LUMP |
5,200.00 |
5,200.00 |
|
|
|
|
|
|
| S-09 |
repair/replace anchor bolts
|
12   |
EACH |
450.00 |
5,400.00 |
|
|
|
|
|
|
| S-10 |
replace bolts in lateral connection plate
|
36   |
EACH |
150.00 |
5,400.00 |
|
|
|
|
|
|
| S-11 |
install platforms at barrier gates
|
4   |
EACH |
10,500.00 |
42,000.00 |
|
|
|
|
|
|
| S-12 |
install new water line
|
765   |
LNFT |
19.00 |
14,535.00 |
|
|
|
|
|
|
| S-13 |
replace sidewalk checkered plate
|
418   |
LNFT |
225.00 |
94,050.00 |
|
|
|
|
|
|
| S-14 |
replace ladders
|
5   |
EACH |
8,350.00 |
41,750.00 |
|
|
|
|
|
|
| S-15 |
replace navigation light support platform
|
lump |
LUMP |
40,000.00 |
40,000.00 |
|
|
|
|
|
|
| S-16 |
replace deteriorated bolts
|
264   |
EACH |
20.00 |
5,280.00 |
|
|
|
|
|
|
| S-17 |
install rest pier fender access platform
|
lump |
LUMP |
75,000.00 |
75,000.00 |
|
|
|
|
|
|
| S-18 |
install walkway grating and handrail on top of fender
system |
400   |
LNFT |
100.00 |
40,000.00 |
|
|
|
|
|
|
| S-19 |
field paint existing bridge metalwork
|
lump |
LUMP |
764,000.00 |
764,000.00 |
|
|
|
|
|
|
| S-20 |
replace anchor bolt nuts and washers
|
34   |
EACH |
150.00 |
5,100.00 |
|
|
|
|
|
|
| S-21 |
replace operator house doors
|
2   |
EACH |
7,300.00 |
14,600.00 |
|
|
|
|
|
|
| S-22 |
replace operator house window blinds
|
8   |
EACH |
1,850.00 |
14,800.00 |
|
|
|
|
|
|
| S-23 |
repair exterior wall cracks and paint exterior walls
of operator's house |
lump |
LUMP |
1,500.00 |
1,500.00 |
|
|
|
|
|
|
| S-24 |
remodel bathroom fixtures inside operator's house
|
lump |
LUMP |
14,600.00 |
14,600.00 |
|
|
|
|
|
|
| S-25 |
repair and install new floor and wall tiles inside
operator's house |
lump |
LUMP |
14,500.00 |
14,500.00 |
|
|
|
|
|
|
| S-26 |
remove and replace operator house windows
|
lump |
LUMP |
14,600.00 |
14,600.00 |
|
|
|
|
|
|
| S-27 |
paint interior of operator's house
|
lump |
LUMP |
14,500.00 |
14,500.00 |
|
|
|
|
|
|
| S-28 |
install miscellaneous items at operator's house
|
lump |
LUMP |
14,600.00 |
14,600.00 |
|
|
|
|
|
|
| S-29 |
remove abandoned conduit
|
398   |
LNFT |
21.00 |
8,358.00 |
|
|
|
|
|
|
| S-30 |
remove abandoned conduit hangers
|
28   |
EACH |
300.00 |
8,400.00 |
|
|
|
|
|
|
| S-31 |
lateral bracing repairs
|
lump |
LUMP |
5,000.00 |
5,000.00 |
|
|
|
|
|
|
| S-32 |
replace roadway stringers
|
357   |
LNFT |
750.00 |
267,750.00 |
|
|
|
|
|
|
| S-33 |
repair holes in chord web
|
6   |
EACH |
900.00 |
5,400.00 |
|
|
|
|
|
|
| S-34 |
install walkway around operator's house
|
lump |
LUMP |
50,000.00 |
50,000.00 |
|
|
|
|
|
|
| S-35 |
install air compressor platform and deck drain pipe
|
1   |
EACH |
25,000.00 |
25,000.00 |
|
|
|
|
|
|
| S-36 |
modify suspended platform hangers/supports
|
lump |
LUMP |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
4,791,114.30 |
|
|
|
|
|
|
|