Lead Project: 102-02-0040
Parish: CADDO
Routes: LA 511
Description: JIMMY DAVIS BRIDGE REPAIRS
Type Const: repair approaches, abutments, piers and joints. clean and spot paint stringer and
floor beams connections, and related work.
Estimated Construction Cost: $692,332.80
 
RankLicenseBidderConstruction Bid
1 44133 GIBSON & ASSOCIATES INC $538,075.60
2 12136 SHILOH CONTRACTORS, INC. $672,962.10
3 25652 TOPCOR SERVICES, INC $877,284.50
 
Item Number Item Description Quantity Unit of Measure - 1 -
GIBSON & ASSOCIATES INC
- 2 -
SHILOH CONTRACTORS, INC.
- 3 -
TOPCOR SERVICES, INC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 54,000.00 54,000.00 57,000.00 57,000.00 38,000.00 38,000.00    
202-02-I removal of concrete approach slabs 134      EACH 10.00 1,340.00 1.00 134.00 275.00 36,850.00    
203-05 excavation and embankment lump      LUMP 5,000.00 5,000.00 11,808.00 11,808.00 35,000.00 35,000.00    
713-01 temporary signs & barricades lump      LUMP 32,000.00 32,000.00 60,225.00 60,225.00 25,050.00 25,050.00    
727-01 mobilization lump      LUMP 67,000.00 67,000.00 72,000.00 72,000.00 80,000.00 80,000.00    
732-01-A-03 plastic pavement striping (4" width)(hot appl thermo)
(40 mil thickness)
300      LNFT 0.42 126.00 30.00 9,000.00 20.00 6,000.00    
813-01 concrete approach slabs 140.78   SQYD 320.00 45,049.60 195.00 27,452.10 275.00 38,714.50    
S-101 pavement relief joints 85      LNFT 450.00 38,250.00 290.00 24,650.00 215.00 18,275.00    
S-102 temporary jacking of girders lump      LUMP 19,000.00 19,000.00 3,350.00 3,350.00 38,000.00 38,000.00    
S-103 deck repair 2      EACH 14,000.00 28,000.00 30,000.00 60,000.00 19,300.00 38,600.00    
S-104 preformed silicone joint sealing system 64      LNFT 90.00 5,760.00 70.00 4,480.00 275.00 17,600.00    
S-105 west abutment repair lump      LUMP 26,500.00 26,500.00 24,500.00 24,500.00 38,000.00 38,000.00    
S-106 east abutment repair lump      LUMP 26,500.00 26,500.00 24,500.00 24,500.00 38,000.00 38,000.00    
S-107 girder end treatment and bearing repair 8      EACH 1,500.00 12,000.00 1,725.00 13,800.00 4,500.00 36,000.00    
S-108 adjusting guard rail 280      LNFT 14.00 3,920.00 18.00 5,040.00 60.00 16,800.00    
S-109 repair of bent 6 lump      LUMP 15,000.00 15,000.00 16,500.00 16,500.00 15,000.00 15,000.00    
S-110 contraction joint repair 792      LNFT 15.00 11,880.00 6.50 5,148.00 22.50 17,820.00    
S-111 cleaning of stringer / floor beam connections 100      EACH 970.00 97,000.00 2,000.00 200,000.00 2,900.00 290,000.00    
S-112 floor beam crack repair 11      EACH 1,000.00 11,000.00 1,750.00 19,250.00 2,300.00 25,300.00    
S-113 bottom flange repair lump      LUMP 6,000.00 6,000.00 5,500.00 5,500.00 4,000.00 4,000.00    
S-114 risers repair by epoxy injection 35      LNFT 150.00 5,250.00 210.00 7,350.00 325.00 11,375.00    
S-115 pier 4 riser repair lump      LUMP 3,500.00 3,500.00 3,275.00 3,275.00 6,000.00 6,000.00    
S-116 dynamic message sign unit 6      EACH 4,000.00 24,000.00 3,000.00 18,000.00 1,150.00 6,900.00    
                       
 CONTRACTOR TOTAL       538,075.60   672,962.10   877,284.50    