| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - W. E. MCDONALD & SON, LLC. |
- 2 - PRAIRIE CONTRACTORS INC. |
- 3 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 4 - GILCHRIST CONSTRUCTION CO. LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
20   |
SQYD |
50.00 |
1,000.00 |
8.00 |
160.00 |
6.50 |
130.00 |
35.00 |
700.00 |
| 202-02-H |
removal of guard rail
|
345   |
LNFT |
5.00 |
1,725.00 |
15.00 |
5,175.00 |
10.00 |
3,450.00 |
15.00 |
5,175.00 |
| 202-02-I |
removal of existing drainage pipe
|
248   |
LNFT |
5.00 |
1,240.00 |
7.00 |
1,736.00 |
5.50 |
1,364.00 |
10.00 |
2,480.00 |
| 203-07 |
borrow (vehicular measurement)
|
200   |
CUYD |
10.00 |
2,000.00 |
15.00 |
3,000.00 |
10.25 |
2,050.00 |
18.00 |
3,600.00 |
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
500   |
CUYD |
10.00 |
5,000.00 |
15.00 |
7,500.00 |
10.25 |
5,125.00 |
23.00 |
11,500.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
15   |
EACH |
250.00 |
3,750.00 |
200.00 |
3,000.00 |
150.00 |
2,250.00 |
150.00 |
2,250.00 |
| 303-01-B |
in-place cement stabilized base course (8 1/2" thick)
|
30,809   |
SQYD |
5.20 |
160,206.80 |
5.19 |
159,898.71 |
5.25 |
161,747.25 |
6.50 |
200,258.50 |
| 303-02 |
removal of existing patches
|
250   |
SQYD |
15.00 |
3,750.00 |
15.00 |
3,750.00 |
15.25 |
3,812.50 |
5.00 |
1,250.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
100   |
CUYD |
50.00 |
5,000.00 |
75.00 |
7,500.00 |
52.00 |
5,200.00 |
100.00 |
10,000.00 |
| 502-01 |
superpave asphaltic concrete
|
5,490.6 |
TON |
90.00 |
494,154.00 |
94.90 |
521,057.94 |
79.00 |
433,757.40 |
81.00 |
444,738.60 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
665.0 |
TON |
70.00 |
46,550.00 |
30.00 |
19,950.00 |
140.00 |
93,100.00 |
120.00 |
79,800.00 |
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
19,836   |
GAL |
3.75 |
74,385.00 |
1.63 |
32,332.68 |
4.20 |
83,311.20 |
3.20 |
63,475.20 |
| 507-02-B |
aggregate (s2)
|
29,171   |
SQYD |
1.30 |
37,922.30 |
1.10 |
32,088.10 |
1.10 |
32,088.10 |
1.90 |
55,424.90 |
| 507-02-C |
aggregate (s3)
|
29,171   |
SQYD |
1.30 |
37,922.30 |
1.10 |
32,088.10 |
1.10 |
32,088.10 |
1.40 |
40,839.40 |
| 509-01 |
cold planing asphaltic pavement
|
26,931   |
SQYD |
0.50 |
13,465.50 |
2.25 |
60,594.75 |
2.30 |
61,941.30 |
1.00 |
26,931.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,244   |
CUYD |
0.01 |
- 22.44 |
0.01 |
- 22.44 |
0.10 |
- 224.40 |
0.01 |
- 22.44 |
| 510-01-C |
pavement patching (10" minimum thickness)
|
45   |
SQYD |
250.00 |
11,250.00 |
250.00 |
11,250.00 |
185.00 |
8,325.00 |
180.00 |
8,100.00 |
| 701-01-E |
cross drain pipe (12" rcp)
|
8   |
LNFT |
200.00 |
1,600.00 |
70.00 |
560.00 |
62.00 |
496.00 |
280.00 |
2,240.00 |
| 701-05-K-01 |
side drain pipe (30" cmp)(erosion)
|
240   |
LNFT |
35.00 |
8,400.00 |
100.00 |
24,000.00 |
85.00 |
20,400.00 |
75.00 |
18,000.00 |
| 701-15 |
concrete collar
|
1   |
EACH |
1,500.00 |
1,500.00 |
1,000.00 |
1,000.00 |
800.00 |
800.00 |
1,000.00 |
1,000.00 |
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
75.0 |
LNFT |
42.00 |
3,150.00 |
45.00 |
3,375.00 |
43.00 |
3,225.00 |
45.00 |
3,375.00 |
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
78.0 |
LNFT |
62.00 |
4,836.00 |
66.00 |
5,148.00 |
64.00 |
4,992.00 |
65.00 |
5,070.00 |
| 704-03 |
blocked out guard rail
|
68.8 |
LNFT |
22.00 |
1,513.60 |
25.00 |
1,720.00 |
23.00 |
1,582.40 |
24.00 |
1,651.20 |
| 704-11-A |
guard rail end treatment (flared)
|
1   |
EACH |
2,100.00 |
2,100.00 |
2,300.00 |
2,300.00 |
2,200.00 |
2,200.00 |
2,000.00 |
2,000.00 |
| 704-11-B |
guard rail end treatment (tangent)
|
3   |
EACH |
2,500.00 |
7,500.00 |
2,600.00 |
7,800.00 |
2,600.00 |
7,800.00 |
2,500.00 |
7,500.00 |
| 706-02-A |
concrete drive (4" thick)
|
10.0 |
SQYD |
125.00 |
1,250.00 |
80.00 |
800.00 |
72.00 |
720.00 |
200.00 |
2,000.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
25,000.00 |
25,000.00 |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
4.870 |
MILE |
300.00 |
1,461.00 |
400.00 |
1,948.00 |
150.00 |
730.50 |
350.00 |
1,704.50 |
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
3.528 |
MILE |
300.00 |
1,058.40 |
0.01 |
0.04 |
1.00 |
3.53 |
150.00 |
529.20 |
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
13.953 |
MILE |
600.00 |
8,371.80 |
0.01 |
0.14 |
1.00 |
13.95 |
425.00 |
5,930.03 |
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
645   |
EACH |
2.00 |
1,290.00 |
0.50 |
322.50 |
1.00 |
645.00 |
2.00 |
1,290.00 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
6,500.00 |
6,500.00 |
5,000.00 |
5,000.00 |
4,525.00 |
4,525.00 |
4,800.00 |
4,800.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
35,000.00 |
35,000.00 |
30,000.00 |
30,000.00 |
56,000.00 |
56,000.00 |
50,000.00 |
50,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
2   |
EACH |
75.00 |
150.00 |
85.00 |
170.00 |
77.00 |
154.00 |
75.00 |
150.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
75.00 |
300.00 |
85.00 |
340.00 |
77.00 |
308.00 |
75.00 |
300.00 |
| 731-02 |
reflectorized raised pavement markers
|
325   |
EACH |
4.50 |
1,462.50 |
5.00 |
1,625.00 |
4.75 |
1,543.75 |
5.50 |
1,787.50 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
6.976 |
MILE |
2,500.00 |
17,440.00 |
2,800.00 |
19,532.80 |
2,550.00 |
17,788.80 |
2,600.00 |
18,137.60 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.764 |
MILE |
700.00 |
1,234.80 |
800.00 |
1,411.20 |
725.00 |
1,278.90 |
850.00 |
1,499.40 |
| 735-01 |
mailboxes
|
53   |
EACH |
1.00 |
53.00 |
8.00 |
424.00 |
6.25 |
331.25 |
5.00 |
265.00 |
| 735-02 |
mailbox supports (single)
|
44   |
EACH |
125.00 |
5,500.00 |
100.00 |
4,400.00 |
100.00 |
4,400.00 |
100.00 |
4,400.00 |
| 735-03 |
mailbox supports (double)
|
3   |
EACH |
175.00 |
525.00 |
200.00 |
600.00 |
180.00 |
540.00 |
175.00 |
525.00 |
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
325.00 |
325.00 |
300.00 |
300.00 |
285.00 |
285.00 |
275.00 |
275.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
7,000.00 |
7,000.00 |
100.00 |
100.00 |
11,000.00 |
11,000.00 |
5,000.00 |
5,000.00 |
| S-001 |
saw cutting asphaltic concrete pavement
|
500   |
INFT |
2.00 |
1,000.00 |
1.25 |
625.00 |
2.85 |
1,425.00 |
3.00 |
1,500.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,029,819.56 |
|
1,039,560.52 |
|
1,082,703.53 |
|
1,117,429.59 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - M. MATT DURAND, LLC |
- 6 - H & S CONSTRUCTION CO., INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
20   |
SQYD |
18.00 |
360.00 |
61.42 |
1,228.40 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
345   |
LNFT |
2.00 |
690.00 |
8.00 |
2,760.00 |
|
|
|
|
| 202-02-I |
removal of existing drainage pipe
|
248   |
LNFT |
8.00 |
1,984.00 |
28.00 |
6,944.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
200   |
CUYD |
10.00 |
2,000.00 |
12.00 |
2,400.00 |
|
|
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
500   |
CUYD |
12.00 |
6,000.00 |
14.00 |
7,000.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
15   |
EACH |
60.00 |
900.00 |
145.00 |
2,175.00 |
|
|
|
|
| 303-01-B |
in-place cement stabilized base course (8 1/2" thick)
|
30,809   |
SQYD |
5.90 |
181,773.10 |
7.53 |
231,991.77 |
|
|
|
|
| 303-02 |
removal of existing patches
|
250   |
SQYD |
10.00 |
2,500.00 |
18.00 |
4,500.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
100   |
CUYD |
36.50 |
3,650.00 |
95.00 |
9,500.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
5,490.6 |
TON |
100.00 |
549,060.00 |
108.00 |
592,984.80 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
665.0 |
TON |
130.00 |
86,450.00 |
150.00 |
99,750.00 |
|
|
|
|
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
19,836   |
GAL |
3.50 |
69,426.00 |
3.22 |
63,871.92 |
|
|
|
|
| 507-02-B |
aggregate (s2)
|
29,171   |
SQYD |
2.10 |
61,259.10 |
2.12 |
61,842.52 |
|
|
|
|
| 507-02-C |
aggregate (s3)
|
29,171   |
SQYD |
1.50 |
43,756.50 |
1.54 |
44,923.34 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
26,931   |
SQYD |
0.85 |
22,891.35 |
3.90 |
105,030.90 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,244   |
CUYD |
0.12 |
- 269.28 |
0.01 |
- 22.44 |
|
|
|
|
| 510-01-C |
pavement patching (10" minimum thickness)
|
45   |
SQYD |
104.00 |
4,680.00 |
188.00 |
8,460.00 |
|
|
|
|
| 701-01-E |
cross drain pipe (12" rcp)
|
8   |
LNFT |
112.00 |
896.00 |
210.00 |
1,680.00 |
|
|
|
|
| 701-05-K-01 |
side drain pipe (30" cmp)(erosion)
|
240   |
LNFT |
61.00 |
14,640.00 |
89.00 |
21,360.00 |
|
|
|
|
| 701-15 |
concrete collar
|
1   |
EACH |
1,800.00 |
1,800.00 |
2,700.00 |
2,700.00 |
|
|
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
75.0 |
LNFT |
65.00 |
4,875.00 |
46.20 |
3,465.00 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
78.0 |
LNFT |
71.00 |
5,538.00 |
68.20 |
5,319.60 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
68.8 |
LNFT |
26.00 |
1,788.80 |
24.20 |
1,664.96 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
1   |
EACH |
2,700.00 |
2,700.00 |
2,310.00 |
2,310.00 |
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
3   |
EACH |
3,200.00 |
9,600.00 |
2,750.00 |
8,250.00 |
|
|
|
|
| 706-02-A |
concrete drive (4" thick)
|
10.0 |
SQYD |
104.00 |
1,040.00 |
179.00 |
1,790.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
19,500.00 |
19,500.00 |
45,500.00 |
45,500.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
4.870 |
MILE |
450.00 |
2,191.50 |
850.00 |
4,139.50 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
3.528 |
MILE |
530.00 |
1,869.84 |
363.00 |
1,280.66 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
13.953 |
MILE |
700.00 |
9,767.10 |
797.50 |
11,127.52 |
|
|
|
|
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
645   |
EACH |
2.40 |
1,548.00 |
1.20 |
774.00 |
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
9,000.00 |
9,000.00 |
6,500.00 |
6,500.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
23,000.00 |
23,000.00 |
95,000.00 |
95,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
2   |
EACH |
59.00 |
118.00 |
82.50 |
165.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
94.50 |
378.00 |
82.50 |
330.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
325   |
EACH |
7.00 |
2,275.00 |
5.61 |
1,823.25 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
6.976 |
MILE |
4,000.00 |
27,904.00 |
3,194.40 |
22,284.13 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.764 |
MILE |
1,060.00 |
1,869.84 |
841.50 |
1,484.41 |
|
|
|
|
| 735-01 |
mailboxes
|
53   |
EACH |
1.20 |
63.60 |
1.10 |
58.30 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
44   |
EACH |
130.00 |
5,720.00 |
137.50 |
6,050.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
3   |
EACH |
165.00 |
495.00 |
192.50 |
577.50 |
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
295.00 |
295.00 |
357.50 |
357.50 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
6,500.00 |
6,500.00 |
6,850.00 |
6,850.00 |
|
|
|
|
| S-001 |
saw cutting asphaltic concrete pavement
|
500   |
INFT |
1.20 |
600.00 |
1.50 |
750.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,193,083.45 |
|
1,498,931.54 |
|
|
|
|
|