Lead Project: 820-03-0011
Parish: EVANGELINE
Routes: LA 748
Description: LA 1169 - ST. LANDRY PARISH LINE
Type Const: cold planing asphaltic concrete pavement, pavement patching, in-place cement stabilized
base course, asphaltic surface treatment, superpave asph. conc. overlay, and related work.
Estimated Construction Cost: $1,534,949.31
 
RankLicenseBidderConstruction Bid
1 08815 W. E. MCDONALD & SON, LLC. $1,029,819.56
2 34356 PRAIRIE CONTRACTORS INC. $1,039,560.52
3 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,082,703.53
4 12312 GILCHRIST CONSTRUCTION CO. LLC $1,117,429.59
5 13086 M. MATT DURAND, LLC $1,193,083.45
6 04089 H & S CONSTRUCTION CO., INC. $1,498,931.54
 
Item Number Item Description Quantity Unit of Measure - 1 -
W. E. MCDONALD & SON, LLC.
- 2 -
PRAIRIE CONTRACTORS INC.
- 3 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 4 -
GILCHRIST CONSTRUCTION CO. LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 20      SQYD 50.00 1,000.00 8.00 160.00 6.50 130.00 35.00 700.00
202-02-H removal of guard rail 345      LNFT 5.00 1,725.00 15.00 5,175.00 10.00 3,450.00 15.00 5,175.00
202-02-I removal of existing drainage pipe 248      LNFT 5.00 1,240.00 7.00 1,736.00 5.50 1,364.00 10.00 2,480.00
203-07 borrow (vehicular measurement) 200      CUYD 10.00 2,000.00 15.00 3,000.00 10.25 2,050.00 18.00 3,600.00
203-07-A borrow (vehicular meas.)(selected soils) 500      CUYD 10.00 5,000.00 15.00 7,500.00 10.25 5,125.00 23.00 11,500.00
204-05-A temporary sediment check dams (hay) 15      EACH 250.00 3,750.00 200.00 3,000.00 150.00 2,250.00 150.00 2,250.00
303-01-B in-place cement stabilized base course (8 1/2" thick) 30,809      SQYD 5.20 160,206.80 5.19 159,898.71 5.25 161,747.25 6.50 200,258.50
303-02 removal of existing patches 250      SQYD 15.00 3,750.00 15.00 3,750.00 15.25 3,812.50 5.00 1,250.00
401-02 aggregate surface course (adjusted vehicular
measurement)
100      CUYD 50.00 5,000.00 75.00 7,500.00 52.00 5,200.00 100.00 10,000.00
502-01 superpave asphaltic concrete 5,490.6    TON 90.00 494,154.00 94.90 521,057.94 79.00 433,757.40 81.00 444,738.60
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
665.0    TON 70.00 46,550.00 30.00 19,950.00 140.00 93,100.00 120.00 79,800.00
507-01-A asphaltic material (crs-2p emulsion) 19,836      GAL 3.75 74,385.00 1.63 32,332.68 4.20 83,311.20 3.20 63,475.20
507-02-B aggregate (s2) 29,171      SQYD 1.30 37,922.30 1.10 32,088.10 1.10 32,088.10 1.90 55,424.90
507-02-C aggregate (s3) 29,171      SQYD 1.30 37,922.30 1.10 32,088.10 1.10 32,088.10 1.40 40,839.40
509-01 cold planing asphaltic pavement 26,931      SQYD 0.50 13,465.50 2.25 60,594.75 2.30 61,941.30 1.00 26,931.00
509-02 contractor retained reclaimed asphaltic pavement - 2,244      CUYD 0.01 - 22.44 0.01 - 22.44 0.10 - 224.40 0.01 - 22.44
510-01-C pavement patching (10" minimum thickness) 45      SQYD 250.00 11,250.00 250.00 11,250.00 185.00 8,325.00 180.00 8,100.00
701-01-E cross drain pipe (12" rcp) 8      LNFT 200.00 1,600.00 70.00 560.00 62.00 496.00 280.00 2,240.00
701-05-K-01 side drain pipe (30" cmp)(erosion) 240      LNFT 35.00 8,400.00 100.00 24,000.00 85.00 20,400.00 75.00 18,000.00
701-15 concrete collar 1      EACH 1,500.00 1,500.00 1,000.00 1,000.00 800.00 800.00 1,000.00 1,000.00
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 75.0    LNFT 42.00 3,150.00 45.00 3,375.00 43.00 3,225.00 45.00 3,375.00
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 78.0    LNFT 62.00 4,836.00 66.00 5,148.00 64.00 4,992.00 65.00 5,070.00
704-03 blocked out guard rail 68.8    LNFT 22.00 1,513.60 25.00 1,720.00 23.00 1,582.40 24.00 1,651.20
704-11-A guard rail end treatment (flared) 1      EACH 2,100.00 2,100.00 2,300.00 2,300.00 2,200.00 2,200.00 2,000.00 2,000.00
704-11-B guard rail end treatment (tangent) 3      EACH 2,500.00 7,500.00 2,600.00 7,800.00 2,600.00 7,800.00 2,500.00 7,500.00
706-02-A concrete drive (4" thick) 10.0    SQYD 125.00 1,250.00 80.00 800.00 72.00 720.00 200.00 2,000.00
713-01 temporary signs & barricades lump      LUMP 10,000.00 10,000.00 25,000.00 25,000.00 10,000.00 10,000.00 20,000.00 20,000.00
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
4.870  MILE 300.00 1,461.00 400.00 1,948.00 150.00 730.50 350.00 1,704.50
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
3.528  MILE 300.00 1,058.40 0.01 0.04 1.00 3.53 150.00 529.20
713-04-A temporary pavement markings (solid line)(4" width) 13.953  MILE 600.00 8,371.80 0.01 0.14 1.00 13.95 425.00 5,930.03
713-06-A temporary reflectorized raised pavement markers (tabs) 645      EACH 2.00 1,290.00 0.50 322.50 1.00 645.00 2.00 1,290.00
722-02 project site laboratory (equipped) 1      EACH 6,500.00 6,500.00 5,000.00 5,000.00 4,525.00 4,525.00 4,800.00 4,800.00
727-01 mobilization lump      LUMP 35,000.00 35,000.00 30,000.00 30,000.00 56,000.00 56,000.00 50,000.00 50,000.00
729-16-B object marker assembly (type 2) 2      EACH 75.00 150.00 85.00 170.00 77.00 154.00 75.00 150.00
729-16-C object marker assembly (type 3) 4      EACH 75.00 300.00 85.00 340.00 77.00 308.00 75.00 300.00
731-02 reflectorized raised pavement markers 325      EACH 4.50 1,462.50 5.00 1,625.00 4.75 1,543.75 5.50 1,787.50
732-02-A plastic pavement striping (solid line) (4" width) 6.976  MILE 2,500.00 17,440.00 2,800.00 19,532.80 2,550.00 17,788.80 2,600.00 18,137.60
732-03-A plastic pavement striping (broken line)(4" width) 1.764  MILE 700.00 1,234.80 800.00 1,411.20 725.00 1,278.90 850.00 1,499.40
735-01 mailboxes 53      EACH 1.00 53.00 8.00 424.00 6.25 331.25 5.00 265.00
735-02 mailbox supports (single) 44      EACH 125.00 5,500.00 100.00 4,400.00 100.00 4,400.00 100.00 4,400.00
735-03 mailbox supports (double) 3      EACH 175.00 525.00 200.00 600.00 180.00 540.00 175.00 525.00
735-04 mailbox supports (multiple) 1      EACH 325.00 325.00 300.00 300.00 285.00 285.00 275.00 275.00
740-01 construction layout lump      LUMP 7,000.00 7,000.00 100.00 100.00 11,000.00 11,000.00 5,000.00 5,000.00
S-001 saw cutting asphaltic concrete pavement 500      INFT 2.00 1,000.00 1.25 625.00 2.85 1,425.00 3.00 1,500.00
                       
 CONTRACTOR TOTAL       1,029,819.56   1,039,560.52   1,082,703.53   1,117,429.59
 
Item Number Item Description Quantity Unit of Measure - 5 -
M. MATT DURAND, LLC
- 6 -
H & S CONSTRUCTION CO., INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 20      SQYD 18.00 360.00 61.42 1,228.40        
202-02-H removal of guard rail 345      LNFT 2.00 690.00 8.00 2,760.00        
202-02-I removal of existing drainage pipe 248      LNFT 8.00 1,984.00 28.00 6,944.00        
203-07 borrow (vehicular measurement) 200      CUYD 10.00 2,000.00 12.00 2,400.00        
203-07-A borrow (vehicular meas.)(selected soils) 500      CUYD 12.00 6,000.00 14.00 7,000.00        
204-05-A temporary sediment check dams (hay) 15      EACH 60.00 900.00 145.00 2,175.00        
303-01-B in-place cement stabilized base course (8 1/2" thick) 30,809      SQYD 5.90 181,773.10 7.53 231,991.77        
303-02 removal of existing patches 250      SQYD 10.00 2,500.00 18.00 4,500.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
100      CUYD 36.50 3,650.00 95.00 9,500.00        
502-01 superpave asphaltic concrete 5,490.6    TON 100.00 549,060.00 108.00 592,984.80        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
665.0    TON 130.00 86,450.00 150.00 99,750.00        
507-01-A asphaltic material (crs-2p emulsion) 19,836      GAL 3.50 69,426.00 3.22 63,871.92        
507-02-B aggregate (s2) 29,171      SQYD 2.10 61,259.10 2.12 61,842.52        
507-02-C aggregate (s3) 29,171      SQYD 1.50 43,756.50 1.54 44,923.34        
509-01 cold planing asphaltic pavement 26,931      SQYD 0.85 22,891.35 3.90 105,030.90        
509-02 contractor retained reclaimed asphaltic pavement - 2,244      CUYD 0.12 - 269.28 0.01 - 22.44        
510-01-C pavement patching (10" minimum thickness) 45      SQYD 104.00 4,680.00 188.00 8,460.00        
701-01-E cross drain pipe (12" rcp) 8      LNFT 112.00 896.00 210.00 1,680.00        
701-05-K-01 side drain pipe (30" cmp)(erosion) 240      LNFT 61.00 14,640.00 89.00 21,360.00        
701-15 concrete collar 1      EACH 1,800.00 1,800.00 2,700.00 2,700.00        
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 75.0    LNFT 65.00 4,875.00 46.20 3,465.00        
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 78.0    LNFT 71.00 5,538.00 68.20 5,319.60        
704-03 blocked out guard rail 68.8    LNFT 26.00 1,788.80 24.20 1,664.96        
704-11-A guard rail end treatment (flared) 1      EACH 2,700.00 2,700.00 2,310.00 2,310.00        
704-11-B guard rail end treatment (tangent) 3      EACH 3,200.00 9,600.00 2,750.00 8,250.00        
706-02-A concrete drive (4" thick) 10.0    SQYD 104.00 1,040.00 179.00 1,790.00        
713-01 temporary signs & barricades lump      LUMP 19,500.00 19,500.00 45,500.00 45,500.00        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
4.870  MILE 450.00 2,191.50 850.00 4,139.50        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
3.528  MILE 530.00 1,869.84 363.00 1,280.66        
713-04-A temporary pavement markings (solid line)(4" width) 13.953  MILE 700.00 9,767.10 797.50 11,127.52        
713-06-A temporary reflectorized raised pavement markers (tabs) 645      EACH 2.40 1,548.00 1.20 774.00        
722-02 project site laboratory (equipped) 1      EACH 9,000.00 9,000.00 6,500.00 6,500.00        
727-01 mobilization lump      LUMP 23,000.00 23,000.00 95,000.00 95,000.00        
729-16-B object marker assembly (type 2) 2      EACH 59.00 118.00 82.50 165.00        
729-16-C object marker assembly (type 3) 4      EACH 94.50 378.00 82.50 330.00        
731-02 reflectorized raised pavement markers 325      EACH 7.00 2,275.00 5.61 1,823.25        
732-02-A plastic pavement striping (solid line) (4" width) 6.976  MILE 4,000.00 27,904.00 3,194.40 22,284.13        
732-03-A plastic pavement striping (broken line)(4" width) 1.764  MILE 1,060.00 1,869.84 841.50 1,484.41        
735-01 mailboxes 53      EACH 1.20 63.60 1.10 58.30        
735-02 mailbox supports (single) 44      EACH 130.00 5,720.00 137.50 6,050.00        
735-03 mailbox supports (double) 3      EACH 165.00 495.00 192.50 577.50        
735-04 mailbox supports (multiple) 1      EACH 295.00 295.00 357.50 357.50        
740-01 construction layout lump      LUMP 6,500.00 6,500.00 6,850.00 6,850.00        
S-001 saw cutting asphaltic concrete pavement 500      INFT 1.20 600.00 1.50 750.00        
                       
 CONTRACTOR TOTAL       1,193,083.45   1,498,931.54        