| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - LOUISIANA BRIDGE, INC. |
- 2 - CECIL D. GASSIOTT LLC |
- 3 - C W & W CONTRACTORS, INC. |
- 4 - W L BASS CONSTRUCTION INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
2,350.00 |
2,350.00 |
20,000.00 |
20,000.00 |
7,500.00 |
7,500.00 |
15,600.00 |
15,600.00 |
| 202-02-A-01 |
removal of bridge(sta.15+00.00;19.73' wide x 76.38'
long timber structure) |
1   |
EACH |
3,900.00 |
3,900.00 |
15,000.00 |
15,000.00 |
7,500.00 |
7,500.00 |
4,200.00 |
4,200.00 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
25,000.00 |
25,000.00 |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
| 204-02 |
temporary hay or straw bales
|
12   |
EACH |
28.50 |
342.00 |
30.00 |
360.00 |
10.00 |
120.00 |
0.00 |
0.00 |
| 204-03 |
temporary slope drains
|
50   |
LNFT |
11.50 |
575.00 |
5.00 |
250.00 |
10.00 |
500.00 |
0.00 |
0.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
2   |
EACH |
85.25 |
170.50 |
300.00 |
600.00 |
250.00 |
500.00 |
0.00 |
0.00 |
| 204-06 |
temporary silt fencing
|
849   |
LNFT |
2.30 |
1,952.70 |
3.00 |
2,547.00 |
3.00 |
2,547.00 |
0.00 |
0.00 |
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
113.2 |
CUYD |
92.50 |
10,471.00 |
80.00 |
9,056.00 |
100.00 |
11,320.00 |
80.00 |
9,056.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
68.25 |
6,825.00 |
100.00 |
10,000.00 |
75.00 |
7,500.00 |
60.00 |
6,000.00 |
| 704-09 |
guard rail anchor sections (turndown)
|
100.0 |
LNFT |
40.00 |
4,000.00 |
50.00 |
5,000.00 |
45.00 |
4,500.00 |
35.00 |
3,500.00 |
| 711-01-C |
riprap (30 lb, 14" thick)
|
301   |
SQYD |
90.00 |
27,090.00 |
60.00 |
18,060.00 |
85.00 |
25,585.00 |
84.00 |
25,284.00 |
| 711-04 |
geotextile fabric
|
301   |
SQYD |
4.00 |
1,204.00 |
3.00 |
903.00 |
3.00 |
903.00 |
1.00 |
301.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
4,200.00 |
4,200.00 |
11,000.00 |
11,000.00 |
15,000.00 |
15,000.00 |
4,891.00 |
4,891.00 |
| 716-01-A |
mulch (vegetative)
|
0.5 |
TON |
602.00 |
301.00 |
2,750.00 |
1,375.00 |
3,225.00 |
1,612.50 |
1,200.00 |
600.00 |
| 717-01 |
seeding
|
11   |
LB |
28.25 |
310.75 |
30.00 |
330.00 |
32.00 |
352.00 |
10.00 |
110.00 |
| 718-01 |
fertilizer
|
236   |
LB |
1.85 |
436.60 |
3.00 |
708.00 |
3.00 |
708.00 |
2.00 |
472.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
18,100.00 |
18,100.00 |
25,000.00 |
25,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
85.50 |
684.00 |
100.00 |
800.00 |
95.00 |
760.00 |
75.00 |
600.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
3,820.00 |
3,820.00 |
50,000.00 |
50,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
| 804-01-B |
precast concrete piles (14")
|
1,968   |
LNFT |
57.00 |
112,176.00 |
75.00 |
147,600.00 |
80.00 |
157,440.00 |
73.00 |
143,664.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
10,000.00 |
10,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 805-10-A |
bridge superstructure & substructure (28' wide roadway;
45deg crossing) |
5   |
SPAN |
33,755.00 |
168,775.00 |
15,000.00 |
75,000.00 |
23,000.00 |
115,000.00 |
31,000.00 |
155,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
402,683.55 |
|
403,590.00 |
|
434,348.50 |
|
449,279.00 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - KEY CONSTRUCTORS, INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| 202-02-A-01 |
removal of bridge(sta.15+00.00;19.73' wide x 76.38'
long timber structure) |
1   |
EACH |
7,500.00 |
7,500.00 |
|
|
|
|
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
12   |
EACH |
25.00 |
300.00 |
|
|
|
|
|
|
| 204-03 |
temporary slope drains
|
50   |
LNFT |
10.00 |
500.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
2   |
EACH |
250.00 |
500.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
849   |
LNFT |
2.50 |
2,122.50 |
|
|
|
|
|
|
| 403-01 |
aggregate roadway surfacing (vehicular measurement)
|
113.2 |
CUYD |
55.00 |
6,226.00 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
60.00 |
6,000.00 |
|
|
|
|
|
|
| 704-09 |
guard rail anchor sections (turndown)
|
100.0 |
LNFT |
35.00 |
3,500.00 |
|
|
|
|
|
|
| 711-01-C |
riprap (30 lb, 14" thick)
|
301   |
SQYD |
90.00 |
27,090.00 |
|
|
|
|
|
|
| 711-04 |
geotextile fabric
|
301   |
SQYD |
3.25 |
978.25 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
7,500.00 |
7,500.00 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
0.5 |
TON |
2,550.00 |
1,275.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
11   |
LB |
25.00 |
275.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
236   |
LB |
2.50 |
590.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
45,000.00 |
45,000.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
75.00 |
600.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
16,500.00 |
16,500.00 |
|
|
|
|
|
|
| 804-01-B |
precast concrete piles (14")
|
1,968   |
LNFT |
55.00 |
108,240.00 |
|
|
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 805-10-A |
bridge superstructure & substructure (28' wide roadway;
45deg crossing) |
5   |
SPAN |
35,000.00 |
175,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
450,696.75 |
|
|
|
|
|
|
|