| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BLOUNT BROS. CONSTRUCTION, INC. |
- 2 - T. L. WALLACE CONSTRUCTION, INC. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
- 4 - JAMES CONSTRUCTION GROUP LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
10,000.00 |
10,000.00 |
7,500.00 |
7,500.00 |
60,000.00 |
60,000.00 |
75,000.00 |
75,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
10,000.00 |
10,000.00 |
16,500.00 |
16,500.00 |
3,000.00 |
3,000.00 |
20,000.00 |
20,000.00 |
| 202-02-A-01 |
removal of bridge(concrete slab span bridge on steel
girders with timber piles and bents) |
1   |
EACH |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
80,000.00 |
80,000.00 |
87,000.00 |
87,000.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
392.0 |
SQYD |
4.50 |
1,764.00 |
5.00 |
1,960.00 |
10.00 |
3,920.00 |
20.00 |
7,840.00 |
| 203-05 |
excavation and embankment
|
lump |
LUMP |
40,000.00 |
40,000.00 |
75,000.00 |
75,000.00 |
75,000.00 |
75,000.00 |
190,000.00 |
190,000.00 |
| 204-02 |
temporary hay or straw bales
|
65   |
EACH |
20.00 |
1,300.00 |
25.00 |
1,625.00 |
15.00 |
975.00 |
30.00 |
1,950.00 |
| 204-03 |
temporary slope drains
|
90   |
LNFT |
13.00 |
1,170.00 |
20.00 |
1,800.00 |
35.00 |
3,150.00 |
15.00 |
1,350.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
9   |
EACH |
115.00 |
1,035.00 |
375.00 |
3,375.00 |
250.00 |
2,250.00 |
350.00 |
3,150.00 |
| 204-05-B |
temporary sediment check dams (stone)
|
1   |
EACH |
420.00 |
420.00 |
4,500.00 |
4,500.00 |
650.00 |
650.00 |
800.00 |
800.00 |
| 204-06 |
temporary silt fencing
|
710   |
LNFT |
3.00 |
2,130.00 |
3.15 |
2,236.50 |
2.00 |
1,420.00 |
4.00 |
2,840.00 |
| 302-01-A |
class ii base course(crushed stone)
|
994.7 |
CUYD |
75.00 |
74,602.50 |
45.00 |
44,761.50 |
115.00 |
114,390.50 |
160.00 |
159,152.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
22   |
CUYD |
45.00 |
990.00 |
100.00 |
2,200.00 |
130.00 |
2,860.00 |
100.00 |
2,200.00 |
| 502-01 |
superpave asphaltic concrete
|
782.4 |
TON |
110.00 |
86,064.00 |
170.00 |
133,008.00 |
150.00 |
117,360.00 |
135.00 |
105,624.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
14.2 |
TON |
120.00 |
1,704.00 |
190.00 |
2,698.00 |
175.00 |
2,485.00 |
150.00 |
2,130.00 |
| 701-05-K |
side drain pipe (30")
|
70   |
LNFT |
90.00 |
6,300.00 |
60.00 |
4,200.00 |
100.00 |
7,000.00 |
120.00 |
8,400.00 |
| 701-06-B |
side drain pipe arch (18" equiv.)
|
78   |
LNFT |
70.00 |
5,460.00 |
56.00 |
4,368.00 |
90.00 |
7,020.00 |
100.00 |
7,800.00 |
| 704-03 |
blocked out guard rail
|
50.0 |
LNFT |
30.00 |
1,500.00 |
31.25 |
1,562.50 |
26.00 |
1,300.00 |
25.00 |
1,250.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
75.00 |
7,500.00 |
75.00 |
7,500.00 |
62.00 |
6,200.00 |
60.00 |
6,000.00 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
3,000.00 |
12,000.00 |
2,650.00 |
10,600.00 |
2,200.00 |
8,800.00 |
2,100.00 |
8,400.00 |
| 705-01 |
barbed wire fence
|
700   |
LNFT |
7.00 |
4,900.00 |
8.00 |
5,600.00 |
7.00 |
4,900.00 |
6.00 |
4,200.00 |
| 711-01-D |
riprap (55 lb,18" thick )
|
1,028   |
SQYD |
70.00 |
71,960.00 |
64.00 |
65,792.00 |
95.00 |
97,660.00 |
55.00 |
56,540.00 |
| 711-04 |
geotextile fabric
|
1,028   |
SQYD |
3.00 |
3,084.00 |
2.50 |
2,570.00 |
2.50 |
2,570.00 |
4.00 |
4,112.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
| 716-01-A |
mulch (vegetative)
|
4.4 |
TON |
550.00 |
2,420.00 |
870.00 |
3,828.00 |
550.00 |
2,420.00 |
700.00 |
3,080.00 |
| 717-01 |
seeding
|
70   |
LB |
8.00 |
560.00 |
15.00 |
1,050.00 |
8.50 |
595.00 |
12.00 |
840.00 |
| 718-01 |
fertilizer
|
2,213   |
LB |
1.00 |
2,213.00 |
0.93 |
2,058.09 |
0.60 |
1,327.80 |
0.10 |
221.30 |
| 727-01 |
mobilization
|
lump |
LUMP |
40,000.00 |
40,000.00 |
130,000.00 |
130,000.00 |
140,000.00 |
140,000.00 |
150,000.00 |
150,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
110.00 |
440.00 |
100.00 |
400.00 |
80.00 |
320.00 |
80.00 |
320.00 |
| 735-01 |
mailboxes
|
1   |
EACH |
100.00 |
100.00 |
25.00 |
25.00 |
50.00 |
50.00 |
10.00 |
10.00 |
| 735-02 |
mailbox supports (single)
|
1   |
EACH |
150.00 |
150.00 |
190.00 |
190.00 |
150.00 |
150.00 |
140.00 |
140.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
30,000.00 |
30,000.00 |
31,000.00 |
31,000.00 |
50,000.00 |
50,000.00 |
35,000.00 |
35,000.00 |
| 804-01-F |
precast concrete piles (24")
|
1,080   |
LNFT |
110.00 |
118,800.00 |
140.00 |
151,200.00 |
150.00 |
162,000.00 |
150.00 |
162,000.00 |
| 804-12 |
loading permanent piles
|
1   |
EACH |
5,000.00 |
5,000.00 |
21,000.00 |
21,000.00 |
7,500.00 |
7,500.00 |
2,500.00 |
2,500.00 |
| 805-01-F |
class a concrete (bents)
|
60.72 |
CUYD |
700.00 |
42,504.00 |
1,300.00 |
78,936.00 |
1,000.00 |
60,720.00 |
1,200.00 |
72,864.00 |
| 805-03 |
class aa concrete
|
150.00 |
CUYD |
700.00 |
105,000.00 |
1,000.00 |
150,000.00 |
1,100.00 |
165,000.00 |
1,000.00 |
150,000.00 |
| 805-08-H |
precast-prestressed concrete girders (type quad beam)
|
1,185.0 |
LNFT |
70.00 |
82,950.00 |
65.00 |
77,025.00 |
80.00 |
94,800.00 |
100.00 |
118,500.00 |
| 806-01 |
deformed reinforcing steel
|
45,093   |
LB |
1.25 |
56,366.25 |
1.00 |
45,093.00 |
1.25 |
56,366.25 |
1.00 |
45,093.00 |
| 807-08 |
structural metalwork
|
lump |
LUMP |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
13,000.00 |
13,000.00 |
18,000.00 |
18,000.00 |
| 810-01 |
concrete railing (type)
|
400.00 |
LNFT |
80.00 |
32,000.00 |
75.00 |
30,000.00 |
70.00 |
28,000.00 |
55.00 |
22,000.00 |
| S-101 |
concrete approach slabs(28' clear roadway @ 20'length)
|
2   |
EACH |
13,000.00 |
26,000.00 |
15,000.00 |
30,000.00 |
14,500.00 |
29,000.00 |
20,000.00 |
40,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
948,386.75 |
|
1,216,161.59 |
|
1,429,159.55 |
|
1,586,306.30 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - C W & W CONTRACTORS, INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| 202-02-A-01 |
removal of bridge(concrete slab span bridge on steel
girders with timber piles and bents) |
1   |
EACH |
30,000.00 |
30,000.00 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
392.0 |
SQYD |
5.00 |
1,960.00 |
|
|
|
|
|
|
| 203-05 |
excavation and embankment
|
lump |
LUMP |
125,000.00 |
125,000.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
65   |
EACH |
10.00 |
650.00 |
|
|
|
|
|
|
| 204-03 |
temporary slope drains
|
90   |
LNFT |
10.00 |
900.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
9   |
EACH |
250.00 |
2,250.00 |
|
|
|
|
|
|
| 204-05-B |
temporary sediment check dams (stone)
|
1   |
EACH |
500.00 |
500.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
710   |
LNFT |
3.00 |
2,130.00 |
|
|
|
|
|
|
| 302-01-A |
class ii base course(crushed stone)
|
994.7 |
CUYD |
100.00 |
99,470.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
22   |
CUYD |
100.00 |
2,200.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
782.4 |
TON |
175.00 |
136,920.00 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
14.2 |
TON |
200.00 |
2,840.00 |
|
|
|
|
|
|
| 701-05-K |
side drain pipe (30")
|
70   |
LNFT |
100.00 |
7,000.00 |
|
|
|
|
|
|
| 701-06-B |
side drain pipe arch (18" equiv.)
|
78   |
LNFT |
75.00 |
5,850.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
50.0 |
LNFT |
40.00 |
2,000.00 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
75.00 |
7,500.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
4,500.00 |
18,000.00 |
|
|
|
|
|
|
| 705-01 |
barbed wire fence
|
700   |
LNFT |
20.00 |
14,000.00 |
|
|
|
|
|
|
| 711-01-D |
riprap (55 lb,18" thick )
|
1,028   |
SQYD |
95.00 |
97,660.00 |
|
|
|
|
|
|
| 711-04 |
geotextile fabric
|
1,028   |
SQYD |
3.00 |
3,084.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
4.4 |
TON |
6,000.00 |
26,400.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
70   |
LB |
50.00 |
3,500.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
2,213   |
LB |
3.00 |
6,639.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
130,000.00 |
130,000.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
100.00 |
400.00 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
1   |
EACH |
200.00 |
200.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
1   |
EACH |
200.00 |
200.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| 804-01-F |
precast concrete piles (24")
|
1,080   |
LNFT |
200.00 |
216,000.00 |
|
|
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
1.00 |
1.00 |
|
|
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
60.72 |
CUYD |
1,200.00 |
72,864.00 |
|
|
|
|
|
|
| 805-03 |
class aa concrete
|
150.00 |
CUYD |
1,000.00 |
150,000.00 |
|
|
|
|
|
|
| 805-08-H |
precast-prestressed concrete girders (type quad beam)
|
1,185.0 |
LNFT |
150.00 |
177,750.00 |
|
|
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
45,093   |
LB |
3.00 |
135,279.00 |
|
|
|
|
|
|
| 807-08 |
structural metalwork
|
lump |
LUMP |
45,000.00 |
45,000.00 |
|
|
|
|
|
|
| 810-01 |
concrete railing (type)
|
400.00 |
LNFT |
100.00 |
40,000.00 |
|
|
|
|
|
|
| S-101 |
concrete approach slabs(28' clear roadway @ 20'length)
|
2   |
EACH |
15,000.00 |
30,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,674,147.00 |
|
|
|
|
|
|
|