| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BOH BROS. CONSTRUCTION CO., LLC. |
- 2 - COMMAND CONSTRUCTION INDUSTRIES LLC |
- 3 - BARRIERE CONSTRUCTION CO., LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
550   |
SQYD |
25.00 |
13,750.00 |
15.00 |
8,250.00 |
30.00 |
16,500.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
20   |
EACH |
50.00 |
1,000.00 |
150.00 |
3,000.00 |
19.00 |
380.00 |
|
|
| 204-06 |
temporary silt fencing
|
200   |
LNFT |
3.00 |
600.00 |
5.00 |
1,000.00 |
3.00 |
600.00 |
|
|
| 302-02-C |
class ii base course (8" thick)(crushed stone)
|
14,410.0 |
SQYD |
20.00 |
288,200.00 |
21.00 |
302,610.00 |
29.00 |
417,890.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
5,260.0 |
TON |
120.00 |
631,200.00 |
110.00 |
578,600.00 |
100.00 |
526,000.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
855.0 |
TON |
120.00 |
102,600.00 |
250.00 |
213,750.00 |
230.00 |
196,650.00 |
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
7,100   |
SQYD |
85.00 |
603,500.00 |
140.00 |
994,000.00 |
126.00 |
894,600.00 |
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
21,000   |
LNFT |
2.50 |
52,500.00 |
1.75 |
36,750.00 |
1.90 |
39,900.00 |
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
18,000   |
LNFT |
3.00 |
54,000.00 |
1.75 |
31,500.00 |
1.00 |
18,000.00 |
|
|
| 602-03 |
cleaning and sealing cracks
|
500   |
LNFT |
5.50 |
2,750.00 |
5.00 |
2,500.00 |
3.80 |
1,900.00 |
|
|
| 602-05-I-01 |
full depth patching of jointed conc pvmt (9" thick)
(16.0 sq yds & under) |
105.0 |
SQYD |
160.00 |
16,800.00 |
200.00 |
21,000.00 |
186.00 |
19,530.00 |
|
|
| 602-05-I-02 |
full depth patching of jointed conc pvmt (9" thick)
(16.1 - 48.0 sq yds) |
370.0 |
SQYD |
140.00 |
51,800.00 |
150.00 |
55,500.00 |
158.00 |
58,460.00 |
|
|
| 602-05-I-03 |
full depth patching of jointed conc pvmt (9" thick)
(48.1 sq yds & over) |
3,000.0 |
SQYD |
125.00 |
375,000.00 |
140.00 |
420,000.00 |
149.00 |
447,000.00 |
|
|
| 706-01-A |
concrete walk (4" thick)
|
550.0 |
SQYD |
80.00 |
44,000.00 |
70.00 |
38,500.00 |
85.00 |
46,750.00 |
|
|
| 706-02-C |
concrete drive (6" thick)
|
200.0 |
SQYD |
100.00 |
20,000.00 |
75.00 |
15,000.00 |
117.00 |
23,400.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
40,000.00 |
40,000.00 |
142,804.38 |
142,804.38 |
20,000.00 |
20,000.00 |
|
|
| 713-02-B |
temporary pavement markings (6" width)
|
1,000   |
LNFT |
0.55 |
550.00 |
0.25 |
250.00 |
0.10 |
100.00 |
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
350   |
LNFT |
1.00 |
350.00 |
0.50 |
175.00 |
0.10 |
35.00 |
|
|
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
11   |
EACH |
100.00 |
1,100.00 |
0.50 |
5.50 |
50.00 |
550.00 |
|
|
| 713-05-C |
temporary pavement legends and symbols (only)
|
6   |
EACH |
100.00 |
600.00 |
50.00 |
300.00 |
50.00 |
300.00 |
|
|
| 713-05-F |
temporary pavement legends and symbols (stop)
|
4   |
EACH |
100.00 |
400.00 |
60.00 |
240.00 |
50.00 |
200.00 |
|
|
| 714-01 |
slab sodding
|
200   |
SQYD |
16.00 |
3,200.00 |
10.00 |
2,000.00 |
7.60 |
1,520.00 |
|
|
| 717-01 |
seeding
|
100   |
LB |
15.00 |
1,500.00 |
20.00 |
2,000.00 |
23.00 |
2,300.00 |
|
|
| 718-01 |
fertilizer
|
3,000   |
LB |
1.00 |
3,000.00 |
1.00 |
3,000.00 |
1.20 |
3,600.00 |
|
|
| 723-02 |
granular material (vehicular measurement)
|
400   |
CUYD |
30.00 |
12,000.00 |
50.00 |
20,000.00 |
31.00 |
12,400.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
300,000.00 |
300,000.00 |
400,000.00 |
400,000.00 |
315,000.00 |
315,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
200   |
EACH |
6.00 |
1,200.00 |
5.00 |
1,000.00 |
6.32 |
1,264.00 |
|
|
| 732-01-B |
plastic pavement striping (6" width)
|
1,000   |
LNFT |
1.00 |
1,000.00 |
1.00 |
1,000.00 |
1.00 |
1,000.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
350   |
LNFT |
1.50 |
525.00 |
1.00 |
350.00 |
1.75 |
612.50 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
120   |
LNFT |
5.00 |
600.00 |
4.00 |
480.00 |
4.90 |
588.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.200 |
MILE |
2,600.00 |
520.00 |
3,000.00 |
600.00 |
3,700.00 |
740.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.030 |
MILE |
900.00 |
27.00 |
800.00 |
24.00 |
975.00 |
29.25 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
11   |
EACH |
230.00 |
2,530.00 |
200.00 |
2,200.00 |
250.00 |
2,750.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
6   |
EACH |
250.00 |
1,500.00 |
200.00 |
1,200.00 |
275.00 |
1,650.00 |
|
|
| 732-04-F |
plastic pavement legends & symbols (stop)
|
4   |
EACH |
250.00 |
1,000.00 |
225.00 |
900.00 |
285.00 |
1,140.00 |
|
|
| 732-05 |
removal of existing markings
|
0.500 |
MILE |
6,000.00 |
3,000.00 |
6,000.00 |
3,000.00 |
7,080.00 |
3,540.00 |
|
|
| 736-09 |
loop detector
|
700   |
LNFT |
12.00 |
8,400.00 |
15.00 |
10,500.00 |
15.00 |
10,500.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
50,000.00 |
50,000.00 |
23,000.00 |
23,000.00 |
|
|
| S-001 |
concrete walks (handicapped ramp-type a)
|
49   |
EACH |
2,100.00 |
102,900.00 |
250.00 |
12,250.00 |
2,150.00 |
105,350.00 |
|
|
| S-002 |
concrete walks (handicapped ramp-type b)
|
4   |
EACH |
2,300.00 |
9,200.00 |
250.00 |
1,000.00 |
2,150.00 |
8,600.00 |
|
|
| S-003 |
reconstruction of concrete curb & gutterbottom
(barrier curb) |
5,200   |
LNFT |
38.00 |
197,600.00 |
40.00 |
208,000.00 |
93.00 |
483,600.00 |
|
|
| S-004 |
reconstruction of concrete curb & gutter bottom
(mountable curb) |
3,700   |
LNFT |
38.00 |
140,600.00 |
40.00 |
148,000.00 |
94.00 |
347,800.00 |
|
|
| S-005 |
drilled doweled barrier concrete curb
|
210   |
LNFT |
25.00 |
5,250.00 |
30.00 |
6,300.00 |
44.00 |
9,240.00 |
|
|
| S-006 |
drilled doweled mountable concrete curb
|
160   |
LNFT |
25.00 |
4,000.00 |
30.00 |
4,800.00 |
47.00 |
7,520.00 |
|
|
| S-007 |
doweled barrier concrete curb
|
100   |
LNFT |
25.00 |
2,500.00 |
15.00 |
1,500.00 |
33.00 |
3,300.00 |
|
|
| S-008 |
doweled mountable concrete curb
|
2,400   |
LNFT |
15.00 |
36,000.00 |
15.00 |
36,000.00 |
42.00 |
100,800.00 |
|
|
| S-009 |
manhole cover
|
1   |
EACH |
300.00 |
300.00 |
250.00 |
250.00 |
900.00 |
900.00 |
|
|
| S-010 |
catch basin cover
|
2   |
EACH |
700.00 |
1,400.00 |
400.00 |
800.00 |
1,100.00 |
2,200.00 |
|
|
| S-011 |
tree protection
|
lump |
LUMP |
500.00 |
500.00 |
25,000.00 |
25,000.00 |
100.00 |
100.00 |
|
|
| S-012 |
tree trimming
|
lump |
LUMP |
500.00 |
500.00 |
25,000.00 |
25,000.00 |
100.00 |
100.00 |
|
|
| S-013 |
root pruning
|
15   |
EACH |
550.00 |
8,250.00 |
200.00 |
3,000.00 |
100.00 |
1,500.00 |
|
|
| S-014 |
hand formed poured in place concrete curb within the
limits of the tree dri p line |
200   |
LNFT |
40.00 |
8,000.00 |
15.00 |
3,000.00 |
160.00 |
32,000.00 |
|
|
| S-015 |
gravel bed and filter cloth over tree roots
|
200   |
SQYD |
25.00 |
5,000.00 |
30.00 |
6,000.00 |
100.00 |
20,000.00 |
|
|
| S-016 |
catch basin adjustment type a
|
16   |
EACH |
1,200.00 |
19,200.00 |
750.00 |
12,000.00 |
3,800.00 |
60,800.00 |
|
|
| S-017 |
manhole adjustment
|
6   |
EACH |
2,000.00 |
12,000.00 |
750.00 |
4,500.00 |
2,200.00 |
13,200.00 |
|
|
| S-018 |
drop inlet adjustment
|
10   |
EACH |
1,500.00 |
15,000.00 |
400.00 |
4,000.00 |
2,200.00 |
22,000.00 |
|
|
| S-019 |
sewer manhole adjustment with rings
|
3   |
EACH |
400.00 |
1,200.00 |
500.00 |
1,500.00 |
2,500.00 |
7,500.00 |
|
|
| S-020 |
drain and water manhole adjustment with rings
|
7   |
EACH |
400.00 |
2,800.00 |
500.00 |
3,500.00 |
3,900.00 |
27,300.00 |
|
|
| S-023 |
replacement catch basin frame and cover
|
14   |
EACH |
1,800.00 |
25,200.00 |
1,000.00 |
14,000.00 |
3,500.00 |
49,000.00 |
|
|
| S-024 |
replacement grate inlet frame and cover
|
1   |
EACH |
2,000.00 |
2,000.00 |
1,000.00 |
1,000.00 |
1,200.00 |
1,200.00 |
|
|
| S-025 |
manhole frame and cover
|
7   |
EACH |
2,200.00 |
15,400.00 |
500.00 |
3,500.00 |
1,800.00 |
12,600.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,265,502.00 |
|
3,888,888.88 |
|
4,426,988.75 |
|
|
|