| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BOH BROS. CONSTRUCTION CO., LLC. |
- 2 - BARRIERE CONSTRUCTION CO., LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
100   |
SQYD |
25.00 |
2,500.00 |
33.00 |
3,300.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,000   |
LNFT |
0.50 |
500.00 |
1.00 |
1,000.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
100.0 |
CUYD |
20.00 |
2,000.00 |
50.00 |
5,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
2,351.4 |
TON |
100.00 |
235,140.00 |
110.00 |
258,654.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
107.6 |
TON |
160.00 |
17,216.00 |
275.00 |
29,590.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement (2" avg. depth)
|
15,274   |
SQYD |
4.00 |
61,096.00 |
5.00 |
76,370.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
36.0 |
SQYD |
190.00 |
6,840.00 |
220.00 |
7,920.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
100,000.00 |
100,000.00 |
120,000.00 |
120,000.00 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
0.604 |
MILE |
500.00 |
302.00 |
440.00 |
265.76 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
0.604 |
MILE |
600.00 |
362.40 |
550.00 |
332.20 |
|
|
|
|
| 714-01 |
slab sodding
|
15   |
SQYD |
40.00 |
600.00 |
55.00 |
825.00 |
|
|
|
|
| 715-01 |
topsoil
|
80   |
CUYD |
60.00 |
4,800.00 |
150.00 |
12,000.00 |
|
|
|
|
| 717-01 |
seeding
|
100   |
LB |
20.00 |
2,000.00 |
17.00 |
1,700.00 |
|
|
|
|
| 718-01 |
fertilizer
|
100   |
LB |
6.00 |
600.00 |
11.00 |
1,100.00 |
|
|
|
|
| 723-01 |
granular material (net section)
|
200   |
CUYD |
30.00 |
6,000.00 |
20.00 |
4,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
80,000.00 |
80,000.00 |
110,000.00 |
110,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
100   |
EACH |
6.00 |
600.00 |
6.00 |
600.00 |
|
|
|
|
| 732-01-B |
plastic pavement striping (6" width)
|
2,386   |
LNFT |
1.00 |
2,386.00 |
1.50 |
3,579.00 |
|
|
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
435   |
LNFT |
2.75 |
1,196.25 |
3.00 |
1,305.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.604 |
MILE |
3,000.00 |
1,812.00 |
2,500.00 |
1,510.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.604 |
MILE |
1,000.00 |
604.00 |
900.00 |
543.60 |
|
|
|
|
| 736-09 |
loop detector
|
100   |
LNFT |
25.00 |
2,500.00 |
17.00 |
1,700.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
40,000.00 |
40,000.00 |
|
|
|
|
| S-001 |
concrete walks (handicapped ramp - type a)
|
13   |
EACH |
2,300.00 |
29,900.00 |
3,300.00 |
42,900.00 |
|
|
|
|
| S-002 |
concrete walks (handicapped ramp - type b)
|
21   |
EACH |
2,350.00 |
49,350.00 |
3,400.00 |
71,400.00 |
|
|
|
|
| S-004 |
reconstruction of concrete curb and gutter bottom
|
86   |
LNFT |
120.00 |
10,320.00 |
65.00 |
5,590.00 |
|
|
|
|
| S-008 |
concrete pavement repair (18.0 sq.yd. and under)
|
134.0 |
SQYD |
225.00 |
30,150.00 |
220.00 |
29,480.00 |
|
|
|
|
| S-009 |
concrete pavement repair (18.1 sq.yd. to 48.0 sq.yd.)
|
322.3 |
SQYD |
215.00 |
69,294.50 |
210.00 |
67,683.00 |
|
|
|
|
| S-010 |
concrete pavement repair (48.1 sq.yd. and over)
|
535.6 |
SQYD |
205.00 |
109,798.00 |
200.00 |
107,120.00 |
|
|
|
|
| S-011 |
tree protection
|
lump |
LUMP |
2,000.00 |
2,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| S-012 |
tree triming
|
lump |
LUMP |
9,200.00 |
9,200.00 |
14,000.00 |
14,000.00 |
|
|
|
|
| S-013 |
root pruning
|
lump |
LUMP |
6,600.00 |
6,600.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| S-014 |
hand formed poured in-place concrete curb within the
limits of tree driplin e |
31   |
LNFT |
150.00 |
4,650.00 |
140.00 |
4,340.00 |
|
|
|
|
| S-015 |
gravel bed and filter cloth over tree roots
|
13.7 |
SQYD |
10.00 |
137.00 |
180.00 |
2,466.00 |
|
|
|
|
| S-016 |
catch basin adjustment type a
|
2   |
EACH |
1,500.00 |
3,000.00 |
3,800.00 |
7,600.00 |
|
|
|
|
| S-017 |
manhole adjustment
|
2   |
EACH |
2,000.00 |
4,000.00 |
2,450.00 |
4,900.00 |
|
|
|
|
| S-017A |
drain and water manhole adjustment with rings
|
2   |
EACH |
800.00 |
1,600.00 |
500.00 |
1,000.00 |
|
|
|
|
| S-017B |
sewer manhole adjustment with rings
|
2   |
EACH |
800.00 |
1,600.00 |
500.00 |
1,000.00 |
|
|
|
|
| S-023 |
catch basin frame and cover
|
2   |
EACH |
2,200.00 |
4,400.00 |
3,000.00 |
6,000.00 |
|
|
|
|
| S-024 |
grate inlet frame and cover
|
2   |
EACH |
1,500.00 |
3,000.00 |
3,300.00 |
6,600.00 |
|
|
|
|
| S-025 |
resetting existing stone
|
85   |
LNFT |
170.00 |
14,450.00 |
235.00 |
19,975.00 |
|
|
|
|
| S-026 |
resetting tile street
|
1   |
EACH |
1,400.00 |
1,400.00 |
1,000.00 |
1,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
888,904.15 |
|
1,104,348.56 |
|
|
|
|
|