DBE GOAL FED
Lead Project: 704-36-0046
Parish: ORLEANS
Routes:
Description: PERMANENT REPAIR TO FEDERAL AID ELIGIBLE ROADS
Type Const: asphaltic concrete cold planing & overlay, pcc patching & ad a ramps and striping
Estimated Construction Cost: $678,764.84
 
RankLicenseBidderConstruction Bid
1 02179 BOH BROS. CONSTRUCTION CO., LLC. $888,904.15
2 06276 BARRIERE CONSTRUCTION CO., LLC $1,104,348.56
 
Item Number Item Description Quantity Unit of Measure - 1 -
BOH BROS. CONSTRUCTION CO., LLC.
- 2 -
BARRIERE CONSTRUCTION CO., LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 100      SQYD 25.00 2,500.00 33.00 3,300.00        
204-06 temporary silt fencing 1,000      LNFT 0.50 500.00 1.00 1,000.00        
402-01 traffic maintenance aggregate (vehicular measurement) 100.0    CUYD 20.00 2,000.00 50.00 5,000.00        
502-01 superpave asphaltic concrete 2,351.4    TON 100.00 235,140.00 110.00 258,654.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
107.6    TON 160.00 17,216.00 275.00 29,590.00        
509-01 cold planing asphaltic pavement (2" avg. depth) 15,274      SQYD 4.00 61,096.00 5.00 76,370.00        
706-01-A concrete walk (4" thick) 36.0    SQYD 190.00 6,840.00 220.00 7,920.00        
713-01 temporary signs & barricades lump      LUMP 100,000.00 100,000.00 120,000.00 120,000.00        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
0.604  MILE 500.00 302.00 440.00 265.76        
713-04-A temporary pavement markings (solid line)(4" width) 0.604  MILE 600.00 362.40 550.00 332.20        
714-01 slab sodding 15      SQYD 40.00 600.00 55.00 825.00        
715-01 topsoil 80      CUYD 60.00 4,800.00 150.00 12,000.00        
717-01 seeding 100      LB 20.00 2,000.00 17.00 1,700.00        
718-01 fertilizer 100      LB 6.00 600.00 11.00 1,100.00        
723-01 granular material (net section) 200      CUYD 30.00 6,000.00 20.00 4,000.00        
727-01 mobilization lump      LUMP 80,000.00 80,000.00 110,000.00 110,000.00        
731-02 reflectorized raised pavement markers 100      EACH 6.00 600.00 6.00 600.00        
732-01-B plastic pavement striping (6" width) 2,386      LNFT 1.00 2,386.00 1.50 3,579.00        
732-01-D plastic pavement striping (12" width) 435      LNFT 2.75 1,196.25 3.00 1,305.00        
732-02-A plastic pavement striping (solid line) (4" width) 0.604  MILE 3,000.00 1,812.00 2,500.00 1,510.00        
732-03-A plastic pavement striping (broken line)(4" width) 0.604  MILE 1,000.00 604.00 900.00 543.60        
736-09 loop detector 100      LNFT 25.00 2,500.00 17.00 1,700.00        
740-01 construction layout lump      LUMP 5,000.00 5,000.00 40,000.00 40,000.00        
S-001 concrete walks (handicapped ramp - type a) 13      EACH 2,300.00 29,900.00 3,300.00 42,900.00        
S-002 concrete walks (handicapped ramp - type b) 21      EACH 2,350.00 49,350.00 3,400.00 71,400.00        
S-004 reconstruction of concrete curb and gutter bottom 86      LNFT 120.00 10,320.00 65.00 5,590.00        
S-008 concrete pavement repair (18.0 sq.yd. and under) 134.0    SQYD 225.00 30,150.00 220.00 29,480.00        
S-009 concrete pavement repair (18.1 sq.yd. to 48.0 sq.yd.) 322.3    SQYD 215.00 69,294.50 210.00 67,683.00        
S-010 concrete pavement repair (48.1 sq.yd. and over) 535.6    SQYD 205.00 109,798.00 200.00 107,120.00        
S-011 tree protection lump      LUMP 2,000.00 2,000.00 15,000.00 15,000.00        
S-012 tree triming lump      LUMP 9,200.00 9,200.00 14,000.00 14,000.00        
S-013 root pruning lump      LUMP 6,600.00 6,600.00 15,000.00 15,000.00        
S-014 hand formed poured in-place concrete curb within the
limits of tree driplin e
31      LNFT 150.00 4,650.00 140.00 4,340.00        
S-015 gravel bed and filter cloth over tree roots 13.7    SQYD 10.00 137.00 180.00 2,466.00        
S-016 catch basin adjustment type a 2      EACH 1,500.00 3,000.00 3,800.00 7,600.00        
S-017 manhole adjustment 2      EACH 2,000.00 4,000.00 2,450.00 4,900.00        
S-017A drain and water manhole adjustment with rings 2      EACH 800.00 1,600.00 500.00 1,000.00        
S-017B sewer manhole adjustment with rings 2      EACH 800.00 1,600.00 500.00 1,000.00        
S-023 catch basin frame and cover 2      EACH 2,200.00 4,400.00 3,000.00 6,000.00        
S-024 grate inlet frame and cover 2      EACH 1,500.00 3,000.00 3,300.00 6,600.00        
S-025 resetting existing stone 85      LNFT 170.00 14,450.00 235.00 19,975.00        
S-026 resetting tile street 1      EACH 1,400.00 1,400.00 1,000.00 1,000.00        
                       
 CONTRACTOR TOTAL       888,904.15   1,104,348.56        