| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BOH BROS. CONSTRUCTION CO., LLC. |
- 2 - BARRIERE CONSTRUCTION CO., LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
137   |
SQYD |
25.00 |
3,425.00 |
24.00 |
3,288.00 |
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
57.0 |
LNFT |
40.00 |
2,280.00 |
30.00 |
1,710.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
450   |
LNFT |
1.00 |
450.00 |
2.00 |
900.00 |
|
|
|
|
| 401-01 |
aggregate surface course (net section)
|
168.1 |
CUYD |
100.00 |
16,810.00 |
100.00 |
16,810.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
65.0 |
CUYD |
20.00 |
1,300.00 |
65.00 |
4,225.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
3,082.2 |
TON |
110.00 |
339,042.00 |
111.00 |
342,124.20 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
397.3 |
TON |
160.00 |
63,568.00 |
235.00 |
93,365.50 |
|
|
|
|
| 509-01-A |
cold planing asphaltic pavement (1.5" thickness)
|
78   |
SQYD |
20.00 |
1,560.00 |
3.00 |
234.00 |
|
|
|
|
| 509-01-B |
cold planing asphaltic pavement (2" thickness)
|
14,618   |
SQYD |
4.00 |
58,472.00 |
2.00 |
29,236.00 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
1,223   |
SQYD |
110.00 |
134,530.00 |
152.00 |
185,896.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
3   |
EACH |
1,500.00 |
4,500.00 |
2,150.00 |
6,450.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
4   |
EACH |
1,000.00 |
4,000.00 |
2,700.00 |
10,800.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
5.4 |
SQYD |
190.00 |
1,026.00 |
225.00 |
1,215.00 |
|
|
|
|
| 706-01-C |
concrete walk (6" thick)
|
20.7 |
SQYD |
200.00 |
4,140.00 |
195.00 |
4,036.50 |
|
|
|
|
| 707-01 |
concrete curb
|
10.0 |
LNFT |
100.00 |
1,000.00 |
90.00 |
900.00 |
|
|
|
|
| 707-02 |
concrete gutter
|
10.0 |
LNFT |
100.00 |
1,000.00 |
110.00 |
1,100.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
70,000.00 |
70,000.00 |
|
|
|
|
| 713-02-A |
temporary pavement markings (4" width)
|
9,987   |
LNFT |
0.25 |
2,496.75 |
0.25 |
2,496.75 |
|
|
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
500   |
LNFT |
0.83 |
415.00 |
0.50 |
250.00 |
|
|
|
|
| 715-01 |
topsoil
|
40   |
CUYD |
60.00 |
2,400.00 |
150.00 |
6,000.00 |
|
|
|
|
| 717-01 |
seeding
|
29   |
LB |
33.00 |
957.00 |
20.00 |
580.00 |
|
|
|
|
| 718-01 |
fertilizer
|
960   |
LB |
1.40 |
1,344.00 |
1.00 |
960.00 |
|
|
|
|
| 723-02-A |
granular material (vehicular measurement) (temporary
access & patching sub- base) |
133   |
CUYD |
30.00 |
3,990.00 |
40.00 |
5,320.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
80,000.00 |
80,000.00 |
101,000.10 |
101,000.10 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
231   |
EACH |
6.00 |
1,386.00 |
6.00 |
1,386.00 |
|
|
|
|
| 732-01-B |
plastic pavement striping (6" width)
|
1,350   |
LNFT |
1.00 |
1,350.00 |
1.00 |
1,350.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
285   |
LNFT |
1.50 |
427.50 |
1.50 |
427.50 |
|
|
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
366   |
LNFT |
2.75 |
1,006.50 |
2.00 |
732.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
4.260 |
MILE |
2,700.00 |
11,502.00 |
2,800.00 |
11,928.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.669 |
MILE |
935.00 |
625.52 |
1,050.00 |
702.45 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
8   |
EACH |
220.00 |
1,760.00 |
200.00 |
1,600.00 |
|
|
|
|
| 732-04-B |
plastic pavement legends & symbols (double arrow)
|
1   |
EACH |
260.00 |
260.00 |
242.00 |
242.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
5   |
EACH |
240.00 |
1,200.00 |
200.00 |
1,000.00 |
|
|
|
|
| 732-04-E |
plastic pavement legends & symbols (school crossing)
|
4   |
EACH |
440.00 |
1,760.00 |
450.00 |
1,800.00 |
|
|
|
|
| 736-09 |
loop detector
|
380   |
LNFT |
17.00 |
6,460.00 |
16.00 |
6,080.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
5,000.00 |
5,000.00 |
12,000.00 |
12,000.00 |
|
|
|
|
| S-001 |
catch basin reconstruction
|
2   |
EACH |
3,500.00 |
7,000.00 |
2,800.00 |
5,600.00 |
|
|
|
|
| S-002 |
catch basin frame and cover
|
1   |
EACH |
2,000.00 |
2,000.00 |
3,100.00 |
3,100.00 |
|
|
|
|
| S-003 |
concrete walks (6" thick)(handicapped ramps-type a)
|
14   |
EACH |
2,300.00 |
32,200.00 |
2,600.00 |
36,400.00 |
|
|
|
|
| S-004 |
concrete walks (6" thick)(handicapped ramps-type b)
|
14   |
EACH |
2,300.00 |
32,200.00 |
2,600.00 |
36,400.00 |
|
|
|
|
| S-005 |
drain manhole frame and cover
|
2   |
EACH |
800.00 |
1,600.00 |
3,100.00 |
6,200.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
846,443.27 |
|
1,015,845.00 |
|
|
|
|
|