February 06, 2014 Error processing SSI file

Letting of 2/25/2009 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 454-04-0076
Parish: ST TAMMANY
Routes: I-12
Description: TANGIPAHOA PARISH LINE - JCT. US 190 (COVINGTON)
Type Const: grading, drainage structures, cold planing asphatic concrete pavement, superpave
asphaltic concrete pavement, pavement patching, portland cement conrete pvmt, and related work.
Estimated Construction Cost: $16,156,466.35
Maximum Number of Days Allowed for Construction: 370
Calculated Daily User Cost: $5,000.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 06276 BARRIERE CONSTRUCTION CO., LLC. $12,453,000.00 160 $13,253,000.00
2 02179 BOH BROS. CONSTRUCTION CO., LLC. $13,993,681.07 250 $15,243,681.07
3 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $15,025,627.85 300 $16,525,627.85
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC.
- 2 -
BOH BROS. CONSTRUCTION CO., LLC.
- 3 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 10,000.00 10,000.00 1,000.00 1,000.00 20,000.00 20,000.00    
202-02-H removal of guard rail 4,999      LNFT 10.00 49,990.00 5.00 24,995.00 20.00 99,980.00    
203-01 general excavation 3,872      CUYD 1.00 3,872.00 12.00 46,464.00 18.00 69,696.00    
203-07 borrow (vehicular meas.) 24,600      CUYD 20.00 492,000.00 15.00 369,000.00 18.00 442,800.00    
203-07-B borrow (vehicular meas.)(plastic soils) 2,400      CUYD 20.00 48,000.00 20.00 48,000.00 18.00 43,200.00    
204-02 temporary hay or straw bales 20      EACH 100.00 2,000.00 15.00 300.00 50.00 1,000.00    
204-06 temporary silt fencing 15,000      LNFT 1.50 22,500.00 1.50 22,500.00 5.00 75,000.00    
302-02-G class ii base course (16" thick) 8,710.2    SQYD 35.00 304,857.00 80.00 696,816.00 44.00 383,248.80    
502-01 superpave asphaltic concrete 58,927.1    TON 80.00 4,714,168.00 88.00 5,185,584.80 77.50 4,566,850.25    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,900.0    TON 80.00 152,000.00 130.00 247,000.00 150.00 285,000.00    
508-01 asphalt concrete (sma) wearing course 40,356.9    TON 90.00 3,632,121.00 115.00 4,641,043.50 125.00 5,044,612.50    
509-01 cold planing asphaltic pavement 327,439      SQYD 3.00 982,317.00 2.00 654,878.00 2.00 654,878.00    
509-02 contractor retained reclaimed asphaltic pavement - 13,643      CUYD 20.00 - 272,860.00 15.00 - 204,645.00 0.10 - 1,364.30    
510-01-D pavement patching (18" minimum thickness) 300      SQYD 150.00 45,000.00 185.00 55,500.00 150.00 45,000.00    
602-02-A cleaning and resealing existing longitudinal pavement
joints
702      LNFT 2.00 1,404.00 11.00 7,722.00 1.00 702.00    
602-02-B cleaning and resealing existing transverse pavement
joints
848      LNFT 2.00 1,696.00 10.00 8,480.00 1.00 848.00    
602-03 cleaning and sealing cracks 1,000      LNFT 3.00 3,000.00 8.00 8,000.00 1.00 1,000.00    
701-10-G reinforced concrete pipe (extension)(18") 12      LNFT 300.00 3,600.00 110.00 1,320.00 425.00 5,100.00    
701-15 concrete collar 17      EACH 1,000.00 17,000.00 450.00 7,650.00 725.00 12,325.00    
702-07-A cross drain safety end (type 1) 1      EACH 750.00 750.00 4,500.00 4,500.00 6,000.00 6,000.00    
704-01-A guard rail (single thrie beam)(3'-1 1/2" post spacing) 125.0    LNFT 45.00 5,625.00 45.00 5,625.00 52.00 6,500.00    
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 287.5    LNFT 41.00 11,787.50 40.00 11,500.00 30.00 8,625.00    
704-01-C guard rail (double thrie beam)(3'-1 1/2" post spacing) 287.5    LNFT 61.00 17,537.50 60.00 17,250.00 52.00 14,950.00    
704-03 blocked out guard rail 3,325.0    LNFT 18.00 59,850.00 18.00 59,850.00 19.00 63,175.00    
704-06 guard rail anchor sections (trailing end) 25.0    LNFT 78.00 1,950.00 75.00 1,875.00 78.00 1,950.00    
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
37.5    LNFT 91.00 3,412.50 90.00 3,375.00 95.00 3,562.50    
704-08-B guard rail transitions (double thrie beam) 350.0    LNFT 61.00 21,350.00 60.00 21,000.00 55.00 19,250.00    
704-10 guard rail anchor block 14      EACH 1,900.00 26,600.00 1,825.00 25,550.00 1,400.00 19,600.00    
704-11-A guard rail end treatment (flared) 24      EACH 2,400.00 57,600.00 2,300.00 55,200.00 2,000.00 48,000.00    
706-03-A incidental concrete paving (4" thick) 1,175.3    SQYD 45.00 52,888.50 60.00 70,518.00 50.00 58,765.00    
707-04 asphaltic curb 100.0    LNFT 50.00 5,000.00 30.00 3,000.00 60.00 6,000.00    
710-01 flowable fill 50      CUYD 90.00 4,500.00 300.00 15,000.00 155.00 7,750.00    
713-01 temporary signs & barricades lump      LUMP 497,550.00 497,550.00 100,000.00 100,000.00 900,000.00 900,000.00    
713-02-C temporary pavement markings (8" width) 8,427      LNFT 0.01 84.27 0.17 1,432.59 0.42 3,539.34    
713-02-E temporary pavement markings (24" width) 3,198      LNFT 0.01 31.98 0.55 1,758.90 1.50 4,797.00    
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
62.013  MILE 10.00 620.13 10.00 620.13 1.00 62.01    
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
62.130  MILE 100.00 6,213.00 20.00 1,242.60 1.00 62.13    
713-04-A temporary pavement markings (solid line)(4" width) 148.470  MILE 100.00 14,847.00 25.00 3,711.75 1.00 148.47    
713-05-A temporary pavement legends and symbols (arrow) 12      EACH 80.00 960.00 10.00 120.00 52.00 624.00    
713-05-C temporary pavement legends and symbols (only) 12      EACH 80.00 960.00 10.00 120.00 52.00 624.00    
716-01-A mulch (vegetative) 10.0    TON 800.00 8,000.00 700.00 7,000.00 710.00 7,100.00    
721-01 mowing 2,320.0    ACRE 20.00 46,400.00 40.00 92,800.00 35.00 81,200.00    
727-01 mobilization lump      LUMP 725,000.00 725,000.00 1,135,000.00 1,135,000.00 1,489,000.00 1,489,000.00    
729-16-B object marker assembly (type 2) 94      EACH 90.00 8,460.00 65.00 6,110.00 65.00 6,110.00    
729-16-C object marker assembly (type 3) 34      EACH 110.00 3,740.00 80.00 2,720.00 77.00 2,618.00    
731-02 reflectorized raised pavement markers 4,100      EACH 5.25 21,525.00 5.50 22,550.00 5.50 22,550.00    
732-01-C plastic pavement striping (8" width) 2,809      LNFT 1.00 2,809.00 1.00 2,809.00 1.15 3,230.35    
732-01-E plastic pavement striping (24" width) 1,066      LNFT 4.50 4,797.00 4.50 4,797.00 4.00 4,264.00    
732-02-A plastic pavement striping (solid line) (4" width) 49.490  MILE 3,000.00 148,470.00 2,400.00 118,776.00 3,000.00 148,470.00    
732-03-A plastic pavement striping (broken line)(4" width) 20.671  MILE 1,000.00 20,671.00 800.00 16,536.80 800.00 16,536.80    
732-04-A plastic pavement legends & symbols (arrow) 4      EACH 500.00 2,000.00 200.00 800.00 210.00 840.00    
732-04-C plastic pavement legends & symbols (only) 4      EACH 500.00 2,000.00 200.00 800.00 220.00 880.00    
732-05 removal of existing markings 3.000  MILE 500.00 1,500.00 5,000.00 15,000.00 5,750.00 17,250.00    
739-01 hydro-seeding 30.00   ACRE 1,000.00 30,000.00 1,000.00 30,000.00 1,000.00 30,000.00    
740-01 construction layout lump      LUMP 196,483.12 196,483.12 25,000.00 25,000.00 50,000.00 50,000.00    
S-001 rumble strips (ground-in) 40.5    MILE 900.00 36,450.00 900.00 36,450.00 330.00 13,365.00    
S-002 concrete apron 37      EACH 1,000.00 37,000.00 1,400.00 51,800.00 900.00 33,300.00    
S-003 exposing existing r.c. pipe 153      LNFT 100.00 15,300.00 50.00 7,650.00 26.00 3,978.00    
S-004 dynamic message sign unit 6      EACH 10,000.00 60,000.00 13,000.00 78,000.00 12,500.00 75,000.00    
S-005 remove and relocate sign posts and footings 5      EACH 3,100.00 15,500.00 3,100.00 15,500.00 2,200.00 11,000.00    
S-006 cleaning existing ditches 6,350      LNFT 1.75 11,112.50 3.50 22,225.00 4.50 28,575.00    
S-007 video detector device and connection 1      EACH 8,000.00 8,000.00 7,000.00 7,000.00 7,000.00 7,000.00    
S-008 video detection system (intersection) 1      EACH 5,000.00 5,000.00 9,500.00 9,500.00 4,500.00 4,500.00    
S-009 raising and/or undersealing concrete pavement slabs 10,000      LBS 4.00 40,000.00 6.00 60,000.00 4.50 45,000.00    
                       
 ITEM TOTAL (CONSTRUCTION BID)       12,453,000.00   13,993,681.07   15,025,627.85    
 NUMBER OF DAYS BID AT $5,000 PER DAY.       800,000.00   1,250,000.00   1,500,000.00    
 TOTAL BID       13,253,000.00   15,243,681.07   16,525,627.85    