February 06, 2014 Error processing SSI file

Letting of 2/25/2009 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 450-37-0022
Parish: ST CHARLES
Routes: I-310
Description: MISSISSIPPI RIVER BRIDGE (LULING) CABLE STAY REPLACEMENT
Type Const: replacement of existing stay cables, miscellaneous bridge repairs, and related work.
Estimated Construction Cost: $35,738,507.01
Maximum Number of Days Allowed for Construction: 500
Calculated Daily User Cost: $2,000.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 47347 KIEWIT LOUISIANA CO $30,485,408.30 500 $31,485,408.30
2 00755 L & A CONTR.CO/IHI INC, A JT. VENT. $32,987,999.96 500 $33,987,999.96
3 35836 AMERICAN BRIDGE CO. $36,743,889.00 500 $37,743,889.00
4 00271 MASSMAN CONSTRUCTION CO. $55,864,898.30 500 $56,864,898.30
 
Item Number Item Description Quantity Unit of Measure - 1 -
KIEWIT LOUISIANA CO
- 2 -
L & A CONTR.CO/IHI INC, A JT. VENT.
- 3 -
AMERICAN BRIDGE CO.
- 4 -
MASSMAN CONSTRUCTION CO.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
713-01 temporary signs & barricades lump      LUMP 150,000.00 150,000.00 1,500,000.00 1,500,000.00 500,000.00 500,000.00 500,000.00 500,000.00
713-03-A-01 temporary pvmt. markings (broken line)(4" w)(4' l)
(type i removable)
1.534  MILE 3,750.00 5,752.50 4,500.00 6,903.00 4,000.00 6,136.00 3,750.00 5,752.50
713-04-A-01 temporary pvmt. markings (solid line)(4" w)(type i
removable)
3.422  MILE 11,500.00 39,353.00 13,800.00 47,223.60 12,000.00 41,064.00 11,500.00 39,353.00
713-06 temporary reflectorized raised pavement markers 205      EACH 5.50 1,127.50 6.60 1,353.00 10.00 2,050.00 5.50 1,127.50
713-07 temporary precast concrete barrier (contractor
furnished)
107      EACH 1,025.00 109,675.00 9,976.00 1,067,432.00 1,200.00 128,400.00 3,800.00 406,600.00
713-08 temporary precast concrete barrier (department
furnished)
107      EACH 480.00 51,360.00 7,907.00 846,049.00 400.00 42,800.00 3,000.00 321,000.00
713-10 temporary precast concrete barrier movement 175      EACH 675.00 118,125.00 192.00 33,600.00 200.00 35,000.00 800.00 140,000.00
727-01 mobilization lump      LUMP 3,000,000.00 3,000,000.00 4,250,000.00 4,250,000.00 5,400,000.00 5,400,000.00 8,200,000.00 8,200,000.00
731-02 reflectorized raised pavement markers 205      EACH 5.50 1,127.50 6.60 1,353.00 10.00 2,050.00 5.50 1,127.50
732-02-A plastic pavement striping (solid line) (4" width) 3.422  MILE 2,450.00 8,383.90 2,940.00 10,060.68 2,500.00 8,555.00 2,450.00 8,383.90
732-03-A plastic pavement striping (broken line)(4" width) 1.534  MILE 850.00 1,303.90 1,020.00 1,564.68 1,000.00 1,534.00 850.00 1,303.90
732-05 removal of existing markings 7.000  MILE 6,000.00 42,000.00 7,200.00 50,400.00 7,000.00 49,000.00 6,000.00 42,000.00
740-01 construction layout lump      LUMP 400,000.00 400,000.00 200,800.00 200,800.00 100,000.00 100,000.00 200,000.00 200,000.00
807-08 structural metalwork lump      LUMP 75,000.00 75,000.00 219,600.00 219,600.00 75,000.00 75,000.00 175,000.00 175,000.00
S-001 emergency tow trucks 500      DAY 810.00 405,000.00 1,680.00 840,000.00 625.00 312,500.00 3,600.00 1,800,000.00
S-002 dynamic message sign unit 2      EACH 31,000.00 62,000.00 28,620.00 57,240.00 50,000.00 100,000.00 13,250.00 26,500.00
S-003 impact attenuators(construction zone) 3      EACH 9,500.00 28,500.00 13,800.00 41,400.00 25,000.00 75,000.00 12,000.00 36,000.00
S-004 repair and restoration of impact attenuator 3      EACH 6,900.00 20,700.00 8,400.00 25,200.00 17,000.00 51,000.00 7,500.00 22,500.00
S-005 traffic control management lump      LUMP 300,000.00 300,000.00 424,300.00 424,300.00 400,000.00 400,000.00 4,000,000.00 4,000,000.00
S-101 temporary stay system,installation and removal lump      LUMP 5,000,000.00 5,000,000.00 3,000,000.00 3,000,000.00 4,500,000.00 4,500,000.00 9,750,000.00 9,750,000.00
S-102 new cable stay system and installation lump      LUMP 12,000,000.00 12,000,000.00 12,500,000.00 12,500,000.00 14,000,000.00 14,000,000.00 16,250,000.00 16,250,000.00
S-103 removal of existing stay system lump      LUMP 3,000,000.00 3,000,000.00 2,250,000.00 2,250,000.00 4,900,000.00 4,900,000.00 5,750,000.00 5,750,000.00
S-104 geometry control and cable force verification lump      LUMP 178,000.00 178,000.00 608,600.00 608,600.00 300,000.00 300,000.00 200,000.00 200,000.00
S-105 removal and storage of existing instrumentation lump      LUMP 50,000.00 50,000.00 120,000.00 120,000.00 200,000.00 200,000.00 150,000.00 150,000.00
S-106 cleaning and modification of anchorage boxes 72      each 12,000.00 864,000.00 5,020.00 361,440.00 1,500.00 108,000.00 10,000.00 720,000.00
S-107 cleaning and sealing of the superstructure lump      LUMP 1,300,000.00 1,300,000.00 900,000.00 900,000.00 1,500,000.00 1,500,000.00 2,494,000.00 2,494,000.00
S-108 web-enabled camera system lump      LUMP 350,000.00 350,000.00 97,500.00 97,500.00 400,000.00 400,000.00 250,000.00 250,000.00
S-109 repair crack in deck plate 90      ea 5,000.00 450,000.00 9,900.00 891,000.00 3,500.00 315,000.00 6,000.00 540,000.00
S-110 grind crack in weld 45      ea 3,000.00 135,000.00 2,123.00 95,535.00 600.00 27,000.00 1,250.00 56,250.00
S-111 repair crack in deck rib 13      ea 5,000.00 65,000.00 7,888.00 102,544.00 600.00 7,800.00 4,500.00 58,500.00
S-112 repair crack in cross girder 3      ea 8,000.00 24,000.00 7,734.00 23,202.00 2,000.00 6,000.00 6,500.00 19,500.00
S-113 repair expansion joint 1      ea 250,000.00 250,000.00 113,700.00 113,700.00 150,000.00 150,000.00 200,000.00 200,000.00
S-114 repair fairing plate lump      lump 2,000,000.00 2,000,000.00 2,300,000.00 2,300,000.00 3,000,000.00 3,000,000.00 3,500,000.00 3,500,000.00
                       
 ITEM TOTAL (CONSTRUCTION BID)       30,485,408.30   32,987,999.96   36,743,889.00   55,864,898.30
 NUMBER OF DAYS BID AT $2,000 PER DAY.       1,000,000.00   1,000,000.00   1,000,000.00   1,000,000.00
 TOTAL BID       31,485,408.30   33,987,999.96   37,743,889.00   56,864,898.30