Lead Project: 424-04-0058
Parish: IBERIA
Routes: US 90
Description: US 90 INTERCHANGE @ LA 675 SIGNING
Type Const: signage and all related work.
Estimated Construction Cost: $304,523.20
 
RankLicenseBidderConstruction Bid
1 15498 GLOVER ENTERPRISES, INC. $229,596.90
2 34068 ALPHA SERVICE AND PRODUCTS, INC. $244,047.80
3 43371 RMD HOLDINGS LTD $298,197.48
4 23811 HIGHWAY TECHNOLOGIES INC $351,828.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
GLOVER ENTERPRISES, INC.
- 2 -
ALPHA SERVICE AND PRODUCTS, INC.
- 3 -
RMD HOLDINGS LTD
- 4 -
HIGHWAY TECHNOLOGIES INC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-I-01 removal of existing sign (type "a") 91      EACH 67.00 6,097.00 50.00 4,550.00 200.00 18,200.00 75.00 6,825.00
202-02-I-03 removal of existing sign (type "d") 4      EACH 500.00 2,000.00 60.00 240.00 500.00 2,000.00 250.00 1,000.00
202-02-I-05 removal of existing sign (overhead mounted) 2      EACH 500.00 1,000.00 1.00 2.00 5,000.00 10,000.00 1,500.00 3,000.00
202-02-J-02 removal of existing sign supports (3 1/2" dia.) 5      EACH 300.00 1,500.00 100.00 500.00 200.00 1,000.00 3,000.00 15,000.00
202-02-M removal of existing u-channel supports 45      EACH 50.00 2,250.00 45.00 2,025.00 75.00 3,375.00 120.00 5,400.00
706-03-C incidental concrete paving (6" thick) 16.8    SQYD 80.00 1,344.00 85.00 1,428.00 150.00 2,520.00 205.00 3,444.00
713-01 temporary signs & barricades lump      LUMP 4,000.00 4,000.00 15,000.00 15,000.00 15,000.00 15,000.00 17,000.00 17,000.00
727-01 mobilization lump      LUMP 30,000.00 30,000.00 35,000.00 35,000.00 25,000.00 25,000.00 34,000.00 34,000.00
729-01 sign (type a) 650.7    SQFT 19.00 12,363.30 21.00 13,664.70 24.25 15,779.48 25.00 16,267.50
729-02 sign (type b) 32.8    SQFT 27.00 885.60 27.00 885.60 26.25 861.00 30.00 984.00
729-04 sign (type d) 1,955.5    SQFT 22.00 43,021.00 23.00 44,976.50 24.00 46,932.00 25.00 48,887.50
729-05 sign (type e) 144.0    SQFT 24.00 3,456.00 28.50 4,104.00 36.00 5,184.00 30.00 4,320.00
729-08-A mounting (2 1/2" post) 10      EACH 695.00 6,950.00 700.00 7,000.00 575.00 5,750.00 600.00 6,000.00
729-08-B mounting (3 1/2" post) 32      EACH 760.00 24,320.00 850.00 27,200.00 725.00 23,200.00 850.00 27,200.00
729-08-C-01 mounting (5" post)(structure) 2      EACH 1,000.00 2,000.00 1,300.00 2,600.00 1,075.00 2,150.00 3,000.00 6,000.00
729-08-E mounting (s3 x 5.7) 8      EACH 800.00 6,400.00 700.00 5,600.00 725.00 5,800.00 1,300.00 10,400.00
729-08-F mounting (w6 x 12) 22      EACH 995.00 21,890.00 885.00 19,470.00 983.00 21,626.00 1,500.00 33,000.00
729-08-G mounting (w8 x 18) 2      EACH 1,350.00 2,700.00 1,500.00 3,000.00 1,525.00 3,050.00 5,000.00 10,000.00
729-08-H mounting (w8 x 24) 18      EACH 1,750.00 31,500.00 2,100.00 37,800.00 2,185.00 39,330.00 3,500.00 63,000.00
729-17 milepost assembly (ground mounted) 4      EACH 275.00 1,100.00 150.00 600.00 125.00 500.00 25.00 100.00
740-01 construction layout lump      LUMP 2,500.00 2,500.00 5,000.00 5,000.00 10,500.00 10,500.00 5,000.00 5,000.00
S-001 remove and remount logo panel 12      ea 110.00 1,320.00 75.00 900.00 120.00 1,440.00 250.00 3,000.00
S-002 dynamic message sign unit 2      ea 6,500.00 13,000.00 1,250.00 2,500.00 8,000.00 16,000.00 10,000.00 20,000.00
S-003 structural mounted support bracket for type "a" sign 2      ea 3,000.00 6,000.00 5,000.00 10,000.00 6,500.00 13,000.00 3,000.00 6,000.00
S-004 removal of exist. cantilever-post, arm & foundation 2      ea 1,000.00 2,000.00 1.00 2.00 5,000.00 10,000.00 3,000.00 6,000.00
                       
 CONTRACTOR TOTAL       229,596.90   244,047.80   298,197.48   351,828.00