| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - M. MATT DURAND, LLC |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - H & S CONSTRUCTION CO., INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
50   |
SQYD |
10.00 |
500.00 |
55.00 |
2,750.00 |
25.00 |
1,250.00 |
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
243.0 |
SQYD |
10.00 |
2,430.00 |
25.00 |
6,075.00 |
11.00 |
2,673.00 |
|
|
| 202-02-I |
removal of existing drain pipe
|
217   |
LNFT |
23.00 |
4,991.00 |
15.00 |
3,255.00 |
36.60 |
7,942.20 |
|
|
| 203-01 |
general excavation
|
1,025   |
CUYD |
7.50 |
7,687.50 |
17.00 |
17,425.00 |
30.00 |
30,750.00 |
|
|
| 203-07 |
borrow (vehicular measurement)
|
100   |
CUYD |
9.00 |
900.00 |
40.00 |
4,000.00 |
74.00 |
7,400.00 |
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
175   |
CUYD |
12.00 |
2,100.00 |
50.00 |
8,750.00 |
74.00 |
12,950.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
25   |
EACH |
60.00 |
1,500.00 |
25.00 |
625.00 |
47.00 |
1,175.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
180.00 |
720.00 |
300.00 |
1,200.00 |
150.00 |
600.00 |
|
|
| 302-02-C |
class ii base course (8" thick)
|
2,057.7 |
SQYD |
19.00 |
39,096.30 |
40.00 |
82,308.00 |
48.00 |
98,769.60 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
50   |
CUYD |
94.00 |
4,700.00 |
85.00 |
4,250.00 |
85.00 |
4,250.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
2,463.8 |
TON |
96.00 |
236,524.80 |
145.00 |
357,251.00 |
135.00 |
332,613.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
126.0 |
TON |
119.00 |
14,994.00 |
250.00 |
31,500.00 |
170.00 |
21,420.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
7,039   |
SQYD |
0.80 |
5,631.20 |
3.75 |
26,396.25 |
6.00 |
42,234.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 351   |
CUYD |
1.20 |
- 421.20 |
1.00 |
- 351.00 |
0.01 |
- 3.51 |
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
70   |
SQYD |
95.00 |
6,650.00 |
175.00 |
12,250.00 |
165.00 |
11,550.00 |
|
|
| 510-02 |
pavement widening
|
422.8 |
SQYD |
70.00 |
29,596.00 |
175.00 |
73,990.00 |
174.00 |
73,567.20 |
|
|
| 701-01-K |
cross drain pipe (30" rcp/pcp)
|
56   |
LNFT |
110.00 |
6,160.00 |
210.00 |
11,760.00 |
300.00 |
16,800.00 |
|
|
| 701-01-N |
cross drain pipe (42" rcp/pcp)
|
44   |
LNFT |
180.00 |
7,920.00 |
280.00 |
12,320.00 |
435.00 |
19,140.00 |
|
|
| 701-01-P |
cross drain pipe (54" rcp/pcp)
|
4   |
LNFT |
460.00 |
1,840.00 |
1,125.00 |
4,500.00 |
990.00 |
3,960.00 |
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
464   |
LNFT |
53.00 |
24,592.00 |
120.00 |
55,680.00 |
163.00 |
75,632.00 |
|
|
| 701-03-K |
storm drain pipe (30" rcp/pcp)
|
72   |
LNFT |
73.00 |
5,256.00 |
145.00 |
10,440.00 |
319.00 |
22,968.00 |
|
|
| 701-05-G |
side drain pipe (18")
|
124   |
LNFT |
37.00 |
4,588.00 |
125.00 |
15,500.00 |
152.00 |
18,848.00 |
|
|
| 701-15 |
concrete collar
|
1   |
EACH |
1,100.00 |
1,100.00 |
2,045.00 |
2,045.00 |
2,700.00 |
2,700.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
6   |
EACH |
1,600.00 |
9,600.00 |
3,205.00 |
19,230.00 |
3,600.00 |
21,600.00 |
|
|
| 706-02-C |
concrete drive (6" thick)
|
87.3 |
SQYD |
90.00 |
7,857.00 |
130.00 |
11,349.00 |
80.00 |
6,984.00 |
|
|
| 712-02 |
sacked concrete revetment
|
140   |
SQYD |
90.00 |
12,600.00 |
105.00 |
14,700.00 |
120.00 |
16,800.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
15,000.00 |
15,000.00 |
20,000.00 |
20,000.00 |
40,000.00 |
40,000.00 |
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
600   |
LNFT |
0.50 |
300.00 |
0.20 |
120.00 |
0.40 |
240.00 |
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
812   |
LNFT |
1.20 |
974.40 |
0.50 |
406.00 |
1.32 |
1,071.84 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
1.924 |
MILE |
2,300.00 |
4,425.20 |
350.00 |
673.40 |
373.75 |
719.10 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.924 |
MILE |
550.00 |
1,058.20 |
390.00 |
750.36 |
623.66 |
1,199.92 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
4.010 |
MILE |
720.00 |
2,887.20 |
520.00 |
2,085.20 |
833.75 |
3,343.34 |
|
|
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
4   |
EACH |
72.00 |
288.00 |
150.00 |
600.00 |
57.50 |
230.00 |
|
|
| 713-05-C |
temporary pavement legends and symbols (only)
|
4   |
EACH |
72.00 |
288.00 |
150.00 |
600.00 |
57.50 |
230.00 |
|
|
| 726-01 |
bedding material
|
70.0 |
CUYD |
75.00 |
5,250.00 |
125.00 |
8,750.00 |
106.00 |
7,420.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
11,000.00 |
11,000.00 |
75,000.00 |
75,000.00 |
75,000.00 |
75,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
795   |
EACH |
7.20 |
5,724.00 |
5.00 |
3,975.00 |
5.87 |
4,666.65 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
300   |
LNFT |
1.30 |
390.00 |
1.25 |
375.00 |
1.21 |
363.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
406   |
LNFT |
5.50 |
2,233.00 |
5.50 |
2,233.00 |
4.37 |
1,774.22 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
2.005 |
MILE |
4,000.00 |
8,020.00 |
3,200.00 |
6,416.00 |
3,339.60 |
6,695.90 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.240 |
MILE |
1,100.00 |
264.00 |
1,100.00 |
264.00 |
874.00 |
209.76 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
4   |
EACH |
280.00 |
1,120.00 |
275.00 |
1,100.00 |
230.00 |
920.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
4   |
EACH |
480.00 |
1,920.00 |
275.00 |
1,100.00 |
241.50 |
966.00 |
|
|
| 735-01 |
mailboxes
|
4   |
EACH |
1.20 |
4.80 |
5.00 |
20.00 |
79.00 |
316.00 |
|
|
| 735-02 |
mailbox supports (single)
|
4   |
EACH |
140.00 |
560.00 |
150.00 |
600.00 |
280.00 |
1,120.00 |
|
|
| 739-01 |
hydro-seeding
|
1.00 |
ACRE |
2,500.00 |
2,500.00 |
1,400.00 |
1,400.00 |
1,725.00 |
1,725.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
8,400.00 |
8,400.00 |
17,400.00 |
17,400.00 |
8,500.00 |
8,500.00 |
|
|
| S-001 |
saw cutting asphaltic concrete pavement
|
1,010   |
INFT |
1.20 |
1,212.00 |
3.25 |
3,282.50 |
1.50 |
1,515.00 |
|
|
| S-002 |
sawcutting of portland cement concrete
|
1,278   |
INFT |
1.20 |
1,533.60 |
3.25 |
4,153.50 |
1.50 |
1,917.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
514,465.00 |
|
940,502.21 |
|
1,014,715.22 |
|
|
|