| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - W. E. MCDONALD & SON, LLC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - JAMES CONSTRUCTION GROUP LLC |
- 4 - DIAMOND B CONSTRUCTION CO., L.L.C. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
125,000.00 |
125,000.00 |
100,000.00 |
100,000.00 |
40,000.00 |
40,000.00 |
100,000.00 |
100,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
15,000.00 |
15,000.00 |
25,000.00 |
25,000.00 |
10,000.00 |
10,000.00 |
50,000.00 |
50,000.00 |
| 202-02-A-01 |
removal of bridge sta. 10+261.08; 11.89 x 7.01 timber
bridge |
1   |
ea |
6,000.00 |
6,000.00 |
50,000.00 |
50,000.00 |
4,825.00 |
4,825.00 |
50,000.00 |
50,000.00 |
| 202-02-A-02 |
removal of bridge sta. 20+302.47; 22.62 x 5.79 timber
bridge |
1   |
ea |
6,000.00 |
6,000.00 |
20,000.00 |
20,000.00 |
10,000.00 |
10,000.00 |
50,000.00 |
50,000.00 |
| 202-02-A-03 |
removal of bridge sta. 20+717.51; 22.56 x 5.50 timber
bridge |
1   |
ea |
6,000.00 |
6,000.00 |
20,000.00 |
20,000.00 |
10,000.00 |
10,000.00 |
50,000.00 |
50,000.00 |
| 202-02-A-04 |
removal of bridge sta. 20+918.08; 11.89 x 5.79 timber
bridge |
1   |
ea |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
4,825.00 |
4,825.00 |
50,000.00 |
50,000.00 |
| 202-02-A-05 |
removal of bridge sta. 30+400.41; 17.37 x 5.79 timber
bridge |
1   |
ea |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
7,000.00 |
7,000.00 |
50,000.00 |
50,000.00 |
| 202-02-H |
removal of guard rail
|
379   |
ln m |
10.00 |
3,790.00 |
30.00 |
11,370.00 |
22.00 |
8,338.00 |
20.00 |
7,580.00 |
| 203-02 |
drainage excavation
|
4,925   |
cu m |
8.00 |
39,400.00 |
9.00 |
44,325.00 |
25.00 |
123,125.00 |
5.50 |
27,087.50 |
| 203-05 |
excavation and embankment
|
lump |
lump |
100,000.00 |
100,000.00 |
140,000.00 |
140,000.00 |
200,000.00 |
200,000.00 |
113,000.00 |
113,000.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
35   |
ea |
200.00 |
7,000.00 |
225.00 |
7,875.00 |
150.00 |
5,250.00 |
250.00 |
8,750.00 |
| 204-06 |
temporary silt fencing
|
1,214   |
ln m |
10.00 |
12,140.00 |
4.00 |
4,856.00 |
9.00 |
10,926.00 |
25.00 |
30,350.00 |
| 302-02-D |
class ii base course (220 mm thick)
|
11,215.2 |
sq m |
21.00 |
235,519.20 |
13.50 |
151,405.20 |
16.00 |
179,443.20 |
16.75 |
187,854.60 |
| 302-02-D-01 |
class ii base course (220 mm thick)(crushed stone only)
|
2,598.3 |
sq m |
35.00 |
90,940.50 |
30.00 |
77,949.00 |
45.00 |
116,923.50 |
34.50 |
89,641.35 |
| 304-05 |
lime treatment (type e)
|
209.12 |
Mg |
485.00 |
101,423.20 |
125.00 |
26,140.00 |
440.00 |
92,012.80 |
1.00 |
209.12 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
20   |
cu m |
100.00 |
2,000.00 |
48.00 |
960.00 |
250.00 |
5,000.00 |
125.00 |
2,500.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
100.0 |
cu m |
1.00 |
100.00 |
20.00 |
2,000.00 |
230.00 |
23,000.00 |
35.00 |
3,500.00 |
| 502-01 |
superpave asphaltic concrete
|
2,798.8 |
Mg |
115.00 |
321,862.00 |
135.00 |
377,838.00 |
115.00 |
321,862.00 |
117.00 |
327,459.60 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
623.9 |
Mg |
140.00 |
87,346.00 |
210.00 |
131,019.00 |
140.00 |
87,346.00 |
145.00 |
90,465.50 |
| 701-05-N |
side drain pipe (1050 mm)
|
9.1 |
ln m |
260.00 |
2,366.00 |
250.00 |
2,275.00 |
850.00 |
7,735.00 |
350.00 |
3,185.00 |
| 704-03 |
blocked out guard rail
|
687.52 |
ln m |
65.00 |
44,688.80 |
65.00 |
44,688.80 |
60.00 |
41,251.20 |
70.00 |
48,126.40 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
152.40 |
ln m |
185.00 |
28,194.00 |
195.00 |
29,718.00 |
175.00 |
26,670.00 |
185.00 |
28,194.00 |
| 704-11-A |
guard rail end treatment (flared)
|
16   |
ea |
2,500.00 |
40,000.00 |
2,200.00 |
35,200.00 |
2,000.00 |
32,000.00 |
2,100.00 |
33,600.00 |
| 708-01 |
right-of-way monument
|
37   |
ea |
250.00 |
9,250.00 |
450.00 |
16,650.00 |
140.00 |
5,180.00 |
150.00 |
5,550.00 |
| 708-02 |
right-of-way monument witness post
|
37   |
ea |
250.00 |
9,250.00 |
450.00 |
16,650.00 |
50.00 |
1,850.00 |
55.00 |
2,035.00 |
| 711-01-C |
riprap (15 kg, 300 mm thick)
|
110   |
sq m |
73.00 |
8,030.00 |
55.00 |
6,050.00 |
50.00 |
5,500.00 |
60.00 |
6,600.00 |
| 711-01-D |
riprap (25 kg, 460 mm thick)
|
2,775   |
sq m |
76.00 |
210,900.00 |
65.00 |
180,375.00 |
56.00 |
155,400.00 |
65.00 |
180,375.00 |
| 711-04 |
geotextile fabric
|
2,885   |
sq m |
2.00 |
5,770.00 |
2.00 |
5,770.00 |
2.00 |
5,770.00 |
2.00 |
5,770.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
35,000.00 |
35,000.00 |
28,000.00 |
28,000.00 |
12,000.00 |
12,000.00 |
85,000.00 |
85,000.00 |
| 713-03-B |
temporary pavement markings (broken line)(100 mm width)
(3.0 m length) |
0.080 |
km |
200.00 |
16.00 |
250.00 |
20.00 |
200.00 |
16.00 |
210.00 |
16.80 |
| 713-04-A |
temporary pavement markings (solid line)(100 mm width)
|
4.664 |
km |
400.00 |
1,865.60 |
550.00 |
2,565.20 |
400.00 |
1,865.60 |
420.00 |
1,958.88 |
| 716-01-A |
mulch (vegetative)
|
12,485.0 |
kg |
0.50 |
6,242.50 |
0.55 |
6,866.75 |
0.60 |
7,491.00 |
0.55 |
6,866.75 |
| 717-01 |
seeding
|
331   |
kg |
14.60 |
4,832.60 |
15.00 |
4,965.00 |
15.25 |
5,047.75 |
16.00 |
5,296.00 |
| 718-01 |
fertilizer
|
4,112   |
kg |
0.60 |
2,467.20 |
0.60 |
2,467.20 |
1.15 |
4,728.80 |
0.65 |
2,672.80 |
| 720-01-A |
erosion control system, slope protection (type a)
|
8,600   |
sq m |
1.50 |
12,900.00 |
1.60 |
13,760.00 |
1.25 |
10,750.00 |
1.65 |
14,190.00 |
| 722-01 |
project site laboratory
|
1   |
ea |
10,000.00 |
10,000.00 |
25,000.00 |
25,000.00 |
10,000.00 |
10,000.00 |
6,500.00 |
6,500.00 |
| 726-01 |
bedding material
|
115.1 |
cu m |
85.00 |
9,783.50 |
75.00 |
8,632.50 |
120.00 |
13,812.00 |
75.00 |
8,632.50 |
| 727-01 |
mobilization
|
lump |
lump |
65,000.00 |
65,000.00 |
310,000.00 |
310,000.00 |
275,000.00 |
275,000.00 |
345,000.00 |
345,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
4   |
ea |
65.00 |
260.00 |
80.00 |
320.00 |
75.00 |
300.00 |
80.00 |
320.00 |
| 729-16-C |
object marker assembly (type 3)
|
20   |
ea |
75.00 |
1,500.00 |
80.00 |
1,600.00 |
75.00 |
1,500.00 |
80.00 |
1,600.00 |
| 731-02 |
reflectorized raised pavement markers
|
86   |
ea |
5.00 |
430.00 |
5.50 |
473.00 |
5.00 |
430.00 |
5.50 |
473.00 |
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
4.664 |
km |
2,500.00 |
11,660.00 |
2,000.00 |
9,328.00 |
2,500.00 |
11,660.00 |
2,650.00 |
12,359.60 |
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
0.080 |
km |
700.00 |
56.00 |
550.00 |
44.00 |
700.00 |
56.00 |
750.00 |
60.00 |
| 735-01 |
mailboxes
|
1   |
ea |
1.00 |
1.00 |
5.20 |
5.20 |
10.00 |
10.00 |
13.00 |
13.00 |
| 735-02 |
mailbox supports (single)
|
1   |
ea |
750.00 |
750.00 |
160.00 |
160.00 |
145.00 |
145.00 |
160.00 |
160.00 |
| 740-01 |
construction layout
|
lump |
lump |
8,000.00 |
8,000.00 |
35,000.00 |
35,000.00 |
50,000.00 |
50,000.00 |
75,000.00 |
75,000.00 |
| 804-01-C |
precast concrete piles (400 mm)
|
1,182.8 |
ln m |
210.00 |
248,388.00 |
187.00 |
221,183.60 |
450.00 |
532,260.00 |
200.00 |
236,560.00 |
| 804-12 |
loading permanent piles
|
4   |
ea |
1.00 |
4.00 |
5,000.00 |
20,000.00 |
7,250.00 |
29,000.00 |
1.00 |
4.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
18.92 |
cu m |
1,500.00 |
28,380.00 |
1,500.00 |
28,380.00 |
2,500.00 |
47,300.00 |
2,000.00 |
37,840.00 |
| 805-01-F |
class a concrete (bents)
|
100.87 |
cu m |
950.00 |
95,826.50 |
1,500.00 |
151,305.00 |
950.00 |
95,826.50 |
1,600.00 |
161,392.00 |
| 805-03 |
class aa concrete
|
407.55 |
cu m |
850.00 |
346,417.50 |
750.00 |
305,662.50 |
850.00 |
346,417.50 |
1,100.00 |
448,305.00 |
| 805-12-M |
reinforced concrete box culverts (1800 mm x 1800 mm)
|
76.82 |
ln m |
2,000.00 |
153,640.00 |
2,100.00 |
161,322.00 |
2,000.00 |
153,640.00 |
2,000.00 |
153,640.00 |
| 806-01 |
deformed reinforcing steel
|
50,947   |
kg |
1.25 |
63,683.75 |
1.50 |
76,420.50 |
2.25 |
114,630.75 |
2.25 |
114,630.75 |
| 810-01 |
concrete railing (barrier)
|
228.00 |
ln m |
200.00 |
45,600.00 |
245.00 |
55,860.00 |
250.00 |
57,000.00 |
210.00 |
47,880.00 |
| 813-01 |
concrete approach slabs
|
446.40 |
sq m |
260.00 |
116,064.00 |
250.00 |
111,600.00 |
245.00 |
109,368.00 |
225.00 |
100,440.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,798,737.85 |
|
3,129,054.45 |
|
3,431,487.60 |
|
3,468,644.15 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - MERRICK CONSTRUCTION CO. |
- 6 - KEY CONSTRUCTORS, INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
390,000.00 |
390,000.00 |
275,000.00 |
275,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
40,000.00 |
40,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 202-02-A-01 |
removal of bridge sta. 10+261.08; 11.89 x 7.01 timber
bridge |
1   |
ea |
15,000.00 |
15,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-A-02 |
removal of bridge sta. 20+302.47; 22.62 x 5.79 timber
bridge |
1   |
ea |
45,000.00 |
45,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-A-03 |
removal of bridge sta. 20+717.51; 22.56 x 5.50 timber
bridge |
1   |
ea |
45,000.00 |
45,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-A-04 |
removal of bridge sta. 20+918.08; 11.89 x 5.79 timber
bridge |
1   |
ea |
45,000.00 |
45,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-A-05 |
removal of bridge sta. 30+400.41; 17.37 x 5.79 timber
bridge |
1   |
ea |
22,500.00 |
22,500.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
379   |
ln m |
50.00 |
18,950.00 |
10.00 |
3,790.00 |
|
|
|
|
| 203-02 |
drainage excavation
|
4,925   |
cu m |
8.00 |
39,400.00 |
15.00 |
73,875.00 |
|
|
|
|
| 203-05 |
excavation and embankment
|
lump |
lump |
450,000.00 |
450,000.00 |
350,000.00 |
350,000.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
35   |
ea |
20.00 |
700.00 |
120.00 |
4,200.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
1,214   |
ln m |
0.50 |
607.00 |
5.00 |
6,070.00 |
|
|
|
|
| 302-02-D |
class ii base course (220 mm thick)
|
11,215.2 |
sq m |
30.00 |
336,456.00 |
37.00 |
414,962.40 |
|
|
|
|
| 302-02-D-01 |
class ii base course (220 mm thick)(crushed stone only)
|
2,598.3 |
sq m |
30.00 |
77,949.00 |
40.00 |
103,932.00 |
|
|
|
|
| 304-05 |
lime treatment (type e)
|
209.12 |
Mg |
200.00 |
41,824.00 |
425.00 |
88,876.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
20   |
cu m |
60.00 |
1,200.00 |
150.00 |
3,000.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
100.0 |
cu m |
50.00 |
5,000.00 |
150.00 |
15,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
2,798.8 |
Mg |
125.00 |
349,850.00 |
150.00 |
419,820.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
623.9 |
Mg |
200.00 |
124,780.00 |
175.00 |
109,182.50 |
|
|
|
|
| 701-05-N |
side drain pipe (1050 mm)
|
9.1 |
ln m |
400.00 |
3,640.00 |
500.00 |
4,550.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
687.52 |
ln m |
60.00 |
41,251.20 |
65.00 |
44,688.80 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
152.40 |
ln m |
175.00 |
26,670.00 |
185.00 |
28,194.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
16   |
ea |
2,000.00 |
32,000.00 |
2,500.00 |
40,000.00 |
|
|
|
|
| 708-01 |
right-of-way monument
|
37   |
ea |
6.00 |
222.00 |
100.00 |
3,700.00 |
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
37   |
ea |
25.00 |
925.00 |
100.00 |
3,700.00 |
|
|
|
|
| 711-01-C |
riprap (15 kg, 300 mm thick)
|
110   |
sq m |
30.00 |
3,300.00 |
70.00 |
7,700.00 |
|
|
|
|
| 711-01-D |
riprap (25 kg, 460 mm thick)
|
2,775   |
sq m |
40.00 |
111,000.00 |
70.00 |
194,250.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
2,885   |
sq m |
1.00 |
2,885.00 |
7.00 |
20,195.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
244,000.00 |
244,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(100 mm width)
(3.0 m length) |
0.080 |
km |
50.00 |
4.00 |
200.00 |
16.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(100 mm width)
|
4.664 |
km |
50.00 |
233.20 |
400.00 |
1,865.60 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
12,485.0 |
kg |
0.75 |
9,363.75 |
0.64 |
7,990.40 |
|
|
|
|
| 717-01 |
seeding
|
331   |
kg |
8.50 |
2,813.50 |
15.40 |
5,097.40 |
|
|
|
|
| 718-01 |
fertilizer
|
4,112   |
kg |
0.70 |
2,878.40 |
1.19 |
4,893.28 |
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
8,600   |
sq m |
1.50 |
12,900.00 |
1.30 |
11,180.00 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
ea |
25,000.00 |
25,000.00 |
30,000.00 |
30,000.00 |
|
|
|
|
| 726-01 |
bedding material
|
115.1 |
cu m |
110.00 |
12,661.00 |
115.00 |
13,236.50 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
lump |
435,000.00 |
435,000.00 |
500,000.00 |
500,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
ea |
75.00 |
300.00 |
65.00 |
260.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
20   |
ea |
75.00 |
1,500.00 |
75.00 |
1,500.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
86   |
ea |
5.00 |
430.00 |
5.00 |
430.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
4.664 |
km |
2,500.00 |
11,660.00 |
2,500.00 |
11,660.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
0.080 |
km |
700.00 |
56.00 |
700.00 |
56.00 |
|
|
|
|
| 735-01 |
mailboxes
|
1   |
ea |
5.00 |
5.00 |
250.00 |
250.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
1   |
ea |
175.00 |
175.00 |
250.00 |
250.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
lump |
350,000.00 |
350,000.00 |
150,000.00 |
150,000.00 |
|
|
|
|
| 804-01-C |
precast concrete piles (400 mm)
|
1,182.8 |
ln m |
300.00 |
354,840.00 |
215.00 |
254,302.00 |
|
|
|
|
| 804-12 |
loading permanent piles
|
4   |
ea |
1,000.00 |
4,000.00 |
5,000.00 |
20,000.00 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
18.92 |
cu m |
1,180.00 |
22,325.60 |
1,750.00 |
33,110.00 |
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
100.87 |
cu m |
845.00 |
85,235.15 |
1,250.00 |
126,087.50 |
|
|
|
|
| 805-03 |
class aa concrete
|
407.55 |
cu m |
575.00 |
234,341.25 |
1,000.00 |
407,550.00 |
|
|
|
|
| 805-12-M |
reinforced concrete box culverts (1800 mm x 1800 mm)
|
76.82 |
ln m |
1,700.00 |
130,594.00 |
2,100.00 |
161,322.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
50,947   |
kg |
1.00 |
50,947.00 |
2.50 |
127,367.50 |
|
|
|
|
| 810-01 |
concrete railing (barrier)
|
228.00 |
ln m |
200.00 |
45,600.00 |
245.00 |
55,860.00 |
|
|
|
|
| 813-01 |
concrete approach slabs
|
446.40 |
sq m |
145.00 |
64,728.00 |
285.00 |
127,224.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
4,372,700.05 |
|
4,441,193.88 |
|
|
|
|
|